12
SHERLOCK, SMITH & ADAMS, INC. ARENITECTS - ENGINEERS ISGIIDEERY. ALMIA Ii S. NAVAL STATION ROOSEVELT ROADS. P.R. REPAIRS TO NAVAL HOSPITAL DETAILS HO SPtCflCA11OH HO. HAVF*C DRWG. HO. IF XXXXX XXXXX XXXXX s ? HO jJj LL IL! -J LI) C) -) Ix Lii I— z U C) U) Ix 0 (;I3NCIFI CONCRETE CLEVTS PLA E I (,ON( RI IL ANCHOR WF[ICFI rC 1 EMAL.E F EMALE SWING ROD FITTING SLAB CS HI AM ANCHOR PFS,A & II SLACK AIRCHAF F CABL[ PROUDE BRACED RODS WHERE PLOD ELEVA11ON CONCRETE ANCHOR WEDGE TYPE N U F CONCRETE EXPANSION ANCHOR (N NOT TO SCALE TYP.1M7—6 CONCRETE CLEY1S PLATE (N NOT TO SCALE TIP JM7.-6 POSI TION NO 1 ANCHOR PT. C ANCHOR PF. A RODS TO VIBRATION ISOLATORS CABLE ANCHOR PT. A TOP SlEW NOT TO SCALE LAIERAL RESJRA11Z CE SUSPENDE1QU1EMENT tIN TYP. j!.47—6 WALL FRAMING MOUNTING FRAME INSECT/BIRD SCREEN AIR FLOW PROTECTIVE REAR GUARD BY FAN MANUFACTURER COMBINATION HEAVY DUFY STORM LOUVER & BACKDRAFF DAMPER FURNISHED BY FAN MANUFACTURER WALL MOUNTED PROPELLER FAN (TN NOT TO SCALE M3—1 M7—6 M2—1 M2—2 TO Li (/1 Hi 0 TO I— -J 0(1) TOO -J > 0 (I) Os: <LiJ I— cf-los: -J Hi > Hi C,, -J I— UJ C) -J to S < V PUJE NO. M7-( Pwr II

NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

SHER

LOC

K,

SMITH

&A

DA

MS,

INC.

AR

ENITEC

TS-

ENG

INEER

SISG

IIDE

ER

Y.

AL

MIA

IiS.

NA

VA

LST

AT

ION

RO

OS

EV

EL

TR

OA

DS

.P

.R.

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

DETA

ILSH

OS

PtC

flCA

11OH

HO

.H

AV

F*CD

RW

G.

HO

.IF

XX

XX

XX

XX

XX

XX

XX

Xs

?H

O jJjLLIL

!

-J

LI)C)

-)

IxLiiI—zUC

)

U)

Ix0

(;I3NC

IFI

CO

NC

RE

TE

CLEV

TSPL

AE

I

(,ON

(R

IIL

AN

CH

OR

WF

[ICF

IrC

1EM

AL.E

FEM

ALE

SWIN

GR

OD

FITT

ING

SLAB

CS

HIAM

AN

CHO

RPFS,A

&II

SLACK

AIRCHAFF

CA

BL[

PRO

UD

EBRA

CEDRO

DS

WHERE

PLO

D

ELEVA

11ON

CO

NC

RE

TE

AN

CH

OR

WED

GE

TYPE

NU

F

CONCRETEEXPANSION

ANCHOR(N

NO

TTO

SCALE

TYP.1M

7—6

CONCRETECLEY1S

PLATE(N

NO

TTO

SCALE

TIPJM

7.-6

POSI

TION

NO

1

AN

CHO

RPT.

C

AN

CHO

RPF.

A

ROD

STO

VIBRA

TION

ISOLA

TORS

CABLE

AN

CHO

RPT.

ATO

PSlEW

NO

TTO

SCALE

LAIERA

LRESJRA

11ZC

ESU

SPEND

E1QU

1EMEN

TtIN

TYP. j!.47—

6

WALL

FRAM

ING

MO

UN

TING

FRAM

E

INSEC

T/BIR

DSCREEN

AIRFLO

W

PROTECTIV

EREA

RG

UA

RD

BYFA

NM

AN

UFA

CTURER

COM

BINA

TION

HEA

VY

DU

FYSTO

RM

LOU

VER

&BA

CKD

RAFF

DA

MPER

FURN

ISHED

BYFA

NM

AN

UFA

CTURER

WALL

MOUNTED

PROPELLER

FAN(T

NNOT

TOSCALE

M3—

1M

7—6

M2—

1M

2—2

TOLi

(/1Hi

0TOI—-J0(1

)T

OO-J>0(I)

Os:

<L

iJI—cf-lo

s:

-JHi

>Hi

C,,-J

I—UJ

C)

-J

to

S<VPUJE

NO.M7-(

Pw

rII

Page 2: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

SIJPt-H

&R

EU

RN

IIIl.I

II

2W

AI

(Ill

lIPII

V/U

VIC

OO

LIN

G

CO

IL

VA

UL

TC

OC

K

VO

WM

EA

SU

RIN

GST

AT

ION

-AW

YUALH

RV

ENfS

—W

ITHD

VEH

FIOW

CHILLEDW

ATERCOIL

PIPING

uN

NO

TT

OSC

AL

IU

FRO

M

ThINK

OUTTEA

(TYP

TYP

1777

IV

/

TA

LA

T,’V

,,,(i.

INO

ICA

TINO

(JIIAD

RA

NI

PUM

P&

7W

AYCON

TROLVALVE

-

3/4

”lA

NC

ERRO

DSU

PPOR

T

TOMCO

NO

TLUCTIO

NA

BO

VE

AU

TOM

ATIC

AIRVENT

RETU

RN

SYSTEM

TOSY

STE

M-

CO

MB

INA

TION

AIRSE

PAR

AT

OR

PUM

PA

ND

STRA

INER

.

-

PIPESIZE

DETER

MIN

EDB

Y

BLO

W—

OFF

W/

SIZEO

FA

IRSEPA

RA

TOR

HO

SEEN

D

AiR

SEPAR

ATO

RPIPIN

G6N

TEMPO

RARY

BALANCINGLO

OP

(PUM

PSHW

P—I

&H

WP—

2ONLY)

IINIO

N

‘CCOIL

COM

BINA

TION

FLOW-

UCAY

MR

INBA

LAN

CING

CALVE

SALCOCK

NO

TT

OS

CA

LE

STRW

INFR

GATEV

ALV

E-

176—1

M7—

7M

6—2

VA

LVE

HO

TW

ATERCOIL

PIPING

43NN

OT

TOS

CA

LE

BALA

NCIN

GCO

CK

TYPM

7-7

PRESSU

RE

REDU

CING

VALVE

BALANCINGCOCK

-CHECK

VALVE

•—i/4

”W

ATERM

AK

E-UP

REDU

CEDPR

ESS.

BACK

FLOWPR

EVEN

TERA

SSEMBLY

‘ADIA

T’pE

NO

TTO

SC

AL

E

CDU

PLING

GU

ARD

WATER

MAKE—

UPA

SSEMBLY

/N

GLOBEVALVE

—---

-

ON

ESH

OT

FEEDER

2l/2

GAL

YST

EM

SUPPL

Y

4”THICK

CON

G.

PAD

PRESSU

RE

GA

GE

W/

COCK

(TYP.)

COM

BINA

TION

STRAIN

ER&

SUCTIO

ND

IFFUSER

DUMM

YW

ELD,DO

NOTCUT

ORBURN

THRULINE

PIPE

1/4”DIA.

VENTHOLE

KW

A

1HIANALI;LOv

Ln

0

o

-J

F—>

0U)

0Y

I—

o(f)

02<

W

-J

<zu,

N5

NW

tN

O.

STAN

D

—YP1M

7—7

SYSTEM

RETURN

PUM

PPIPIN

GN

OT

TOS

CA

LE

Mi—

it116—

21

DUMM

YPIPE

MUST

BESAM

E

MATERIAL

ASLINE

PIPEIF

LINEPIPE

WALL

ISLESS

THAN15’

“0’01W

PIPE

‘C’SIZE

PLATE

FIXEDPIPE

SUPPO

RT

(“NN

OT

TOS

CA

LE

TIP.1117—7

ONESH

OT

FEEDER

PIPINC

NO

TTO

SC

AL

E

NOICSEE

PLAN

FOR

PIPESIZES,

M6—

2jM7—

7

SHER

LOC

K,

SMITF-I

&A

DA

MS,

INC.

AR

cHITEC

TS-

ENG

INEER

SI4

1G

cER

Y.

ALABAA4A

U.S.

NA

VA

LSTA

TION

RO

OSEV

ELTR

OA

DS.

P.R

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

DETA

ILSN

OS

PIC

WW

A000

NO

.4A

VY

*CN

OO

NN

O.

ItN

O

_xxxxxxxxx

xxxxx

o_Y

_??

M7-

Wr

N

Page 3: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

TQ

TA

NR

VE

NT

CO

NN

EC

TIu

)

-

NO

TTO

SCALE

CJT

SD

E

M3—

31M7—

8

0(J0—(1)0o

(I)

-J>0

--

ArC

HO

RS

EC

CR

E.I

ITC’

BLO

C-

CO

NS

T

DR

IPP

AN

EL

I

STEAM

VALVEAND

VEN

TD

RIPPA

NE

li

STEEL

GA

LVA

NIZED

STEEL

SD—

436

CLAM

PING

V1NG

LnuJI—zLUC-)

tJ-)

0C-)-J

ED

SO

DU

CTM

OU

NTED

FILTERN

OT

TOSCA

LE

Cl)-JI—LL

M2—

1647—

S642-2642-3

F-

-J

•RZ>4:

z

SHER

LOC

K,

SMITH

&A

DA

MS.

INC.

AR

1ITtC

TS

—EN

G1N

EERSl1

GE

RY

,L

AaA

IA

US

.N

AV

AL

ST

ArIO

NR

OO

SEV

EL

TR

OA

DS

.P

R.

_____

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

NS

TR

.C

ON

TU

HO

.

xxxxx

DETA

ILS

P(A

TE

H0

HO

.T

AV

TA

CD

OG

no.

yr

HO

.xxxxxX

XX

XX

XX

XX

Xor

M7-

rwc

Page 4: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

PRIMA

RYLO

OP

(CHILTLR

PLAN

T)

SECON

DA

RYLO

OP

(AIR

HA

NO

TING

UN

ITE)

NOTTO

SCALE

VB

RA

TICJN

INSU

LA

TO

R/

WA

TERPR

OO

FE

LA

STIC

SCA

LE

R

_—

”0

FAST

NE

R(C

ON

CR

ET

E)

-PU

MP

CU

RB

SEE

DETA

IL2/A

8-

6

NO

TTO

SCALE

NOTE:DRAIN

LINESHALL

BEINSULATED

SHER

LOC

K,

SMITH

&A

DA

MS,

INC

.M

DN

JEC

TS

-EN

GIN

EERSM

GII1G

OeERY

.A

LABA

IIA

US.

NA

VA

LSTA

TION

RO

OSEV

ELTR

OA

DS.

PR

,

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

DETA

ILSS

PtC

FIC

AT

1O

NN

O.

NA

VT

*CO

NW

O.

NO

.IT

NO

XX

XX

XX

XX

XX

XX

XX

Xoc

cccITNY

0coC

!)cr0-J>z0F-

80

80

cJW

R.

8’O

-CWR

PUM

PB

ASE

½”

NPT

THERMAL

WELL

(TYP

5)M

INIMUM

DEPTH

=75

mm

DECO

UPLER

PIPING

(‘i”NN

UT

10SCA

LEM

—31M

/—9

UTILITY

SJiTU

INC

ROO

F

PUM

PBA

SE—

UTILITYBUILDING

ROO

FtN

M3—

31M7—

9

DRAINLINE

SHA

LLBE

ATLEA

ST

THESA

ME

SIZEA

STHE

NIPPLE

ONTHE

DRA

INPA

N

SCREW

SCREW

IHERM

OME

TE.RS

CON

TROL

VA

LVES

WITH

EXISTIN

GEQ

UIPM

ENT

OPEN

PROVIIDE

DE

PTH

OFSEA

LREQ

UIRED

TOO

VERCO

ME

OPERA

TING

STATIC

PRESSU

RE

DIFFEREN

CE

HO

TW

ATERCIRCU

LATIN

GPU

MP

(HC

P.

SEESH

EETM

6—2

FOR

CON

TINU

ATIO

N

CON

TROLS

BOILER

DRA

IN

HPS

----H

PR

I-------1V

HI(F-l

PRFSSU

RF

SWA

M/flO

NflF

NS

AW

PIP

IIIJr,

CON

DEN

SATE

DRAINTRA

P(N

M4—

1M

7—9

144—2

NO

TTO

SCALE

NO

TTO

SCALE

.LLL

iJ

000-3u

JIzU0U

)

0C-)

-JEn

TYP.1M7—

9

HO

TW

ATERH

EATIN

GBOILER

PIPING

4N

TYP.IM

7—9

(1c

I—-JNY>NYzVEl

CO

NS

TT

CO

NY

N.

NO

.

XXX

XX

TIC

ICNO.M

7-

Page 5: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

TOBLO

W—

DO

WN

TAN

KSEE

DETA

IL

(BO

ILERS

B—

3&

B—

4)

WA

TERLEV

ERG

AU

GE

W/

STO

PS

STEAMBOILER

PIPING

6T

h43-3IM

7—I0

-JUU

J-J-J>z0(I)

C-)

-)

SHER

LOC

K,

SMITH

&A

DA

MS.

INC.

RD

1I1EC

TS

—EN

GIN

EERS

4E

RS

ALA

BAM

A

u.S

.N

AV

AL

STA

TIO

NR

OO

SEV

EL

TR

OA

DS,

P.R

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

DETA

ILS

CO

NSIR

.C

UR

iO.

NO

,N

P[C

OC

000NN

ON

AV

UA

CC

OR

NN

O.

VUVU

XX

XX

XX

XX

XX

XX

XX

X—

NCN

ON

?

A’M

ISA

IlII

VA

IVI

N’

2

‘ilAM

SIII’P

IY

II)111

1111l4Iil

IT

IN.’’’I

lilTLi

2”I (III

Ii4

TIlLSCII

N.

I

N,

‘Ti

CON

IRO

LS

TOC

ON

DEN

SATE

ILVEL

CON

IRO

LB

LOW

W—

DD

WN

/SEPAR

ATD

R

4”V

ENT

2’R

ET

,2’

VEN

T

/p

NO

TTO

SCA

LEDETAIL

“A”—STEAM

BOILERPIPIN

G

U

/

CO

NT

EN

SA’S

RETU

RN

I Al, 1<

¾’

CO

_SW

ATER

SUPPL

Y

,,—SIE

AM

BOILER

/

WA

TERC

OU

LMN

&SIG

HT

GI,A

SS

DETAIL“B”—

BLOW

—D

OW

N/SEPA

RATO

RPIPIN

G

NO

TTO

SCA

LE

PUM

P

1..j

TOB

LO

W—

OO

WN

/SEPA

TA

TO

R

TOCO

LDW

ATER

SUPPL

Y

TOD

RAIN

CH

ILLEREV

APO

RA

TOR

DRA

IN

WA

’R

I;,

VS

&SIG

HT

GIA

SS

SIGH

TG

LASS

2C

ON

NE

CO

ON

S

6’

NO

T-‘

SCA

LE

L__

l

DETAIL“C”—

CON

DEN

SATE

RETURN

ASSEM

BLYPIPIN

G

PRE

SSUR

EG

AU

GE

STBRATIN

GISO

LATO

R

8

CHILLEREV

APO

RATO

RPIPIN

GN

OT

TOSC

ALE

CO

MB

INA

TION

BA

LAN

CIN

GFLO

WM

EASU

RIN

GO

ERIC

E

M3—

2IM7—

10

iQ]L

IDEN

TIFYPIPIN

GC

OM

PON

ENTS

ARE

TYPIC

AL

FOR

ALLLO

CA

TION

SSH

OW

N

0COci

VU:0Ho

(1)

-J

>0F-

(1)

.VE

WI’-

-J>VU:zC,

UJ

zwC-)

(1)

El::0C

-)-JED0

M7-1(

DW

(Ii

Page 6: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

EA1]

H000r

(AR

CHECK

VALVE

PIP‘TO

RISA

ILFYREU

FFVALVE

—.

(SETPT

PS.I.G

SUPPL

YA

DS.)

/

EX20

FUEL

OILSU

PPLY&

RETURN

PIPING

TOU

ND

ERGRO

UN

DTA

NK

S

EP,“‘

FUELUK

‘Pill

V&

ILlTuR

N

Ti‘A

ll1(1

‘TIlillilILl

INTlfA

NR

O2”

¾”

P0B

OILER

BURN

ERS

FUELOIL

FILTERS

5”A

BO

VE

TOO

OF

WA.

FUELUT.

IRAILTI

IIPU

MPS

‘F1P

-2

RO

OF

ESELQ

LDAY

TANKSY

STEMLO

TS--iT

BOILERFUEL

OILPIPIN

G(T

NN

OT

TOSC

ALE

TI

FORCO

NN

ECTION

SECOW

G

OPU

SEA

DSB.U

F,L

CON

NECT

TOG

ENER

ATO

R-

SET(TY

P2)

10Q

J2

TRENCH

--

I”

F

_______

I—

_j

2”N

W.

SU

PP

LY

1

VA

CUU

MR

ELIEFV

ALV

E

2”C.W

.SU

PPLY

L

DECO

UPLER

PIPING

(TN

55TO

SCA

LEM

i—TIM

]—11

CIRCULA

TING

PUM

P

OW

N—

I

UNION(TY

P.)

2N

GATEV

ALV

E(TYP)

FIN.

-REV

ERSE

PUM

PING

SYSTEM

I”

NO

SCA

LE

OIL

FIRE

DD

OM

ES

TIC

WA

TE

RH

EA

TE

R(T

NM

i—iM

7—11

WIT

HC

IRC

UL

AT

ING

PUM

P

FUELOIL

FILTERS

FUEL

OILRA

NSFER

PUM

PS

A

LiJ0U

)C)

OD

E

-)

OS

C)

I—zLUC)

(1)

0C)

-J020

/_///

UTILITY

TRENCH

TOG

ENERA

TOR

DA

YTA

NK

S—SEE

DW

GS.

GEN

ERATO

RFU

ELOIL

PIPING

(TN

NO

TTO

SCALE

M3_3jM

7_11

0(1)

0I—_J

o(1)

coo-J>0(I)

-J>NE0

SHER

LOC

K,

SMITH

&A

DA

MS,

INC.

RcI4[7E

CT

S-

ENAII4EERSI441E

c.4ER

Y.

AL

8A1A

000510.

00010

00.

XXXXx

US.

NA

VA

LSTA

TION

RO

OSEV

ELTR

OA

DS.

P.RN

10

00

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

DETA

ILSS

PE

C10C

000I4

NO

.00000C

DO

WN

.N

O.

IFN

OX

XX

XX

7I

XX

XX

XX

XX

XX

I5t?

or?

?

Page 7: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

MIN.I

MAX.

IM

ARKI

SYSTEMAPPROX.

RANGE‘F

INTANK

PRESSAT

REUEFAT

TANKMIN

VOLVOLUM

EI

IAPPROX.

ISYSTEM

TEMP

INITIALPRESS.

PRYFILL

IM

AX.OPER.

PRESS.I

MIN.

ACCEPTI

REMARKS

SYSTEMTYPE

VOL.GAL.

SIZEPSIG

TANKPSIG

VALVEPSIG

P510GALLON

GALLON

ET

-lCOOLING

VERTICAL350

14x2645

600

290

908

5

ET—2

HEATINGVERTICAL

35016x41

60180

02

0505

2212

C/)U-JCDUxC-:C’:

AIIIITA

(IIIll’)

1161160

Xliii

III(II

IAI

ATNY

110141/1)9161LI N/SAl

‘IVill_IN

AIR

HA

ND

L.I

NC

UN

II

DliF

BI20

460

DI15

360

12,170

460

50012,1/0

3,310560”

0:1602,200

—6O

”—

________

—281,900

/110,51/

CHILLEDW

ATERCOOLING

COIL&

B.).TAN,

MAX.

GPILINGCOIL

WT’R

P.D=10

FT.H

0,CONSTANT

VOLUME

360

10,360

1.00

500

412,700

SUPPLYFAN

I;IVIIINC

C/Ill

HEATPIPE

COILS-__________________

H/lIlY

IYITIIN

IIVIA

II1IA

IHIllSIDE

TOTALSTATiC

FANFAN

POWER

COILMAX

COILAIR

SIDECOOLINU

I.AlA

(.lIY/91

6114CHILLED

WA/ER

PRECOOIINC

COILHEAT

TRANSFERCOIL

REMARKS

IIl/SD

I MM

RC

PRESSURE

TYE

—AIR

FACE

VEL,PR

ESS.D

ROP

IOIA

L‘;

PBW

ITENT.

WATER

LVG.W

ATERCH’CLEO

RUN

CUT

PIPESI/C

U’)’

VANENT

AIRLVG.

AIRENT

AIRAIR

6114P.D

(INw

G)

VP

CCFM

PPM(IN

w.G

.)B

TU/IIR

11111/Il)?I

‘FTEM

P‘F

TE

MP

TW

ATER6P

MSU

PPLYRE/HAN

‘,w

.

WIT.

INW

C

1.00

22 ‘1,/lOll

154.11110

668

6.17

61.7

599

CII1

225

4553

4552

54055

1)30

811

45

‘SD

16

‘186

CH

ILL

ER

SC

HE

DU

LE

-*+3’, -

659

50

66.11

95DIRECT

IVERTiCAL

CII-2

225

[540

,,,5-

4516

95DIRECT

IVERTiCAL

ROTARYSCREW

100TO

25

*UA5LI)

UNA

CROSS-

1/IFI/IlL

STARTER

746

617

637

50I

EVAPORATORCONDENSER

COMPRESSORS

ELECTRICAL

-

MAXIM

UMENT.

AIRFANS

PERCENTMINIMUM

EE0—

-

COM

PRESSORS

FAN

SREM

ARKS

MARK

IONSGPM

WATER

WATER

PRESSURETEM

P.I

iTYPE

CAPACITYINCLUDING

FANSVOLTS1

PHASECYCLE

MAXIM

UM

(‘F

)(

‘F)

DROP(PT)

(‘F)DRIVE

DISCHARGEREDUCTION

&COM

PRESSORSRLA

LRA*

I TOTALFLA

MAXIM

UMM

AXIMUM

IM

AXA/UM

63.7

50.0

599

ROTARYSCREW

100T

025

61.9

50I

550

50.0

31

610

94

54.6

94

460

25

II

II

II

I

3

PROVIDE2-W

AY

CONTROlVALVE

PROVIDE2—

WAY

CONTROLVALVE

EX

PA

NS

ION

TA

NK

SC

HE

DU

LE

60562

I4)0

4603

.160

562410

250052

250052

SOTEI—

BOILERS

SHALLOPERATE

ONJP—

5FUEL

OIL.

________________

HOTW

ATERBOILER

SCHEDULE(OIL

FIRED)

MIN.

GROSSM

IN.NET

NOTE1

HOTW

ATERAPPROX,

ELECTRICALVENT

MARK

DESCRIPTIONSERVICES

INPUTCAP.

HEATINGCAP.

FUELOIL

OPERATINGW

ATERBURNER

—SIZE

REMARKS

BTU/H

R.BTU

/HR.

(G,P.H

.(TEM

PERATURE(F)

GALLONSM

OTORH

.P.VOLT’S

PHASECYCLE

INCHES

VERTICALFORCED

DRAFT,STEEL,

B—I

HEATINGCOILS

2,230,0001,895,000

18090

300460

360

120

FUBELESSOIL

FIRED,HOT

WAFER

8—2

VERTICALFORCED

DRAFT,STEEL.

HEATINGCOILS

2,230,0001,895,000

18.0190

300460

360

I2’ø

TUBELESSOIL

FIRED,HOT

WAFER

_______

CO

ND

EN

SA

TE

RE

TU

RN

AS

SE

MB

LY

PUMP

CAPACITYM

IN.TANK

SIZETANK

CARBON

MARK

(BOILER(G

ALS.)

STEELTHICKNESS

PUMP

ELECTRICALREM

ARKS

HEADHP

IVOLTS

IPH

ASE

ICYCLE

HORSEPOWER)

(MIN.

GA.)GPM

(P.s.LG.)

II

I—

MECHANICAL

FLOAT&

CR—i

3D70

II0

001½”I

460I

60REGENERATIVE

TURBINETh’PE

PUMP

—M

ECHANICALFLOAT

&

CR—2

5070

Il0

1003”

4603

60REGENERATIVE

TURBINETYPE

PUMP

ST

EA

MB

OIL

ER

SC

HE

DU

LE

(OIL

FIR

ED

)

/OTE1—

14DTE

2—I

AIR

SE

PA

RA

TO

R

AIRSEPARATOR

IPIPE

COLDI

REMARKS

PMP.O.

STRAINERI

FILLI

UN

T

X.

BUILT—IN

ISIZE

IW

ATERI

AS-i,Z

&3

41470

5YES

I/14

II

r.

ISIZE

6FT

REOUIREDI

TANKI

SIZEI

AS—H

2W499

5YES

W

NOTEI

MIN.

CROSS

MIN.

NETN

OTE

2POW

ERVENT

OPERATiNG

MARK

DESCRIPTIONSERVICES

INPUTCAP.

HEATINGCAP.

PRESSURE

FUELOIL

BURNERSIZE

REMARKS

BTU/HR.81/i/H

R.(P510)

(GPH

)M

OTORH.P.

VOLTSPHASE

CYCLEINCHES

63

VERTICALFORCED

DRAFT,

PROVIDECONDENSATE

RETURNAND

KITCHENAREA

1,000,000850,000

20(A

DJ)

9.03/4

4603

6024

TUBELESSOIL

FIRED,STEAM

BLOW—

DOWN

SEPARATOR

VERTICALFORCED

DRAFT,

NOCONDENSATE

RETURN

0—4

STERILIZERS1,612,000

1,370,000100

(AD

J)5.0

3/4460

360

125

TUBELESSOIL

FIRED,STEAM

OILER0—

3SHALL

BEDESIGNED

FOROPERATING

ATPRESSU

RESUP

TO100

PSICTO

SERVEAS

ABACK

UPTO

BOULERNO.

8—4.

OILERSSHALL

OPERATEON

JP—5

FUELOIL,

______

DOMESTIC

HOTW

ATERHEATER

SCHEDULE

MIN.GROSS

MIN.

NETNOTE

TPOW

ER—

VENT

MARK

DESCRIPTIONSERVICES

INPUTCAP.

HEATINGCAP.

FUELOIL

BURNERSIZE

REMARKS

VOLTSPH

ASE

CYCLE

8Th/HR

.BR/i/H

R.(O

PH)

MOTOR

H.P.

INCHES

VERTICALFORCED

DRAFT,DOM

EW

TH—

OWN—

ITUBELESS

OILFIRED,

HOTW

ATERHEATING

1,240,0001,095,000

15.0114”

4603

60I2

0

NOTE1—

BOILERSSHALL

OPERATEON

JP—5

FUELOIL

DESIGNCONDITIONS

8LL.

VAT

_I

Cf)

SC-)

UuJ

C-)

(1)

LI:T0C-)-JED

CD

SQ

..

ULU0I—-,j

“El:

0(/)

-J

‘El:>0F—(I)

-J>zDLOCAITON

-SUMMER

YI1NIER

AREASTO

BEO

UTSID

E90100/811518

681D8/571W

0

HEATED&

COOLEDINSIDE

751,50%R

H.,

MAX.

6SF,

AREASTO

BCO

UTSID

E-

68100/571W0

HEAVEDONLY

INSIDE—

551.

SHER

LOC

K,

SMITh

&A

DA

MS,

INC.

M1H

IItCT

S—

D4G

1NEER

S41O

dcR

YALASA)4A

US.

NA

VA

LST

AT

iON

RO

OSE

VE

LT

RO

AS

S.

P.R

.

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

SCH

EDU

LES

P,4

0E

00.

HO

SP

EC

flC0000

HO

.H

AV

FAC

0000.

HO

.V

40xxxxx

XX

XX

XX

XX

XX

xxxxx

M8-

pw

n0

Page 8: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

C

C

L.

0’C

-.

- (_) C-)-

C C Z

r

>>

.

C-, -

p71

C

C

C

C

0

C)

C

2

:CC

In

10’C

>

C

C

(,0

NU,0

U,0

to

..0

CC

0)C

03P1

:CC

P1

CC0C

>2:C

C-)

0

0)

U,00

s-fl

0

to-)C

C

0)C

C

C)

C>

CC

(-4

0

0

(-4

0’

C3

C2

-C

0)

0

(—4

CC

C

C

;$

C

0’0

C

5-) =

03

Cp

U, U, U,

C C C 0C C C C

c_/, u, (ID (41

(_) C) C) C-)2: 2: 2: 2:

(-4 (,) (.-4

01 0) 0) C!

0 C C C!

PP9P:(-4 (-4 (_,4 r,) I

U,

:

C0 0

C C

0) 0)0 C

C C;oIn P1C) C)

C0

C

0’C

C:oP1C-)

(41

C

C)

C-)2

:Oo:

—>:-)C

‘1 CC P1 CP9 ‘1

:C

2:

<C

(41

-C2:

C)<

C

03

Cp

C

C

0)

U)

C)2:

C—

C

C

Cp

C

C

0)

U,

C-)2:

C—

CC

0

0)C

CCP1C)

C)

(10)

-n

C

-

C’)

m

-a

C’)

C-

ID(ii

CC!C

0) —J--C

C CCC

0) 0) 0) 0) 0) 0):i: 2: 2: 2: 2:C C C C C C

I I I I I IC_) (--4 (-4 (-4 C-) C,)

0) 0) 03 0 03 03

((

C-) C

pCpqU, ( (- U,

C —4 ‘-3 CC U, U, 0

— -C--

:P1

(0 C

pJp_, r,,CC C

0)0) 0)CC C

030 03

C

0)C

0)

CCC

CC)0)-CCC

E:

C

22:

C)‘4

0)CI

-Hol:t-.

C CC -

I4,);

p —er

C C2: C:Cd

C C

(--4 C

a’

p :0)C

C

0 C2:

C

C)

CC

* ‘-4 —

C 23C < C

Ut C P1

-2:2: InCC 0)0) =1

z )C)

C)C-) CC

C_I C)C CC C

0) 0)C C

C C

-C -CC CC CCCP1 In

C Z3- C

—i>

U)

C)

CC

C

CU)C

-CC

CC

I-)2:0)CC)

C

C-,03

C-,C

CMa

CM C,.C 03

C C)

CMC

C..a

0)

CM CM CM CM CM CMCM CM CMICM CM

_

0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) >>

. > +C>

NJ (-a (-a t%M r,j r,M (-4 (-3p-)CMCMCMC-Jr,jaCM

— — —— — —(-(C

— Ct,)— ——

—Inn

-. to C C-) CM U, C-) U, 0) F’,) C (.4 U, U, (%J C) CM U, C%) C)

C_)

0) t,J —4 -a CD Cfl -,. . CM -. . — —. >

1’C--”p’r-’°p’:-N °‘(:-4C,,C C)4C)CC (M4

Ca - to a to 0 0 0) ‘ (0 U, 0) C,) - 0 C CM CD C) C

-----

----- --- —- -a2 —1

C•obobbbob coàà bOCCO obo r0 Ffl

--.--

--,--

-C

C 0 0 0 0 -P. 0 0 CM C ‘ 0 0 0 0 C 0 0 0 0 01 (fl I

---“-

—- I

I IC>

C 0 0 0 0 C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -

.

;

00000000C C 0 C00000I0000

---“-----

---- - ----

-- —-

P-’In- C)$41C)C)r0’jU)InPlP>

.____::.

_:°

— — CM —— — CM CM CM CM

C

----;

-

-----

2p

(--4 (- CM -C (0 CM (0 (0 (0 CM U) 0) CC C

0)0)0) 0)0) -C (-1

0)> >0)0)0)> 0)>>> >0)0)0)0) >0)>

3,

—— —

--

0)C(C,4to,

! S S S S • S S S S S S S

*

)CPC

c_fl (4( tfl U,0, U) (-41 CC CC U, (p CC>

r_M U,C.. U, U, U, U, U,

CCCCC

ppppppp ppp9pC

. - . - - . - - 41. , - a

C 0 0 0 0 0 0 0 0 C C 0 C CC C

C

-n)::

‘-4 —4 —4 —1 -4 ‘—4 —4 —4 —4 ‘—4 —4 2:

I I I I I I I I I I I I I I

C

2:‘4-I,

U,-

C

0

—4

-

0’

01C

,0

-4

C”CM

p-C

(0

U)C

: totP0CM. FCIJTC 0ECThNG Oaua(b

NAW PUBLIC WORKS CENTER, JACKSONVILLE, FL

ROOSE\/ELT ROADS. P.R.

0

CM

-C -CC0)

2)

-C

CP1

(-1

(,1

C

:0

U)0)

2:(-1

U)

C

0

U)0)

C

U)

C

0

(1

2:

U)

C

-P -P

0)

C”)C’)

C3,2:4,4

u_S. NAVAL STATION

SCHEDULES

Page 9: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

DU

CT

CO

NST

RU

CT

ION

&L

EA

RJE

ST

SCH

ED

UL

E

SU

PP

LY

AIR

DIFFU

SER

SCH

ED

UL

E

DESCRIP11ONSIZE

THROWMIN.

REMARKS

CR4*

INLETSIZE

100SO

CLG01FF

6x

64—

WAY

60

225SO

CLG01FF

9x

94—

WAY

8”O

400SO

CLG01FF

12x

124—

WAY

1O0

630SQ

CLGD

IE15

x15

4—W

AY12”0

*DIFFUSERS

SHALLBE

4—W

AYTHROW

UNLESSOTHERW

iSESHOW

N

ONTHE

PLANS.DIFFUSERS

MOUNTED

INACOUSTiCAL

TIECEILINGS

SHALLBE

DESIGNEDTO

FITINTO

A24x24

-rBAR

SYSTEM.

SEE

REFLECTEDCLG.

PLANSFOR

LOCATiONSAND

CEILINGTYPE

PU

MP

SCH

ED

UL

E

MAXMIN.

MIN.POW

ER

MARKSERViCE

RC.P.U.

HEADM

OTOR—

TYPELOCATiON

REMARKS

FT.H20

SIZEH.P.

VOLTSPH.

CY.

4WP—

iHOT

WAFER

WIG.

1760380

607½

46060

BASEM

IDBOILER

RU.SUB

BSMT.

UWP—

2HOT

WATER

WIG.

.1,760

38060’

7½460

60BASE

MiD

BOILERRU.

SUBBSM

T.

4CP—i

BOILER—i

1,760130

281½

46060

BASEM

IDBOILER

ROOMSUB

BSUT.STANDBY

4CP-2

BOILER—2

1,760130

28’1½

46060

BASEM

IDBOILER

ROOMSUB

BSMT.

DLP—i

CWPRIM

.LOOP

1,760540

54’10

46060

BASEM

IDM

ECHRU.

U11LITi’BLDG.

ELP—2

CWPRIM

.LOOP

1,760540

54’10

460..

BASEM

IDM

ECHRU.

UTiLITYBLDG.

:LP—3

CWPRIM

.LOOP

760540

54’10

461360

BASEM

IDM

ECHRU.

UTILITYBLDG.

STANDBY

CZP—1

CWSECONDARY

LOOP1,760

54045’

10460

60BASE

MID

MECH

RU.UTILITY

BLDG.VARIABLE

SPEED

GE

NE

RA

TO

RFU

EL

OIL

DA

YT

AN

KS

YS

TE

MS

RUPTUREREVERSING

PUMP

TANKTANK

BASINMARK

VOLUMEM

ATERIALCAPACITY

MINCAPACITY

I PUMP

HEADELECTRICAL

REMARKS

ULAPPROVED

W/

OVERFLOWALARM

,LOW

FUEL

07-I275

12150

18012

1/3120

1 I60

ALARM&

RUPTUREBASIN

WARNING

(GALLONS)(GAUGE)

(7TANKS)

(OPH)(PSI.)

H.PVOLTS

IPH.

jCY.

ULAPPROVED

W/

OVERFLOWALARM

,LOW

FUEL

DI-2

27512

150180

121/3

1201

60ALARM

&R

UPR

IEBASIN

WARNING

U.S.

NA

VA

LSTA

TiON

RO

OSEV

ELTR

OA

DS.

P.R

.

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

SCH

EDU

LES

RE

TU

RN

AN

DE

XH

AU

ST

GR

ILL

ES

CH

ED

UL

E

V=

RETURN

AIRGRILLE

E=

EXH

AU

STAIR

GRILLE

10x

8230

340

400

IDx

4

12x

12x

818

x6

20x

6

4x

1)111,11111

111111.1

A,’,

DUCTLEAK

CLASS

‘A’

II,4

)II’I’IY

IIUIH

,III’I’IA

XIII

ISU

PPLYDUCT

SUPPLY

DUCTRET1JITN

EUHAUSOUTSIDE

REMA

RWI

I AIIMAlIII

IllI IIII4A

IIIIM

IIIAI111111

4lO

UFINAL

FILTERFROM

TERMINAL

UNITAIR

AIRCLA

SSP

RE

S’R

ERECTA

NG

ULA

RROUND

III4U

IIIA11011

IIII 11141

III1111

TOROOM

INLETTO

ROOMINLET

DUCTDUCT

DUCT

AIIUI

i’

2

A8”

63

O

Al III2

II12

A8’

63

16x

MA

CF

MSIZE

**

EQUIVALENTSlIPS

*

606x6

906x6

8x4

1308x6

I2x4

170D

6

1908x8

I2x6x6

1010108

‘150l2

xT

2I6xT

DlB

xB

53014

x12

18x

10

59014

x14

24x

B

670I6

xT

418x12

800lO

x16

24x10

90018x16

24x12

04018

x18

24x

1430

x12

12202D

xIS

26x14

139022

2026

x16

30x

14

1S5024

x2D

30R

1636

x14

**

I—

1)0141141

01)1114

UIII;I

I AIIMTIIF

¶,IIPPI4

FAND

ISCHA

RGE

TOTHE

TERMINAL

UNITINLET

HilL

BEDUCT

LLAKTESTED

FILTERSCHEDULE

IIITill

—M

INIMUM

FILTERFILTER

MAX.

CARTRIDGEFILTER

RECOM

MEN

DED

FILlER

LOJIIMLNI

LOCAIIUNC

f.M.

EFFICIENCYP

DIN.

W.C

SIZENUM

BERRN

0DIN

GCHANGE

OUTREM

ARKS

SiI1VED

*-*

*HxW

xDARRANGEM

ENTP.O

.IN.

1420

FF

.3A/A

A247,A

24XA

202220

907.300

0.424x12x12

IIZl

1.0

11—3K

/IlA

)46A

2O2

220907

3000.4

24x12x12I

‘‘1.0

FF

-3A/C

A236

——

A2O

2430

90%300

0.424x12x12

11.0

FF..3A/I)

A231,A

234—

1480gp

3000.4

24x12xl2/

24x24x12I

/I

.0

FF—3A

/EA

250—

A25I

1720907

30004

24x12x12/

24x24x121/

I10

FF—3A

/GA

253A254

A254

37090%

3000.4

24x12x12I

‘‘‘1.0

FF—3A

/H0218,0219,0221

0205530

90%300

0.424x12x12

I—

1.0

rF.-3A

/K0229,D

2280221

540907.

3000.4

24x12x121

1.0

FF—3A

/L13230

02216130

907.300

0.424x12x12

I1.0

FF—3A/M

02140206

12090%

3000.4

24x12x121

1.0

FF—3A/Q

C224C233

184090%

3100.4

24x12x12/

24x24x121/

I—

1.0

11—30/A

C233C239

166090%

3000.4

24x12xi2/

24x24x121/

11.0

FF—38/8

D216D21T

153090%

3000.4

24x12x12/

24x24x121

/I

1.0

FF—3B/13

C233C201

153090%

3000.4

24xi2x12/

24x24x12I

/I

i.D

FF—3B/E

C203A,C222,C223

C2D3A2310

90%J0O

0.424x24x12

2—

1.0

11—30/14

C208C2O3

195099.97%

3000.4

24x24x122

1.0

FF—1A

0227D

202ISO

90%300

0.424x12x12

I2)

1.0

PF—3A

AHU—3A

PENT.1

2.17025%

3000.15

——

0.3

PF—36

AHU—38

PENT.2

0,36025%

3000.15

——

10.3

IF—3D

AHIj—3B

PENT.2

10,36090%

4000.45

——

.0N

OTES

*SELECI

EQUIVALENTSIZES

ONLYIF

REQUIREDBY

DUCTWORK

LIMITATIONS.

**

LARGERCAPACITIES

SHALLUSE

MU

LTIPLEG

RILLES.

**

*CONTRACTOR

MAYSUDSTTTTJTE

ROUND

NECKOF

EOLIIV1LENTSIZES

—MAX

STATICPRESSURE

DROPFOR

RETTJRN

&EXHAUST

GRILLES&

REOSTERSSHALL

BE

.10IN

OLE

*ABOVE

CEILINGSOR

INM

ECHANICALPEN

THO

USES

NOTES:

**

FILTEREFFICIENCY

BASEDON

ASHRAE52—

76TEST

STANDARDNO.

OFFILTERS

OFSIZE

&Q

UA

NTITY

TOM

OUNTIN

FILTER/MIXING

BOXOF

AHIJTO

BEFURNISHED.

(DBOTTIOM

ACCESSFILTER

&HOUSING

—MAX

STATICPRESSURE

DROPFOR

SUPPLY

AIRDIFFUSERS

SHALLBE

.10IN.

W.C.

J

a(IT00aI——

‘<

(IT00(/3a-

0

>

z0I—(1)

<L

jJI-J>=1wD

SHE

RL

OC

K,

SMITH

&A

DA

MS,

INC.

AR

EHI1EC

JS-

ENG

INEERS

I1E

41E

RY

.L

AM

IA

coH

nO

HIT

h.

NO

xxxxx

OA

NE

NO

.

NO

.N

HV

FAC

CO

NG

.N

O.

IFC

O.

xxxxxx

xxxxx5ttT

777

M8-

Pwc

A

Page 10: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

II

II

II

II

(J(I

°[.1

(i

L3.-,————I

SU

PP

LY

FP

J

LI

rUS

c0R

L0A

05

AU

TOD

DC

CO

NTA

CT

AIRHANDLING

UNITFAN

MOTOR

WIRING

DIAGRAM

CiR

CU

ITIB

REA

XER

L3-

ITLRM

INALU

!NII

_____

DCP

ITO

OT

HE

RTER

MIN

AL

IJNTc

AN

DA

FTE

RF

LiE

RS

I

TOO

TH

ER

TERM

INA

LU

NIT

S

CO

NTR

OL

FUN

CTIO

N

TERMINAL

UNIT(TY

PICAL)

POIN

TPO

INT

MU

NB

ERD

ESC

RIPT

iON

TY

PE

[ICRDIGITAL

CONTROLPANEL

DOCDIRECT

DIGITALCONTROL

VAVVARIABLE

AIRVOLUM

E

CVCONSTANT

AIRVOLUM

E

CVTRCONSTANT

VOLUME

TERMINAL

REHEAT

SDSM

OKEDETECTOR

OA.

OUTDOORAIR

DADOUTSIDE

AIRDAM

PER

R.A.RETURN

AIR

RAORETURN

AIRDAM

PER

N.ONORM

ALLYOPEN

NC

.NORM

ALLYCLOSED

CCOM

MON

CWS

CHILLERW

ATERSUPPLY

CARCHILLED

WATER

RETURN

HA

SHOT

WATER

SUPPLY

HTMlHOT

WATER

RETURN

TEMPERATURE

SENSOR

HHUM

IDITYSENSOR

DIBINARY

INPUT

DOBINARY

OUTPUT

AlANALOG

INPUT

AOANALOG

OUTPUT

PDIFFERENTIAL

PRESSURE

SENSOR

GEN

ERAL:

(A)

WHEN

PLACED

INO

PERATIO

NTHE

CON

TROL

SYSTEM

SSHALL

BEEN

ERGIZED

THRUH

AN

D—

OFF—

AU

TOSW

ITCHES

(WH

ENIN

AUTOPO

SITION

),D

AM

PERSSH

ALL

OPEN

TOTHEIR

RESPECTIVE

POSITIO

NS

AN

DA

FTERA

VARIABLETIM

EDELAY

THEAIR

HANDLINGUNIT

FAN

/SAND

THEIRIN

TERLOCK

EDFA

NS

SHALLSTART.

THESY

STEMMAY

ALSO

BEEN

ERGIZED

FROM

THE

TERMIN

AL

UNITTH

ERMO

STATS

(SEETERM

INA

LUNIT

CO

NTR

OL).

(B)

WH

ENEV

ERAIR

HANDLINGU

NIT/S

ARE

STOPPED

CON

TROL

SYSTEM

SHALLBE

DE—

ENERG

IZEDAND

DA

MPERS

SHA

LLCLO

SE,AIR

HANDUNGU

NIT/S

ANDINTERLOCKED

FANSSI-LALL

STOP.

(C)ANY

DUCTSM

OKEDETECTOR

SENSIN

GSM

OKESHALL

SIGNALTHE

FIREALARM

CONTROLPANEL.

ANDALSO

SEND

ASIGNAL

TOTHE

RESPECTIVE

AiRHANDLING

UNIT.W

HENSIGNAL

ISRECEIVED

BYTHE

AIRHANDLING

UNIT,THE

UNITSHALL

STOP

AND

INTERLOCKEDFANS

SHALLSTO

PU

NLESS

OTHERWISE

INDICATED.THE

SYSTEMMAY

ONLYBE

RESTARTEDDY

THEFIRE

DEPARTMENT

OROTHER

QUALIREDPERSO

NN

ELFROM

THEFIRE

ALARMCO

NTRO

LPANEL.

WHEN

ANALL

CLEARSIGNAL

ISRECEIVED

ALL

DETECTORS,CrC.

SHALLBE

AUTOMATICALLY

RESETAND

DAMPERS

SHALLO

PENTO

THEIRRESPECTIV

EPO

SITION

S.AFTER

AVARIABLE

TIME

DELAYAIR

HANDLINGUNIT

FAN

/SA

ND

INTERLOCKEDFANS

SHALLSTART.

COORDINATETHE

WORK

FURN

ISHED

AND

INSTALLEDUNDER

THEELECTRICAL

SECTIONOF

THESPECIFICATIONS

WITH

WORK

FURNISHEDAND

INSTALLEDUNDER

THE

MECHANICAL

SECTIONOF

THESPECIFiCA

TION

S

AHU—3A

WHEN

THE

SYSTEMIS

INOPERATION

ASH

ERE—IN

--BEFORE

INDICATEDTHE

FOLLOWING

SEQU

ENCE

SHALLO

CCUR.

THEAIR

HANDLINGUNIT

SHALLOPERATE

CONTINUOUSLYSU

BJECTTO

THEHAND—

OFF—AUTO

SWITCHES.

THEAIR

HANDLINGUNIT

FANSHALL

OPERATETHROUGH

FIREALARM

SYSTEMCONTACTS.

THECHILLED

WATER

CONTROLVALVE

V—i

SHALLBE

MODULATED

BYA

DISCHARGEAIR

SENSO

R/CON

TROLLER

TOM

AINTAINTHE

SETPO

INT.

ARETURN

AIRHUM

IDITYSEN

SOR

SETAT

50%R.H

.

(AD

JUSTA

BLE)SH

ALL

OV

ERRIDE

THE

DISCH

ARG

EAIR

TEMPERATURE

SENSO

RAND

SHALLM

ODULATETHE

CHILLEDW

ATERCONTROL

VALVEV—

iTO

MAINTAIN

SETPOINT

HUMIDITY.

DIFFERENTIALPR

ESSUR

ESEN

SORS

SHALLM

ONITORTHE

PRESSURE

DRO

P

ACRO

SSALL

FILTERSW

HENPRESSU

REDROP

RISESABOVE

SETPOINT

(1.0IN.

W.G.

ADJUSTABLE.FOR

8DB

&90%

FILTERS&

.50IN.

W.G

ADJUSTABLE.FO

R25%

FILTERS)ALARM

SHA

LLO

CCUR

ANDRED

PILOTLIGHT

LABELED

FILTERN

o.—

DIRTY,

ROOM“

SHALLBE

ENERGIZED.PILOT

LIGHTSSHALL

BELOCATED

NEXTTO

AHUD

CP.EACH

FILTERSHALL

HAVEITS

OWN

PILOTLIGHT

ANDIDEN1TFYING

MARK

ONLABEL.

AHU—.3B

AHU—3B

ISSIM

ILAREXCEPT

CHILLEDW

ATERCONTROL

VALVESHALL

GEV—

2.

TERMINAL

UNITCO

NTRO

L:

GEN

ERAL

THETERM

INALUNIT

CONTROLSSHALL

BEFACTORY

INSTALLEDA

ND

SHALLBE

COMPATIBLE

WITH

THEDDC

SYSTEMFU

RNISH

ED.

ALLTERM

INALUNITS

SERVED

BYONE

AIRHANDUNG

UNITSHALL

GECO

NN

ECTEDBACK

TOTHE

AIRHANDLING

UNITD

CP.TH

E

UNITSHALL

BECAPABLE

OFM

AINTAININGTHE

AIRFLOW

SAS

INDICATEDON

THETERM

INALUNIT

SCHED

ULE.

ALLTERM

INALUNITS

SHALLBE

INTERFACEDW

ITHTHE

DDCCONTROL

SYSTEMCENTRAL

PROCESSO

RSO

THATSPA

CETEM

PERATURESM

AYBE

READAND

RESETFROM

THECENTRAL

UNITPRO

CESSOR.

EACHTERM

INALUNIT

THERMOSTAT

SHALLHAVE

THE

CAPABILITYTO

STARTTH

EENTIRE

DDCCO

NTRO

LSY

STEM.

______________________________________________________

CAV(CO

NSTA

NT

AIRV

OLU

ME)

W/

REHEAT

ASPA

CETEM

PERATURESEN

SOR

SHALLM

ODULATETHE

REHEATCOIL

CONTROLVALVE

FROMTHE

MAXIM

UMTO

THEM

INIMUM

HOTW

ATERFLOW

TOM

AINTAINSET

POINT.

EXH

AU

STFA

NS

EXHAUSTFANS

SHALLBE

INTERLOCKEDTO

OPERATEONLY

WHEN

THEAIR

HANDLINGSYSTEM

ITSERV

ESIS

OPERATING.ANT’

INTERLOCKEDDAM

PERSSHALL

OPEN

WHEN

FAN

STARTSAND

CLOSE

WHEN

FANSTO

PS.

I—

L(i)—

IO

A>

I.

AHUD

CPI

‘,IIRI

ltIIN

J.

[IIiTO

FINE

ALA

RM

PAN

EL

III’[.A

iMIII

I

1111%111111

IT)I

IRE

ALA

RM

PAN

EL

AHU—3A

CON

TROL

DIAGRAMA

HU

—3B

SIMILAR

-907.FILTER

SLEPLANS

FORQUANTITY

ANDLOCATION

CON1R

.LEGEND

IHTMl

IHAS

L-

ROOMTEM

PERATURESEN

SOR/CO

NTROLLER

CO

NT

RO

LFU

NC

TIO

N

AIRHANDLING

UNIT(TY

PICAL)

POIN

TPO

INT

MU

NB

ER

DE

SCR

IPTIO

NT

YPE

IO

UT

SIDE

AIR

DA

MPE

RS

AD

2FILTER

STA

TU

S(D

IFFER

EN

TIA

LP

RE

SS

UR

E)

Al

3A

VER

AG

EM

IXED

AIR

TEMPER

ATU

RE

Al

4C

OO

LING

COIL

VA

LVE

AO

5SU

PPLY

FAN

STA

RT

/STO

PB

O

6SU

PPLY

FAN

CU

RR

ENT

Al

7SU

PPLY

DU

CT

SMO

KE

IND

ICA

TION

DI

8A

VER

AG

ESU

PPLY

AIR

TEMPER

ATU

RE

Al

9R

ETUR

NFA

NST

AR

T/ST

OP

BO

10R

ETUR

NFA

NC

UR

REN

TAl

11R

ETUR

NA

IRTEM

PERA

TUR

EAl

12R

ETUR

NA

IRH

UM

IDITY

Al

13R

ETUR

ND

UC

TSM

OK

EIN

DIC

ATIO

NRI

TERMINAL

UNITCO

NTRO

LDIAGRAM

CIR

CU

ITIR

REA

KER

2 IH

EA

TIN

Gro

IlV

AI

yE

SEQU

ENCE

OF

CON

TROL:

AOAl

(0)ALL

CONTROLVALVES

SI-tALLBE

TWO

(2)W

AYUNLESS

OTHERWISE

INDICATED.

RE

TU

RN

FAN

UTO

AU

TOC

ON

TAC

T

RETURNAIR

FANM

OTORW

IRINGDIAGRAM

0..

VTCU0IoU

)IoI-

J>4:

z01—U)

-J>zvi

(I,

CI—2CC

SHER

LOC

K.

SMITH

&A

DA

MS,

INC.

AR

c1FTtC

TS

—EN

G#4EER

SU

41O

flT

U.S

.N

AV

AL

STA

UO

NR

OO

SEV

EL

TR

OA

DS

.P

.R.

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

CON

TROLS

CO

HS

IRCO

NT’4

HO

.

xxxxx

RA

WH

O.

•SPC

CST

CA

I1OH

40.I

AH

WA

CO

RO

G.

‘4°TF

HO

.xxxx

Ixxxxx

XX

XX

XSHEET

M9-

wr

A

Page 11: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

SEQU

ENCE

OF(.X

)NU

-<U

L

LULLED

WATER

PUM

PCLP—

1AND

CHILLERCH—

1(‘CLP—

2&

CH—

2SIM

ILAR)

lIFCO

NTRO

LSY

STEMSHALL

BEEN

ERGIZED

THO

UG

F1A

FA

ND

-OF

AU

TOSV

TTCHI O

CATEE)

ONTHE

CON

TROL

PAN

ELSLJB

JECI

fO

USC

CON

TROL

VbL

NTUE

CO

NO

UL

SYSfEM

ISEN

ERG

ZEOCLP—

1ShA

LLSTA

REAND

WHEN

WA

lERFLO

W5

PRO

V[N

THRO

UG

HA

FLOW5W

1rI

LOCA

TEDON

THECH

TLEOW

ATERD

ISCHA

RGE

FROMTHE

CHILLER,

THLCH

ILLERCO

NTRO

LCIRCU

ITSH

ALL

BE

ENERG

IZELAND

EHECHILLER

SHALLO

PERATE

THRO

UG

HITS

OWN

SAFETY

ANDO

PERATIN

GM

ICR

OPR

OC

ESSOR

CON

TROL

SYSTEM

TO

MAINTAIN

DI’PLlA

RGE

WATER

TEMPERA

rURE

SETPO

INT

THECH

ILLERM

ICR

OPR

OC

ESSOR

CO

NtR

OLS

SHALLBE

COM

PATIBLE

TH

THE

DOCSY

STEMFU

RNISH

EDAND

SHALLBE

CAPA

BLEOF

SEND

ING

ANDR

EC

EIN

CD

ATA

SECON

DA

RYVARIABLE

VOLUME

CHILLEDW

ATERPU

MPS

CZP—1,

EX.CW

—2

ANDEX

.CWP—

STAN

DBY

:

PUM

PSCX

CAT—

2AND

TXC

V,—

STAN

DB

YA

REEX

ISTING

CON

STAN

TV

OLU

ME

PUM

PSTH

AT

SHA

LLBE

PROV

iDED

VT

HA

NEW

CON

TACT

INITS

EXISTIN

GSTA

RTERW

HICHSH

ALL

BEEN

ERGIZED

BYTHE

DD

CSY

STEMA

SH

ERE--IN

--AFTER

NO

TEDPU

MP

CZ

P-l

5A

NEW‘IA

RA

BLE

VOLUME

PUM

PPU

MP

CXC

WP--2

SHA

LLO

PERATE

WH

ENEV

ERBO

THCH

ILLERSA

REIN

OPER

ATIO

N.

A

DIFFEREN

TIAL

PRESSU

RE

SENSO

R/C

ON

TRO

LLERSH

ALL

SIGN

AL

THEV

ARIA

BLEFREQ

UEN

CYD

RIVE

WHICH

SHA

LLV

ARY

PUM

PC

ZP

-I

SPEEDIN

RELATIO

NTO

THECO

NTRO

LLERSIG

NA

LW

HENTHE

PUM

PH

AS

REDU

CEDITS

SPEEDTO

0OR

WHEN

ON

ECH

ILLERH

AS

BEENSH

UTD

OW

NBY

TILEDDC

SYSTEM

THENEX

CWP—

2SH

ALL

BESTO

PPEDAND

PUM

PCZP—

ISH

ALL

STAR

TA

ND

OPER

ATE

AS

PREVIO

USLY

DESCRIBED

.PU

MP

TXCW

P—STA

ND

BYIS

TOBE

USED

WH

ENEV

ERCZP—

ID

REX

.CWP—

2IS

DO

WN

.

HO

TW

ATERPU

MP

HW

P—l,

HW

C—l,

BOILER

B—i,

HW

C—2,

BOILER

B—2

ANDH

WP—

2

THECO

NTRO

LSY

STEMSHALL

BEEN

ERGIZED

THRO

UG

HH

AN

D—

OFF—

AU

TOSW

ITCHES

LOCA

TEDON

THECO

NTRO

LPA

NEL

SUB

JECT

TO

DDCCO

NTRO

L.PIT-lEN

THECO

NTRO

LSY

STEMIS

ENERG

IZEDBO

ILERLO

OP

PUM

PH

CP—1

SHA

LLSTA

RT

ANDW

I-LENW

ATER

FLOW

ISPRO

VEN

THRO

UG

HA

FLOWSW

ITCHLO

CATED

ONBO

ILERB—

IPLATER

DISCH

ARG

E.TH

ENTHE

BOILER

CON

TROL

CIRCUIT

SHA

LLBE

ENERG

IZEDAND

THEBO

ILERSH

ALL

OPERA

TETH

ROU

GH

ITSOW

NSA

FETYAND

OPERA

TING

CON

TROLS

TOM

AIN

TAIN

DISC

HA

RG

EW

ATER

TEMPERA

T1JRESET

POIN

TH

CP—2

ANDBO

ILERB—

2SHALL

BETHE

SAM

EA

SIN

DICA

TEDFO

RH

CP—I

ANDB—

iA

TEMPER

ATU

RE

SENSO

RLO

CATED

ON

THEM

IXEDH

OT

WATER

RETURN

TOBO

ILERSB—

IAND

8—2

SHA

LLA

LLOW

THED

DC

SYSTEM

TOSEQ

UEN

CE

THE

PUM

PAND

BOILER

OPERA

TION

INR

ESPON

SETO

THEBU

ILDIN

GLO

AD

.THE

DD

CSY

STEMSH

ALL

START

HI/VP—i

WHEN

THEBO

ILERW

ATER

TEMPERA

TURE

IS

REACH

EDIIW

P—2

SHA

LLO

PERATE

INA

STAN

DBY

MODE

TOH

WP—

i.THE

BOILER

CON

TROL

SHA

LLBE

COM

PATIBLE

WiTH

THEDDC

SYSTEM

FURN

ISHED

ANDSHALL

SECA

PABLE

OFSEN

DIN

GAND

RECEIVIN

GD

ATA

.

FUEL

OILTRA

NSFER

PUM

PSFTP—

iAND

FTP—2

(FTP—3

ANDFTP—

4SIM

ILAR)

FTP—i

ANDFTP—

2SH

ALL

BESTA

RTEDBY

THEDDC

SYSTEM

AS

FOLLO

WS:

THE

LEAD

PUM

PSH

ALL

STAR

TA

ND

OPER

ATE

TOPRO

VID

E

FUEL

OILSU

PPLYIF

THESY

STEMPR

ESSUR

ED

RO

PSTO

APO

INT

30%BELO

WTHE

DESIG

NPR

ESSUR

ETH

ENTH

ELA

GPU

MP

SHA

LL

START

ANDO

PERA

TE.THE

DDESY

STEMSH

ALL

START

ANDM

ON

ITOR

THEPU

MP

OPERA

TION

ANDSH

ALL

ALTERN

ATE

LEAD

/LAG

PUM

P

SEQU

ENC

E.

GEN

ERATO

RFU

ELOIL

DAYTANK

DT—1

ANDD

T—2

THEDDC

SYSTEM

SHA

LLM

ONITORTHE

DAYTANK

REVERSE

PUM

PO

N—

OFF

OPERA

TION

.HIGH

LEVEL

ANDLOW

LEVEL

DA

YTANK

OILLEV

ELSSH

ALL

BEALARM

EDTO

THEDOC

SYSTEM

AS

WELL

AS

FUEL

OILIN

RU

PTUR

EV

ESSELW

ARN

ING

ALA

RM.

BOILER

B—3

ANDCRU—

i(BO

ILERB—

4AND

CRUSIM

ILAR)

THEBO

ILERSH

ALL

OPERA

TETH

ROU

GH

ITSOW

NSA

FETYAND

OPERA

TiNG

CON

TROLS

TOM

AIN

TAIN

THED

ESIGN

STEAM

PRESSU

RE

THEBO

ILERCO

NTRO

LSSH

ALL

OPERA

TEC

R0—

iA

SREQ

UIRED

FOR

FEEDW

ATER,

THE

DD

ESY

STEMSH

ALL

MO

NITO

R

THEBO

ILERCO

NTRO

LPA

NEL,

STEAM

PRESSU

RE.

ANDCPU

—i

OPERA

TiON

TOPRO

VID

EALL

ALA

RMS

THEBO

ILERC

ON

TRO

LS

SHA

LLBE

COM

PATIBLE

WITH

THEDDC

SYSTEM

FURN

ISHED

ANDSH

ALL

BEC

APA

BLE

OFSEN

DIN

GAND

RECEIVIN

GD

ATA

.

1111’

CI111.1

ERlO

OP

I ‘IJNIT’L

IP—1

TOCLP—

2AN

DCH

—2

1W

,—

(‘I)

It

ii11111111’

/I)NI

‘lIMO

C/I’

2(N(Id)

H1

l)

1.;I IIIII

IL/1./N

IPU

MP

C/I’

I

, ( {-

(CLP—2

&CH

—2

SIMILAR)

1’)

LOCA

TI:IN

33.0CR-

-

“B’

PENTH

OU

SE.)

CW

S

CO

NT

RO

LFU

NC

TIO

N

CHILLEDW

ATERPU

MP

CLP—1

ANDCHILLER

CH—1

CHILLEDW

ATERZO

NE

PUM

PSC

ZP—i,

CZP—2

ANDCZP—

3

CL

P—1

AN

DC

H—

1

POIN

TPO

INT

MU

NB

ER

DE

SCR

IPTIO

NTY

PE

CH

ILLEDW

ATER

FLOW

SWITC

H

2CH

ILLEDW

ATER

SUPPL

YTEM

PERA

TUR

E

6

L.H

ILL

±.UW

AIb

RN

I-.IU

NN

IMV

bK

AIU

R

CZ

P—1

CZ

P—

2A

ND

CZ

P—

3

POIN

TPO

INT

MU

NB

ERD

ESC

RIPT

ION

TYPE

6D

IFFER

EN

TIA

LP

RE

SS

UR

ESI

7C

ZP—

l:

SP

EE

DD

RIV

EAl

SC

ZP—

iI

IAL

PR

ES

SU

RE

CO

NT

RO

LL

ER

AO

9D

IFFER

EN

TIA

LP

RE

SS

UR

ESI

10C

ZP—

2S

TA

RT

/ST

OP

80

11D

IFFER

EN

TIA

LP

RE

SS

UR

EBI

12C

ZP—

3S

TA

RT

/ST

OP

(STA

ND

—B

Y)

so

CIRCUITI9REA

I<ER

LI

UT

Q

CON

TACT

PUM

PM

OTORW

IRINGDIAGRAM

HWC—

2AND

BOILERB—

2(SIM

ILAR)

HWC—

1AND

BOILERB—

iHOT

WATER

PUM

PHW

P—1

ANDH

WP—

2

-JLi

-J-J>z0(I)

C)

—3

CO

NT

RO

LFU

NC

TIO

N

HWC—

1AND

BOILER

B—i

AND

HO

TW

ATERPU

MP

HW

P—l

ANDH

WP—

2

POIN

TPO

INT

MU

NB

ER

DE

SCR

IPTiO

NTY

PE

1M

AIN

HO

TW

ATER

RE

TU

RN

TE

MPE

RA

TU

RE

Al

2B

OIL

ER

HO

TW

AT

ER

SU

PP

LY

TE

MPE

RA

TU

RE

Al

LiH

OP—

iS

TA

RT

/ST

OP

60

4D

IFFEREN

TIAL

PRE

SSUR

EBI

5FLO

WSW

ITCH

SO

6B

OILER

CO

NTR

OL

PAN

EL

Al

7H

WP—

1ST

AR

TST

OP

SO

SD

IFFEREN

TIAL

PRE

SSUR

ESI

9H

WP—

2ST

AR

TST

OP

SO

10D

IFFEREN

TiAL

PRE

SSUR

ESI

a-0IXI—0(/)

:i:>z0I—(1)

(I)

-J>z

C!)-J0Iz0()

LiIzL

iC-)

(I)

0C-)-J

CDEL.

SHERLO

CK.

SMITH

&ADAM

S,INC.

AIT

cHflE

CT

S-

ENG

INEER

SE

RR

ALM

AM

A

U.S.

NA

VA

LSTA

TiON

RO

OSEV

ELTR

OA

DS.

P.R.

RE

PA

IRS

TO

NA

VA

LH

OSPIT

AL

CO

NT

RO

LS10.

,IrcI-x

xxxx

XX

XX

XxX

xxx

XX

XX

Xs.w

99?

PI.AW

HO

.M9-

Pw

r.li

Page 12: NOT - pr...valve balancing cock-check ... rwc. primary loop (chiltlr plant) secondary loop (air hanoting unite) not to scale vbraticjn insulator / water proof elastic scaler _—-¼”0

INTERA

CTION

OFDDC

WITH

EMERG

ENCY

POW

ER

(XIII

II)IIIII’IIIIN

I

FUEL

OILTRA

NSFER

PUM

PSFTP—

iAND

FTP—2

(FFP—3

ANDFIP—

4SIM

ILAR)

FTP—1

AN

DFTP—

2SHALL

BESTA

RTEDBY

THEDDC

SYSTEMAS

FOLLO

WS.

THELEAD

PUM

PSH

ALL

START

ANDO

PERATE

10PROVTDE

FIJELOIL

SUPPLY

.IF

THESY

STEMPR

ESSUR

ED

RO

PSTO

APO

INT

30%BELOW

THED

ESIGN

PRESSU

RE

THEN

THELAG

PUM

PSHALL

START

ANDO

PERATE.

THEDOC

SYSTEMSHALL

STARTAND

MONITOR

THEPU

MP

OPERA

TION

ANDSH

ALL

ALTERN

ATE

LEAD

/LAG

PUM

P

SEQU

ENC

E.

GEN

ERATO

RFU

ELOIL

DAYTANK

DT—1

ANDDT—

2

THEDDC

SYSTEM

SHALLM

ONITORTHE

TATTANK

REVERSE

PUM

PO

N—

OFF

OPERA

TION

HIGHLEVEL

ANDLOW

LEVEL

DAYTANK

OILLEV

ELSSH

ALL

BEALARM

EDTO

THEX

CSY

STEMAS

WELL

ASFU

ELOIL

INRU

PTURE

VESSEL

WARNING

ALAPM

BOILER

B—3

ANDCRU—

1(BO

ILERB—

4AND

CRUSIM

ILAR)

THEBO

ILERSH

ALL

OPERA

TETH

ROU

GH

TSOW

NSA

FETYAND

OPERA

TING

CON

TROLS

TOM

AINTAINTHE

DESIG

NSTEAM

PRESSU

RE

THEBO

ILERCO

NTRO

LSSH

AL_

OPERA

TECRC—

ASREO

UIRED

FOR

FEEDW

ATERTHE

DOCSY

STEMSH

ALL

MONITOR

I—

THEBO

ILERCO

NTRO

LPA

NEL,

STEAI.4PR

ESSUR

E,AND

CRU—I

OPERA

TION

TOPRO

VID

EALL

ALA

RMS

THEBO

ILERCO

NTRO

LS

I——

SIGNALFROM

FIREALARM

CONTROLPANEL

SHA

LLBE

COM

PATIBLE

WITH

THEDOC

SSTE

MFU

RNISH

EDAND

SHALLBE

CAPA

BLEO

FSEN

DIN

GA

ND

RECEIVIN

GDATA.

NOTES.

ONLYTHE

SYSTEMS

SHOWN

SHALLBE

ADIRECT

DIGITALCONTROL

SYSTEM.

THEEXISTING

EQUIPMENT

SERVED

BYA

PNEUMATIC

SYSTEMW

HICHIS

TOREM

AIN.INCLUDES

CONTROLAIR

COMPRESSOR,

DRYER.PIPING

TERMINAL

BOXESAND

PNEUMADC

THERMOSTATS

AIRHANDLING

UNITSETC.

THEDIAL—

UPM

ODEMSHALL

BECAPABLE

OFCOM

MUNICATION

‘MEl-ITHE

BASEPUBLIC

WORKS

DEPARTMENT.

0CO00I—0(1

3O

c3-J

>0F-

(I-)

z

cr-J

>

1)11V

I

(iNIIIA

I

TIIICIN

OR(Xl 1111111111

iNMIIIII U

MEJN

IIN

NMNIl

IIA

IA

HU

-j]A

HU

-3AA

HU

-3A

LFTTLDCP

IDCP

DCP

ITERM

INALTERM

INAL

IUNIT

UNIT

ICONTROLLERS

CONTROLLERS

CHILLERDCP

CLP-1

EN—I

CLP-2

CH—2

STAN

DBY

GEN

ERATO

RSY

STEM:

ER

_PUM

PSI

I BOILERI

EQUIPI

DCPj

IDCP

IL

ei

CZP—l

HCP—I

FTP—I

CZP—2

B—I

FTP—2

CZP-.3

NCR—?

FTP—i

B—2

FTP—H

HAP—I

OX—I

HWP—

2DT—

2B—

3CR

U—I

B—H

CRU—2

SPECIAL

SEQU

ENCE

OFEV

ENTS

FORTHE

BETW

HENTHE

HO

S°ITAL’S

MAIN

NORMAL

ElECTRICAL

SYSTEM

ISLO

STAND

THEALTERNATE

EMERGENCY

GEN

ERATO

R

SY’.ITEMIS

ASFO

LLOW

S

WH

ENTH

EN

OR

MA

LPO

WER

ISIN

TE

RR

5D

DU

ETO0O

WE

RIN

TERR

UPTIO

NTH

ENC

HILLER

CH

—I

SHA

LLG

OTO

2/3

CA

PAC

ITYO

PERA

TION

BY

UTILIZIN

GTH

EC

HILLER

CA

PAC

ITYM

OD

JAT

IDN

CO

NTR

OLS.

CLP—

lA

ND

CZP—

lSH

ALL

OPER

ATE

TOPR

OV

TOE

PAR

TIAL

CO

OLIN

GC

APA

CITY

LIURIN

GTH

ISPO

WER

INTER

RU

PTION

WHEN

NO

RM

AL

ELECTR

ICA

LPO

WER

IST

EL

RN

ED

THEN

ALLSY

STEMS

SHA

LLG

DTO

NO

RM

AL

SEO

IJEN

CE

.

AL

AR

MP

OIN

TS

—FUEL

OILTANK

LOWLEVEL

L—

FINALFILTER

DIFFERENTiALPRESSU

RE

DDCSY

STEMS

ARCH

ITECTURE

JUi

AC1)

AC

)

T0

Ui

F—Ui

C)

U,

OS

0C)

-JED

AIiSH

ERLO

CK

.SM

ITH&

AD

AM

S,IN

C.

AR

cHl1E

C1

M41A

jER

Y,

AL

M4P

.

U.S.

NA

VA

LST

AnO

NR

OO

SAV

ELTR

OA

DS,

P.R

.

RE

PAIR

STO

NA

VA

LH

OSPIT

AL

CON

TROLS

HS

m.

CO

NT

O.

NO

.

xxxxx

Ixxxxx

I?

OF

??

M9-

PW

CA