MHI#10 号号号 pre-EP 号 EP1 Process log Status of working Result of pre-EP/EP1 Comparison of EP1 between MHI#10 and #11 d : 2010/3/8 3/15 ss : CP @flanges, pre-EP(5μm), EP1(100μm), Degreasing(FM-20), HPR(2h rs : M. Sawabe, Kirk, M. Satoh (KEK), K. Nakamura, N. Tasaki, F. Tsukada (Assist Engineering Co.), T. Okada (K-VAC) Kirk 1 STF Cavity Group Meeting @2010/3/15

MHI#10 号機の pre-EP と EP1

Embed Size (px)

DESCRIPTION

MHI#10 号機の pre-EP と EP1. Process log Status of working Result of pre-EP/EP1 Comparison of EP1 between MHI#10 and #11. Period : 2010/3/8 ~ 3/15 Process : CP @flanges, pre-EP(5 μ m), EP1(100 μ m), Degreasing(FM-20), HPR(2hours) Workers : M. Sawabe, Kirk, M. Satoh (KEK), - PowerPoint PPT Presentation

Citation preview

Page 1: MHI#10 号機の pre-EP と EP1

MHI#10号機の pre-EPとEP1

Process log Status of working Result of pre-EP/EP1 Comparison of EP1 between MHI#10 and #11

Period : 2010/3/8 ~ 3/15Process : CP @flanges, pre-EP(5μm), EP1(100μm), Degreasing(FM-20), HPR(2hours)Workers : M. Sawabe, Kirk, M. Satoh (KEK),

K. Nakamura, N. Tasaki, F. Tsukada (Assist Engineering Co.),T. Okada (K-VAC)

Kirk1STF Cavity Group Meeting

@2010/3/15

Page 2: MHI#10 号機の pre-EP と EP1

STF Cavity Group Meeting @2010/3/15

2

3/8 18:15 MHI#10 moves from V.T. area to EP area

3/9 9:55 check every flange / polish every flange except for input port10:26~ CP @flanges10:30~ Attachment of jigs for EP / found several scratches on one beam pipe flange11:39 Set cavity to EP bed with crane13:00 Installation of cathode bar to cavity13:21 Pressure test with N2 gas13:31 Meeting for tomorrow’s working procedure

3/10 9:00 preparation working starts10:23 pre-EP starts11:24 pre-EP stops [1:01] / Idling rotation starts (3 rpm)11:34 Idling rotation stops11:36 EP acid is removed from cavity11:56 First rinsing with ultra pure water starts13:27 First rinsing with ultra pure water stops [1:30]13:36 Detachment of restriction jigs13:44 Un-installation of cathode bar from cavity / washing cathode bar13:57 transferring cavity from EP bed to wagon14:04 Detachment of jigs for EP / Detaching every blind flanges

(black deposit was found on Teflon flange / cleaning Teflon flanges)14:12 Shower rinsing starts in CP room14:26 Shower rinsing stops / Checking every flange [O.K.]

/ Checking inside cavity (No marks) [O.K.] / No smell

Process log ①

Page 3: MHI#10 号機の pre-EP と EP1

Process log ②

STF Cavity Group Meeting @2010/3/15

3

3/10 14:29 re-attachment of jigs for EP14:51 Set cavity to EP bed with crane15:30 Installation of cathode bar to cavity15:43 Pressure test with N2 gas15:50 Attachment temperature sensors to cavity / Setting cooling fan

3/11 8:49 cavity rotation starts 8:55 EP acid cycle starts in reservoir / EP acid level was higher than nominal

/ adjustment of acid flow rate 9:11 EP1 starts13:29 EP1 stops [4:21] / Idling rotation (3 rpm)13:49 Idling rotation stops13:50 EP acid is removed from cavity14:16 First rinsing with ultra pure water starts / It takes 2 minutes for overflow15:48 First rinsing with ultra pure water stops [1:30]15:56 Detachment of restriction jigs16:04 Un-installation of cathode bar from cavity / washing cathode bar16:22 transferring cavity from EP bed to wagon16:45 Detachment of jigs for EP / Detaching every blind flanges

(black deposit was found on Teflon flange again / cleaning Teflon flanges)16:53 Shower rinsing starts in CP room17:03 Shower rinsing stops / Checking every flange (probe port was attacked by EP acid)

/ Checking inside cavity (white stain on beam pipe) / No smell

Page 4: MHI#10 号機の pre-EP と EP1

Process log ③

STF Cavity Group Meeting @2010/3/15

4

3/11 17:10 Attachment of jigs for degreasing17:17 Flowing FM-20 into cavity17:23 Degreasing with ultrasonic starts18:22 Degreasing with ultrasonic stops [1:00]18:25 Removing FM-20 from cavity18:30 Detachment of jigs for degreasing18:40 Shower rinsing in CP room18:56 set to HPR turn table19:04 Checking tolerance between position of nozzle and center of beam pipe19:10 HPR for inside cavity starts21:04 HPR for inside cavity stops by manual control [2:04]

keep in HPR room by next Monday21:18 fin.

3/15 9:00 take out from HPR room14:30 transfer from STF to workshop for annealing

Page 5: MHI#10 号機の pre-EP と EP1

Status of working ①

STF Cavity Group Meeting @2010/3/15

5

CP @flangesAttachment of EP jigs Setting on EP bed

Inserting cathode bar伸縮天井

Page 6: MHI#10 号機の pre-EP と EP1

Status of working ②

STF Cavity Group Meeting @2010/3/15

6

ビームパイプのマスキング

pre-EP後の状況 黒い染みは磨いて落とす

Page 7: MHI#10 号機の pre-EP と EP1

Status of working ③

STF Cavity Group Meeting @2010/3/15

7

歯医者に行っていたのでこの後の写真は無い。

カソードバッグが硫黄で汚れていた EP1後の状況(多少減った感じ)

Page 8: MHI#10 号機の pre-EP と EP1

STF Cavity Group Meeting @2010/3/15

Status of pre-EP for MHI#10 ①

8

current

voltage

Tcavity

Treservoir

Troom

Tcavity

average current density

電圧を 5Vにキープして、空洞内液温が 35℃を超えないように制御する。

Page 9: MHI#10 号機の pre-EP と EP1

Status of pre-EP for MHI#10 ②

STF Cavity Group Meeting @2010/3/15

9

左図は平均電流密度と電圧の相関右図は定常状態での分布

Page 10: MHI#10 号機の pre-EP と EP1

STF Cavity Group Meeting @2010/3/15

Status of EP1 for MHI#10 ①

10

current voltage Tcavity

Treservoir

Troom

Tcavity

average current density

電流と空洞内液温があまり高くならないように制御する。

Page 11: MHI#10 号機の pre-EP と EP1

Status of EP1 for MHI#10 ②

STF Cavity Group Meeting @2010/3/15

11

左図は平均電流密度と電圧の相関右図は定常状態での分布

Page 12: MHI#10 号機の pre-EP と EP1

STF Cavity Group Meeting @2010/3/15

12

#1 #2 #3 #4 #5 #6 #7 #8 #9 #10

両ビームパイプで温度が異なる。途中からファンを右側固定にしたが、それでもなお左側に比べて高かった。左側の方は首振りにした後でも温度がそれほど変わっていない。バッテリーの問題で最後までデータが取れなかった。

Status of EP1 for MHI#10 ③

Page 13: MHI#10 号機の pre-EP と EP1

STF Cavity Group Meeting @2010/3/15

13

#1 #2 #3 #4 #5 #6 #7 #8 #9 #10

1回目の水張りで EP液はほとんど無くなっていることがわかる。前ページと縦軸のスケールが異なることに注意。

Status of W.R. after EP1 for MHI#10

Page 14: MHI#10 号機の pre-EP と EP1

STF Cavity Group Meeting @2010/3/15

Comparison of EP1 for MHI#10&11 ①

14

Tcavity

Treservoir

Troom

current

voltage

Page 15: MHI#10 号機の pre-EP と EP1

STF Cavity Group Meeting @2010/3/15

Comparison of EP1 for MHI#10&11 ②

15

Tcavity

average current density

Page 16: MHI#10 号機の pre-EP と EP1

STF Cavity Group Meeting @2010/3/15

Comparison of EP1 for MHI#10&11 ③

16

Page 17: MHI#10 号機の pre-EP と EP1

STF Cavity Group Meeting @2010/3/15

Comparison of EP1 for MHI#10&11 ④

17