1
The off Approa Cont Operati the low impact the age Need Organis achieve STAKEH High Pe ` fering/Pro ach/Elemen text ionally, most bu west unit cost. Th on these metric ents, workers, fie d sations are/shou e a certain predic HOLDER RESULTS erforming TEAMS oduct: nts sinesses, if not a he group of emp cs are those who eld force, operat uld be looking fo ctability in front S driven by flawl S of motivated P all, aim for Custo ployees who hav o are the bottom tors the front e or Front Line Sup end employee less EXECUTION PEOPLE omer satisfactio e the greatest m of the pyramid end employees. pervisors who ca performance – of PROCESSES b nat d an by UVP for O Operationa Th th ta OP al excellen his framework of e bulwark of the rgets: Certification guarantee qu on Investmen professionals Creation of a competent o Both the emp employee ne Win Win. PEX nce progra f methodologies e curriculum and in the capability uantifiable Retur nt from the s thus facilitated a Cadre of highly operations leade ployer and eeds aligned in m s is d y to rn d. y rs, a

Opex One Pager

  • Upload
    opexhat

  • View
    150

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Opex One Pager

The off

Approa

ContOperati

the low

impact

the age

NeedOrganis

achieve

STAKEH

High Pe`

fering/Pro

ach/Elemen

textionally, most bu

west unit cost. Th

on these metric

ents, workers, fie

dsations are/shou

e a certain predic

HOLDER RESULTS

erforming TEAMS

oduct:

nts

sinesses, if not a

he group of emp

cs are those who

eld force, operat

uld be looking fo

ctability in front

S driven by flawl

S of motivated P

all, aim for Custo

ployees who hav

o are the bottom

tors – the front e

or Front Line Sup

end employee

less EXECUTION

PEOPLE

omer satisfactio

e the greatest

m of the pyramid

end employees.

pervisors who ca

performance –

of PROCESSES b

n at

d

an

by

UVP for OOperationa

Th

th

ta

OP

al excellen

his framework of

e bulwark of the

rgets:

Certification

guarantee qu

on Investmen

professionals

Creation of a

competent o

Both the emp

employee ne

Win Win.

PEX

nce progra

f methodologies

e curriculum and

in the capability

uantifiable Retur

nt from the

s thus facilitated

a Cadre of highly

operations leade

ployer and

eeds aligned in

m

s is

d

y to

rn

d.

y

rs,

a