http://nodal.ercot.com 1 Market Trials DAM/RUC/SASM Weekly Update April 16, 2010

Market Trials DAM/RUC/SASM

  • Upload
    ted

  • View
    27

  • Download
    1

Embed Size (px)

DESCRIPTION

Market Trials DAM/RUC/SASM. Weekly Update. April 16, 2010. Antitrust Admonition. ANTITRUST ADMONITION - PowerPoint PPT Presentation

Citation preview

Page 1: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 1

Market TrialsDAM/RUC/SASM

Weekly Update

April 16, 2010

Page 2: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 2

Antitrust Admonition

ANTITRUST ADMONITION

ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate the antitrust laws. The ERCOT Board has approved guidelines for members of ERCOT Committees, Subcommittees and Working Groups to be reviewed and followed by each Market Participant attending ERCOT meetings. If you have not received a copy of these Guidelines, copies are available at the Client Relations desk. Please remember your ongoing obligation to comply with all applicable laws, including the antitrust laws.

DISCLAIMER

All presentations and materials submitted by Market Participants or any other Entity to ERCOT staff for this meeting are received and posted with the acknowledgement that the information will be considered public in accordance with the ERCOT Websites Content Management Operating Procedure.

Page 3: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 3

Agenda

• DAM summary for 4/13 and 4/15

• QSE Activities for Next Week

• FAQ

• General Reminders/Updates

• Environment Report

– Planned outages– Known Issues

• Dashboard Update

• Settlements/COMS

• Special Topics

• Question and Answers / General Discussion

• Appendix

ERCOT asks that Market Participants log into the WebEx session using their company name

and then their name. This will allow ERCOT to take roll-call offline.

Page 4: Market Trials DAM/RUC/SASM

Market Trials 2010 Roadmap

http://nodal.ercot.com 4

Page 5: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 5

Submission Overview for Apr 13

Submission overview

Overall, 156 QSEs

participated for Op Day 4/14

Page 6: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 6

Submission Overview for Apr 13

Submission overview

Page 7: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 7

Submission Overview for Apr 13

Submission overview

• Energy Bids from QSEs – 80% of Load was requested.

Page 8: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 8

Submission Overview for Apr 13

Submission overview

• AS Offers

– 31 QSEs submitted

– No AS insufficiency

• AS Self-Arrangement from QSEs

– 50% of AS Obligation was requested, ~43-47% received

– 38 QSEs sent in AS Self-Arrangement

• Energy Only Offers – 82 QSEs submitted EOOs

• PTP Obligation Bids – not allowed this week

Page 9: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 9

Submission Overview for Apr 15

Submission overview

Overall, 179 QSEs

participated for Op Day 4/16

Page 10: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 10

Submission Overview for Apr 15

Submission overview

Page 11: Market Trials DAM/RUC/SASM

Overview for Apr 15

• RRS - Hour 3 cleared at $567 and Hour 19 cleared at $633.49

Analysis:– Hour 3 - Due to a multi-hour block as the marginal offer with high

prices• Cost of the block covered by the one hour that the unit is marginal.

– Hour 19 - still under review

http://nodal.ercot.com 11

Page 12: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 12

Submission Overview for Apr 15

Submission overview

• Energy Bids from QSEs – 120% of Load was requested.

Page 13: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 13

Submission Overview for Apr 15

Submission overview

• AS Offers

– 30 QSEs submitted

– No AS insufficiency

• AS Self-Arrangement from QSEs

– 50% of AS Obligation was requested, ~37-44% received

– 45 QSEs sent in AS Self-Arrangement

• Energy Only Offers – 90 QSEs submitted EOOs

• PTP Obligation Bids – not allowed this week

Page 14: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 14

RUC Overview for Apr 15

RUC overview

• ERCOT committed three Resources:

– TXCITY_CC1_1 for Hours 7-10, 18

– TXCITY_CC1_2 for Hours 11-17

– FRNYPP_CC1_4 for Hours 1-24

• No Resources were decommitted

• ERCOT system operations approved this result

Page 15: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 15

Next Week’s Activities

DAM executing on 4/20 and 4/22 (Op Days are 4/21

and 4/23)

• Changes from this week’s activities:

– Self-Arranged AS no longer requested at 50%;

should be submitted at a reasonable quantity

that reflects the QSE’s business

– PTP Obligation Bids can be submitted again;

guardrails are up to 5 bids totaling 50 MW per

QSE per hour.

– Virtual Bids/Offers guardrails relaxed to 10

transactions per QSE per hour, with no MW

restriction; bids/offers should be reasonable

• Remember that Tuesday’s Load Bid MW target is

80% of forecasted load, and Thursday’s is 120%.

Week 4

Note: Dates are DAM execution days

4/20/2010 & 4/22/2010

Objective

DAM + DRUCRT/DA

Settlements

Network Constraints IncludedSelf-Arranged AS Requested Actual

Load Bid MW Requested

80% Tue/120% Thurs forecasted

load

Virtual Bids / Offers

Up to 10 transactions/

QSE/hr

PTP Obligations

Up to 5 bids totaling 50 MW/QSE/hr

NOIE CRR OffersAllocated CRRs

only

COP Updates

After DAM and DRUC

starting 4/15

DRUCDRUC w/ each

DAM

Page 16: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 16

Next Week’s Activities

DRUC executing on 4/20 and 4/22 after DAM (at

1430)

– COP updates required after DAM and DRUC

complete (resource status, AS schedule)• COPs will therefore be disconnected from

zonal/telemetry - this is expected.

Note that outages from zonal will be transferred

into nodal starting next week

– This transfer will represent approximately 85%

of the actual zonal outages

Week 4

Note: Dates are DAM execution days

4/20/2010 & 4/22/2010

Objective

DAM + DRUCRT/DA

Settlements

Network Constraints IncludedSelf-Arranged AS Requested Actual

Load Bid MW Requested

80% Tue/120% Thurs forecasted

load

Virtual Bids / Offers

Up to 10 transactions/

QSE/hr

PTP Obligations

Up to 5 bids totaling 50 MW/QSE/hr

NOIE CRR OffersAllocated CRRs

only

COP Updates

After DAM and DRUC

starting 4/15

DRUCDRUC w/ each

DAM

Page 17: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 17

FAQ

Q: Why did my fixed quantity Energy Bid clear above my bid price?

A: There is a known effect of the DAM optimization wherein fixed quantity bids could be

cleared higher than their bid price (and fixed quantity offers could clear lower than their

offer price). This is due to a rule that fixed quantity bids/offers cannot set the price. The

issue is described at length in Appendix 7 of the DAM requirements, posted at

http://nodal.ercot.com/docs/pd/mms/pd/damsasmr/mms_dam_and_sasm_req_09q1_v4_0%20%28blackline%29.doc

.

Page 18: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 18

General Reminders/Updates

• Network Model Update

– Next scheduled load is 5/3• An updated settlement points and MP short name list was posted for the 4/14 model load at

http://nodal.ercot.com/readiness/markettrials/index.html

• Phase 5 Kick Off WebEx set for April 29, 2010, from 1:00 until 4:00 Central.

– Details on the calendar page at http://www.ercot.com/calendar/2010/04/20100429-MT

• Phase 5 Handbook for DAM/RUC/SASM was posted on 3/31

– http://nodal.ercot.com/readiness/markettrials/dam/index.html

• New AS Plan for next week

– We have updated the AS Plan to mirror the zonal AS Plan, effective Op Day 4/18 (previously we were using test data that was flat throughout the day). We will update the nodal AS Plan every month when the zonal plan is updated

– NOTE: This means that your AS Obligations will change next week.

Page 19: Market Trials DAM/RUC/SASM

General Reminders/Updates

Trade confirmation testing

• ERCOT will maintain a list of QSEs that desire to test trade confirmation/bilateral process with other QSEs during market trials

• Email sent to Nodal Project Managers with a .xls attachment.

• Please fill out the spreadsheet, or send the following information, to [email protected] with the subject line ‘Trade Confirmation Testing Contacts’ by today (Friday, April 16, 2010).

– QSE short name– Contact name for trade confirmation– Phone number– Email address

• Once we have received this contact information, we will compile and distribute it to all QSEs participating so that the trading contacts can work together to complete their testing. Note that this information will only be shared with other trading contacts who have volunteered their own information.

http://nodal.ercot.com 19

Page 20: Market Trials DAM/RUC/SASM

Support Metrics

* This week, 23 out of 267 questions were responded to outside of the 24 hour time frame.

Market Participant Inbound Questions

Last Week This Week

http://nodal.ercot.com 20

Page 21: Market Trials DAM/RUC/SASM

Day-to-day operations summary: Planned / Unplanned Outages

• Outages– Planned Outages

• 04/23/10 – 04/25/10 – ERCOT will be performing the initial release for Phase 5 on 4/23– Due to the size and complexity of the release, it will be necessary to take systems

down periodically throughout the weekend– ERCOT will be running a series of tests that Sunday which may result in notifications

and / or data in the Nodal Production systems that are associated with that test. • 04/16/10 06:00 P.M. – 04/16/2010 07:00 P.M & 04/17/10 10:00 A.M. – 04/17/2010 11:00

A.M. – Market Manager site failover testing is planned during this period. A brief delay in

processing may occur. If authentication errors are encountered, signing back into the application will resolve the issue.

– Unplanned Outages• 04/13/10 12:00 P.M. – 04/13/2010 02:30 P.M.

– Authentication exceptions were being reported against EWS submissions. Issue occurred as a result of an update to the identity management system. Market Manager was fully functional during this time period.

• 04/12/10 09:00 A.M – 6:00 P.M– MPIM Application performance issues were noted during the day. MPs were unable

to assign certain roles to user certificates. Any new certificates created during this period with “NMMS” or “EMMS” roles will need to be completely terminated and reissued.

http://nodal.ercot.com 21

Page 22: Market Trials DAM/RUC/SASM

Environment Report-Known Issues

Full DAM/RUC/SASM known issues list will post every Friday night at http://nodal.ercot.com/readiness/markettrials/dam/index.html

New DAM/RUC/SASM known issues

• There is an issue with the DAM when AS Offers are submitted for two Load Resources that are mapped to the same load point (PTID) in the network model. This is a valid modeling scenario and the DAM software will be updated to deal with this scenario. In the interim, DAM Operators will need to cancel one of the two AS Offers submitted until the defect is fixed., which is planned for the 4/23 release

• Two prices were reported for settlement point BVE_CC1. This was due to a modeling error with the 4/14 model load. There are two physical combined cycles “BYU_CC1” and “BVE_CC1” mapped to the same logical resource node.

– If causing import issues with your system, workaround is to delete one of the two settlement point prices prior to import

– We will communicate the date of fix later

http://nodal.ercot.com 22

Page 23: Market Trials DAM/RUC/SASM

Environment Report-Known Issues

New DAM/RUC/SASM known issues (cont’d)

• MMS Phase 2 validation notification messages for Self Arranged AS transactions have an incorrect transaction type identified in the MRID being relayed back. Currently a value of “SAS” is being sent when it should return “SAA” instead.

• Get real-time SPP MarketInfo service returns incorrect GMT offset associated with the start time field. The offset currently being returned is set to -06:00 hrs when it should reflect -05:00 hrs.

• Request for “AggregatedASOfferCurves” data via EWS MarketInfo service is failing with xsd validation error message. Workaround is to download the report from MIS or via the Get Reports service.

• Market Manager – Dropdowns on the Trades page are static and not checking the latest info on the first load of the page. Select a different trade date, then reselect desired trade date and the drop downs will refresh and become dynamic.

http://nodal.ercot.com 23

Page 24: Market Trials DAM/RUC/SASM

Environment Report-Known Issues

New MIS known issues

• NP5-751-CD, Daily RUC Committed or Decommitted Resources and NP5-752-CD, Hourly RUC Committed or Decommitted Resources, are currently on the known issues list as delayed reports for Phase 4. These will instead be moving to early Phase 5 delivery. I will be communicating the information contained within these reports either on this weekly call or via email to the Nodal PMs.

http://nodal.ercot.com 24

Page 25: Market Trials DAM/RUC/SASM

Nodal Scorecard

MPs measured on 50% participation 5 DAM runs so far (4/1, 4/6, 4/8, 4/13, 4/15) Submission of DAM specific transactions All QSEs (includes sub-QSEs)

QSEs with Resources 54/78 (88% generation) COPs, TPOs do not count as participation (they count towards Real-Time Metric (MP15A))

QSEs without Resources 95/191If QSE without Load, transaction choices are Energy Bids, Energy Only Offers, PTP Obligation Bids

76% load participation

AMBER/RED scores go live on 4/21, MPs contacted this week

MP16 DAM Participation Metric Results

http://nodal.ercot.com 25

Page 26: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 26

COMS/Settlements Update

• Next weeks Operating Dates will be Settled (4/21 and 4/23)– DAM Statements and Invoices and RTM Initial Statements will be

posted according to Protocol Timelines– Must have DAM awards or own CRRs to receive a DAM Statement– Extracts will be posted within 48 hours of Statement approvals

• COMS/Settlements known issues list will be posted next Wednesday, 4/21– http://nodal.ercot.com/readiness/markettrials/coms/index.html

• May CRR Auction Invoices will be posted on Monday, 4/19

• Phase 5 Settlement Calendar Extract will be posted Friday, 4/23

• Dedicated COMS call beginning the first week in May

Page 27: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 27

COMS/Settlements Key April Dates

• April Operating Dates that will be settled– 4/21 Op Day

• DAM Statements and Invoices posted on 4/23• RTM Initial Statement posted on 5/3

– 4/23 Op Day• DAM Statements and Invoices posted on 4/27• RTM Initial Statement posted on 5/3

– 4/28 Op Day• DAM Statements and Invoices posted on 4/30• RTM Initial Statement posted on 5/10

– 4/30 Op Day• DAM Statements and Invoices posted on 5/4• RTM Initial Statement posted on 5/10

• First RTM Invoice will be posted on 5/6– It will invoice the RTM Initial Statement for operating day 4-21

Page 28: Market Trials DAM/RUC/SASM

Special Topics

DAM run on 4/13:

• A resource with an exclusive TPO was not fully dispatched for energy, even though the LMP at that resource node was greater than the resource’s incremental offer price for two operating hours (discovered by the price validation tool). This occurred because the SPP for this resource node during one post-process of the DAM engine was different than that during another due to a shift factor inconsistency.

• This inconsistency will happen when:

1) a contingency outages generators or Energy only offers/bids, and;

2) this contingency results in binding/violated constraints.

• In Network Security Monitor (NSM)/Network Constrained Unit Commitment (NCUC), contingencies that outage generators or loads require special process. The main point is to preserve power balance in post contingency scenario.

• LMP calculations require shift factors at electrical buses/settlement points, which is based on network topology only.

• But due to special processing in NSM/NCUC, the optimization results in situations where LMP and MW on offer/bid curve are not consistent.

http://nodal.ercot.com 28

Page 29: Market Trials DAM/RUC/SASM

Special Topics

JOUs and COP consistencies

• In DAM, if the different owners of the jointly-owned unit have submitted conflicting COP statuses for the current day, online statuses will overwrite offline statuses when DAM is determining the initial condition of the unit (i.e., is the unit online or offline at the start of the next operating day.

• In RUC, if the different owners have conflicting COP statuses for the next operating day:

– If any owner has OUT status for any hour then the unit is considered OUT.

– If all owners have submitted a COP, and at least one of them has an online status in a particular hour then the resource status for the unit is online (unless any owner has OUT)

http://nodal.ercot.com 29

Page 30: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 30

Q&A

Q&A / Open Forum

Page 31: Market Trials DAM/RUC/SASM

Appendix

Appendix– DAM Kickoff slides– Pre- and post-DAM reports– Special Topics

http://nodal.ercot.com 31

Page 32: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 32

Objectives

Objectives of Phase 4.0 DAM/RUC Market Trials:

• Execute DAM, RUC, and SASM in the Market Trials environment twice a week

• Generate awards, notifications, and reports

Page 33: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 33

Entry Criteria

ERCOT Entry Criteria for Phase 4.0:

• ERCOT has completed required integration testing for Phase 4.0 functionality

• ERCOT has published all known, market-relevant defects to Market Participants

via the Readiness Center

Market Participant Entry Criteria for Phase 4.0:

• QSEs have met the system requirements (digital certificate with ‘MMS Trader’

role assigned, etc.)

• QSEs have completed the qualification testing and have confirmed their ability to

use Web Services or the Market Manager to submit transactions necessary to

support Day-Ahead Market Trials

Page 34: Market Trials DAM/RUC/SASM

Summary of QSE Activities

• QSEs with Resources: • Maintain SCED offers and ensure Start-Up and Minimum Generation

Offers are available prior to the Day Ahead 10:00 a.m. (Central) deadline

• Submit AS Offers• Update COP after DAM, DRUC, HRUC starting 4/13

• QSEs with Load: • Self-Arrange requested amount of AS Obligations• Bid a portion of their Load in the DAM (see example on next slide). In

general, this should take the form of an Energy Bid but during the last week of April, can also be in the form of a PTP Obligation Bid.

– Tuesday- 80% of QSE’s forecasted Load– Thursday- 120% of QSE’s forecasted Load

http://nodal.ercot.com 34

Page 35: Market Trials DAM/RUC/SASM

Summary of QSE Activities

• QSEs with Load (cont’d): Example for load bids

• All QSEs:

• May submit a limited amount of DAM Energy Only Offers and DAM Energy Bids that do not represent actual Resources or Loads (virtual bids and offers) – limit is up to a MW quantity total contained within a certain number of transactions per hour.

• PTP Obligation Bids will be limited as well

Details with dates on next slide

http://nodal.ercot.com 35

Hour-Ending HE 0100 HE0200 HE0300 … HE2400 ERCOT System Load Forecast

(download from MIS) 21,000 20,500 20,000 20,500 120% of System Load Forecast 25,200 24,600 24,000 24,600

QSE-A with Load Ratio Share = 10% 2,520 2,460 2,400 2,460 QSE-B with Load Ratio Share = 1% 252 246 240

246

QSE-C with Load Ratio Share = 5% 1,260 1,230 1,200

1,230

Page 36: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 36

Schedule/Key Dates

Week 1 Week 2 Week 3 Week 4 Week 5

Note: Dates are DAM execution days 4/1/2010

4/6/2010 & 4/8/2010

4/13/2010 & 4/15/2010

4/20/2010 & 4/22/2010

4/27/2010 & 4/29/2010

ObjectiveConnectivity /

ExecutionAS co-

optimizationNetwork constrained

+ Initial DRUCDAM + DRUC

DAM + DRUC + HRUC + SASM

Network Constraints None None Included Included IncludedSelf-Arranged AS Requested 100% 50% 50% Actual Actual

Load Bid MW Requested

80/120% forecasted load

80/120% forecasted load

80/120% forecasted load

80/120% forecasted load

80/120% forecasted load

Virtual Bids / Offers

Up to 5 transactions totaling 50

MW/QSE/hr

Up to 5 transactions totaling 50

MW/QSE/hr

Up to 10 transactions totaling

100 MW/QSE/hr

Up to 10 transactions/

QSE/hrUp to 10

transactions/QSE/hr

PTP Obligations

Up to 5 bids totaling

50 MW/QSE/hr

Up to 5 bids totaling

50 MW/QSE/hr None

Up to 5 bids totaling

50 MW/QSE/hr

Up to 5 bids totaling 50 MW/QSE/hr (unless

the bid represents QSE's load)

NOIE CRR OffersAllocated CRRs

onlyAllocated CRRs

only NoneAllocated CRRs

only Allocated CRRs only

COP Updates Not needed Not neededAfter DAM and

DRUCAfter DAM and

DRUCAfter DAM, DRUC and

HRUC

DRUC None None DRUC ThursdayDRUC after each

DAM DRUC after each DAMHRUC None None None None LimitedSASM None None None None Yes

Page 37: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 37

Activities

Market Participant Activities:

• Submit, update, and cancel DAM submission items, while keeping within the guardrails.– Three-Part Supply Offers (including Minimum Energy Offer and Startup Costs)– COP– AS Offer– AS Self-Arrangement– Energy-Only Offers– Energy Bids– PTP Obligation Bids– CRR Offer (for NOIEs only)

• Report any issues to the Market Trials Team at [email protected]

• Download and review pre-DAM and post-DAM report postings

• Download and review RUC postings, as applicable

• Download and review SASM posting, as applicable

• Update COP (after DAM, RUC)

• Submit self-selected credit limit to ERCOT, if desired, as often as weekly

Page 38: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 38

Activities

ERCOT Activities:

• Execute DAM (including Phase 2 Validation), DRUC, HRUC and SASM

periodically

• Generate Awards, Day-Ahead LMPs/SPPs, and other reports

• Communicate DAM/RUC/SASM reports and outputs to the market via Market

Information System (MIS) postings

• Verify QSE submission activities

• Work with Market Participants to resolve issues

• Update Counterparty credit limits with self-selected credit limits submitted by

MPs

Page 39: Market Trials DAM/RUC/SASM

Other

Note:• All transactions will be supported.

• Trade submission and confirmation (Energy, Capacity and AS Trades) may be exercised at this time.

• DAM notifications will be active.

• Phase 2 Validation process will be active and supported.

• QSE transactions that do not follow the guidelines are subject to cancellation at ERCOT’s discretion.

• ERCOT may run DAM on non-supported days. No QSE participation is requested, and ERCOT staff will not be available to answer questions regarding the outputs of these non-supported processes.

• CRR information from the market trials auction conducted in March for the month of April will be integrated into the market system. CRR Offers (by NOIEs) must contain CRR IDs from this auction in order to be valid.

http://nodal.ercot.com 39

Page 40: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 40

Exit Criteria

ERCOT Exit Criteria

• ERCOT completes DAM execution with Market Participant data, as planned

• ERCOT completes RUC execution with Market Participant data, as planned

• ERCOT completes SASM execution with Market Participant data, as planned

 

Market Participant Exit Criteria

• Each QSE participates in at least 50% of the available scheduled DAM executions by successfully submitting the relevant transactions as tracked on the DAM participation dashboard

Page 41: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 41

Dashboard

Page 42: Market Trials DAM/RUC/SASM

MP16 Day-Ahead Market Participation

Requires at least 50% participation in Market Trials Day Ahead Market runs (includes all sub-QSEs)

Metric is reported up to the 168 Hour Test

80% of Load and 80% of Generation participation required to meet the metric

Light up date of 4/1 for GREEN/WHITE and 4/21 for AMBER/RED

Participation equals any DAM-specific transactions (bids, offers, or AS self-arrangements)

Nodal Scorecard Reminder

http://nodal.ercot.com 42

Page 43: Market Trials DAM/RUC/SASM

Supplemental Materials

Slide 43

Reference and Description Location Version

External Interfaces Specification

http://nodal.ercot.com/readiness/sandbox/index.html 1.19

Explanation of Market Submission Items

http://nodal.ercot.com/readiness/markettrials/connectivity/index.html

0.26

Market Manager User Guide http://nodal.ercot.com/readiness/markettrials/connectivity/index.html

0.06

MMS Requirements http://nodal.ercot.com/docs/pd/mms/index.html#req Various

Market Connectivity Handbook http://nodal.ercot.com/readiness/markettrials/connectivity/index.html

0.97

DAM/RUC Known Issues List http://nodal.ercot.com/readiness/markettrials/dam/index.html

N/A

Web Services XSDs http://nodal.ercot.com/readiness/sandbox/index.html 1.3.19

Sample Reports, Extracts, and DDLs

http://nodal.ercot.com/readiness/reports/index.html Various

DAM ERCOT Operating Procedures

http://nodal.ercot.com/readiness/markettrials/dam/index.html

2.0

DRUC/WRUC ERCOT Operating Procedures

http://nodal.ercot.com/readiness/markettrials/dam/index.html

0.2

http://nodal.ercot.com 43

Page 44: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 44

Report Postings

Posted by 6 am:

• Ancillary Services (AS) Plan

• Load Ratio Shares (these will be static based on Zonal production data as of October 16, 2009) *

• AS Obligations *

• Wind Generation Resource Power Potential (WGRPP) forecast * and Aggregated WGRPP forecast

• List of all Settlement Points and the mapping to Electrical Buses

• Load forecasts for ERCOT system, Weather Zones and Load Zones

• Load forecast distribution factors

• Distribution Loss Factors and forecasted Transmission Loss Factors

• Weather assumptions

 

* Denotes MIS Certified reports

Page 45: Market Trials DAM/RUC/SASM

http://nodal.ercot.com 45

Report Postings

Posted after each DAM:

• Awards (AS Offers, Energy Offers, DAM Energy-Only Offers, DAM Energy Bids, CRR Offers, and PTP Obligation Bids) *

• DAM Clearing Price for Ancillary Services (MCPC)

• Day-Ahead hourly Settlement Point Prices (SPPs)

• Day-Ahead hourly Locational Marginal Prices (LMPs)

• Shadow Prices

• Quantity of AS Offers

• Aggregated AS Offer Curve

• Total quantity of energy (in MWh) bought and sold in DAM

See DAM Handbook for a list of all DAM/RUC/SASM reports available starting in Phase 4.0 - http://nodal.ercot.com/readiness/markettrials/dam/index.html. See MIS Handbook for a comprehensive list of reports available - http://nodal.ercot.com/readiness/markettrials/mis/index.html.

* Denotes MIS Certified reports

Page 46: Market Trials DAM/RUC/SASM

Special Topics

Phase 2 Validation reports and process• Phase 2 validation re-evaluates all submitted transactions at 7 am in

the day-ahead with updated information, such as AS Obligation, CRR ownership, credit limits, etc.

• If there is a validation error, ERCOT will cancel the transaction• We send a notification that a Phase 2 report is available for a particular

transactions type, and notification containing the cancellation for the transaction.

• You can query for the Phase 2 report via web service or on the Reports page of the Market Manager in order to view the reason for the cancellation.

• Correct and resubmit prior to 10 am.• Note that submissions are locked out during the Phase 2 process,

which is currently taking about 15 minutes to complete.

http://nodal.ercot.com 46

Page 47: Market Trials DAM/RUC/SASM

Special Topics

Day-Ahead Self Commitment

DAM clearing engine treats your TPO differently if you submit Startup and Minimum Energy (SU/ME) costs as $0 vs. NULL

• If you submit with SU/ME as $0, DAM engine treats this as a normal offer where the QSE is not requesting SU/ME to be covered. HSL/LSL constraints will be respected. Also, if you are selected for an online Ancillary Service, you will also be awarded at least LSL on your offer curve.

• If you submit with SU/ME as NULL, DAM engine is signaled to ignore the HSL/LSL constraints for the resource. In this scenario, the offer curve submitted will start at 0 MW and go to the max MW quantity desired – again, DAM will ignore LSL/HSL constraints. If the offer curve submitted doesn’t start at 0 MW, it will be extended to 0 MW by DAM. If the resource is selected for Ancillary Services, no requirement to also award TPO at LSL (since no LSL constraint honored in this case).

http://nodal.ercot.com 47

Page 48: Market Trials DAM/RUC/SASM

Special Topics

Day-Ahead Self Commitment

The purpose of the NULL: It allows a QSE to use part of a Resource to serve its own load, and then offer in the rest to the DAM and enable the offer to be co-optimized with its AS Offer.

Example:

A Resource has 100 MW LSL and 400 MW HSL, and the QSE has already committed 300 MW of the Resource through some other mechanism. The QSE wishes to offer the remaining 100 MW, which would otherwise be ignored due to the 100 MW LSL.

Then going into real-time, so QSEs will need to update their TPO to cover the full capacity of the resource, from LSL to HSL, rather than from 0 MW. To do that if the resource is awarded in the DAM, the QSE must provide a reason code, which is DSCM.

This functionality came about due to TPTF subgroup on the issue. It has not yet been added to the protocols but will during our protocol traceability/cleanup effort.

http://nodal.ercot.com 48

Page 49: Market Trials DAM/RUC/SASM

Special Topics

Bid/Offer efficiencies

• ERCOT has identified efficiencies in Bid/Offers submission with regard to the format of submission

• This applies to all transaction that use a Bid ID or an Offer ID (Energy Only Offers, Energy Only Bids, PTP Obligation Bids, and CRR Offers)

• Preference is for QSEs to submit the same Bid/Offer ID for each hour in the submission, versus submitting a different Bid/Offer ID for every hour. The market system treats the submission the exact same way, regardless of which format is used

• Using the preferred format will optimize DAM system performance

• For xml examples detailing this issue, please view a document that will be posted along with this presentation on the calendar page at http://www.ercot.com/calendar/2010/04/20100409-MT

• This was discussed at NATF 4/6, we send an email to the nodal technical contacts that we have on file for all QSEs, and we will add it to the External Interfaces Specification

http://nodal.ercot.com 49