Company Introduction
Widening the Horizon
+ Content
Company Background
Safety Policy
Engineering Services
Clientele
Maintenance Services
Projects Completed
+ Company Background
Founded in 1985
Managing Director – Lau Pon Lee
Started in Johor Port Berhad – Maintenance Contractor for 26 yrs
90 over permanents employees
Offices in Malaysia, Singapore and Indonesia
Served clients in South East Asia, China, Japan, India, USA and Caribbean region
+ Safety Policy
We are committed to provide a safe, healthy and clean working environment.
We are committed to take measures to ensure our own safety and health and of all other workers at work.
We are committed to periodically review and evaluate Papilla’s policy and programs on HSE.
+ Engineering Services
Heavy Machinery - Pre-Construction
Heavy Machinery Construction
Engineering and Technical Services
+ Heavy Machineries - Pre-Construction
Oversee all aspects of client’s project
Estimating, scheduling, engineering, contracting, labour, cost control and coordination with owner & architect
Composed of both project management and site supervision professionals
+ Heavy Machineries Construction
Assist clients to realize their visions
Customize services to fit into client’s requirements
Cater for projects of varying scope, budget, schedule and complexity
+ Engineering and Technical Services
Construction reviews
Technical site surveys
Condition assessment
Operation and maintenance services
Emergency repair
Modernization and retrofitting
+ Clienteles and Associates
+ Projects Papilla Completed with MHI
Northport and Johor Port, Malaysia – Supply of ship to shore cranes and rubber tyre gantry cranes.
Northport, Malaysia – Repair for ship to shore crane gantry device crack
Johor Port, Malaysia – Repair for ship to shore crane portal beam accident
Chittagong Port, Bangladesh – Residential engineer by Papilla
+ Projects Completed PTP
2011 - Replacement of all Gantry wheels and gearbox and install additional wheels for 3 units IMPSA STS crane
2008 - Reconstruct 3 units IMPSA STS crane trolley drive mechanism and Boom alignment work
2008 - 4 units Noell STS crane boom hinge boring and pin replacement
2002 - Off loading 5 units Noell STS crane
1999 - 2002 - 36 units Hanjung RTG and 6 units Favelle Favco RTG erection work ( 1999 - 2002 )
+ Complex Projects Completed
2012 - Favalle Favco Level Luffing Crane E&I installation
2010 - Technip Sub-Sea Flexible Pipe Manufacturing Plant Installation Work
2009 - National Oilwell Varco 3,000 tonne Super Marine Crane
2008 - STS crane A Frame repair ( Westport)
2007 – 5 units MHI STS crane equalizer crack repair ( North port )
2007 - 2 units IMPSA STS crane Erection ( Penang Port )
2007 – 3 units IMPSA STS crane electrical Installation work (North Port)
+ Offloading 5 Units Noell STS Crane - PTP
+ IMPSA STS Crane Erection Work – Penang Port (2007)
+ IMPSA STS Crane Erection Work – Penang Port (2007)
+ IMPSA STS Crane Gantry Wheel and Gearbox Replacement – (PTP)
+ IMPSA STS Crane Gantry Wheel and Gearbox Replacement – (PTP)
+ IMPSA STS Crane Gantry Wheel and Gearbox Replacement – (PTP)
+ IMPSA STS Crane Boom Hinge Boring and Pin Replacement
+ IMPSA STS Crane Boom Hinge Boring and Pin Replacement
+ STS Crane A-Frame Repair – Westport
Special temporary support
+ A-Frame Repair – STS Crane (Westport)
+ Equaliser Crack Repair - Northport
+ Gearbox Overhaul - JPB
+ Gearbox Replacement – BICT
+ Gearbox Replacement - BICT
+ Favelle Favco Level Luffing Crane (2012)
+ Favelle Favco Level Luffing Crane (2012)
+ Favelle Favco Pedestal Crane (2000)
+ Favelle Favco Pedestal Crane (2002)
+ Kapar Energy Ventures – Stacker Reclaimer Repair Works
+ Kapar Energy Ventures – Stacker Reclaimer Repair Works
+ National Oilwell Varco 3,000 Tonne Super Marine Crane
+ Mechanical Work
Bull gear installation
Chain assembly
Rail – mid post
Rail – upper pedestal
Sheave and bearing – Top bail
Slewing bearing
Slewing motor – Top bail
Erection Work
+ Bull Gear Installation
+ Chain Assembly
+ Rail – Mid Post
+ Rail – Upper Pedestal
+ Sheave and Bearing - Top Bail
+ Slewing Bearing
+ Slewing Motor – Top Bail
+ Erection Work
+ Erection Work
+ Electrical Work
Installation of electrical cable support systems
Wiring of control systems
Installation of control room
Installation of slip ring
+ Installation of Electrical Cable Support Systems
+ Wiring of Control Systems
+ Installation of Control Room
+ Installation of Slip Ring
+ Completed Components
+ Monadelphous Muhibbah Marine Shiploader -Wiggins Island Coal Export Terminal, Australia
+ Installation of Pin And Sheave
+ Installation of Cabble Ladder and Conduit
+ Installation of Mast
+ Installation of Boom
+ Technip Sub-Sea Flexible Pipe Manufacturing Plant (2009-2012)
+ Electrical And Mechanical Installation Work
+