MINERALITY OPTIMIZATION PACKAGE GET THE MOST FROM YOUR PLANT
METALLURGIST TRAINING
OPTIMIZATION SOFTWARE
PLANT SURVEY & OPTIMIZATION REPORT
By Minerality
“The typical benefit of an opHmizaHon study is a 5-‐10% increase in throughput at a given product size. For a more complex circuit, the gains may be more dramaHc.” Mineral Comminu-on Circuits: Their Opera-on & Op-miza-on, JKMRC, Page 332.
www.minerality.com / [email protected]
If a once-‐off op-miza-on study can result in a 5-‐10 % throughput increase, what would a more con8nuous op8miza8on strategy achieve?
By Minerality
www.minerality.com / [email protected]
By itself, doing an op-miza-on study will make your mining opera-ons more money, but by following a con-nuous approach you will be saving even more. How much can your opera8ng plants improve?
By Minerality
*For 0.5 % Cu grade, 17 % Recovery at USD 5,700/ton Cu
www.minerality.com / [email protected]
By Minerality
Improvement range from op=miza=on (USD per hour extra)
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
200 500 800 1100 1400 1700 2000 2300 2600 2900 3200 3500 3800 4100 4400 4700 5000 5300 5600 5900 6200 6500 6800 7100
USD
$ per hou
r extra
Throughput (tph)
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
200
500
800
1100
1400
1700
2000
2300
2600
2900
3200
3500
3800
4100
4400
4700
5000
5300
5600
5900
6200
6500
6800
7100
USD
$ per hou
r extra
Throughput (tph)
www.minerality.com / [email protected]
By Minerality
Improvement range from op=miza=on (USD per hour extra)
For a 2,000 tons per hour Copper Plant you can expect between $2,423 per hour or $4,845 per hour more. For a 5,000 tons per hour Copper Plant you can expect between $6056 per hour or $ 12,112 per hour more.
*For 0.5 % Cu grade, 17 % Recovery at USD 5,700/ton Cu
www.minerality.com / [email protected]
By Minerality
Even a 1 % improvement in a 2,000 tph plant will result in USD 12,000 improvement per day
*For 0.5 % Cu grade, 17 % Recovery at USD 5,700/ton Cu
A Minerality opHmizaHon package adds value through a combinaHon of three elements:
www.minerality.com / [email protected]
By Minerality
1. Plant survey & op8miza8on report: For immediate improvements
2. MetSMART op8miza8on soFware to con-nuously increase yield & recovery
3. 3 Day training workshop for process metallurgists
Cyclone Issues Feed Size Changes Slurry Pooling in Mill
Improve recovery Respond to ore changes Prevent bad decisions by tesHng with MetSMART
By Minerality
www.minerality.com / [email protected]
Case studies
Slurry CondiHons in Mill
MetSMART solves this, expert control systems do not
By Minerality
www.minerality.com / [email protected]
Slurry condi=ons
Slurry pooling or low slurry levels can not be diagnosed by measurement devices. MetSMART can diagnose and solve this. Slurry pooling may drop throughput by up to 10 %.
0
500
1000
1500
2000
2500
3000
0 10 20 30 40 50 60 70 80 90
Throughp
ut [tph
]
Time (mins)
By Minerality
www.minerality.com / [email protected]
MetSMART solves this, expert control systems do not
Slurry pooling costs money-‐ MetSMART fixes this
AYer changing the SAG mill variables the slurry pooling stopped. 2050 tph to 2300 tph. 10 % improvement. 250 tph*1.5 % Cu grade*85% Recovery = 3.2 tph Cu extra 5700 USD/tons *3.2 tph = USD18,240 more per hour
Feed Size Changes
By Minerality
www.minerality.com / [email protected]
Feed size changes
MetSMART solves this, expert control systems do not
Changes in feed size may occur suddenly resulHng in a drop of throughput and drop in energy efficiency.
0
200
400
600
800
1000
1200
1400
1600
1800
2000
0 10 20 30 40 50 60 70 80 90
Throughp
ut [tph
]
Time (mins)
By Minerality
www.minerality.com / [email protected]
MetSMART solves this, expert control systems do not
Feed size changes cost money-‐ MetSMART fixes this
AYer changing the SAG mill variables to account for new F80, throughput increase from 1620 tph to 1700 tph. 80 tph*1.5 % Cu grade*85% Recovery = 1 tph Cu extra 5700 USD/tons *1 tph = USD 5,700 more per hour
Prevent bad decisions by tesHng with MetSMART
By Minerality
www.minerality.com / [email protected]
MetSMART solves this, expert control systems do not
An overloaded mill will result in hours of down Hme and subsequent losses.
0
10
20
30
40
50
60
70
80
90
100
0 10 20 30 40 50 60 70 80 90
Availability [%
]
Days
By Minerality
www.minerality.com / [email protected]
MetSMART solves this, expert control systems do not
Bad decisions = down=me. MetSMART fixes this
AYer checking changes before making them, the availability of plant increased from 90 % to 92%. 12,000 tons per day opera-on becomes 12,250 tons per day opera-on. 250 tph*1.5 % Cu grade*85% Recovery = 3.2 tph Cu extra 5700 USD/tons *3.2 tph = USD 18,240 more per hour
By Minerality
www.minerality.com / [email protected]
Roping cyclones effect recirculaHng loads, leading to a major drop in product quality. Wrong recirculaHng loads cause valuable minerals to go to waste.
Cyclone issues
RecirculaHng Loads
solves this, expert control systems do not
0
20
40
60
80
100
120
0 10 20 30 40 50 60 70 80 90
Recovery (%
)
Time (mins)
By Minerality
www.minerality.com / [email protected]
MetSMART solves this, expert control systems do not
Cyclone issues cost money-‐ MetSMART fixes this
AYer changing opera-on to reduce recircula-ng load from 500 % to 300 %, the recovery changed from 78 % to 80 %. On 600 tph opera-on 600 tph*1.5 % Cu grade*2% Recovery = 0.18 tph Cu extra 5700 USD/tons *1 tph = USD24,000 more per day
Respond to ore changes
By Minerality
www.minerality.com / [email protected]
MetSMART solves this, expert control systems do not
Feed ore hardness changes conHnuously. The effect of a feed change on the plant must be known.
Ore body variability
0
200
400
600
800
1000
1200
1400
1600
1800
2000
0 10 20 30 40 50 60 70 80 90
Throughp
ut [tph
]
Time (mins)
solves this, expert control systems do not solves this, expert control systems do not
By Minerality
www.minerality.com / [email protected]
MetSMART solves this, expert control systems do not
Feed ore variability costs money-‐ MetSMART fixes this
AYer changing opera-on to deal with new ore, throughput increases from 1620 tph to 1700 tph. 80 tph*1.5 % Cu grade*85% Recovery = 1 tph Cu extra 5700 USD/tons *1 tph = USD5,700 more per hour
Improve recovery
By Minerality
www.minerality.com / [email protected]
The interacHon between valuable minerals and waste must be known. If they float at the same rate reagents must be changed.
Flota=on Improvements
Stop sending valuables to the tailings dams.
0
10
20
30
40
50
60
70
80
90
100
0 10 20 30 40 50 60 70 80 90
Recovery [%
]
Time (mins)
By Minerality
www.minerality.com / [email protected]
MetSMART solves this, expert control systems do not
Poor flota=on decisions cost money-‐ MetSMART fixes this
AYer making flota-on adjustments the recovery improved from 76% to 78%. On 1500 tph opera-on 1500 tph*1.5 % Cu grade*2% Recovery = 0.45 tph Cu extra 5700 USD/tons *0.45 tph = USD60,000 more per day
For more informa=on
Email: [email protected] Phone: +1 416 400 7925
By Minerality
www.minerality.com / [email protected]