C270 (HK BIODIESEL PLANT) Safety Report

C270 Monthly Safety Report – February 2013

Page 2: Monthly safety report 2013 02

Safety :Contribution from All Level ( Top to Shop )

SAFETY STATISTICS

C270 Monthly Safety Report – February 2013

Jan 2013 Feb 2013

Accumulated Man-hour 445,951 517,794

Days worked from Commencement

449 477

Accumulated Man-day Lost 814 926

Cumulative Accident Frequency Rate

1.03 0.97

Page 3: Monthly safety report 2013 02

SAFETY INSPECTION / MEETINGPhysical site safety walks

C270 Monthly Safety Report – February 2013

Page 4: Monthly safety report 2013 02

SAFETY INSPECTION / MEETING

Weekly Safety Meetings with Safety Representatives of Subcontractors

C270 Monthly Safety Report – February 2013

Page 5: Monthly safety report 2013 02

AREA NEED IMPROVEMENT

C270 Monthly Safety Report – February 2013

HOUSEKEEPINT – Safe AccessPlanning of storage of construction material in transit

PROMPT RECTIFICATION

Improvement – Construction material in transit removed to maintain safe access

Page 6: Monthly safety report 2013 02

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

HOUSEKEEPINT – Safe AccessPlanning of storage of construction material in transit

Improvement – Construction material in transit removed to maintain safe access

C270 Monthly Safety Report – February 2013

Page 7: Monthly safety report 2013 02

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

NOISE NUISANCEExcessive noise generated to employees working near by

Improvement – Provision of Acoustic Barrier to minimize noise nuisance to protect occupational health of employee

C270 Monthly Safety Report – February 2013

Page 8: Monthly safety report 2013 02

POSITIVE SAFETY ATTITUDE

PRE-WORK MEETING

Installation of Pipe Bridge – Integration of safety consideration in both Planning Stage and Implementation Stage

C270 Monthly Safety Report – February 2013

Page 9: Monthly safety report 2013 02

POSITIVE SAFETY ATTITUDE

PRE-WORK MEETING

Installation of Pipe Bridge – Integration of safety consideration in both Planning Stage and Implementation Stage

C270 Monthly Safety Report – February 2013

Page 10: Monthly safety report 2013 02

POSITIVE SAFETY ATTITUDE

SITE SECURITY CONTROL

Security Guard Force + Electronic Recognition System + Managerial Regular Checking

C270 Monthly Safety Report – February 2013

Page 11: Monthly safety report 2013 02

POSITIVE SAFETY ATTITUDE

OCCUPATIONAL HEALTH & SAFETY CONTROL

Regular Physical Checking to Individual’s Safety HelmetOccupational Health Advice

C270 Monthly Safety Report – February 2013

Page 12: Monthly safety report 2013 02

POSITIVE SAFETY ATTITUDE

Regular Site Safety Inspection by Labour Department’s District Occupational Officer

QUALITY, SAFETY and ENVIRONMENT Inspection by Government Department

C270 Monthly Safety Report – February 2013

Page 13: Monthly safety report 2013 02

SAFETY TRAINING

Site Specific Safety Induction

Current MonthAccumulate (Oct 2011 –

Feb 2013)

No. of class 17 335

No. of Attendee 62 1503

INDUCTIONTRAINING

C270 Monthly Safety Report – February 2013

Page 14: Monthly safety report 2013 02

TOOL BOX TALKTRAININGSAFETY TRAINING

Topic No. of attendee

Safety Lifting Safety 76

Safety Before & After Long Holiday 77

Environmental Dust Control Management 62

Safety RA – Working on Jetty 16

Current Month Total 229 nos.

Accumulated Total : 5,294 nos.

C270 Monthly Safety Report – February 2013

Page 15: Monthly safety report 2013 02

SAFETY Promotion

3 nos. Safety News / Alert Sharing

9 nos. Safety Reminder to Subcontractors

5 nos. General Safety Advice on Construction Safety

5 nos. Internal – BDI interface

1 no.Risk Assessment – Fabrication & Installation

of Pipe Bridge

1 no. Safety Promotional Article

Safety Circulation

C270 Monthly Safety Report – February 2013

Page 16: Monthly safety report 2013 02

C270 Monthly Safety Report – February 2013