Template #: 0000-20955-F01 R8 NuScale Nonproprietary Copyright © 2018 by NuScale Power LLC EQ Programs Engineer Patrick Conley NuScale’s Vision for EQ Collaboration, Innovation and Affordability October 31, 2018

NuScale’s Vision for EQ Collaboration, Innovation and

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Template #: 0000-20955-F01 R8NuScale NonproprietaryCopyright © 2018 by NuScale Power LLC

EQ Programs Engineer

Patrick Conley

NuScale’s Vision for EQ – Collaboration, Innovation and Affordability

October 31, 2018

2

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

Agenda

• NuScale Update (News, DCA, Schedule)

• NuScale EQ Program Technical Details

• NuScale Approach to EQ

• Supplier Opportunities

• Q&A

3

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

This material is based upon work supported by the Department of

Energy under Award Number DE-NE0000633.

This report was prepared as an account of work sponsored by an

agency of the United States (U.S.) Government. Neither the U.S.

Government nor any agency thereof, nor any of their employees,

makes any warranty, express or implied, or assumes any legal liability

or responsibility for the accuracy, completeness, or usefulness of any

information, apparatus, product, or process disclosed, or represents

that its use would not infringe privately owned rights. Reference herein

to any specific commercial product, process, or service by trade name,

trademark, manufacturer, or otherwise does not necessarily constitute

or imply its endorsement, recommendation, or favoring by the U.S.

Government or any agency thereof. The views and opinions of authors

expressed herein do not necessarily state or reflect those of the U.S.

Government or any agency thereof.

Acknowledgement & Disclaimer

4

NuScale NonproprietaryCopyright © 2018 by NuScale Power LLC

Template #: 0000-20955-F01 R8

NuScale Update

5

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

NuScale News Headlines

6

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

P5 - ACRS review

Adv SER w/no OIs

6/23/20

Design Certified

Jan 2021

Completed

DCA

12/31/16

NRC

Accepted

3/15/17

P3 - ACRS review of

SER w/OIs

8/27/19

Rulemaking

Jan 2021P1 – PSER and RAIs

4/16/18

Total projected duration for NRC

certification - 46 months

P4 - Adv SER w/no OIs

12/12/19

P6 – FSER

Design Approved

9/08/20

P2 – SER w/OIs

5/16/19

NuScale Baseline DC Review Schedule

2017 2018 2019 2020 2021

7

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

Blazing the Trail to Commercialization

8

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

• Utah Associated Municipal Power

Systems (UAMPS) Carbon Free Power

Project (CFPP) will be first deployment

• A 12-module plant (720 MWe) with

commercial operation in 2026

• Preferred location within the Idaho

National Laboratory (INL) site

• DOE awarded $16.5 million in matching

funds to perform site selection, secure

site and water, and prepare combined

operating license application to NRC

First Deployment:

UAMPS CFPP

9

NuScale NonproprietaryCopyright © 2018 by NuScale Power LLC

Template #: 0000-20955-F01 R8

NuScale EQ

10

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

NuScale EQ

• Status

– Industry RFI Responses

– Next Steps

• RFP for Program Development

Assistance

• Scope

– Harsh Electrical (50.49)

– Harsh Mechanical (ASME

QME-1)

– Mild Environments

11

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

NuScale EQ, continued

• Regs/Codes/Standards

– NUREG 0800

– DSRS 3.11

– RG 1.89

– RG 1.100

– ASME QME-1 2007

– IEEE 323-1974

• EQ Design Influences

– discovered gap in trip

coverage

– informed bioshield design

– informed RXB design

12

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

NuScale EQ, continued

• Unique EQ Challenges

– FOAK equipment

– radiological source terms

– continuous vacuum/elevated

temperatures/submergence

– VRLA batteries

– multi-module affects

– no debris generation in CNV

13

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

• Each module feeds one turbine generator

train, eliminating single-shaft risk

• 100% turbine bypass capability

• Small, simple commercial grade

components support short straightforward

refueling outagesNOT TO SCALE

main steam isolation

valves

main feedwater isolation

valves

decay heat removal

actuation valves

decay heat removal

passive condenser

control rod drives

reactor vent valves

steam header

feedwater header

control rods

reactor recirculation

valves

reactor pool

containment vessel

reactor pressure vessel pressurizer

upper plenum

steam generators

hot leg riser

reactor core

downcomer

lower plenum

safety relief valves

NuScale Power Train

14

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

Nuclear fuel cooled indefinitely without AC or DC power*

*Alternate 1E power system design eliminates the need for 1E qualified

batteries to perform ESFAS protective functions – Patent Pending

Innovative Advancements to Reactor Safety

15

NuScale NonproprietaryCopyright © 2018 by NuScale Power LLC

Template #: 0000-20955-F01 R8

NuScale Approach to EQ

16

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

NuScale EQ Approach – A NuWay

• Reasons for NuWay

– major risks

• schedule

• resources

– lessons learned

• Collaboration

– configuration and testing

– review and acceptance process

17

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

NuScale EQ Approach – A NuWay, continued

• Risk Mitigation

– design finalization

– pre-designed test plans and mitigation strategies

– FOAK testing and qualification

– test failures

• Cost Reduction

– shared test chambers/limit number of tests

– streamlined reporting

– ITAAC considerations

18

NuScale NonproprietaryCopyright © 2018 by NuScale Power LLC

Template #: 0000-20955-F01 R8

Opportunities

19

Template #: 0000-20955-F01 R8

NuScale NonproprietaryCopyright © 2018 by NuScale Power, LLC

Potential Supplier Opportunities

• Supplier Registration

• Creative Concepts

• DOE Funding

• NuScale/Supplier EQ Workshop

20

NuScale NonproprietaryCopyright © 2018 by NuScale Power LLC

Template #: 0000-20955-F01 R8

Q&A

21

Copyright © 2018 by NuScale Power, LLC

NuScale NonproprietaryTemplate #: 0000-20955-F01 R8

Patrick Conley

EQ Programs Engineer

[email protected]