57
+ Company Introduction Widening the Horizon

Papilla Company Introduction

Embed Size (px)

Citation preview

Page 1: Papilla Company Introduction

+

Company Introduction

Widening the Horizon

Page 2: Papilla Company Introduction

+ Content

Company Background

Safety Policy

Engineering Services

Clientele

Maintenance Services

Projects Completed

Page 3: Papilla Company Introduction

+ Company Background

Founded in 1985

Managing Director – Lau Pon Lee

Started in Johor Port Berhad – Maintenance Contractor for 26 yrs

90 over permanents employees

Offices in Malaysia, Singapore and Indonesia

Served clients in South East Asia, China, Japan, India, USA and Caribbean region

Page 4: Papilla Company Introduction

+ Safety Policy

We are committed to provide a safe, healthy and clean working environment.

We are committed to take measures to ensure our own safety and health and of all other workers at work.

We are committed to periodically review and evaluate Papilla’s policy and programs on HSE.

Page 5: Papilla Company Introduction

+ Engineering Services

Heavy Machinery - Pre-Construction

Heavy Machinery Construction

Engineering and Technical Services

Page 6: Papilla Company Introduction

+ Heavy Machineries - Pre-Construction

Oversee all aspects of client’s project

Estimating, scheduling, engineering, contracting, labour, cost control and coordination with owner & architect

Composed of both project management and site supervision professionals

Page 7: Papilla Company Introduction

+ Heavy Machineries Construction

Assist clients to realize their visions

Customize services to fit into client’s requirements

Cater for projects of varying scope, budget, schedule and complexity

Page 8: Papilla Company Introduction

+ Engineering and Technical Services

Construction reviews

Technical site surveys

Condition assessment

Operation and maintenance services

Emergency repair

Modernization and retrofitting

Page 9: Papilla Company Introduction

+ Clienteles and Associates

Page 10: Papilla Company Introduction

+ Projects Papilla Completed with MHI

Northport and Johor Port, Malaysia – Supply of ship to shore cranes and rubber tyre gantry cranes.

Northport, Malaysia – Repair for ship to shore crane gantry device crack

Johor Port, Malaysia – Repair for ship to shore crane portal beam accident

Chittagong Port, Bangladesh – Residential engineer by Papilla

Page 11: Papilla Company Introduction

+ Projects Completed PTP

2011 - Replacement of all Gantry wheels and gearbox and install additional wheels for 3 units IMPSA STS crane

2008 - Reconstruct 3 units IMPSA STS crane trolley drive mechanism and Boom alignment work

2008 - 4 units Noell STS crane boom hinge boring and pin replacement

2002 - Off loading 5 units Noell STS crane

1999 - 2002 - 36 units Hanjung RTG and 6 units Favelle Favco RTG erection work ( 1999 - 2002 )

Page 12: Papilla Company Introduction

+ Complex Projects Completed

2012 - Favalle Favco Level Luffing Crane E&I installation

2010 - Technip Sub-Sea Flexible Pipe Manufacturing Plant Installation Work

2009 - National Oilwell Varco 3,000 tonne Super Marine Crane

2008 - STS crane A Frame repair ( Westport)

2007 – 5 units MHI STS crane equalizer crack repair ( North port )

2007 - 2 units IMPSA STS crane Erection ( Penang Port )

2007 – 3 units IMPSA STS crane electrical Installation work (North Port)

Page 13: Papilla Company Introduction

+ Offloading 5 Units Noell STS Crane - PTP

Page 14: Papilla Company Introduction

+ IMPSA STS Crane Erection Work – Penang Port (2007)

Page 15: Papilla Company Introduction

+ IMPSA STS Crane Erection Work – Penang Port (2007)

Page 16: Papilla Company Introduction

+ IMPSA STS Crane Gantry Wheel and Gearbox Replacement – (PTP)

Page 17: Papilla Company Introduction

+ IMPSA STS Crane Gantry Wheel and Gearbox Replacement – (PTP)

Page 18: Papilla Company Introduction

+ IMPSA STS Crane Gantry Wheel and Gearbox Replacement – (PTP)

Page 19: Papilla Company Introduction

+ IMPSA STS Crane Boom Hinge Boring and Pin Replacement

Page 20: Papilla Company Introduction

+ IMPSA STS Crane Boom Hinge Boring and Pin Replacement

Page 21: Papilla Company Introduction

+ STS Crane A-Frame Repair – Westport

Special temporary support

Page 22: Papilla Company Introduction

+ A-Frame Repair – STS Crane (Westport)

Page 23: Papilla Company Introduction

+ Equaliser Crack Repair - Northport

Page 24: Papilla Company Introduction

+ Gearbox Overhaul - JPB

Page 25: Papilla Company Introduction

+ Gearbox Replacement – BICT

Page 26: Papilla Company Introduction

+ Gearbox Replacement - BICT

Page 27: Papilla Company Introduction

+ Favelle Favco Level Luffing Crane (2012)

Page 28: Papilla Company Introduction

+ Favelle Favco Level Luffing Crane (2012)

Page 29: Papilla Company Introduction

+ Favelle Favco Pedestal Crane (2000)

Page 30: Papilla Company Introduction

+ Favelle Favco Pedestal Crane (2002)

Page 31: Papilla Company Introduction

+ Kapar Energy Ventures – Stacker Reclaimer Repair Works

Page 32: Papilla Company Introduction

+ Kapar Energy Ventures – Stacker Reclaimer Repair Works

Page 33: Papilla Company Introduction

+ National Oilwell Varco 3,000 Tonne Super Marine Crane

Page 34: Papilla Company Introduction

+ Mechanical Work

Bull gear installation

Chain assembly

Rail – mid post

Rail – upper pedestal

Sheave and bearing – Top bail

Slewing bearing

Slewing motor – Top bail

Erection Work

Page 35: Papilla Company Introduction

+ Bull Gear Installation

Page 36: Papilla Company Introduction

+ Chain Assembly

Page 37: Papilla Company Introduction

+ Rail – Mid Post

Page 38: Papilla Company Introduction

+ Rail – Upper Pedestal

Page 39: Papilla Company Introduction

+ Sheave and Bearing - Top Bail

Page 40: Papilla Company Introduction

+ Slewing Bearing

Page 41: Papilla Company Introduction

+ Slewing Motor – Top Bail

Page 42: Papilla Company Introduction

+ Erection Work

Page 43: Papilla Company Introduction

+ Erection Work

Page 44: Papilla Company Introduction

+ Electrical Work

Installation of electrical cable support systems

Wiring of control systems

Installation of control room

Installation of slip ring

Page 45: Papilla Company Introduction

+ Installation of Electrical Cable Support Systems

Page 46: Papilla Company Introduction

+ Wiring of Control Systems

Page 47: Papilla Company Introduction

+ Installation of Control Room

Page 48: Papilla Company Introduction

+ Installation of Slip Ring

Page 49: Papilla Company Introduction

+ Completed Components

Page 50: Papilla Company Introduction

+ Monadelphous Muhibbah Marine Shiploader -Wiggins Island Coal Export Terminal, Australia

Page 51: Papilla Company Introduction

+ Installation of Pin And Sheave

Page 52: Papilla Company Introduction

+ Installation of Cabble Ladder and Conduit

Page 53: Papilla Company Introduction

+ Installation of Mast

Page 54: Papilla Company Introduction

+ Installation of Boom

Page 55: Papilla Company Introduction

+ Technip Sub-Sea Flexible Pipe Manufacturing Plant (2009-2012)

Page 56: Papilla Company Introduction

+ Electrical And Mechanical Installation Work

Page 57: Papilla Company Introduction

+

Thank you

Widening the Horizon