  • Phase I Stormwater Best Management Practices Implementation Plan

    Prepared for

    Boston Water and Sewer Commission

    May 2013

    18TremontStreet

    Suite700Boston,MA02108

  • Contents Section Page

    I

    1 Introduction.........................................................................................................................................111.1 Summary..........................................................................................................................................111.2 GreenInfrastructureTechnologies..................................................................................................11

    1.2.1 Bioretention(RainGardens)...............................................................................................131.2.2 PlanterBox..........................................................................................................................131.2.3 InfiltrationSystems.............................................................................................................131.2.4 PorousPavements..............................................................................................................141.2.5 RainBarrels/Cisterns..........................................................................................................141.2.6 GreenRoof..........................................................................................................................14

    1.3 GIDemonstrationProjectLocations................................................................................................151.4 IntegrationofGITechnologiesandBWSCMonitoringData...........................................................15

    2 GreenInfrastructureDemonstrationProjects......................................................................................212.1 CentralSquare,EastBoston............................................................................................................21

    2.1.1 DescriptionofSite&Owners.............................................................................................212.1.2 GIGoals,Plan&Status.......................................................................................................212.1.3 MonitoringPlan..................................................................................................................222.1.4 MaintenancePlan...............................................................................................................23

    2.2 CityHallPlaza...................................................................................................................................242.2.1 DescriptionofSite&Owners.............................................................................................242.2.2 GIGoals,Plan&Status.......................................................................................................242.2.3 MonitoringPlan..................................................................................................................282.2.4 MaintenancePlan...............................................................................................................28

    2.3 AudubonCircle................................................................................................................................282.3.1 DescriptionofSite&Owners.............................................................................................282.3.2 GIGoals,Plan&Status.......................................................................................................282.3.3 MonitoringPlan..................................................................................................................292.3.4 MaintenancePlan...............................................................................................................29

    3 GIDemonstrationProjectImplementation..........................................................................................313.1 Schedule..........................................................................................................................................313.2 StakeholderInvolvement.................................................................................................................313.3 InclusionofBMPMaterialsintheBWSCSitePlanReviewProcess................................................31

    4 References...........................................................................................................................................41

    Tables11 GreenInfrastructureTechnologyPotentialApplication...............................................................................1121 ListofRecommendedMaintenanceTasksforGreenInfrastructureattheCentralSquare,EastBoston

    Site................................................................................................................................................................2322 MBTAGovernmentCenterStationImprovementsProjectProposedGIImprovements............................2631 BWSCGIDemonstrationProjectsEstimatedSchedule................................................................................31

    Figures21 AerialPhotoofCentralSquare.....................................................................................................................2122 SitePlanofCentralSquareShowingProposedGITechnologiesandFlowPathways..................................2223 CityHallPlazaalongCambridgeStreet.........................................................................................................2424 FinalPlantoCaptureRunofffromCityHallPlazaalongCambridgeStreet.................................................2525 FinalPlantoCaptureRoofRunofffromMBTAStationHeadHouse............................................................25

  • CONTENTS, CONTINUED

    II

    26 ApproximateDrainageAreaManagedbyProposedGITechnologies.........................................................2727 AudubonCircleProjectLocationatIntersectionofBeaconStreetandParkDrive.....................................2828 ApproximateDrainageAreaManagedbyProposedGITechnologies.........................................................29

  • Acronyms and Abbreviations

    III

    ADA AmericanswithDisabilitiesAct

    BMP bestmanagementpractice

    BTD BostonTransportationDepartment

    BPW BostonPublicWorksDepartment

    BRA BostonRedevelopmentAuthority

    BWSC BostonWaterandSewerCommission

    CFS cubicfootpersecond

    GI greeninfrastructure

    GSI greenstormwaterinfrastructure

    LID lowimpactdevelopment

    MBTA MassachusettsBayTransportationAuthority

    Parks BostonParksandRecreationDepartment

    TMDL totalmaximumdailyload

    USEPA UnitedStatesEnvironmentalProtectionAgency

  • 1-1

    SECTION1

    Introduction 1.1 Summary ThepurposeofthisreportistodocumenttheBostonWaterandSewerCommissions(BWSC)proposedstormwaterbestmanagementpractices(BMPs),alsoreferredtoasgreeninfrastructure(GI)technologies,forimplementationasdemonstrationprojectswithintheCityofBostonpursuanttoSectionVII,PartD,Paragraph26oftheConsentDecree.BWSChasidentifiedthreedemonstrationprojects,asoutlinedinParagraph26asCentralSquareinEastBoston,CityHallPlaza,andAudubonCircle,inwhichtheBWSCplanstoimplementandevaluateGIforrunoffreductionandwaterqualityimprovements.ThisplanincludesrecommendationsandschedulesfortheimplementationofspecificGI/lowimpactdevelopment(LID)BMPsforeachsite.TheBMPsproposedaretailoredtomonitoringdatacollectedbytheBWSCandwill,inadditiontoaddressingpollutantdischarges,bolstertheBWSCsstakeholderinvolvementandpubliceducationefforts.

    1.2 Green Infrastructure Technologies Greeninfrastructure(GI)referstoadecentralizednetworkofsitespecificstormwatermanagementtechniquesthatareimplementedtoreducethevolumeofstormwaterrunoffenteringthestormdrainsystemwhilealsomimickingthenaturalhydrologiccycle.AsopposedtograyinfrastructurethetraditionalnetworkoflargescaleconveyanceandtreatmentsystemsundergroundGImanagesstormwaterthroughavarietyofsmallscale,costeffective,visibleandintegratedfeatureslocatedonsite.InFebruary2013,theBWSCsubmittedtheStormwaterBestManagementPracticesProposalandGuidanceDocumenttotheU.S.EnvironmentalProtectionAgency(USEPA)(BWSC,2013).ThepurposeoftheBMPGuidanceDocumentwastoproposeasuiteofstormwaterBMPsforpotentialapplicationbytheBWSCpursuanttoSectionVII,PartD,Paragraph25oftheConsentDecree.TheBMPGuidanceDocumentincorporatesGItechnologiesevaluatedbyGeosyntecConsultants.Table11presentstheGItechnologiesevaluatedbyGeosyntecintheBWSCreportandtheirapplicabilitytothethreedemonstrationprojectsunderconsideration.

    TABLE11GreenInfrastructureTechnologyPotentialApplication

    Project Bioreten

    tion

    Plan

    terB

    ox

    Tree

    Box

    Filter

    ConstructedStormwaterW

    etland

    SubsurfaceIn

    filtrationSystem

    1

    DryWells

    InfiltrationBa

    sin

    Prop

    rietaryIn

    filtrationDe

    vice

    PorousPavem

    ents

    Discon

    nectIm

    perviousSurfaces

    RainBarrels/Cistern

    Green

    Roo

    f

    CentralSquare CityHallPlazaGovernmentCenterMBTAStation

    CityHallPlazaPlazaDesign AudubonCircle 1TreetrencheswerenotspecificiallyidentifiedintheBWSCGuidanceDocument,however,thetechnologyisavariationonsubsurfaceinfiltrationsystems.

  • 1 INTRODUCTION

    1-2

    GIemploysthefollowingprocessestodesignahydrologicallyfunctionalsitethatmimicspredevelopmentconditions:

    Storageandinfiltration(allowingwatertoslowlysinkintothesoil) Filtrationandevaporation/transpirationusingnativevegetation Rainwaterharvesting,orcaptureandreuse(storingrunofftowaterplants,flushtoilets,etc.)

    GIsystemsaredesignedtocapturesmallstormvolumes(typicallya1inchstormevent)toreducethefrequentdi