13
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th , 2010

Offshore Wind Connection & Costs

  • Upload
    nowles

  • View
    44

  • Download
    0

Embed Size (px)

DESCRIPTION

Mary Doswell Alternative Energy Solutions December 7 th , 2010. Offshore Wind Connection & Costs. Virginia Offshore Wind Integration Study. Virginia Beach Transmission System. Study Scope. Landstown Substation. Virginia Offshore Border. Offshore Transmission Station. Shore Line. - PowerPoint PPT Presentation

Citation preview

Page 1: Offshore Wind Connection & Costs

OFFSHORE WINDCONNECTION & COSTS

Mary Doswell

Alternative Energy Solutions

December 7th, 2010

Page 2: Offshore Wind Connection & Costs

Virginia Offshore Wind Integration Study

Page 3: Offshore Wind Connection & Costs

Virginia Beach Transmission System

Page 4: Offshore Wind Connection & Costs

Study Scope

Page 5: Offshore Wind Connection & Costs

Landstown Substation

Page 6: Offshore Wind Connection & Costs

Attachment Facilities – 15 to 25 miles just to shore line. Would be transmission voltage level and possibly need to be multiple DC lines.

Shore Line

Virginia Offshore Border

Once on shore, attachment facilities could extend several more miles to point of interconnection

Distribution voltage lines

Offshore Transmission Station

Page 7: Offshore Wind Connection & Costs

Study Results 2700 MW Site

Page 8: Offshore Wind Connection & Costs

Study Results 4500 MW Site

Page 9: Offshore Wind Connection & Costs

Conclusion

Page 10: Offshore Wind Connection & Costs

Dominion’s Interest in Renewable Energy

Page 11: Offshore Wind Connection & Costs

Offshore Wind - Cost Comparison

Page 12: Offshore Wind Connection & Costs

Cost of N

ew C

ombined C

ycle Gas T

urbineU

S E

IA A

nnual Energy O

utlook 2010

Page 13: Offshore Wind Connection & Costs

Summary