    Wind R&D Seminar  – Deep Sea Offshore Wind

    Challenges and Design of Offshore Substations

    Christer Olerud

    Trondheim

    20.01.2011

    1

  • 8/20/2019 Olerud Christer Goodtech

    2/15

    New large Nordic company

    2

  • 8/20/2019 Olerud Christer Goodtech

    3/15

    Offshore wind farm overview

    3

    Offshore substationOffshore wind farm Land connection point

    Cable to shore3-phase AC

    goo  dt  ech. n o

  • 8/20/2019 Olerud Christer Goodtech

    4/15

    Offshore wind = multidiscipline industry

    4

  • 8/20/2019 Olerud Christer Goodtech

    5/15

    Main Challenges

    Location of offshore substationNumber of offshore substations

    Infield cable pattern and choice of cable types

    Offshore substation layout

    Reactive power compensation

    Grid connection

    Total electrical system

    5

  • 8/20/2019 Olerud Christer Goodtech

    6/15

    Inter array cable network

    Optimizing inter-arraycable network

    1 or 2 substations,

    inside or outside windfarm area

    Radials or loops

    Cable sizes

    6

  • 8/20/2019 Olerud Christer Goodtech

    7/15

    WES  – Wind Energy Simulator

    7

  • 8/20/2019 Olerud Christer Goodtech

    8/15

    Offshore substation layout and equipment

    Cooling of transformers *Switchgear

    Cable pull-in

    Bus ducts *

    8

     Accommodation

    External cladding

    Optimized layout

    Installation *

  • 8/20/2019 Olerud Christer Goodtech

    9/15

    Main transformers

    9

    160 MVA transformer from ABB

    GIT: Gas insulated transformer (Toshiba)

  • 8/20/2019 Olerud Christer Goodtech

    10/15

    Offshore substation, bus ducts

    10

  • 8/20/2019 Olerud Christer Goodtech

    11/15

    Offshore substation, installation

    11

    http://www.scaldis-smc.com http://www.scaldis-smc.com 

    http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/

  • 8/20/2019 Olerud Christer Goodtech

    12/15

    Offshore substations

    12

  • 8/20/2019 Olerud Christer Goodtech

    13/15

    Reactive compensation

    13

    Offshore substationOffshore wind farm Land connection point

    Cable to shore3-phase AC

    goo  dt  ech. n o

    Wind turbine

    (turbine manufacturer)

    Offshore substation

    (wind farm owner)

    Onshore grid

    (grid owner)

    How to optimize ?Demands from grid owner (grid code)

    Placement of equipment

  • 8/20/2019 Olerud Christer Goodtech

    14/15

    Grid connection

    PCC (Point of Common Coupling)

    14

    OSS 

    Onshore couplingpoint 

    OWTs 

    External grid 

    PCC definition a 

    PCC definition b 

    PCC definition c 

    a) at connection point onshore at the grid

    coupling point

    b) at high voltage busbar at the OSS

    c) at the OWT terminals

    Capability in the onshore transmission grid

  • 8/20/2019 Olerud Christer Goodtech

    15/15

    Thank you for your attention!