PT TRANSPORTASI GAS INDONESIA 10 Years Compressor Operation (2002 – 2012) Challenges & Perspective on Compressor Integrity Presented by PT Transportasi Gas Indonesia Regional Office-2 Belilas Compressor Station Pekanbaru, 21 November 2012 TGI Operation Technical Sharing Forum 2012

Operation Technical Sharing

  • Upload
    bgsndrt

  • View
    32

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Operation Technical Sharing

PT TRANSPORTASI GAS INDONESIA

10 Years Compressor Operation (2002 – 2012)Challenges & Perspective on Compressor Integrity

Presented byPT Transportasi Gas Indonesia Regional Office-2

Belilas Compressor StationPekanbaru, 21 November 2012

TGI Operation Technical Sharing Forum 2012

Page 2: Operation Technical Sharing

Presentation outline :

• Compressor Operation in 2002 to 2012

• Technical challenges

• Perspective on Compressor Integrity

TGI Operation Technical Sharing Forum 2012

Page 3: Operation Technical Sharing

Compressor Operation in 2002 to 2012

TGI Operation Technical Sharing Forum 2012

Man Power

Page 4: Operation Technical Sharing

Compressor Operation in 2002 to 2012

TGI Operation Technical Sharing Forum 2012

Flow & Compressor Discharge Pressure

Page 5: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

1. Equipment Failure

GTGC A, Engine Flame Out

GTGC A, GP Over speed

2. Product Obsolete

Gas & Detection System, Power Supply

GTGC PLC product

Page 6: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

1. GTGC A, Engine Flame OutDowntime : Often shutdown and re-start @11:30 am since Dec 2009 – Feb

2010Cause : 1 of 10 units Battery 110VDC for Control Console GTGC A drop

voltage

Rectification: Checking all batteries and perform battery replacement.

Batteries

TCS Panel DC PUMP

EGF

Page 7: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

2. GTGC A, GP Over speed

Downtime : 0.83Hrs unavailable unplanned on March 11, 2012 Often shutdown and re-start since Nov 2011 – April 2012

Cause : Spike at GP over speed probe sensor due grounding shield for GP

Probe cable connection failure

Rectification: Ensure grounding shield connection system are correct base on

Electrical Schematic

Page 8: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

1. Gas & Detection System, Product Obsolete

Cause : Year of 2009 Siemens Cerberus GD

System Power Supply 24VDC Fault

Power Supply Parts PRODUCT OBSOLETE

GD PANELPOWER SUPPLY

GD PANEL

Page 9: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

PREVIOUS

CURRENT

Road Map Gas Warning System

Source:

Page 10: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

Rectification:

Temporary Modified Power Supply 24VDC Source from UPS 24VDC

Siemens Cerberus Gas Detection Control System UPGRADING

Page 11: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

2. GTGC Control Net Product Obsolete Downtime : 583 Hours since May 1, 2009 to may 25, 2009Cause :Module Flex I/O ZF 2080 Node 8 Error

Page 12: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

Rectification: Step 1. Replace Module Flex I/O ZF 2080 Node 8 (Last Spare Part)

Rockwell Automation Information :

Control Net 1.25 Protocol, PLC5 40C, Since 2003PRODUCT OBSOLETE

http://www.ab.com/silver/communications/controlnet125.html:

The Silver Date for these ControlNet 1.25 products is December 31, 2003. As with any discontinued Rockwell Automation product, and depending on component availability, it is our goal to provide repair services and technical support for these products for at least seven years.If a migration path is required, Rockwell Automation offers upgrades and other new ControlNet 1.5 products with current functionality.

Page 13: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

Solar Turbines Product Information Letter (PIL 180)

Turbotronic 3MX, since 2003PRODUCT OBSOLETE

Page 14: Operation Technical Sharing

Technical Challenges :

TGI Operation Technical Sharing Forum 2012

Rectification: Step 2.

UPGRADING SYSTEM

CONTROL NET 1.25 PROTOCOL, PLC5 40C

CONTROL NET 1.5 PROTOCOL, PLC5 40C 1.5

RETROFIT TURBOTRONIC CONTROL SYSTEM

Page 15: Operation Technical Sharing

Perspective on Compressor Integrity :

TGI Operation Technical Sharing Forum 2012

JCS SCS BCS

Manage Spare Parts (Inventory)

Root Cause Failure Analysis

Predictive Maintenance

Product Update and Upgrade

COMPRESSOR INTEGRITY

SPECIALIST TEAM