52
GREGORY BENCIVENGO Portfolio of Selected Work

Portfolio

Embed Size (px)

DESCRIPTION

Undergraduate architectural design porfolio. Bachelor of Architecture candiate, 2013. Syracuse University School of Architecture.

Citation preview

Page 1: Portfolio

GREGORY BENCIVENGO Portfolio of Selected Work

Page 2: Portfolio
Page 3: Portfolio

5_Hudson Yards Museum

6_Yokohama Port Terminal Competition

7_Exhibition Experience

New York, NY

Yokohama, JP

4_Global Environmental Rights InstituteSeneca Falls, NY

1_HOST(ILE) WATERS: House Over Troubled WatersBoston, MA

2_Gallery for Foreign ArtFlorence, IT

3_Slocum Hall InstallationSyracuse University School of Architecture, Syracuse, NY

Page 4: Portfolio

HOST(ILE) WATERS: House Over Troubled Waters [in collaboration with M. Alrabe]

+ 36.00

Level 4

+ 48.00

Level 5

+ 60.00

Level 6

+ 72.00

Level 7

+ 84.00

Level 8

+ 96.00

Level 9

+ 108.00

Roof Level

+ 24.00

Level 3

+ 12.00

Level 2

+ 0.00

Level 1

- 18.00

Mechanical Level

23’ 26’ 7” 28’5” 23’ 42’ 32’ 8” 44’8” 25’

Longitudinal Section C-C: 1/8” = 1’ - 0”

A B C D E G H IF

’7’0 ’2 17’ 37’

Program_1 Pool2 Wetlands3 Commercial4 Cafe5 Kayak Center6 Docks7 Algae Farm8 Laundry9 Classroom10 Learning Center11 Family12 Studio13 Research Lab14 Lounge15 Occupiable Green RoofVoid Void

12

8910

71112

711

711

711

12

1215

15

15

14

12

711

23

314

3

3

33356

4

Green Roof

Parapet

Fritted Glass

Heating Supply

Ventilation Exhaust

InsulationAluminum Cladding

Megatruss

Fire Stair

Elevator Core

Cooling Supply

Algae Tubing

Metal Bracket

Photovoltaic Panels

Water Processing Station

Air Vent

Aluminum Cladding

Occupiable Green Roof

Air Vent

Page 5: Portfolio

+ 36.00

Level 4

+ 48.00

Level 5

+ 60.00

Level 6

+ 72.00

Level 7

+ 84.00

Level 8

+ 96.00

Level 9

+ 108.00

Roof Level

+ 24.00

Level 3

+ 12.00

Level 2

+ 0.00

Level 1

- 18.00

Mechanical Level

23’ 26’ 7” 28’5” 23’ 42’ 32’ 8” 44’8” 25’

Longitudinal Section C-C: 1/8” = 1’ - 0”

A B C D E G H IF

’7’0 ’2 17’ 37’

Program_1 Pool2 Wetlands3 Commercial4 Cafe5 Kayak Center6 Docks7 Algae Farm8 Laundry9 Classroom10 Learning Center11 Family12 Studio13 Research Lab14 Lounge15 Occupiable Green RoofVoid Void

12

8910

71112

711

711

711

12

1215

15

15

14

12

711

23

314

3

3

33356

4

Green Roof

Parapet

Fritted Glass

Heating Supply

Ventilation Exhaust

InsulationAluminum Cladding

Megatruss

Fire Stair

Elevator Core

Cooling Supply

Algae Tubing

Metal Bracket

Photovoltaic Panels

Water Processing Station

Air Vent

Aluminum Cladding

Occupiable Green Roof

Air Vent

Page 6: Portfolio

HEATING/COOLINGSTORAGETANKS

SETTLINGTANKS

WETLANDSPOOL

_THE LIVING MACHINE

_RADIANT PANEL SYSTEM _GEOTHERMAL PUMPS

BOILER

PV

STORAGETANKS

SETTLINGTANKS

PV

HEAT EXCHANGERSTORAGETANKS

EXTRACTION WELL

INJECTION WELL

SETTLINGTANKS

HEATING/COOLING

POOL

GREENROOF

_GREENROOF SYSTEM

STORAGETANKS

SETTLINGTANKS

Page 7: Portfolio
Page 8: Portfolio

Ground Level Plan: 1/16” = 1’ - 0”

2’0’ 7’ 17’ 37’

Site Section: 1/64 = 1’ - 0”

2’0’ 7’ 17’ 37’

27’

27’

19’ 5”

20’ 3”

27’

23’ 26’ 7” 23’ 28’ 5” 42’ 32’ 8” 44’8” 25’

22’ 8 “

B

A

C

D

C

D

B

A

1

2

3

4

5

6

7

A B C D E G H IF

HOST(ILE) WATERS: House Over Troubled Waters

Time 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

_pool_bike center_dock_exercise

_bike centercommunity center

_cafecommunity center

_live-work_residential

_researchpool

_cafe_bike center

_commerical_research_residential_live-workbike center

_dock_exercise

commercialbike centerpool

_community center

Tourists

Neighbor

exercise _pool _bike center_cafe

Commuters

Indiviuals

Family

Live-Work

Page 9: Portfolio

Ground Level Plan: 1/16” = 1’ - 0”

2’0’ 7’ 17’ 37’

Site Section: 1/64 = 1’ - 0”

2’0’ 7’ 17’ 37’

27’

27’

19’ 5”

20’ 3”

27’

23’ 26’ 7” 23’ 28’ 5” 42’ 32’ 8” 44’8” 25’

22’ 8 “

B

A

C

D

C

D

B

A

1

2

3

4

5

6

7

A B C D E G H IF

HOST(ILE) WATERS: House Over Troubled Waters

Page 10: Portfolio

B

27’

27’

19’ 5”

20’ 3”

27’

23’ 26’ 7” 23’ 42’ 32’ 8” 44’8” 25’

Level 4 Plan: 1/8” = 1’ - 0”

22’ 8 “

A

C

D

C

D

B

A

Program_1 Studio2 One Bedroom3 Two Bedroom4 Bathroom5 Business Center6 Laundry7 Outdoor Terrace8 Lounge9 Learning Center11 Classroom12 Exercise13 Information Desk14 PoolFS Fire StairsVoid Void

6

44

9

FSFS

8

3

311111

5 2

7

12

13

222

Void11

Void

Void

Void

14

12

1

2

3

4

5

6

7

A B C D E G H IF 2’0’ 7’ 17’ 37’

Page 11: Portfolio

B

27’

27’

19’ 5”

20’ 3”

27’

23’ 26’ 7” 28’5” 23’ 42’ 32’ 8” 44’8” 25’

Level 5 Plan: 1/8” = 1’ - 0”

1

2

3

4

5

6

7

A B C D E G H IFA

C

D

B

A

Program_1 Studio2 One Bedroom3 Two Bedroom4 Family5 One Bedroom Live-Work6 Two Bedroom Live-Work7 Outdoor Terrace8 Lounge9 Water Bar11 Commercial12 Multi-Purpose13 Research Lab14 Algae Farm15 Break RoomFS Fire StairsVoid Void

1

4

4

15

9FS

FS

14

3

35555

22’ 8 “

56 5

22

7

12

11

13

555

Void 8

Void

Void

Void

7

C

D

2’0’ 7’ 17’ 37’

Page 12: Portfolio

A B C D E G H IF

+ 36.00

Level 4

+ 48.00

Level 5

+ 60.00

Level 6

+ 72.00

Level 7

+ 84.00

Level 8

+ 96.00

Level 9

+ 108.00

Roof Level

+ 24.00

Level 3

+ 12.00

Level 2

+ 0.00

Level 1

- 18.00

Mechanical Level

Page 13: Portfolio

A B C D E G H IF

+ 36.00

Level 4

+ 48.00

Level 5

+ 60.00

Level 6

+ 72.00

Level 7

+ 84.00

Level 8

+ 96.00

Level 9

+ 108.00

Roof Level

+ 24.00

Level 3

+ 12.00

Level 2

+ 0.00

Level 1

- 18.00

Mechanical Level

Slumped Sandblasted Glass

2” PipeTo carry Algae waste

Alum. Cladding

Interior Facade LayerExterior Facade Layer

Alum. Backing framew/ Structural Silicone

Alum. Bracket Connections

Silicon Sealant

Page 14: Portfolio
Page 15: Portfolio
Page 16: Portfolio

+ 25.75m

A B C

+ 20.75m

+ 15.75m

+ 9.75m

+ 6m

+ 3m

GALLERY FOR FOREIGN ART

Page 17: Portfolio

+ 25.75m

A B C

+ 20.75m

+ 15.75m

+ 9.75m

+ 6m

+ 3m

Page 18: Portfolio

defense retreat power community

+

defense retreat power exposure foreigncommunity

Time

Tourists

Florentines

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

dormire

sleep

lavorarelavorare

commutare

preparation walk walk walk walk

palazzo vecchio uffizi david pz michelangelo dinner

commutaresiesta

cenare/rilassare dormire

sleep

Page 19: Portfolio

cafe

artist studio

reception

gallery

library

gallery

officesmeeting room

Page 20: Portfolio
Page 21: Portfolio
Page 22: Portfolio

SLOCUM HALL INSTALLATION [in collaboration with L. Farrell and S. Jung, process photographs courtesy L. Farrell]

Page 23: Portfolio
Page 24: Portfolio

GLOBAL ENVIRONMENTAL RIGHTS INSTITUTE

Page 25: Portfolio
Page 26: Portfolio
Page 27: Portfolio
Page 28: Portfolio
Page 29: Portfolio
Page 30: Portfolio
Page 31: Portfolio
Page 32: Portfolio

HUDSON YARDS MUSEUM

Page 33: Portfolio

A. B. C.Altes Museum Guggenheim Museum Position

Amplified flow of dynamic and static space in museums

+0 +0 +0

Page 34: Portfolio

A. B. C.LACMA Extension New Museum Position

Increased top lighting for galleries

+0 +0 +0

Page 35: Portfolio

A. C.Metropolitan Museum of Art Position

Discrete institutions to reduce monumentality

▼▼

F I F T H AV E N U E

The Great Hall

Garage Entrance

Group RegistrationMembership DeskConcerts & Lectures

Concerts & Lectures

Met Store

Met Store

the cafeteria

C E N T R A L P A R K

South North

West

Grace Rainey Rogers Auditorium

Thomas J. Watson Library

Petrie Court Café and Wine Bar

The Temple of Dendurin The Sackler Wing

American Wing Café

(May–October)

to Parking Garage

80th St 81st St 82nd St 83rd St 84th St

Roof Garden Café

926Roof Garden

Members Dining Room and Patrons Lounge

Special Exhibitions and New Installations

Cafés and Restaurants

Met Stores

Arts of Africa, Oceania, and the Americas

European Sculpture and Decorative Arts

Arms and Armor

Greek and Roman Art

Robert Lehman Collection

The American Wing

Egyptian Art

Medieval Art

Modern and Contemporary Art

350–359

500–556

150–172

370–380

950–965

700–774

100–138

300–307

900–926

Main Entrance at 82nd Street

i

i

i

i

533

532

531

530529

528

527

526 525

524

523

522 520

521

518

519 517

514

512 511

513

516 515

507

510

509

508

505

506

500

501

503

502

547

546545

544

543

542

540539

548

549

553

551

552555

556

550

554

538 537

541599

536

350

358

359

357

352

351353

355

356

354

150

151

534

152154156158

159 157

199

155

153169

168 167 165166 164 163

160162

161

171 172

170

100

101

102

103 104

105

106

107 108

111

113

110

112

115

114

109

117 116

118

121

120

119

122

123

124127 125

126

129

130

131

128

132

133134135138 137

136

306 307

373 374 375 376

372

700

702

701

707

773

774

745

744 746

738

740741743

739

736737

735

734733

732731723

724 725

726727

72872973

0

379

380

378377

371370

302 301300

303

304

305

951952

953954

955

956957

958 962

964

965

963

961

950

959

960

915

914916

904905

906 907

903 912913

902 911

901 910

900

399

908909

st Floor and Mezzanines1 Mezzanine

Mezzanine

Mezzanine

A

All program as one unit

Program broken down by institution

B C D E F G H I

Page 36: Portfolio

Level 9+280’

Level 8+240’

Level 7+208’

Level 6+176’

Level 5+136’

Level 4+112’

Level 3+72’

Level 2+44’

Level 1+24’

Level 0+0’

Roof Level+308’

Page 37: Portfolio

Level 9+280’

Level 8+240’

Level 7+208’

Level 6+176’

Level 5+136’

Level 4+112’

Level 3+72’

Level 2+44’

Level 1+24’

Level 0+0’

Roof Level+308’

Page 38: Portfolio

Level 9+280’

Level 8+240’

Level 7+208’

Level 6+176’

Level 5+136’

Level 4+112’

Level 3+72’

Level 2+44’

Level 1+24’

Level 0+0’

Roof Level+308’

Page 39: Portfolio

Level 9+280’

Level 8+240’

Level 7+208’

Level 6+176’

Level 5+136’

Level 4+112’

Level 3+72’

Level 2+44’

Level 1+24’

Level 0+0’

Roof Level+308’

Page 40: Portfolio
Page 41: Portfolio
Page 42: Portfolio
Page 43: Portfolio
Page 44: Portfolio

YOKOHAMA PORT TERMINAL COMPETITION [in collaboration with M. Tirone]

Page 45: Portfolio

B C

B C

A A

Page 46: Portfolio

B C

B C

A A

DEPARTURE/ARRIVAL HALL

CRUISE DECK

CIQ DEPARTURE/ARRIVAL LOBBY SLOPED GARDEN

STEPPINGSTONEGARDEN

ADMIN.

VISITORS HALL

MOSS WALL COURT GARDEN

MAIN ENTRY PATH

TERMINAL PLAZA

PR CENTER

CRUISE DECK

SHOPPING RESTAURANT FOYER

STONE GARDEN

VISITORS HALL

Page 47: Portfolio

B C

B C

A A

GALLERY

RESTAURANT

RESTAURANT

SLOPEDLAWNGARDEN

FOYERSALON OF CIVIC EXCHANGE

VISITORS DECK

VISITORS DECK GRIDDED GARDEN

Page 48: Portfolio
Page 49: Portfolio
Page 50: Portfolio

EXHIBITION EXPERIENCE Exhibition Fabrication and Installation, Syracuse Architecture Exhibitions Committee

Page 51: Portfolio
Page 52: Portfolio