Wind R&D Seminar – Deep Sea Offshore Wind
Challenges and Design of Offshore Substations
Christer Olerud
Trondheim
20.01.2011
1
8/20/2019 Olerud Christer Goodtech
2/15
New large Nordic company
2
8/20/2019 Olerud Christer Goodtech
3/15
Offshore wind farm overview
3
Offshore substationOffshore wind farm Land connection point
Cable to shore3-phase AC
goo dt ech. n o
8/20/2019 Olerud Christer Goodtech
4/15
Offshore wind = multidiscipline industry
4
8/20/2019 Olerud Christer Goodtech
5/15
Main Challenges
Location of offshore substationNumber of offshore substations
Infield cable pattern and choice of cable types
Offshore substation layout
Reactive power compensation
Grid connection
Total electrical system
5
8/20/2019 Olerud Christer Goodtech
6/15
Inter array cable network
Optimizing inter-arraycable network
1 or 2 substations,
inside or outside windfarm area
Radials or loops
Cable sizes
6
8/20/2019 Olerud Christer Goodtech
7/15
WES – Wind Energy Simulator
7
8/20/2019 Olerud Christer Goodtech
8/15
Offshore substation layout and equipment
Cooling of transformers *Switchgear
Cable pull-in
Bus ducts *
8
Accommodation
External cladding
Optimized layout
Installation *
8/20/2019 Olerud Christer Goodtech
9/15
Main transformers
9
160 MVA transformer from ABB
GIT: Gas insulated transformer (Toshiba)
8/20/2019 Olerud Christer Goodtech
10/15
Offshore substation, bus ducts
10
8/20/2019 Olerud Christer Goodtech
11/15
Offshore substation, installation
11
http://www.scaldis-smc.com http://www.scaldis-smc.com
http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/http://www.scaldis-smc.com/
8/20/2019 Olerud Christer Goodtech
12/15
Offshore substations
12
8/20/2019 Olerud Christer Goodtech
13/15
Reactive compensation
13
Offshore substationOffshore wind farm Land connection point
Cable to shore3-phase AC
goo dt ech. n o
Wind turbine
(turbine manufacturer)
Offshore substation
(wind farm owner)
Onshore grid
(grid owner)
How to optimize ?Demands from grid owner (grid code)
Placement of equipment
8/20/2019 Olerud Christer Goodtech
14/15
Grid connection
PCC (Point of Common Coupling)
14
OSS
Onshore couplingpoint
OWTs
External grid
PCC definition a
PCC definition b
PCC definition c
a) at connection point onshore at the grid
coupling point
b) at high voltage busbar at the OSS
c) at the OWT terminals
Capability in the onshore transmission grid
8/20/2019 Olerud Christer Goodtech
15/15
Thank you for your attention!
15
Offshore substationOffshore wind farm Land connection point
Cable to shore3-phase AC
goo dt ech. n o
Thank you for your attention!Contact person: [email protected]