15
Port Authority of Eastlake; Chargin River Watershed Partners, Inc. 1 January 23. 2013 Port Authority of Eastlake Park Planning Project Steering Committee Meeting MKSK is a landscape architecture, urban design, and planning firm with offices in Columbus, Covington and Indianapolis. MKSK brings landscape architects, urban designers, graphic designers and certified planners, together to offer creative and sustainable solutions. Leadership and expertise guide distinct areas of practice strength for public, private and cultural projects.

Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  1

January 23. 2013

Port Authority of Eastlake Park Planning Project

Steering Committee Meeting

MKSK is a landscape architecture, urban design, and planning firm with offices in Columbus, Covington and Indianapolis. MKSK brings landscape architects, urban designers, graphic designers and certified planners, together to offer creative and sustainable solutions. Leadership and expertise guide distinct areas of practice strength for public, private and cultural projects.

Page 2: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  2

Steering Committee

• John Sima - Owner of Sima Marina and Chair of Eastlake Port Authority

• Chris Aune Port Authority of Eastlake• Chris Aune – Port Authority of Eastlake

• Cindy Quinn-Hopkins – Eastlake Councilwoman; Chair of Eastlake Economic Development Committee

• Chris Woodin - City of Willoughby Councilman, Council Rep on Eastlake Port Authority

• Laura DePledge - Eastlake Councilwoman; Council Rep on Eastlake Port AuthorityLaura DePledge Eastlake Councilwoman; Council Rep on Eastlake Port Authority

• Mark Cain – Eastlake Port Authority

• Vince Urbanski - Lake MetroParks

Port Authority of Eastlake Park Planning Project

Stakeholders

1. Port Authority of Eastlake – Chris Aune2. Chagrin River Watershed Partners, Inc. – Amy Brennan3. Eastlake

a. Cindy Quinn- Hopkins b. Laura DePledgec Economic Community Development Councilc. Economic Community Development Councild. Mayor Ted Andrzejewskie. John Stigalt – Building Commissioner & Floodplain Administratorf. Mike Semik – Service Directorg. Other Council Members?

4. Willoughbya. Chris Woodinb. Mayor David Andersonc. Jack Gorka – WWTPd. Judean Banker – Parks and Rece. Angelo Tomaselli & Ken Wetzel – Service Dept.f O h C il M b ?f. Other Council Members?

5. Lake Metroparks – Vince Urbanski6. Lake County Port Authority – John Loftus/Eddy Eckart7. Lake County Coastal Plan – Jason Boyd8. Chagrin River Salmon Association – Barry Butera9. Chagrin Lagoons Yacht Club – Stan Leff10. Chagrin River Canoe and Kayak Livery – Lisa & Bill Alford11. First Energy – Doug Hogan

Port Authority of Eastlake Park Planning Project

Page 3: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  3

Planning Process / Approach Overview

1. Initial Facilities / Needs Assessmenta. Stakeholder Engagement

Introductions

2. Physical Inventories and Analysisa. Steering Committee Review Meeting

3. Conceptual Design Alternativesa. Charrette / Design Workshopb. Steering Committee Review Meetingc. Public Open House

4. Conceptual Master Plan Refinementa. Steering Committee Review Meeting

5. Finalize Conceptual Master Plan Documenta Steering Committee Review Meetinga. Steering Committee Review Meetingb. Master Plan Adoptions

6. Review & Discuss Site Development / Enhancement Issues, Constraints, and Opportunities

7. Discuss Park Operations / Management8. Review & Discuss Project Timeline and Meetings Schedule9. Open Discussion

Port Authority of Eastlake Park Planning Project

Stakeholder Engagement

• Project Steering Committee meetings (6 meetings)

S k h ld I i ( i 6 10 i )• Stakeholder Interviews (estimate 6-10 meetings)

• Design Workshop/Charrette

• Community Newsletters

• Internet Survey (Survey Monkey™) / Websites / Blogs / Social Media

Port Authority of Eastlake Park Planning Project

Page 4: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  4

Existing Regional Planning Study Documents

Their findings, recommendations, guiding principles, and development guidelines/standards constitute the framework for this park master plan effort.

• Lake County Coastal Plan

• Eastlake Comprehensive Land Use Plan

• Chagrin River Watershed Balanced Growth Plan (Lake Erie Balanced Growth Program, the Lake Erie Protection & Restoration Plan, and the Chargin River watershed Action Plan)

Port Authority of Eastlake Park Planning Project

10 Guiding Principles for a Sustainable Lake Erie WatershedTo attain a living equilibrium between a strong, diversified economy and a healthy Lake Erie ecosystem, activities in the Ohio Lake Erie watershed should:

1 Maximize investment in existing core urban areas transportation and infrastructure networks to1. Maximize investment in existing core urban areas, transportation, and infrastructure networks to enhance the economic vitality of existing communities.

2. Minimize the conversion of green space and the loss of critical habitat areas, farmland, forest and open spaces.

3. Limit any net increase in the loading of pollutants or transfer of pollution leading from one medium to another.

4. To the extent feasible, protect and restore the natural hydrology of the watershed to protect and restore diverse and thriving plant communities and preserve rare and endangered species.

5. Restore the physical habitat and chemical water quality of the watershed to protect and restore diverse and thriving plant communities and preserve rare and endangered species.

6. Encourage the inclusion of all economic and environmental factors into cost / benefit accounting in land use and development decisions.

7 Avoid development decisions that shift economic benefits or environmental burdens from one7. Avoid development decisions that shift economic benefits or environmental burdens from one location to the other.

8. Establish and maintain a safe, efficient, and accessible transportation system that integrates highway, rail, air, transit, water, and pedestrian networks to foster economic growth and personal travel.

9. Encourage that all development and redevelopment initiatives address the need to protect and preserve access to historic, cultural, and scenic resources.

10. Promote public access to and enjoyment of our natural resources for all Ohioans.

Port Authority of Eastlake Park Planning Project

Page 5: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  5

Recommended Widths for Riparian Setbacks

• A minimum of 300 feet on either side of all watercourses draining an area greater than 300 square miles.

• A minimum of 120 feet on either side of all watercourses draining an area greater than 20 square miles and up to 300 square miles.

• A minimum of 75 feet on either side of all watercourses draining an area greater than ½ squareA minimum of 75 feet on either side of all watercourses draining an area greater than ½ square mile and up to 20 square miles.

• A minimum of 25 feet on either side of all watercourses draining an area greater than ½ square mile and having a defined bed and bank.

• The minimum riparian setback extends to the outer edge of the 100-year floodplain and to the outermost boundary of riparian wetlands.

Recommended Widths for Wetland SetbacksRecommended Widths for Wetland Setbacks

• A minimum of 120 feet surrounding all Ohio EPA Category 3 wetlands.

• A minimum of 75 feet surrounding all Ohio EPA Category 2 wetlands.

Port Authority of Eastlake Park Planning Project

Page 6: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  6

Review and Discuss Site Development / Enhancement Issues, Constraints, and Opportunities

1. Project Study Area Boundary / Limits2. Flood Zone and Flooding Restrictions3. First Energy Power Transmission Easement4. River and Tributary Channel Protection / Restoration5. Existing Land Use6. Site Access Needs, Opportunities, and Restrictions

a. Current Internal Landuses, Operationsb. Adjacent Property Operationsc. Future Perimeter Development Considerationsd. Vehicular, Pedestrian, Watercraft, etc.

7 Support Facilities / Infrastructures7. Support Facilities / Infrastructures8. Safety, Security, and Vandalism

a. Site Facilitiesb. Public users

Port Authority of Eastlake Park Planning Project

Page 7: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  7

Existing Study Area Land Uses

• Primary interior road/drive providing access to gravel/aggregate parking areas scattered throughout the parcel

• PAOE Boat Ramp

• Chagrin River Salmon Association Building

• Chagrin River Canoe and Kayak Livery

• Playground Area

• CEI Transmission Power Line Corridor

• Gas/Oil Field/Compound

• A variety of vegetative land cover (woodlots, open/turf grass areas, scrub/shrub fields, wetlands, sparsely vegetated stream/river banks, etc.)

Port Authority of Eastlake Park Planning Project

Page 8: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  8

Port Authority of Eastlake Park Planning Project

Adjacent Land Use / Developments

• First Energy Power Plant

Adj Si l F il R id• Adjacent Single Family Residents

• Perimeter Roadways

• Marina Operations

• Water Treatment Facility

• Etc.

Port Authority of Eastlake Park Planning Project

Page 9: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  9

• Discuss Park Operations / Management

• Review & Discuss Project Timeline and• Review & Discuss Project Timeline and Meetings Schedule

• Open Discussion

Port Authority of Eastlake Park Planning Project

Page 10: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  10

Case Studies

• Chagrin River Park

• Scioto Audubon Metro Park

• Lake Erie Bluffs Collaborative Conservation Plan

Port Authority of Eastlake Park Planning Project

Chagrin River Park Willoughby & Eastlake, Ohio

Page 11: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  11

Chagrin River Park

Scioto Audubon Metro ParkColumbus, Ohio

Page 12: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  12

Scioto Audubon Metro Park

Lake Erie Bluffs Conservation PlanLake County, Ohio

Port Authority of Eastlake Park Planning Project

Page 13: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  13

Lake Erie Bluffs Conservation Plan

Port Authority of Eastlake Park Planning Project

Lake Erie Bluffs Conservation Plan

Page 14: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  14

Project Approach

1. Conduct start-up/preliminary programming meeting with the Steering Committee, City staff, and other stakeholders

2. Review of existing city parks and recreation facilities

3. Research, survey, and investigate local and regional demand for facilities

4. Stakeholder Engagement

Port Authority of Eastlake Park Planning Project

Task 2: Physical Inventories and Analysis

1. Review all currently available and relevant site information, drawings, and data including prior studies and design plans, current building plans, topographic and boundary survey(s)

2. Assemble all currently-available base mapping and survey information in GIS/CAD format

3. Conduct site visit and walk-through of the project area4. Prepare site inventory and analysis plans of existing physical

conditions including off-site influences5. Identify sensitive environmental features/ecological zones6. Identify site ingress/egress issues, constraints, and potential

t itiopportunities7. Evaluate impacts to pedestrian/bicycle trail connectivity8. Assessment of existing and available site infrastructure9. Conduct meeting with Steering Committee/City Staff

Port Authority of Eastlake Park Planning Project

Page 15: Port Authority of Eastlake Powerpointcrwp.org/files/Eastlake_Port_Authority_ParkPlanning_presentation.pdf · Microsoft PowerPoint - Port Authority of Eastlake Powerpoint.pptx Author:

Port Authority of Eastlake; Chargin River Watershed Partners, Inc.  15

Task 3: Conceptual Design Alternatives(concurrent with Task 1)

1. Arrangement of site access and parking facilities

2. Pedestrian spaces, trails, and circulation systems

3 W dl t b ff d t l ti d3. Woodlot, buffer, and natural area conservation and enhancement strategies

4. River access improvements and stream bank enhancements

5. Potential adaptive reuse opportunities of existing facilities

6. Prepare initial cost estimates with options

7. Conduct meeting with Steering Committee/City staff

8. Conduct Public Open House

9. Review meeting with Steering Committee/City staff

Port Authority of Eastlake Park Planning Project

Task 4: Conceptual Master Plan Refinement (March 20, 2013 – April 10, 2013)

1. Refine concept site master plan

2 Prepare phasing and implementation strategy2. Prepare phasing and implementation strategy

3. Solicit review comments from Steering Committee and City staff

4. Prepare final color-rendered site master plan

5. Prepare final cost estimates with options

6. Prepare summary listing of priority implementation and phasing strategiesphasing strategies

7. Conduct final Steering Committee/City staff review meeting to present the Final Concept Master Plan and implementation strategy and recommendations