PT TRANSPORTASI GAS INDONESIA
10 Years Compressor Operation (2002 – 2012)Challenges & Perspective on Compressor Integrity
Presented byPT Transportasi Gas Indonesia Regional Office-2
Belilas Compressor StationPekanbaru, 21 November 2012
TGI Operation Technical Sharing Forum 2012
Presentation outline :
• Compressor Operation in 2002 to 2012
• Technical challenges
• Perspective on Compressor Integrity
TGI Operation Technical Sharing Forum 2012
Compressor Operation in 2002 to 2012
TGI Operation Technical Sharing Forum 2012
Man Power
Compressor Operation in 2002 to 2012
TGI Operation Technical Sharing Forum 2012
Flow & Compressor Discharge Pressure
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
1. Equipment Failure
GTGC A, Engine Flame Out
GTGC A, GP Over speed
2. Product Obsolete
Gas & Detection System, Power Supply
GTGC PLC product
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
1. GTGC A, Engine Flame OutDowntime : Often shutdown and re-start @11:30 am since Dec 2009 – Feb
2010Cause : 1 of 10 units Battery 110VDC for Control Console GTGC A drop
voltage
Rectification: Checking all batteries and perform battery replacement.
Batteries
TCS Panel DC PUMP
EGF
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
2. GTGC A, GP Over speed
Downtime : 0.83Hrs unavailable unplanned on March 11, 2012 Often shutdown and re-start since Nov 2011 – April 2012
Cause : Spike at GP over speed probe sensor due grounding shield for GP
Probe cable connection failure
Rectification: Ensure grounding shield connection system are correct base on
Electrical Schematic
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
1. Gas & Detection System, Product Obsolete
Cause : Year of 2009 Siemens Cerberus GD
System Power Supply 24VDC Fault
Power Supply Parts PRODUCT OBSOLETE
GD PANELPOWER SUPPLY
GD PANEL
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
PREVIOUS
CURRENT
Road Map Gas Warning System
Source:
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
Rectification:
Temporary Modified Power Supply 24VDC Source from UPS 24VDC
Siemens Cerberus Gas Detection Control System UPGRADING
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
2. GTGC Control Net Product Obsolete Downtime : 583 Hours since May 1, 2009 to may 25, 2009Cause :Module Flex I/O ZF 2080 Node 8 Error
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
Rectification: Step 1. Replace Module Flex I/O ZF 2080 Node 8 (Last Spare Part)
Rockwell Automation Information :
Control Net 1.25 Protocol, PLC5 40C, Since 2003PRODUCT OBSOLETE
http://www.ab.com/silver/communications/controlnet125.html:
The Silver Date for these ControlNet 1.25 products is December 31, 2003. As with any discontinued Rockwell Automation product, and depending on component availability, it is our goal to provide repair services and technical support for these products for at least seven years.If a migration path is required, Rockwell Automation offers upgrades and other new ControlNet 1.5 products with current functionality.
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
Solar Turbines Product Information Letter (PIL 180)
Turbotronic 3MX, since 2003PRODUCT OBSOLETE
Technical Challenges :
TGI Operation Technical Sharing Forum 2012
Rectification: Step 2.
UPGRADING SYSTEM
CONTROL NET 1.25 PROTOCOL, PLC5 40C
CONTROL NET 1.5 PROTOCOL, PLC5 40C 1.5
RETROFIT TURBOTRONIC CONTROL SYSTEM
Perspective on Compressor Integrity :
TGI Operation Technical Sharing Forum 2012
JCS SCS BCS
Manage Spare Parts (Inventory)
Root Cause Failure Analysis
Predictive Maintenance
Product Update and Upgrade
COMPRESSOR INTEGRITY
SPECIALIST TEAM