1 Zagreb, 2.12.2009. EIHP Željka Hrs Borković, Margareta Zidar, Marina Malinovec Puček NATIONAL AWARD NATIONAL AWARD CEREMONY CEREMONY Promotion Promotion of of energy energy efficiency efficiency and use of and use of renewable renewable energy energy sources sources in in non non-residential residential buildings buildings GreenBuilding Partner University of Split Building type university library Location (city, country) Split/Croatia Year/period of construction 2008 Year/period of refurbishment - Building area 14.611 m² (gross floor area) Points quantitative criteria 60 NB_HR_01 University library in Split

NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

1

Zagreb, 2.12.2009. EIHP Željka Hrs Borković, Margareta Zidar, Marina Malinovec Puček

NATIONAL AWARD NATIONAL AWARD

CEREMONYCEREMONY

PromotionPromotion of of energyenergy efficiencyefficiency and use of and use of

renewablerenewable energyenergy sourcessources in in

nonnon--residentialresidential buildingsbuildings

GreenBuilding Partner University of Split

Building type university library

Location (city, country) Split/Croatia

Year/period of construction 2008

Year/period of refurbishment -

Building area 14.611 m² (gross floor area)

Points quantitative criteria 60

NB_HR_01

University library in Split

Page 2: NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

2

The heat energy demand for heating is 46 % lower than required by the

Croatian building code.Energy savings

and basis of

calculation (eg. building

code, final energy consumption according to

bills, etc.)

Heat energy is produced by heat pumps integrated in air-condition system

using exhaust air and air from underground levels. Maximum heating and

ventilation capacity is 400 kW. Average COP level is 2.8. Heat energy for

cooling is supplied by adiabatic process, air-condition integrated mechanical

cooling and compact cooling device. Total cooling capacity is 1068 kW.

Average COP level is 4.1. Through integrated design concept high percentage

of energy recuperation is achieved – 80 to 92%.

Building services

- HVACeg. short description, key figures

External envelope – double skin ventilated facade 80 cm, external pane with

reflective coating + internal pane double insulating glass with lowe coating – 1,3

W/m²K; Roof – 0.27 W/m²K; Basement – 0.45 W/m²K; Optimisation of the

building envelope (insulation, airtightness, windows, thermal bridges).

Building envelopeeg. short description, U-values

28,5 kWh/m²a heat energy demand for heating

or 418340 kWh/a primary energy for heating

19,5 kWh/m²a heat energy demand for cooling

or 195475 kWh/a primary energy for cooling

Energy indices (per

m² or m³)

NB_HR_01

University library in Split

Renewable energyeg. short description, key figures

High energy efficient public building – role model for

further public building projects in mediterranean climateReplication and

innovation (description)

CSMS coordinates performance of air-condition system, heat

energy production for heating and cooling and individual space

regulation. DMS is used for performance control, system

surveillance and cost analysis.

Energy management (description)

External shades in ventilated space are automated taking into

account insolation and internal climate parameters. Additional

internal screens are manualy adjusted for optimal light and

insolation conditions.

Other measures (description)

NB_HR_01

University library in Split

Page 3: NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

3

GreenBuilding Partner City of Labin

Building type Kature - multiresidential buildings with

business units

Location (city, country) Labin/Croatia

Year/period of construction development of design documentation

Year/period of refurbishment -

Building area 1.625 x 3 m² (gross floor area)

Points quantitative criteria 49,5

NB_HR_02

MRB Kature

The heat energy demand for heating is 64,7 % lower than required by the

Croatian building code.Energy savings

and basis of

calculation (eg. building

code, final energy consumption according to

bills, etc.)

Air heat pumps (40 kW) will be used for centralized heating, cooling and DHW

energy production. Floor and wall panel heating and cooling. Ventilation for

kitchen and bathroom spaces.

Building services

- HVACeg. short description, key figures

External wall – 0,25 W/m²K; internal wall to unheated area – 0,3 - 0,25 W/m²K;

ceiling toward attick– 0.13 W/m²K; basement ceiling – 0.15 W/m²K; Windows –

0,9 W/m²K. Optimisation of the building envelope (insulation, airtightness,

windows, heat bridges).

Building envelopeeg. short description, U-values

24,82 kWh/m²a heat energy demand for heating

or 35741 kWh/a primary energy for heatingEnergy indices (per

m² or m³)

NB_HR_02

MRB Kature

Page 4: NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

4

Renewable energyeg. short description, key figures

High energy efficient building – role model for further building

projects in mediterranean climateReplication and

innovation (description)

Each residential and business unit will be able to optimize internal

temperature conditions and manage own energy expenses.Energy management (description)

Heat exchanger for every unit for energy supply and preparation.Other measures (description)

NB_HR_02

MRB Kature

GreenBuilding Partner PHOENIX PARK d.o.o.

Building type supra regional shopping centre, mega mixed use

Location (city, country) Sesvete/Croatia

Year/period of construction in preparation of design documentation

Year/period of refurbishment -

Building area 70.948 m² (gross floor area)

Points quantitative criteria 51

NB_HR_04

Phoenix Plaza

Page 5: NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

5

The heat energy demand for heating is 71 % lower than required by national

code.Energy savings

and basis of

calculation (eg. building

code, final energy consumption according to

bills, etc.)

Large shopping, entertainment and communication areas are heated by

centralized air conditioning system consisting of ventilation chambers with heat

exchangers (summer - adiabatic cooling 60%, 1570 kW + external cooling

devices 40%, 1500 kW) and heat recovery (winter 75-85%, 4300 kW, COP 2,8

+ additional heating 1330 kW).

Heating system of retail area (60%) consists of heat pumps (air-water)

recovering waste heat of cooling system and additional heat (if needed) is

supplied by gas boiler (600 kW). Cooling energy is produced in external cooling

system. Fan coils are used for heat energy supply (heating and cooling).

Building services

- HVACeg. short description, key figures

External concrete envelope 15 cm with 18 cm of thermal insulation – 0,30

W/m²K; Optimisation of the building envelope (insulation, airtightness,

windows, thermal bridges).

Building envelopeeg. short description, U-values

8,98 kWh/m³a heat energy demand for heating

or 2.991.955,14 kWh/a primary energy for heating

Energy indices (per

m² or m³)

NB_HR_04

Phoenix Plaza

Renewable energyeg. short description, key figures

Unique example of intergrated design and energy concept.Replication and

innovation (description)

All energy system are integrated with the digital regulation

which combines them into one energy efficient system. This is

achieved with free programmable control units, which allow

every function of the building being easily accommodated.

Digital regulation gets the final touch with the BMS, which

combines controlling, alarming, reporting and many other

complex components of the integrated system, with simple and

user friendly operating, from one or more places, also provides

excellent possibilities for data analyzing and optimizing and

rational use of enegy.

Energy management (description)

All relevant energy processes are supervised and controlled by

CMCS.Other measures (description)

NB_HR_04

Phoenix Plaza

Page 6: NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

6

GreenBuilding Partner HEP (Croatian utility company) Distribution

system operator - Elektra Koprivnica

Building type office building

Location (city, country) Koprivnica/Croatia

Year/period of construction 1968

Year/period of refurbishment 2005

Building area 1.542 m² (gross floor area)

Points quantitative criteria 54,5

EB_HR_03

Office building HEP DP Elektra Koprivnica

70 kWh/m²a heat energy demand for heating

92.048,88 kWh/a primary energy for heating

The heat energy demand for heating is 70,8 % lower than before the

refurbishment.

Energy savings

and basis of

calculation (eg. building

code, final energy consumption according to

bills, etc.)

For heat energy production existing centralised system is used consisting of 2

boilers of 580 kW (existing) using natural gas. Heating and cooling distribution

system is reconstructed to 4 pipe fan coil system. Air conditioning system is

added using heat from centralised system. DHW is produced in centralised

system. Kitchen area is mechanically ventilated.

Building services

- HVACeg. short description, key figures

External wall – 0,30 (0,34) W/m²K; ceiling toward attick– 0.25 W/m²K; Windows

– 1,4 W/m²K. Optimisation of the building envelope (insulation, airtightness,

windows, heat bridges).

Building envelopeeg. short description, U-values

240 kWh/m²a heat energy demand for heating

or 315.596,16 kWh/a primary energy for heatingEnergy indices (per

m² or m³)

EB_HR_03

Office building HEP DP Elektra Koprivnica

Page 7: NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

7

Renewable energyeg. short description, key figures

Refurbishment model of existing office buildings

Use of energy efficient energy 4 pipe distribution systemReplication and

innovation (description)

Energy management (description)

On the window frame micro switches for local control of

heating/cooling system are installed contributing energy

consumption reduction.

Other measures (description)

EB_HR_03

Office building HEP DP Elektra Koprivnica

GreenBuilding Partner VALAMAR TURISTIČČČČKI PROJEKT d.o.o.Building type auto camp sanitary block

Location (city, country) Krk/Croatia

Year/period of construction

Year/period of refurbishment 2006

Building area -

Points quantitative criteria 45

RB_HR_05

Autocamp Politin

Page 8: NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

8

The electricity consumption of heat pumps is 80,6 % lower than by use of

electricity boilers.Energy savings

and basis of

calculation (eg. building

code, final energy consumption according to

bills, etc.)

The main system uses condensing potential of the heat pump of 115 kW for

SHW preparation. Waste water from the sanitary block is used for the

evaporation. The waste sanitary water has sufficient thermal potential and in

energy balance gives about 80-90% of energy recovery.

Building services

- HVACeg. short description, key figures

Building envelopeeg. short description, U-values

24.699 kWh/a electricity demand for SHW

Total primary energy consumption is 103.994 kWh/a. Yearly CO2 emission

savings are 165,35 t.

Energy indices (per

m² or m³)

RB_HR_05

Autocamp Politin

GreenBuilding Endorser HEP Esco d.o.o.

Buildings assisted Primary education school Duga Resa,

High school Duga Resa

Grammar school in Ogulin

Location (city, country) Karlovaččččka County/CroatiaYear/period of construction

Year/period of refurbishment 2005 - 2008

E_HR_05

HEP ESCO d.o.o.

Page 9: NATIONAL AWARD CEREMONY · 2016. 1. 19. · Year/periodof construction in preparationof designdocumentation Year/periodof refurbishment - Buildingarea 70.948m²(grossfloorarea) Pointsquantitative

9

THANK YOU FOR YOUR ATTENTIONTHANK YOU FOR YOUR ATTENTION !!

Margareta Zidar

[email protected]

Željka Hrs Borković

[email protected]

www.eu-greenbuilding.org

www.greenbuilding-hr.com

Marina Malinovec Puček

[email protected]