19
Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation study Steve Leighton Helios

Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

Overview of the objectives

and approach to the Bird Strike Risk

Reduction for Civil Aviation study

Steve Leighton

Helios

Page 2: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

Overview of presentation

� Introduction to our consortium

� Overview of the project objectives

� Overview of the project approach and methodology

Page 3: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

Overview of presentation

� Introduction to our consortium

� Overview of the project objectives

� Overview of the project approach and methodology

Page 4: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

Our consortium includes a mix of aviation, space, ornithology and legal expertise

Introduction to our consortium

� Project Management

� User requirements, commercial & market analysis

� Aviation specialists

� Space technology specialist

� Demonstrator development

� Ornithologists

� Practical airfield bird management experience

� Legal analysis

� Space and aviation specialists

Consortium members and role

Page 5: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

We also already have agreements from a number of airports to support the project…

� 466,393 movements (2009)

� 66,036,957 passengers (2009)

� 446,569 movements (2008)

� 47,430,019 passengers (2008)

� 172,515 movements (2009)

� 18,724,889 passengers (2009)

� Planned new Lisbon airport

� In planning phase

…and we welcome support from any other stakeholders willing to be involved

Introduction to our consortium

Page 6: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

Overview of presentation

� Introduction to our consortium

� Overview of the project objectives

� Overview of the project approach and methodology

Page 7: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

The BSRR project is concerned with the development of sustainable services…

� Examining technology based services to reduce the risk of

hazardous bird strikes to aircraft

� Interested in the role and added value of space based assets

� But not constrained to only using space based solutions

� Concerned primarily with civil aviation flight operations

� But not excluding the possibility of military use of any service

� Focussed “at and around airports”

Overview of project objectives

Page 8: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

We are looking at the development of both near and long term applications

Feasible concept

Future concept

Short-term Long-term

� Current technologies and space assets

� Feasible solution to specific

application needs

� Future technologies and space assets

� Solution to majority of application

needs

Assess the value to usersAssess the value to users

Examine the legal liability issues for the service provision frameworkExamine the legal liability issues for the service provision framework

Examination of commercial viability of service(s)Examination of commercial viability of service(s)

Definition of demonstrator and validation of conceptDefinition of demonstrator and validation of concept

Overview of project objectives

Page 9: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

In developing the concept we are looking to see where technology can assist in reducing risk

Ability to influence bird

risk

High

Low Time before presence in risk area

Real-timeLong-term (weeks – days)

Medium-term (days – hours)

Short-term (hours – mins)

Direct detection of

bird presence

Forecast of factors leading to increased

bird presence

Detection of attractants and understanding of

flight lines

Overview of project objectives

Page 10: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

The ultimate aim being to allow for greater control of the risk of a risk bearing bird strike incident

Ability to influence bird

risk

High

Low Time before presence in risk area

Real-timeLong-term (weeks – days)

Medium-term (days – hours)

Short-term (hours – mins)

Cumulative impact of all

measures

Overview of project objectives

Page 11: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

Overview of presentation

� Introduction to our consortium

� Overview of the project objectives

� Overview of the project approach and methodology

Page 12: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

The study is organised into two phases, the latter only proceeding if the former outlines a viable concept

WP1: User identification and needsWP1: User identification and needs

WP2: State of the art analysis and technologyWP2: State of the art analysis and technology

� Consultation with stakeholders

� Elaboration of needs

� Development of requirements

� High-level functional concept definition

Phase 2Phase 2WP3: Preliminary system and service definitionWP3: Preliminary system and service definition

� System-service specifications

� Preliminary service concept

� Role and value of space component

� Validation approach

28/04/10 05/07/10 15/09/10

Mid Term Review

Mid Term Review

18/02/10

� Technology state of the art analysis

� Preliminary liability analysis

User WorkshopUser Workshop

Study Phase 1: Service requirements and technology

Approach and methodology

Page 13: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

Our initial activities have therefore been focussed on understanding the needs of the stakeholders

Technology

capability

Application

domain

Air Traffic

Management

Aeronautical

Information

Services

Airport

Operations

Long-term

(weeks – days)

Medium-term

(days - hours)

Short-term

(hours - minutes)

Real-time

Prediction Detection

Deployment of bird management resources

Resourcing and planning of bird

management resources

Issue of Notice to Airmen

AIM publicati-

on

Traffic control &

flow manage-

ment

General warnings to traffic

(eg ATIS)

Safety Case

develop-ment

Technology

capability

Application

domain

Air Traffic

Management

Aeronautical

Information

Services

Airport

Operations

Long-term

(weeks – days)

Medium-term

(days - hours)

Short-term

(hours - minutes)

Real-time

Prediction Detection

Deployment of bird management resources

Resourcing and planning of bird

management resources

Issue of Notice to Airmen

AIM publicati-

on

Traffic control &

flow manage-

ment

General warnings to traffic

(eg ATIS)

Safety Case

develop-ment

Summary of envisaged use of bird presence information

Approach and methodology

Page 14: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

We are looking at a system of systems solution, recognising the diversity of the requirements

� Direct detection of birds by observation

� high-resolution passive visible/infrared technology, radar technologies (ground and space), acoustics, CCTV, LIDAR, etc.

� Modelling techniques using remote sensing data as input

� assess the added-value that remote sensing data may present for the development of bird movement/presence models

� Direct detection of birds and modelling techniques that can take advantage of tagging (e.g. GPS based)

� assess the added value of such space systems for the direct detection of birds as part of a bird strike mitigation system

� Communication technologies

� will explore several communication technologies, such as SATCOM,GPRS, DVB

Approach and methodology

Page 15: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

The second phase is concerned with developing a near term concept and demonstrator

WP4: Overall near-term service architecture

and operations

WP4: Overall near-term service architecture

and operations

WP5: Proof of conceptWP5: Proof of concept

� Architecture design

� Operational concept and service definition

Finalis-ation

Finalis-ationWP6: Viability analysis (near-term concept)WP6: Viability analysis (near-term concept)

� Market analysis

� Cost benefit analysis

� Viability & liability analysis

13/04/11 18/05/10

Final ReviewFinal Review

16/09/10

� Proof of concept defn & design

� Validation

� Lessons learnt

WP7: Roadmap and recommendationsWP7: Roadmap and recommendations� Service roadmap

� Recommendations

Study Phase 2: Near-term service definition and validation

Approach and methodology

Page 16: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

The viability of any near-term concept will have to be vigorously demonstrated

� Business case

� Identifiable market

� Legal and liability issues resolved

� Technology available and implementable

� End-user demand

Approach and methodology

Page 17: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

The project is tasked with developing a demonstrator to prove the viability of any near-term application

� Demonstrator development being led by GMV-Skysoft

� Will not necessarily be a real time

system

� Most likely be specific to a

selected demonstrator airfield

with data to allow at least a

partial validation of results

� Looking for candidate airfields

with good bird data to apply the

demonstrator to

Bird Strikes

System

Bird Strikes

System

High-level concept definition

Approach and methodology

Page 18: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

The study is due to run until the end of September, if extended to Phase 2 it will complete in May 2011

Timescales and deliverables

Overview of study timescales

Phase 1 Phase 2

Page 19: Overview of the objectives and approach to the Bird Strike ... of the objectives... · Overview of the objectives and approach to the Bird Strike Risk Reduction for Civil Aviation

Thank you for your attention

Steve Leighton

www.askhelios.com [email protected]