    Its a construction project the size of Los

    Angeles: a rail system that will eventually

    move people from the San Fernando

    Valley down to Los Angeles International

    Airport, from Long Beach to Pasadena andEast L.A. Seventy-nine miles of track, 72

    stations, and $8.4 billion worth of

    construction. And all of it scheduled and

    managed with Primaveras Primavera

    Project Planner (P3).

    P3 handles projects of this size with

    ease, says Jeff Christiansen, Deputy

    Executive Officer for ProgramManagement with Los Angeles Countys

    Metropolitan Transit Authority (MTA).

    The MTA uses P3 to manage contracts,

    schedule the construction of multiple

    segments of rail line, analyze cash flow,

    and analyze contractors schedules and

    submittals. Its our one and only in-house

    schedule management tool, he goes on

    to say.

    The L.A. Metro project clearly needs a tool

    with P3s breadth of capabilities. The

    project involves simultaneous construction

    in different parts of the county. A recently

    completed section (the Red line) runs

    The MTA has schedules for each segment

    of the L.A. Metro project, for each may

    involve 40 to 60 contracts with a total

    value in excess of $500 million. Between

    the 40 to 60 contracts per segment, aproject manager will be concerned about

    the orchestration of hundreds of major

    activities. And these activities are not

    slight: the project schedulers are working

    at a macro level, overseeing $170 million

    tunneling activities and $50 million station

    construction activities. In all, the MTA is

    using P3 to track thousands of major

    activities, each taking place along a critical

    path that stretches out over the course of

    P3 is very easy to use, says Christiansen,

    and its wide application in the

    construction industry makes it very easy

    for us to find people who know how to use

    the product. That helps when Im hiring

    people, which I have to do quitefrequently. Almost everybody that I

    interview has had extensive P3 experience,

    so we dont have to worry about training

    people to use the system.

    P3 on the Blue LineWe use P3 to manage more than 50

    contracts on the Blue line alone, says

    Steven LeDuff, MTAs Senior ScheduleAdministrator on the Pasadena Blue Line

    project. Our schedule covers everything

    from the construction along the right-of-

    way and installation of the rail, all the way

    through purchase of the catenary system,

    our train control systems, telephones, and

    ticket machineseverything. We have a

    standard project schedule that covers all

    these contracts at a high level of detailitshows major construction and major

    procurementand then we have multiple

    interfaces and milestones between the

    contracts. When one contract ends, we can

    let the next contractor in to do the follow-

    on work. Thats how we track the critical

    path through the five years that it takes to

    complete these projects.

    In our database for all 53 contracts on the

    Blue line, continues LeDuff, we have

    approximately 800 activities. Thats at the

    summary level. At the contractors level, a

    contract may have 1,000 activities,

    sometimes 3,000 to 4,000 activities. One

    Two Bala Plaza Bala Cynwyd, PA 19004 USA

    (610) 667-8600 FAX: (610) 667-7894 Intern et: sales @prima vera.com

    Els inore House 77 Fulham Palace Road London England, W6 8JA Uni ted Kingdom

    (44) 181-748 7300 FAX: (44) 181-748 2846

    P R O J E C T P R O F I L E S

    Ke e p ing the LAMe tro on TrackPrimaveras P3 maintains the scheduleon $8.4 billion of budgeted projects

    P3 is very easy to use,and its wide applicationin the construction

    industry makes it veryeasy for us to find

    people who know howto use the product.

  • 7/30/2019 P32PROFL

    3/36

    until the end of the job, and then everybody

    sat down and tried to figure out who had

    impacted whom in order to settle the extra

    moneys involved. Now, because the

    software is so fast, we try to analyze delays

    on a monthly basis.

    With the rainy seasons in California, we

    allow for one to four days of rain each

    month, and the contractors have to factor

    this into their original schedules. Once

    weve exceeded thatsay, if we get seven

    days of rain in a monththen were able to

    go in and look at the schedule that the

    contractor submits at the end of the monthand say, Yes, youve exceeded your

    allotment, we owe you three days. Well

    then move the completion date out three

    days. That might be a year from now, but

    the contractor knows that hes picked up

    three days on his contract and he doesnt

    have to worry about accelerating his work

    or working out of sequence to make up for

    that time. With P3 were able to get thatinstant turn-around each month, and that

    enables us to respond to the contractor

    much faster.

    M ont h ly U pd at es f rom t he F ie l dBecause each of the contracts is so

    substantial in itself, the MTA requires each

    of its contractors to use a schedule-based

    project management system that is capableof sharing data with P3. Many of our

    contractors are also using P3, notes

    Christiansen. We dont require that, but

    most of our contractors have chosen to use

    it on their own. Its a great comfort to know

    that were all pretty standardized on the

    Primavera product. It makes reporting,

    transferring files, and generating data much

    more efficient for us.

    The amount of information that moves

    from the contractors scheduling system is

    not slight, either. Steven LeDuff explains

    that the MTAs scheduling specification,

    section 1310, requires the contractors to

    your own delay. And the only way you

    can do this is with a scheduling system

    like P3.

    M ana g i ng Invo i ce s and C as h

    Flow with P3Once contractors have been awarded

    contracts, they are required to identify the

    pay items associated with each activity in

    the schedule. For instance, they will

    indicate that a concrete wall will take three

    weeks to construct and will cost $20,000.

    They then pass this information along to

    the project managers at MTA, who factor

    the costs into the schedules in P3.

    We use P3 to help with all our invoices,

    MTAs Christiansen explains. Weve

    cost-loaded all our schedules, so thecontractors only get paid when the activity

    is completed, and they only get paid for the

    value of that activity as it appears in the

    system.

    Were also using the Windows version of

    per yearand they want to know how long

    it will take to finish the job.

    So well go into P3 and start rescheduling

    activities. We revise the job based on the

    cash we have available. The Windowsversion of P3 enables us to do this right on

    the screen. We used to have to do this on a

    spreadsheet, and it would take us forever to

    go in and re-status all these activities to

    perform a what-if analysis. With P3, I can

    go on the screen, click on an activity, drag

    it across the screen, let go of it, and its

    rescheduled. That is phenomenal. I already

    have dollar values loaded on the activities,so I just move activities and their logic to

    the right until my cash flow comes within

    the allowable limits. Automatically we get

    a new what-if duration for the project

    that way.

    Ke e p i ng t he LA M e t ro o n t heRight Trac k

    Well be continuing to work on the railprogram for quite a while, says

    Christiansen. There are large sections of

    the community that need rapid rail transit.

    However, rail construction is so expensive

    that we cant go everywhere at once. So

    well continue building the program in

    segments.

    We need some alternatives in LosAngeles, Christiansen goes on to say.

    The population continues to grow, the

    freeways are becoming more congested,

    and the travel times are becoming longer

    and longer.

    Fortunately, the MTA is well on the way to

    constructing this much-needed alternative

    transportation system for the county of LosAngeles, and P3 will play no small part in

    the delivery of that system. When budgets

    change or the weather impacts the critical

    path of major construction projects, P3

    enables the MTA to adjust quickly and

    effectively. When the contractors submit

    We used to have to dothis on a spreadsheet,and it would take usforever to go in and

    re-status all theseactivities to performa what-if analysis.With P3, I can go onthe screen, click on anactivity, drag it acrossthe screen, let go of it,

    and its rescheduled.

  • 7/30/2019 P32PROFL

    4/36

    At an y given time , Che eta h

    Software Systems Inc . may be und er

    contrac t to develop cus to m ized p oint

    of sale and service-delivery software

    app l ica t ions for as m any as 18 or 19

    of the Fortune 100 firm s. The

    Cali fornia-base d com pan y has m ade

    a n am e for i tself throu gh credit-card

    verification system s, soph isticate d

    vehic le rou t ing a nd schedu l ing

    sys tem s, and cus tom er service

    system s. For a b ig software de velop er,

    han dl ing the un ique ne eds o f 18 or 19

    prom inent c lients s im ultaneo usly

    isnt all that im press ive. But Cheet ahSoftware System s isnt e xactly a b ig

    com pan y. The fi rm has som e 15

    programm ers on s ta ff, and every

    projec t they und er take involves s om e

    ki d f t i t i t t

    Support ing Complex Project

    M anage m e nt R equ i re m e nts

    We sh are ou r hum an

    resources am ong th e d i fferent

    pro jects, sa ys Joh n Darroll, Chee tah

    Software p roject ma na ger, so ou r

    pro jec t m anageme nt requ irement s

    are p ret ty co m ple x. Yet Prim avera s

    P3 provide s p recisely the kind of

    sup port that Chee tah requi res.

    Darroll has de veloped a m aster

    project sched ule that coo rdinates al l

    the p hase s of each discrete

    developm ent effort . Each custo m er

    project is ma naged a s a sub projectwithin the m aste r project . In ea ch of

    the su bprojects there are des ign,

    test ing and d ebu gging phas es, as

    well as q ua lity ass uran ce,

    i l i d i i

    on the d esign of one project during

    one hour and debugging another fo r

    the rem ainde r of the da y. Moreover,

    while the fund am ental designs of

    Cheetah Software prod ucts rem ainesse nt ially the sa me , each

    ap plication is tai lored a nd

    custo m ized for the client pu rcha sing

    it . As a con seq ue nce, even

    subpro jec t s t ha t appear t o b e

    runn ing in p arallel can s ee m like very

    different projects.

    From a pro jec t managem ent

    stan dp oint, this level of custo m ization

    ma kes each sub project unique.

    The re m ay be 500 discrete tasks in

    the m aste r project schedu le, Darroll

    explains , bu t each su bp roject ha s

    unique requi rem ents and cons t raints

    be caus e of individual client nee ds .

    Tha ts no t som eth ing you can

    man age on paper o r on a

    blackbo ard. The re are s imply too

    m an y cons traints. Prim avera has

    cons tructed P3 in su ch a way tha t itwil l m ap th e reso urces we have

    against the ta sks we h ave to perform,

    all the while ta king into accou nt th e

    const raints impo sed b y the

    d th j t it lf

    Two Bala Plaza Bala Cynwyd, PA 19004 USA

    (610) 667-8600 FAX: (610) 667-7894 Intern et: sale s@prima vera.com

    P R O J E C T P R O F I L E S

    P3 for Windows Streamlines the Managementof Multiple Development Projects

    Managing Morewith Le ss a t Che e tah

    Software Syste m s

  • 7/30/2019 P32PROFL

    5/36

    A Sche du le t o M ee t

    Ea c h N e e d

    At the be ginn ing of ea ch

    week Darroll distribu tes a n up da ted

    sche du le to each o f Cheeta hsemployees. I created different

    layouts for present ing the schedu ling

    da ta to differen t p eo ple, Darroll

    explains. Mana gem en t gets i ts own

    layou t. The y don t wan t to kno w all

    the differen t activity IDs tha t we us e,

    so I prepare a repo rt for them thatsho ws how were using the res ou rces

    by project . Project lead ers, on th e

    other han d, need a format that he lps

    them ma nage al l the individua ls

    working o n th eir project. The

    individua l resou rces each get on e

    that sho ws just what sho uld be

    do ne . Darrolls sch ed ules t ell ea ch

    individual the expecte d du ration of a

    task, the p ercentage of the task that

    has bee n comp le t ed as o f t he

    be ginn ing of the wee k, an d the

    projected start and finish dates for

    an y new ta sks. Add ition ally, Darroll

    leaves blank column s that the

    individuals us e to record actu al start

    and finish t imes.

    At the e nd of the week,

    Darroll collects the sche du les from

    the engineers and p roject mana gers.All of them kno w how m uch t ime is

    allocate d for their port ion of the

    work, when i ts su pp os ed to start an d

    when its e xpecte d t o en d. The y fill in

    h d h l l d

    P3 H e l ps M anage

    the U nexpe c ted

    Projects and sub projects

    would be far eas ier to m ana ge if there

    were no external interruptions, bu trarely is this the case . While Che eta h

    Software d evelope rs are bu sy

    custo m izing their prod uct for new

    custom ers, they also service reque sts

    from the ir existing custo m ers. Whe n

    priority se rvice calls arrive, on e o r

    mo re of Chee tahs en ginee rs ma y

    have to stop working on a sche duled

    project and devote their t ime and

    en ergy int o th e se rvice call. As a

    resu lt, the y m ay not get a ll the ir

    schedu led work comp leted by the e nd

    of the wee k. More over, if the ir portion

    of a project gets he ld up, that m ay in

    turn ripple th rough th e o verall

    sub project developm ent effort .But P3 helps keep Chee tah s

    de velop m en t efforts go ing, week after

    week. Service ca lls th at were n ot

    imm ed iately de alt with (or that

    i l d)

    is able to he lp keep the com pan ys

    developme nt and s upp ort efforts

    on track.

    Managing Be yond

    Microso ft Proje ct

    Cheetah Software h ad tried

    to u se Microso ft Project at an e arly

    stage, bu t discovered that i t didnt

    allow Darroll to m an age a ll of

    Cheetah s p rojects in a coordinated

    m an ne r. Microso ft Project did n otenab le us to schedule our hum an

    resou rces across m ultiple projects,

    Darroll explain s. Its goo d for

    m ana ging low- to m edium -level

    activities , bu t Project did not h ave the

    flexibility to m an age th e sa m e

    resou rces a cross mu ltiple projects,

    an d th ats ou r biggest criteria. Our

    business an d the detai ls of our

    projects are changing on an almo st

    da ily ba sis. For m e to try to sche du le

    all ou r resources u sing Project was as

    effective a s m e trying to do it on a

    bla ckboa rd. Its fine for s imp le

    pro jects, Darroll says, bu t we

    need ed a tool that would cont rol all

    ou r projects.

    P3 ha s th e flexibility and the

    po wer to ad just mu ltiple su bp rojects

    and to take into account the changesand permutat ions a ssociated with

    m ultiple custo m er con straints and

    de m an ds . Which is precisely why

    Prim averas P3 m akes it po ssible for

    Cheetah to su cceed with a sm all staff

    We couldnt managewithout P3.Its just toocomplex when the samepeople are working onall the different projects.

    You need a way tomanage all the projectsand resources together.

  • 7/30/2019 P32PROFL

    6/36

    The client was a medical device manufacturer, part ofa Fortune 100 company with a strong track record forproduct excellence, but the new product it was devel-oping was unlike any it had developed in the past. Thefirm was doubling the functionality of its devices, but in

    doing so was significantly increasing the number andcomplexity of its development processesall in theface of severe resource constraints and downsizing.Further complicating the management of the project,the firm was modifying its procedures to comply withISO manufacturing practices and working to meet new

    US and European regulations on a wide range offrontswhich meant additional documentation, testing,re-engineering, and verification at numerous stages ofdevelopment. Soon, the firms tried-and-trueMacProject Pro-based project control system wassimply unequal to the task.

    The system was completely overloaded, says Rober tWest, whose Tampa, Florida-based consulting com-

    P R O J E C T P R O F I L E S

    Robert West Consulting: ManagingComplexity with P3 and Monte CarloPrimaveras project control tools help clients manage complex development efforts with ahigh probability of success

    pany was brought in to resuscitate the project controlsystem. The schedule had grown to include 3,500activities in more than 150 linked subprojects, but link-ing two activities across subprojects could take as longas 10 minutes. Youd click on the one, then the other,

    and wait. Updating and revising the schedule took solong that the project was changing faster than it couldbe analyzed and controlled.

    In fact, West goes on to explain, the MacProject Pro-based system was so suspect by the time that Westsfirm arrived on the scene, that company executives

    had no clear idea when the project would be com-pleted. The system was providing a projected projectend date, but no one in the company had enough con-fidence in the system to have any confidence in theinformation it was providing.

    It would take Primaveras Primavera Project Planner(P3) and Primaveras Monte Carlo to change that.

  • 7/30/2019 P32PROFL

    7/36

  • 7/30/2019 P32PROFL

    8/36

  • 7/30/2019 P32PROFL

    9/36

  • 7/30/2019 P32PROFL

    10/36

    Two Ba la Plaza Bala Cynwyd, PA 19 00 4-15 86 US A

    (610 ) 667 -86 00 FAX: (610 ) 667 -78 94 Inte rne t: Sa le s@prima ve ra.co m

    E lis o r e H o u s e 7 7 Fu lh a m P la c e R o a d Lo n d o n U n ite d K in g d o m , W6 8 JA

    (44) 18 1-74 8-73 00 FAX: (44 ) 181 -748 -284 6 Inte rne t: intlsale @prima ve ra.co m

    http://www.primavera.com

    How t he w or ld say s project m anagem ent

    PERT, no matter how big it is, you will get a numberfrom zero to 100, indicating the percentage of time thatthat activity is going to be thegating item to the enddate. With Monte Carlo you can focus in from day one

    on the activities that are going to cause you trouble.

    The Bottom Line: Making it Possible to Make GoodBusiness Decisions

    Within the client organization, the response to theproject management system that West has built on

    Primaveras P3 and Monte Carlo has been overwhelm-ingly positive. Throughout the company, West says,its been very well receivedespecially by the down-stream groups, like Operations, who typically haveprojects thrown over the wall to them by people whosay Okay, now produce it. Theyre thrilled with thelevel of scheduling and the level of information theyregetting out of the system. It helps them plan their jobs.

    And the value of the system is not just apparent to theindividuals doing the day to day development of thisnew set of products. Company executives are now in aposition to make strategic decisions based upon data

    that simply was not available until the P3 and MonteCarlo system was put into place.

    Top management has expressed their extreme satis-faction with what weve put in place, says West. Theyare very satisfied that they have gotten a level of con-trol that theyve never had in the past. Initially there

    was some grousing among people who didnt want toleave the Apple platform, but the quality of the datacoming out of P3 has really silenced the critics. Thedata is there. They are able to look at projections andmake business decisions based on where they are andwhat they see downstream. Theyre able to identify

    their trouble areas months before they happen. Andusing the Monte Carlo software theyre able to knowwhat chance they have of making those dates in thefirst place.

  • 7/30/2019 P32PROFL

    11/36

    Think about large public works projects and youll think

    of the Army Corps of Engineers. Not only is the Corpsfamous for their dams and earthworks, theyre theconstruction backbone of the Army. In the Kansas Citydistrict alone, the Corps of Engineers has overseen theconstruction of military base railroad heads, hospitalfacilities, barracks, base residential housing, and a

    host of smaller projects. Were running about $130million worth of work out of this office, says Harold G.Chart, an Office Engineer at the Fort Riley ResidentOffice, Fort Riley, Kansas. And thats just right now. Itvaries dependent upon funds appropriations.

    We use Primaveras Primavera Project Planner

    (P3) for Windows to monitor contractors constructionschedules, Chart explains. We have a requirementthat contractors submit an electronic version of theschedule, and it has to be in a format that conforms toCorps of Engineers standards, and here that basicallymeans P3. If the contractor doesnt use P3, Chart

    goes on to say, they are obligated to provide theirschedules in a format that Chart can import into P3 foranalysis. P3 has given us the software to convert

    P R O J E C T P R O F I L E S

    P3 at the Army Corps of EngineersMonitoring the progress of more than 130 million worth of projects in theKansas City district.

    many different formats, Chart notes. In this office, we

    can convert schedules from Microsoft, PlanTrack, justabout anything. I havent run across a format that Icouldnt open with P3, and Ive been using it since1987.

    Chart goes on to explain that each contractor providesan initial schedule which the Corps can analyze.Thereafter, on a monthly basis, the contractor providesan updated version of the schedule. That way, saysChart, we can monitor his progress. We can look atimpact for government activities. We can look at theeffect of changes and claims. Actually, says Chart,with all the reporting attributes in P3, we can look at

    almost anything we want to.

    Ensuring that the Services are Well-Served

    The Kansas City District of the Army Corps of Engi-neers ensures that construction projects undertakenfor the government stay on track and on budget.

    Charts group supports not only the Armys First Infan-try Division, which is based out of Fort Riley, But also

  • 7/30/2019 P32PROFL

    12/36

    supports the Air Force at McConnell Air Force Base, inWichita, Kansas.

    For the services, Charts group has managed the

    schedule for a wide range of projects. Weve donebarracks construction, a health care facility, and re-cently we completed a multi-purpose activity and wel-fare building called Emerald City at McConnell AFB.Weve done transient officers quarters, some reservebuildings. Were doing a crash and fire rescue buildingright now. All those buildings have schedules. Chart

    goes on to say that most project schedules are nolonger than two years in duration.

    We also do housing, Chart adds. Were replacingbase housing. At Fort Riley weve got two housing

    jobs, currently, which is around $25 million worth ofwork. Its two different jobsbut the same contractor.Theyre demolishing old base residential housing andbuilding new housing in its place. That will take a yearto a year and a half. One job involves 232 units, theother is 155 units.

    We also handle civil works projects from this office,

    Chart goes on to say. Theres Tuttle Creek Dam,Milford Dam, Perry Lake Dam, Kanopolis Lake Dam.Some civil works jobs require scheduling, too.

    Managing Claims and the Critical Path

    In the course of managing many projects of long dura-tion, there are always claims and counterclaims. Chart

    says that P3 enables his group to analyze the claimsand make sure that the claims are valid.

    We do a lot of claims analysis with P3, says Chart.We look at the period of time before there was achange or a claimusually the monthly update be-fore and then we look at the period after. Then we

    look to see what effect its had on the network and tryto figure out where the critical path flows and whetherit had anything to do with the claim.

    Chart cites weather as an example. Our specificationsrequire that adverse weather must be considered inthe schedule. If a contractor is late getting his submit-tals into us, the weather hasnt effected him at all. Itcould be pouring down rain, but if hes not ready to dothe work because he doesnt have his submittals ap-proved or his materials arent here, were probably notgoing to give him any time.

    In that sense, Chart continues, youre analyzing hisschedule to determine where the critical path is andwhats really driving the train.

  • 7/30/2019 P32PROFL

    13/36

    Easier Management of Complex Project

    Schedules

    None of Charts projects are slight and none are un-

    complicated. There is a seven-story hospital underrenovation at Fort Riley, which must remain functionalas a hospital all the while the renovations are under-way. That requires a lot of scheduling and a lot of

    coordination, says Chart. Typically, the kind of con-tractors bidding this kind of work are used to doinghospitals. Theyre used to working with us, or the VA, orthe Air Force, and they know their business.

    Still, such complex projects require sophisticated man-agement tools. And for Harold Chart, P3 remains thetool of choice.

    Two Ba la Plaza Bala Cynwyd, PA 19 00 4-15 86 US A

    (610) 66 7-860 0 FAX: (610 ) 667 -78 94 Inte rne t: Sa le s@prima ve ra.co m

    E lis o re H o u s e 7 7 Fu lh a m P la c e R o a d Lo n d o n U n ite d K in g d o m , W6 8 JA

    (44) 18 1-74 8-730 0 FAX: (44) 18 1-74 8-284 6 Inte rne t: intlsale @prima ve ra.co m

    http://www.primavera.com

    How t he w or ld say s project m anagem ent

  • 7/30/2019 P32PROFL

    14/36

  • 7/30/2019 P32PROFL

    15/36

  • 7/30/2019 P32PROFL

    16/36

  • 7/30/2019 P32PROFL

    17/36

    With the retail component scheduled to open in the lastquarter of 1997 and the international-class concerthalls first performance targeted for January 1998, LesBrowns team of six planners still has a lot of work

    Two Ba la P laza Ba la Cynwyd, PA 19 00 4-1586 USA

    (610 ) 667 -86 00 FAX: (610 ) 667 -78 94 Inte rne t: Sa le s@prima ve ra.com

    E lis o r e H o u s e 7 7 Fu lh a m P la c e R o a d Lo n d o n U n ite d K in g d o m , W6 8 JA

    (44) 18 1-74 8-73 00 FAX: (44) 18 1-74 8-28 46 Inte rne t: intlsale @prima ve ra.co m

    http://www.primavera.com

    How t he w or ld say s project m anagem ent

    ahead. As future project phases begin, Les team looksfor- ward to using P3 and SureTrak together as a Con-centric Project Management solution that wont havethem running around in circles!

    P R O J E C T P R O F I L E S

  • 7/30/2019 P32PROFL

    18/36

    The Federal Correctional Complex in Allenwood, PA,was not built according to the old rules. Indeed, the$173 million project was the first of its kind: it was thelargest project ever undertaken by the Federal prisonsystem and it involved the concurrent construction ofthree distinct correctional facilitiesa minimum, amedium, and a maximum security unitin three adja-cent villages on a 600-acre parcel of land. In all, thecomplex involved the installation of more than 60 build-ings, a million-gallon elevated water tank, an off-site

    waste treatment facility, and a network of highly so-phisticated internal, external, and perimeter securitysystems. Three general contractors, more than adozen specialists, and one Project Manager were in-volvedand, at the center of it all, PrimaverasPrimavera Project Planner (P3).

    P R O J E C T P R O F I L E S

    Constructing Correctional Institutions theCorrect Waywith Primavera Project

    PlannerP3 enables Gilbert/Commonwealth to Deliver On Time, Within Budget, and Without Claims

    Staying on Top of Progress

    Managing the entire project was Gilbert/Common-wealth of Reading, PA, and the man in charge of theschedule was Scott Daelhousen. Not only wasDaelhousens P3 network coordinating more than20,000 activities, which would take place over thecourse of three years, but it was also cost loadedandDaelhousen was authorizing payment for the contrac-tors based upon the progress recorded in P3.

    To monitor that progress, Daelhousen relied on a staffof eighteen inspectors. Each week, the inspectorswould take copies of the 60-day look-ahead report andgo out and do an assessment to determine what per-centage of the work had been completed for eachlisted item. Daelhousen and an assistant would then

    update the status of activities in P3, and with the up-

  • 7/30/2019 P32PROFL

    19/36

  • 7/30/2019 P32PROFL

    20/36

    loading and looked at the changes that would occurbased on the contractors manpower loading, and weleveled it, looked at it, put the changes in it, and dem-onstrated that the manpower loading considerations

    were not substantially affected by the condition.

    Could he have done that without the power of a toollike P3? Absolutely not, says Daelhousen. Theresno way. Manually you couldnt keep track of somethinglike that, even if you were trying to keep up on somekind of spreadsheet system. You wouldnt be able to

    develop that kind of confidence. You wouldnt have theability to manipulate the data to see what would hap-pen.

    Two Ba la Plaza Bala Cynwyd, PA 19 00 4-15 86 US A

    (610 ) 667 -86 00 FAX: (61 0) 66 7-78 94 Inte rne t: Sa le s@prima ve ra.co m

    E lis o r e H o u s e 7 7 F ulh a m P la c e R o a d Lo n d o n U n ite d K in g d o m , W6 8 JA

    (44) 18 1-74 8-73 00 FAX: (44 ) 181 -748 -284 6 Inte rne t: intlsale @prima ve ra.co m

    http://www.primavera.com

    How t he w orld say s project m anagem ent

    The Bottom Line

    For a complex project that was breaking new ground inmultiple dimensions, the Federal Correctional Complex

    in Allenwood went in with no substantial hitches, anaccomplishment that reflects well not only onDaelhousen, but also on Primaveras P3. It was avery, very successful operation, says Daelhousen. Wecompleted the project on time and within budget, andwe had no claims on the job.

    P R O J E C T P R O F I L E S

  • 7/30/2019 P32PROFL

    21/36

    Mainframes used to make sense for scheduling out-ages and on-line maintenance activities at PECOEnergys Peach Bottom Atomic Power Station. After all,a refueling outage schedule for each of the two 1100Megawatt nuclear reactors involves the coordination of

    more than 10,000 activities and 35,000 relationships.The dependencies are complicated, as are the indi-vidual activities themselves. Such a project requiresthe support of more than 3,000 technicians, workinground the clock, for several weeks. Yes, a mainframeused to make sense until Primaveras P3 for Win-dows became available.

    Then, as PECOs Peach Bottom station soon foundout, a PC running P3 would do an even better job.

    And it would save money. Lots of money.

    P R O J E C T P R O F I L E S

    Re-Engineering the Planning Process at PECONuclears Peach Bottom StationP3 Increases Efficiency and Reduces Costs for PECO Energys Peach Bottom AtomicPower Station

    Developing a Sophisticated Schedule

    Interactively

    PECO Energys Peach Bottom Station was the firstnuclear site to schedule refueling outages and on-line

    maintenance with P3, explains Lee Harrison, the man-ager of Peach Bottoms Scheduling group in OutageManagement. Prior to the implementation of P3 theyhad relied on PREMIS, a mainframe-based schedulingpackage. But PREMIS, while powerful, did not lenditself to an efficiently engineered planning process. An

    outage planner, sitting on the fourth floor of the build-ing adjacent to the reactors themselves, would fill out aPREMIS input sheet, specifying activity code data,relationships, or dates. Then, the planner would comedown two floors and put the PREMIS input sheet into adrop box, from which it would make its way to one ofthe PREMIS programmers in Harrisons central sched-

    uling group.

  • 7/30/2019 P32PROFL

    22/36

  • 7/30/2019 P32PROFL

    23/36

  • 7/30/2019 P32PROFL

    24/36

  • 7/30/2019 P32PROFL

    25/36

  • 7/30/2019 P32PROFL

    26/36

    ill h i t th i d t t F i t i l b fit f PECO E B bli f l

  • 7/30/2019 P32PROFL

    27/36

    will have an impact on their departments. For instance,the users in the chemistry group will look at the

    schedule to see if any surveillance tests are planned.The users in the radiation protection group look to seeif the activities coming up on the schedule have beenreviewed for their radiation work permits.

    Tangible Benefits

    Peach Bottom is contributing power to the power pool

    that supplies the whole Northeast corridor, so a lot offamilies and a lot of businesses depend upon the effi-cient production of power from the system. The plantsdual-unit capability factor an industry measure ofplant output is above 93% these days. Its evenhigh on the units that that had outages that year, saysHarrison, now that the outages are under 30 days.

    By saving in excess of $28,000 per month on main-frame charges, P3 has provided a very tangible finan-

    cial benefit for PECO Energy. By enabling fewer peopleto accomplish more work, more efficiently, it hasgained even greater financial benefits for the company.But Harrison points out that the benefits are not just to

    the bottom line of the company.The most significant Big Picture benefit that Ive seenis that it puts people in control of the quality of theirown work, Harrison explains. With P3, an OutagePlanner can be as good as he can be without havingsoftware, or a process thats less than efficient, in his

    way. Work Week Managers can really own their workweeks, because everything they need to make well-planned, well-executed, well-scheduled work weeks isunder their control, now. The old process got in the wayof people being their best.

    Aside from the reduction in manpower and the reduc-

    tion in mainframe costs, that, I think, is our most signifi-cant gain.

    Two Ba la Plaza Bala Cynwyd, PA 19 00 4-15 86 US A

    (610) 66 7-860 0 FAX: (610 ) 667 -78 94 Inte rne t: Sa le s@prima ve ra.co m

    E lis o re H o u s e 7 7 Fu lh a m P la c e R o a d Lo n d o n U n it e d Kin g d o m , W6 8 JA

    (44) 18 1-74 8-730 0 FAX: (44) 18 1-74 8-28 46 Inte rne t: intlsale @prima ve ra.co m

    http://www.primavera.com

    How t he w or ld say s project m anagem ent

  • 7/30/2019 P32PROFL

    28/36

  • 7/30/2019 P32PROFL

    29/36

  • 7/30/2019 P32PROFL

    30/36

    Williamson reports that the users at PECO also like P3 the Core of an Accessible Integrated

  • 7/30/2019 P32PROFL

    31/36

    Williamson reports that the users at PECO also likeP3s graphical interface and the fact that they can getinformation from the system immediately. No fussingwith input sheets or batch jobs. Theres a lot more

    instant gratification when using P3.Williamson also notes that since PECO beganoutsourcing its mainframe computing, P3 for Windowshas saved the utility money. Mainframe charges tendto get pretty expensive, says Williamson, and you canrack up some pretty extensive CPU time with a main-

    frame-based scheduling package. So one of the gainswith P3 has been a cost-savings.

    P3 - the Core of an Accessible Integrated

    Project Management System

    P3 has shown PECO that it can be instrumental in

    getting more and more end users involved in the plan-ning and scheduling process, that the need for a groupof mainframe-oriented scheduling gurus has dimin-ished. Schedules that work, that enable the plant tooperate effectively and efficiently, are now well withinreach of a wider group of users relying on PC-basedtools.

    P3 for Windows has met our objectives, saysWilliamson. The fact that a lot of users without astrong scheduling background can do their own inputsand see the results of their changesand the degreeto which they like itwell, thats been good to see.

    Two Bala P laza Ba la Cynwyd, PA 19 004 -158 6 USA

    (610) 66 7-860 0 FAX: (610) 66 7-789 4 Inte rne t: Sa le s@prima ve ra.co m

    E lis o re H o u s e 7 7 Fu lh a m P la c e R o a d Lo n d o n U n it e d Kin g d o m , W6 8 JA

    (44) 18 1-74 8-730 0 FAX: (44) 18 1-74 8-284 6 Inte rne t: intlsale @prima ve ra.co mhttp://www.primavera.com

    How t he w or ld say s project m anagem ent

    P R O J E C T P R O F I L E S

  • 7/30/2019 P32PROFL

    32/36

    What do department stores and travel agencies havein common with the Post Office? In the United King-dom, theyre competing with one another for your busi-ness. Since the government lifted the restrictions onthe services it can offer, the retail arm of the Post Of-

    fice, known as Post Office Counters, Ltd. (POCL), hasbeen expanding and diversifying to compete moreeffectively with the other business on the High Street.For POCL, that has meant the addition of new Bureaude Change facilities, national lottery ticket vendingoperations, enhanced operations for selling travel in-surance and collecting telephone and utility bill pay-

    mentshundreds of enhancements and new services,all of which must be made available in as many as19,500 POCL outlets across the UK.

    Key to managing this expansion across so many sepa-rate facilities is Primaveras Primavera Project Planner

    (P3).

    Improving Efficiency at the UK Post OfficeCounters Ltd.Primaveras P3 helps make 19,500 Post Office outlets more competitive

    Improving Efficiency with P3

    P3 helps POCLs London-based Project ManagementServices (PMS) division implement the organizationsnew programs. PMS works closely with the managers

    responsible for each new development, providing arange of services, from consulting to preparing de-tailed, computer-based plans for the many tasks ineach project. A team of 25 planners, based in Londonand Chesterfield, works full-time on project manage-ment activities, meeting regularly with the project man-agers, whom they see as their clients, to discuss and

    update plans.

    Were trying to improve the efficiency of change at thePost Office, says Doug Warwick, Project Support Man-ager for the PMS division. Efficiency is fundamental toPOCLs efforts for that will enable the organization tocompete effectively for the customers business. Notonly does POCL have to provide a better service than

  • 7/30/2019 P32PROFL

    33/36

  • 7/30/2019 P32PROFL

    34/36

    must-have features says Doug Warwick. They just The portability of the laptop systems enables planners

  • 7/30/2019 P32PROFL

    35/36

    dont have the capability to handle major projects likeours, where we can have literally thousands of activi-ties and resources to manage.

    The planners at POCL finally settled on Primaveras P3after Primaveras distributors, Milestone, arranged atrial that would enable PMS planners to compare thethree PC-based packages upon which they had settledas final contenders. Two planners were assigned totest each package with the same 750-activity network,

    assessing a broad range of features including perfor-mance, ease-of-use, and supplier support. Althougheach of the finalists had strengths, the end-result wasa decision in favor of Primaveras P3.

    Users particularly liked the interface, says Warwick,and the quality of the graphics was excellent, an im-

    portant benefit when working with our internal POCLclients.

    Scheduling on the Go

    PMS is running P3 on 486- and Pentium-basedCompaq laptop systems, complete with docking sta-

    tions and 17 monitors that the planners can use whentheyre not on the road. The project data resides on aserver on Novell-based network, and ISDN WAN con-nections between PMS London and Chesterfield sitesprovide planners with high-speed connections to thedata.

    to take the project plans with them when they visitPOCLs project managers, whom they view as theirclients. The planners can modify the plans as they are

    sitting at the meetings, which brings to the process anelement of real-time planning that was never presentwhen they were using mainframe Artemis. The plan-ners used to have to return to the office, make thechanges at a terminal, wait for a report, and bring thechanged schedule backa process that often took atleast a day. Now, says Warwick, the speed with which

    they can make the changes, and the ease with whichwe can modify plans, is tremendous.

    Multi-user access to the project data, which Artemisdid not allow, has also helped us, Warwick goes on tosay, particularly in times of stress when weve had toproduce something very quickly. We can put severalpeople on the task of entering data and we can get itdone in a few hourswhereas it would have taken oneperson at least a full day to do it before. And then wecan take it right back to our customer and say, Here itis. Weve managed to do thisis this the sort of thingyou want? The customers are always impressed by

    that.