CBS/ET-IMTN, 20-23 June 2001 MD - 1 - RMDCN within RA VI – status and perspectives RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF [email protected]

MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

Embed Size (px)

Citation preview

Page 1: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 1 -

RMDCN within RA VI – status and perspectives

RMDCN within RA VI- status and perspectives -

Matteo Dell’Acqua

ECMWF

[email protected]

Page 2: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 2 -

RMDCN within RA VI – status and perspectives

Contents

Background RMDCN configuration Network performance and reliability Benefits and Developments Future

Page 3: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 3 -

RMDCN within RA VI – status and perspectives

Background

RMDCN Steering Group was established in 1994 ITT was issued in March 1998

Equant was selected as the provider for the RMDCN Contract was signed in December 1998 Service Commencement Date was 15 March 2000

Contract runs for 5 or 8 years

Page 4: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 4 -

RMDCN within RA VI – status and perspectives

The Network

Virtual Private Network based on Frame Relay PVCs Guaranteed bandwidth ( CIR ) Ability to take advantage of unused network capacity ( EIR ) PVC costs are in function of the CIR and the location of the end-

points No limit to the number of Sites that can be connected No limit to the number of PVCs that can be established

TCP/IP is used as a transport protocol Fully managed Cisco routers

Connection via a PTT access line to the in-country POP Backup service ( ISDN, PSTN, dual access line )

Page 5: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 5 -

RMDCN within RA VI – status and perspectives

Initial Deployment - membership

Deadline to be included was 1 April 1999 Larger than anticipated, 31 countries in total

All 17 ECMWF Member States Austria, Belgium, Denmark, Finland, France, Germany, Great Britain, Greece,

Ireland, Italy, Netherlands, Norway, Portugal, Spain, Sweden, Switzerland and Turkey

3 ECMWF Co-operating States Hungary, Iceland and Slovenia

11 Region VI countries outside ECMWF Bulgaria, Czech Republic, Former Yugoslav Republic of Macedonia, Jordan,

Latvia, Lebanon, Lithuania, Poland, Romania, Slovakia and the Syrian Arab Republic

Page 6: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 6 -

RMDCN within RA VI – status and perspectives

RMDCN Configuration - 1 Today, 32 countries + ECMWF are connected to RMDCN

Estonia was connected in December 1999 Poland was connected in February 2000 Croatia was connected in June 2000

Syria Regulatory issues are being resolved

Russia Connection to UK Met Office RMDCN Accession Agreement has been signed by Russia

Eumetsat Connections to ECMWF and DWD by RMDCN circuits Awaiting the approval of Eumetsat council

Page 7: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 7 -

RMDCN within RA VI – status and perspectives

RMDCN Configuration - 2

Page 8: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 8 -

RMDCN within RA VI – status and perspectives

Reliability and Performance

Since 15 March RMDCN has been used for operational communications

Network very stable Almost all PVCs get more than 99.5% availability Number of problems reported to the local Help Desk is stable

Bandwidth delivered has been very good EIR mechanism works very well and provides most PVCs with

more bandwidth than requested

Page 9: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 9 -

RMDCN within RA VI – status and perspectives

Service Availability

RMDCN PVCs with Availability < 99.5%

0

1

2

3

4

5

6

7

8

9

January February March April

Page 10: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 10 -

RMDCN within RA VI – status and perspectives

RMDCN repair timeEquant Faults

012345678

Time to restore the service

Nu

mb

er o

f F

ault

s

January February March April

Page 11: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 11 -

RMDCN within RA VI – status and perspectives

RMDCN performanceECMWF - NORWAY RMDCN Traffic (2 mn samples)

14 June 2001

0

40

80

120

160

0:00

2:00

4:00

6:00

8:00

10:0

012

:00

14:0

016

:00

18:0

020

:00

22:0

0

kilo

bit

s/se

c

OUT IN CIR 96kb/s

Page 12: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 12 -

RMDCN within RA VI – status and perspectives

Benefits - 1

Upgrade of the GTS links and changes in the GTS configuration

Acceleration in the migration from X.25 to IP A more flexible modernized network

New connections and changes can be easily introduced Network is monitored by ECMWF on a 24h basis Costs saving

Page 13: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 13 -

RMDCN within RA VI – status and perspectives

Benefits - 2

One point of contact for the RMDCN membership uniformity

RMDCN Operations Committee Co-ordination between all RMDCN participants Network performance and reliability Members are

All RTHs participating, 2 NMCs participating, WMO Secretariat and ECMWF

RMDCN Web Site Set up by ECMWF to disseminate information on the project to

the participating countries RDT to diagnose network problems before opening a TT

Page 14: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 14 -

RMDCN within RA VI – status and perspectives

RMDCN developments

New potential members Countries are requesting pricing information to join the network

Some of the RTHs are considering to use the RMDCN for links to other GTS regions

Changes to the GTS architecture are likely to continue New requests for bandwidth increases, mostly based on

asymetric PVCs. New request for Mission Critical connection.

Page 15: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 15 -

RMDCN within RA VI – status and perspectives

Future - 1

In response to the ITT, only Frame Relay solutions were offered

Large IP networks are being built by network suppliers for Extranet and intranet applications

Quality of service is becoming available for IP More and more fibre networks are being built New satellite communication networks are planned

Page 16: MD - 1 - RMDCN within RA VI – status and perspectives CBS/ET-IMTN, 20-23 June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF

CBS/ET-IMTN, 20-23 June 2001 MD - 16 -

RMDCN within RA VI – status and perspectives

Future - 2

An all-IP solution With higher link speed With features such as IP multi-casting With QOS to guarantee end-to-end traffic