ODOT DISTRICT 3 2021 CONSTRUCTION PROGRAM
CONSTRUCTION PROGRAM 2021
Ashland County Projects
PID Number
Route & Section
Work Type Location
Sale Date
Est. Start &
Est. End
Est. Cost &
Contactor Maintenance of Traffic
97045 ASD SR 3
00.00 Minor
Rehabilitation SR 3, from the County Line to 05/07/20
07/16/20 05/31/21
$1,980,466.00 Shelly & Sands
Traffic maintained by flaggers
87729 ASD US 30
00.16 Minor
Rehabilitation US 30, from just east of SR 603 to
just past SR 511 11/19/20
01/01/21 08/15/21
$3,868,841.00 Shelly & Sands
One lane of traffic on US 30 maintained in each
direction
94433 ASD SR 302
09.34 Bridge
Replacement SR 302, at the bridge over Orange
Creek 01/14/21
03/01/21 10/29/21
$819,000.00 Black Horse
Bridge Const. 120 day road closure
90915 ASD SR 302
01.19 Bridge
Replacement SR 302, just north of Township
Road 63 03/11/21
07/05/21 10/08/21
$250,000.00 Unknown
30 day road closure
109027 ASD US 42/SR 60
15.05/27.40 Culvert
Replacement US 42, just north of SR 604 and SR 60, just south of County Road 500
04/29/21 06/14/21 10/31/21
$350,000.00 Unknown
30 day road closure for each location
110853 ASD US 30
10.28 Intersection Improvement
US 30 at the SR 89 intersection 04/29/21 06/01/21 10/01/21
$1,521,000.00 Unknown
Single lane closures on US 30. SR 89 Closures
TBD
102640 ASD US 250
11.61 Bridge
Replacement US 250, at the bridge over Lang
Creek 05/27/21
06/28/21 11/12/21
$1,005,000.00 Unknown
One lane of traffic maintained by
temporary traffic signal
102108 ASD US 30
00.11 Intersection Improvement
US 30 at the SR 603 intersection 06/17/21 08/01/21 10/31/21
$3,189,339.00 Unknown
Lane closures on US 30 & 60 day closures of SR 603 for both approaches
to US 30.
CONSTRUCTION PROGRAM 2021
CONSTRUCTION PROGRAM 2021
Crawford County Projects
PID Number
Route & Section
Work Type Location
Sale Date
Est. Start &
Est. End
Est. Cost &
Contactor
Maintenance of Traffic
108736 CRA SR 598
00.46 Roadway
Improvement SR 598, from Carter Drive to
Brandt Road 07/15/21
09/01/21 10/31/22
$3,635,383.00 Unknown
Traffic maintained at all times
95577 CRA SR 100
22.23 Bridge
Rehabilitation SR 100, at the bridge over Sycamore
Creek 09/16/21
04/01/22 09/30/22
$810,000.00 Unknown
75 day road closure
CONSTRUCTION PROGRAM 2021
CONSTRUCTION PROGRAM 2021
Erie County Projects
PID Number
Route & Section
Work Type Location
Sale Date
Est. Start &
Est. End
Est. Cost &
Contactor Maintenance of Traffic
111437 ERI SMOOTH
FY 2021 Smooth Seal
SR 13, from US 250 to the Huron Corp limit/ SR 99, from the Huron
County line to SR 4 12/17/20
05/01/21 08/31/21
$1,568,904.00 Erie Blacktop
Traffic maintained by flaggers
101445 ERI SR 60
08.98 Minor
Rehabilitation
SR 60, from the Vermilion Corp. limits to US 6 and US 6, from the
Vermilion Corp. limits to the Lorain County Line
03/11/21 05/01/21 05/31/22
$1,219,820.00 Unknown
Traffic maintained at all times
94393 ERI SR 113
06.84 Minor
Rehabilitation SR 113, from SR 601 to SR 61, 05/13/21
06/01/21 11/01/21
$5,411,450.00 Unknown
SR 113: 60 day closure Fisk Road to Edison High School. 30 day closure Edison High School to Collins Rd. SR 61: 30
day closure Collins Road to Ceylon Rd.
109239 ERI SR 99
01.94 Culvert
Preservation SR 99, south of Strecker Rd. 07/15/21
09/01/21 10/31/21
$175,000.00 Unknown
Maintain one lane of traffic using signals or
flaggers.
105584 ERI BP
FY 2022 Bridge
Painting Various locations on US 6 and SR 2
in Erie County 11/18/21
04/01/22 10/31/22
$2,937,000.00 Unknown
Traffic maintained at all times
CONSTRUCTION PROGRAM 2021
CONSTRUCTION PROGRAM 2021
Huron County Projects
PID Number
Route & Section
Work Type Location
Sale Date
Est. Start &
Est. End
Est. Cost &
Contactor
Maintenance of Traffic
77529 HUR US 20
10.76 Minor
Rehabilitation US 20, from the bridge over SR
61 to the end of the Bypass 06/10/20
05/01/20 06/21/21
$6,292,260.00 Gerken Paving
Inc.
Traffic maintained at all times. Expect single lane closures on US 20, with some short-term
closures at ramps
98462 HUR US 250
05.10 Minor
Rehabilitation
US 250, from eastern Corp limit of Norwalk to the Ashland County
line 11/05/20
05/15/21 10/31/21
$3,784,561.89 Gerken Paving
Traffic maintained by flaggers
106331 HUR US 20
07.35 Resurfacing US 20, from SR 99 to SR 61 01/14/21
05/01/21 08/30/21
$2,602,000.00 Gerken Paving
Traffic maintained by flaggers. Single lane
closures on US 20
109238 HUR Culvert
FY 2021 Culvert
Replacements
SR 13, just south of US 250 SR 99, just south of Twp. Rd. 102 SR 162, just east of Twp. Rd. 79
02/11/21 05/01/21 08/31/21
$550,537.00 Unknown
SR 162: 30 day detour SR 99: 30 day detour
SR 13: Daily lane closures
110357 HUR US 20
17.82 Intersection Improvement
US 20 at SR 601 07/01/21 08/15/21 06/30/22
$1,986,400.00 Unknown
US 20 and SR 601: 60 day detour
83451 HUR 20 BP FY 2022
Bridge Painting
Various locations in Huron County
10/28/21 03/15/22 10/31/22
$2,661,000.00 Unknown
Traffic maintained at all times
102637 HUR SR 162
17.42 Bridge
Replacement SR 162, over the East Branch of
the Huron River 12/16/21
06/15/22 09/01/22
$325,000.00 Unknown
TBD Detour
CONSTRUCTION PROGRAM 2021
CONSTRUCTION PROGRAM 2021
Lorain County Projects
PID Number
Route & Section
Work Type Location
Sale Date
Est. Start &
Est. End
Est. Cost &
Contactor
Maintenance of Traffic
82632 LOR US 20
22.19 Major
Rehabilitation US 20, from Stoney Ridge Rd to
Lear Nagle Road 11/30/17
03/19/18 05/31/21
$26,874,800.65 Fechko
One lane of traffic maintained in each direction. Various
intersecting side street closures.
77537 LOR SR 2
03.86 Minor
Rehabilitation SR 2, from just east of Baumhart
Rd. to just east of SR 58 09/17/20
04/01/21 09/10/21
$6,231,624.11 Kokosing
Traffic maintained at all times with daily
and nightly single lane closures.
79759 LOR IR 480
00.97 Minor
Rehabilitation
IR 480, from the Ohio Turnpike Booth to the CUY County line/ The SR 10 ramp to IR 480 east
11/19/20 04/05/21 09/17/21
$3,052,427.59 Karvo
Traffic maintained at all times with nightly lane closures. Limited
ramp closures for pavement replacement
90942 LOR IR 90
17.85 Bridge
Replacement IR 90, bridge over Norfolk
Southern Railroad 01/14/21
03/01/21 07/31/22
$8,752,000.00 Mosser
Construction
Traffic maintained at all times. Nightly lane
closures as needed
101446 LOR SR 58
24.66 Minor
Rehabilitation SR 58, Amherst/Lorain Corp. to US
6 03/11/21
05/03/21 09/03/21
$889,916.00 Unknown
One lane of traffic maintained in each
direction
104864 LOR SR 113
3.75 Intersection Improvement
SR 113/Baumhart Rd. Roundabout 04/15/21 06/01/21 10/01/21
$2,002,603.00 Unknown
70 Day Closure
CONSTRUCTION PROGRAM 2021
111081 LOR SR 252
1.09 Culvert
Preservation SR 252, between Squire Rd. and
Emmons Rd. 05/27/21
07/05/21 08/19/21
$200,000.00 Unknown
30 Day Closure
101507 LOR/MED RM
FY2021 Pavement
Maintenance
US 20, from just west of SR 301 to just west of SR 57; MED SR 271,
from IR 71 to Summit Co. 05/27/21
08/01/21 10/31/21
$1,000,000.00 Unknown
Traffic maintained at all times with single
lane closures
110096 LOR 254
6.39 Minor
Rehabilitation SR 254, east of Avon Commons Dr.,
to east of Nagle Rd. 06/17/21
08/01/21 10/31/21
$383,297.00 Unknown
Traffic maintained at all times
87684 LOR SR 10
00.00 Minor
Rehabilitation
SR 10, from US 20 to I-480/I-80 interchange; US 20, from SR 10 to
Chestnut Ridge Rd. 10/14/21
04/15/22 10/31/22
$8,860,534.00 Unknown
Traffic maintained at all times
98472 LOR SR 57
04.96 Minor
Rehabilitation
Resurfacing SR 57, from just north of SR 57/83/303 intersection to Grafton SCL; just north of Arbor Ct. to US 20 overlap. Concrete
ramp repairs and bridge maintenance.
12/02/21 05/01/22 07/31/22
$1,688,000.00 Unknown
Traffic maintained at all times
CONSTRUCTION PROGRAM 2021
CONSTRUCTION PROGRAM 2021
Medina County Projects
PID Number
Route & Section
Work Type Location
Sale Date
Est. Start &
Est. End
Est. Cost &
Contactor Maintenance of Traffic
14821 MED
N. Carpenter Road
Major Reconstruction
SR 303 to Boston Rd. 05/03/18 03/12/18 05/31/21
$11,419,901.00 Shelly & Sands
One-way traffic for 120 days
98928 MED US 224
15.61 Culvert
Rehabilitation US 224, eastbound, just past Lake
Rd. before the I -71 on ramps 11/21/19
05/01/20 05/31/21
$194,460.00 Inland Water
Pollution Single lane closures
87716 MED IR 71
06.06 Minor
Rehabilitation
IR 71, from just south of the IR 76 interchange to just north of the
interchange 08/13/20
09/14/20 08/15/21
$4,565,102.15 Kokosing
I-71 Traffic maintained at all times with daily/nightly lane closures. Limited
nighttime ramp closures
109232 MED SR 3
15.05 Major
Rehabilitation SR 3, from just north of Fenn Rd.
to just south of Odessa Rd. 10/01/20
04/01/21 06/01/22
$7,895,251.00 Great Lakes
Const.
One-way traffic will be maintained from
Hamilton Rd to Fenn Rd
100063 MED SR 162
25.43 Bridge
Replacement SR 162, between State Rd. and
Burdett Rd. 08/27/20
06/01/21 08/31/21
$714,900.30 Black Horse
Bridge 90 day detour
94437 MED US 42
02.47 Bridge
Replacement US 42, just north of Crawford Rd. 11/19/20
04/05/21 08/20/21
$835,290.41 Stanley Miller
90 day detour
98395 MED SR 3
03.80 Minor
Rehabilitation SR 3, from just south of the IR 76 ramps to the Medina Corp limits
11/19/20 05/01/21 08/31/21
$2,168,849.47 Karvo
Traffic maintained by flaggers
98570 MED SR 18
00.00 Minor
Rehabilitation SR 18, from the Lorain County line
to the Medina Corp limit 12/17/20
04/15/21 10/15/21
$2,137.188.96 Kokosing
Traffic maintained by flaggers
CONSTRUCTION PROGRAM 2021
103120 MED SR 3
14.95 Traffic Control Maintenance
SR 3, at Fenn Road; signal upgrade with installation of mast
arms 01/28/21
03/15/21 04/01/22
$161, 400.00 Unknown
Traffic maintained by flaggers
92953 MED SR 18
12.99 Roadway
Improvement SR 18, from just west of Alber Dr.
to Nettleton Road 02/11/21
04/15/21 06/30/24
$23,772,314.00 Unknown
Minimum of one lane of traffic in each direction
will be maintained
94436 MED SR 3
17.05 Bridge
Preservation SR 3 bridge over Plum Creek 02/25/21
04/01/21 08/31/21
$610,128.00 Unknown
TBD
110939 MED IR 76
01.80 Culvert
Preservation I-76, just west of SR 3 04/01/21
06/01/21 09/30/21
$400,000.00 Unknown
Traffic maintained at all times with single lane or
shoulder closures
107070 MED SR 3
09.04 Intersection Improvement
Single-lane roundabout at SR 3/SR 162 in Montville Twp.
05/13/21 06/01/21 11/15/21
$1,040,465.00 Unknown
70 day detour
90938 MED SR 94
07.66 Bridge
Replacement SR 94, just south of Wolf Creek
Trail (TR 435) 05/27/21
06/08/21 11/30/21
$772,500.00 Unknown
60 day detour
102028 MED SR 18
15.99 Intersection Improvement
SR 18, from Windfall to Medina Line Road
07/01/21 08/30/21 08/31/22
$6,752,364.00 Unknown
Traffic maintained at all times
106232 MED SR 57
17.65
Drainage System
Maintenance
SR 57, just south of the roundabout at SR 57
08/12/21 10/01/21 06/30/22
$1,473,543.00 Unknown
SR 57: 60 day detour SR 252: 14 day detour
Speith Rd: 8 day detour Lester Rd: 3 day detour
91093 MED IR 76
07.34 Pavement
Maintenance IR 76, from just west of SR 57 to
Summit Co. line 10/28/21
05/01/22 08/31/22
$1,936,899.00 Unknown
Traffic maintained at all times
79761 MED US 42
01.89 Minor
Rehabilitation
US 42, south of Congress Rd., to US 421; MED US 224 ramp to
beginning of US 42 overlap; US 224, from US 42 to IR 76 for
various bridge work
11/18/21 01/01/22 12/31/22
$16,973,984.00 Unknown
Traffic maintained at all times
CONSTRUCTION PROGRAM 2021
CONSTRUCTION PROGRAM 2021
Richland County Projects
PID Number
Route & Section
Work Type Location
Sale Date
Est. Start &
Est. End
Est. Cost &
Contactor
Maintenance of Traffic
93455 RIC US 30
09.26 Major
Rehabilitation US 30, from SR 309 to just east
of the 5th Ave ramps 04/16/20
04/15/20 05/26/23
$61,909,693.19 Shelly & Sands
Traffic maintained at all times
101431 RIC SMOOTH
FY 2021 Smooth Seal
SR 61, from just north of Shelby Corp limit to the Plymouth Corp
limit/ SR 96, from the Shelby Corp limit to SR 13
08/13/20 05/01/21 07/17/21
$1,795,907.24 Kokosing
Traffic maintained by flaggers
87690 RIC SR 13
11.01 Minor
Rehabilitation SR 13, from Hanley Rd to just
south of East Raleigh Ave 10/01/20
05/01/21 07/17/21
$820,740.30 Kokosing
Traffic maintained by flaggers
106355 RIC SR 545
03.77 Culvert
Replacement SR 545, between Crall Rd. East
and Hoover Rd. 12/17/20
03/01/21 07/31/21
$166,091.00 Kelstin
30 day detour
109737 RIC US 30
17.11 Interchange
Improvement
Construct a full-length eastbound US 30 deceleration
lane at the ramp to IR 71 northbound.
02/25/21 06/01/21 09/30/21
$1,000,560.00 Unknown
Traffic maintained at all times
101447 RIC US 42
11.66 Minor
Rehabilitation US 42 from Park Ave. to
Mansfield Corp. 04/29/21
06/01/21 08/31/21
$592,285.00 Unknown
Traffic maintained at all times
CONSTRUCTION PROGRAM 2021
103717 RIC SR 309
06.40 Minor
Rehabilitation
City of Ontario: SR 309, from just north of SR 430 to Mansfield Corp.; City of Mansfield: SR 309,
from Ontario Corp. to US 30
05/13/21 06/01/21 08/31/22
$1,862,013.00 Unknown
Traffic maintained at all times
111240 RIC SR 39
03.35 Pedestrian Facilities
New sidewalks and crosswalks at various locations along SR 39,
west and east Main Street 07/08/21
09/01/21 12/01/22
$1,135,00.00 Unknown
Traffic maintained at all times
CONSTRUCTION PROGRAM 2021
CONSTRUCTION PROGRAM 2021
Wayne County Projects
PID Number
Route & Section
Work Type Location
Sale Date
Est. Start &
Est. End
Est. Cost &
Contactor Maintenance of Traffic
102770 WAY US 250
19.26 Bridge
Replacement
US 250, between Villard St. and Apple Ridge Dr. over
Little Apple Creek 03/26/20
06/01/20 05/31/21
$1,177,000.00 J.D. Williamson
Signalized lane closure
110282 WAY SR 94
18.76 Culvert
Replacement SR 94, between SR 604 and
SR 585 03/11/21
05/01/21 06/30/21
$150,000.00 Unknown
Two way traffic maintained with traffic signals
111500 WAY SR 302
01.86 Minor
Rehabilitation
SR 302, from Grant St. to jnt. line west of SR 302 (Lattasburg Rd.); SR 83, from the SR 83/US 250
interchange to Selby Rd.
04/15/21 05/01/21 08/31/21
$541,126.00 Unknown
Traffic maintained by flaggers
110876 WAY US 30
20.15 Intersection Improvement
US 30 westbound at SR 57 05/13/21 07/01/21 06/01/22
$953,000.00 Unknown
Traffic maintained at all times
91095 WAY SR 83
10.81 Major
Rehabilitation
SR 83, from just south of SR 83/US 30 interchange to SR 3; SR 3, from SR 3 ramp
to Milltown Rd.; SR 83, from overlap ends with SR 3 to just south of Burbank
Rd.; SR 585, beginning from ramp off of SR 3 to
end of ramp to Akron Rd.; Various ramps at US 30. All ramps at SR 585. All ramps
at SR 3/83
08/12/21 10/31/21 09/30/23
$25,935,270.00 Unknown
One lane of traffic will be maintained at all times with ramp
closures still TBD
CONSTRUCTION PROGRAM 2021
CONSTRUCTION PROGRAM 2021
District Wide Projects
PID Number
Route & Section
Work Type Location
Sale Date Est. Start
& Est. Ed
Est. Cost &
Contactor Maintenance of Traffic
101833 D03 PM FY2019
Loop Detector Repair
Various locations throughout the District
04/04/19 05/29/19 05/31/21
$213,390.00 Perram Electric
Traffic maintained at all times
103475 D03 PR
FY2020 (B)
Pruning, Tree/Bush Removal
Various locations throughout the District
10/24/19 12/04/19 03/31/21
$240,500.00 Van Curen
Services Inc Traffic maintained at all times
110809 D03 GR FY 2020
Guardrail Replacement
Various locations throughout the District
04/01/20 07/01/20 07/01/21
$200,000.00 Unknown
Traffic maintained at all times
108007 D03 LG
FY 2022 (A) Lighting
Various locations throughout the District
01/01/21 04/01/21 09/30/21
$139,000.00 Unknown
Traffic maintained at all times
104158 D03 LG FY 2020
Highway Lighting
Various interchanges along US 20 in Lorain County
03/27/20 07/20/20 04/30/21
$1,250,000.00
Miller Cable Traffic maintained at all times
104259
D03 MOW FY 2021 (A)
Mowing
Various locations throughout
Medina County
08/13/20 05/01/20 12/01/21
$364,401.00
Linkel Company Traffic maintained at all times
104260
D03 MOW FY 2021 (B)
Mowing
Various locations throughout CRA, RIC, and WAY Counties
08/27/20 05/01/20 12/01/21
$343,401.00 Brypan LLC
Traffic maintained at all times
104261 D03 MOW
FY 2021 (C) Mowing
Various locations throughout HUR and LOR Counties
09/17/20 05/01/21 12/01/21
$287,948.00 Linkel
Traffic maintained at all times
104288 D03 PR FY 2020
Pruning, Tree/Brush
Removal
Various locations throughout the District
07/23/20 10/30/20 10/31/21
$82,540.00 Russell Tree
Experts103475
Traffic maintained by flaggers
CONSTRUCTION PROGRAM 2021
101438 D03 MICRO
FY2021 Micro
Surfacing
ASD SR 39, from the Richland County line to the Loudonville Corp. limit/ ASD SR 60, from the Loudonville Corp. limit to
SR 95/ ASD SR 89, from the Polk Corp. limit to SR 58
07/16/20 08/01/20 10/31/21
$82,540.00 American
Pavements Traffic maintained by flaggers
110796 D03 TSG FY 2021
Signals Various locations throughout
the District 10/15/20
02/01/21 07/01/21
$99,787.00 Greenwich Electric Inc
Traffic maintained at all times
101469 D03 RPM FY 2021
Raised Pavement Markings
Various locations throughout the District
11/05/20 06/01/21 10/31/21
$168,895.00 W L Markers
Inc. Traffic maintained at all times
104149 D03 GR FY 2021
Guardrail Various locations throughout
the District 12/03/20
02/01/21 01/31/22
$641,475.00 Lake Erie
Construction Traffic maintained at all times
101449 D03 Culvert Culvert
ERI US 250, just south of E Mason Rd/ RIC IR 71, just north of the SR 546 overpass/ WAY SR 95, between Springville Rd. and
S. Jefferson Rd.
12/03/20 12/14/20 10/31/21
$213,065.00 Great Lakes
Demolition Co. Detours TBD
98528 D03 SYSSIGN
FY 2021 (MED) Signs
Various locations throughout the District
02/25/21 05/01/21 04/30/22
$585,000.00 Unknown
Traffic maintained at all times
100077 D03 BH
FY 2021 (A) Bridge Repairs
Various locations throughout the District
02/25/21 04/01/21 08/31/21
$544,000.00 Unknown
Traffic maintained at all times
100081
D03 BH FY 2021 (B)
Bridge Repairs
Various locations throughout the District
02/11/21 04/01/21 08/31/21
$225,000.00 Unknown
Traffic maintained at all times
CONSTRUCTION PROGRAM 2021
106342 D03 SRTS
Milan Safe Routes to
School At Edison High School in the
Village of Milan 02/25/21
04/01/21 08/01/21
$478,981.00 Unknown
Traffic maintained at all times
101468 D03 PM FY 2021
Pavement Markings
Various locations throughout the District
03/11/21 04/01/21 09/30/21
$1,800,000.00 Unknown
Traffic maintained at all times
113985 D03 PM
FY 2021 (B) Pavement Markings
Various locations throughout the District
04/01/21 05/01/21 09/30/21
$782,000.00 Unknown
Traffic maintained at all times
104270 D03LOOP FY 2021
Loops Various locations throughout
the District 04/29/21
06/10/21
$190,000.00 Unknown
Traffic maintained at all times
104254 D03 CRSEAL
FY 2022 Crack Seal
Various locations throughout the District
07/29/21 09/01/21 10/31/21
$400,000.00 Unknown
Traffic maintained at all times
104289 D03 PR FY 2022
Vegetative Maintenance
Various locations throughout the District
07/29/21 10/03/21 09/30/22
$100,000.00 Unknown
Traffic maintained at all times
104164 D03 LG FY 2022
Highway Lighting
The eastbound and westbound rest areas on SR 2 in LOR Co.
07/29/21 08/10/21 01/31/22
$271,000.00 Unknown
Traffic maintained at all times
103121 D03 TSG FY 2022
Traffic Control Maintenance
Various locations throughout the District
09/30/21 04/01/22 11/30/22
$75,000.00 Unknown
Traffic maintained at all times
103478 D03 PR
FY 2022 (B) Vegetative
Maintenance Various locations throughout
the District 09/30/21
10/01/21 11/30/23
$120,000.00 Unknown
Traffic maintained at all times
CONSTRUCTION PROGRAM 2021
104150 D03 GR FY 2022
Guardrail Various locations throughout
the District 10/14/21
02/01/22 01/31/23
$650,000.00 Unknown
Traffic maintained at all times
105590 D03 BP FY 2022
Bridge Painting
Various locations throughout the District
11/18/21 04/01/22 09/30/22
$1,882,705.00 Unknown
Traffic maintained at all times
*Highlighted projects are carry over projects from 2020.
CONSTRUCTION PROGRAM 2021
CONSTRUCTION PROGRAM 2021
We will serve, innovate, and communicate with purpose. ..
We will be productive, lean, efficient and effective. ..
We will utilize the public resources entrusted to us by..
satisfying the State's transportation needs. ..
We will be the standard of excellence for winter maintenance. ..
We will create a working environment based on trust and mutual respect. ..
We will value the diversity of all ODOT people. ..
We will work together — one team: ..
the Ohio Department of Transportation. ..
For more information, please contact the Public Information Office at (419) 207-7181.
Like us on Facebook: www.facebook.com/OhioDepartmentofTransportationDistrict3
Follow us on Twitter: www.twitter.com/ODOT_NorthCenOH
Statewide Traffic Information: www.Ohgo.com
For general information, call (800) 276-4188 or visit District 3’s Web site at: www.transportation.ohio.gov/dist3
O U R M I S S I O N
To provide safe and easy movement of people and goods from..
place to place, we will:..
• Improve safety; ..
• Take care of what we have; ..
• Make our system better; ..
• Enhance capacity. .. O U R V I S I O N