PowerLink 50/100 CFS2, PLPA

Short Instruction Order No.: C53000-B1176-C220-2

Directions for Use

Copyright Siemens AG 2010

Page 2: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

Page - 2 C53000-B1176-C220-2 © SIEMENS AG 2010

Edition: P3.4.1xx

Page 3: Power Link  PL CFS2 PLPA

PowerLink Equipment

Short Instruction

General safety instructions 5

PowerLink description 10

Installation of the module frames 12

PowerLink connector panel 14

HF connection 15

Service Program PowerSys 19

Please note:

The PowerLink equipment is delivered with a CD-ROM or DVD con-taining the service program PowerSys for commissioning and trou-ble shooting of the device, as well as the PowerLink equipment manual with a detailed system description and all necessary in-structions for installation, commissioning, diagnostics and error handling.

For further details we refer you to this attached CD-ROM or DVD!

Copyright Siemens AG 2010

Page 4: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

Table of Contents:

General Safety Regulations ------------------------------------------------------------------------------------------------------- 5

Transport and Storage------------------------------------------------------------------------------------------------------------- 7

Installation --------------------------------------------------------------------------------------------------------------------------- 8 Equipment Manual---------------------------------------------------------------------------------------------------------------- 9

Installation Procedure ------------------------------------------------------------------------------------------------------------- 9

Grounding---------------------------------------------------------------------------------------------------------------------------- 9

PowerLink Description in Brief-------------------------------------------------------------------------------------------------10 Transmission Mode --------------------------------------------------------------------------------------------------------------10 Frequency Range-----------------------------------------------------------------------------------------------------------------10 Frequency Grid -------------------------------------------------------------------------------------------------------------------10 Mechanical Construction--------------------------------------------------------------------------------------------------------11 CFS-2 Part ------------------------------------------------------------------------------------------------------------------------11

Installation of the Module Frames ---------------------------------------------------------------------------------------------12 Dimensions of the PowerLink System ----------------------------------------------------------------------------------------12

Connecting the Device ------------------------------------------------------------------------------------------------------------13 Protective Ground Connection -------------------------------------------------------------------------------------------------13 Connection of the Supply Voltage ---------------------------------------------------------------------------------------------13

The Connector Panel--------------------------------------------------------------------------------------------------------------14 Interconnection of PLPA Unit and CFS-2 ------------------------------------------------------------------------------------14 Interconnection of PLPA Unit and HF-Connecting Board -----------------------------------------------------------------15

Overall Connection Diagram ------------------------------------------------------------------------------------------------15

Commissioning ---------------------------------------------------------------------------------------------------------------------16 Switching on the Supply Voltage ----------------------------------------------------------------------------------------------16 Switching on the Device --------------------------------------------------------------------------------------------------------16 Mounting of Modules in the PowerLink 50/100 -----------------------------------------------------------------------------17

Module Slot Positions in the PowerLink-----------------------------------------------------------------------------------17 Exchanging/Mounting Modules---------------------------------------------------------------------------------------------17

Service Program PowerSys ------------------------------------------------------------------------------------------------------19 PC Requirements-----------------------------------------------------------------------------------------------------------------19 Installation of the Service Program --------------------------------------------------------------------------------------------20

Page - 4 C53000-B1176-C220-2 © SIEMENS AG 2010

Page 5: Power Link  PL CFS2 PLPA

PowerLink 50/100 Equipment Quick Reference

General Safety Regulations

This manual does not represent a complete list of all safety measures re-quired for the operation of equipment (module, device) because addi-tional measures may be necessary under specific operating conditions. It does, however, contain instructions that you must observe for your per-sonal safety and for avoiding damage to equipment. These instructions are highlighted by a warning triangle as shown below according to the degree of danger.

Danger:

signifies that death, serious physical injury or substantial material damage will occur if appropriate precautionary measures are not taken.

Warning:

signifies that death, serious physical injury or substantial material damage may occur if appropriate precautionary measures are not taken.

Caution:

signifies that minor physical injury or material damage may occur if appropriate precautionary measures are not taken.

Qualified personnel Start up and operation of equipment described in this manual (module, device) may only be carried out by qualified personnel. For the purpose of this instruction and product labels, a qualified person is one who is fa-miliar with the installation, construction, and operation of the equipment and the hazards involved. In addition, he has the following qualifications:

> Is trained and authorized to energize, de-energize, clear, ground, and tag circuits and equipment in accordance with established safety prac-tices.

> Is trained in the proper care and use of Power Line equipment in ac-cordance with established safety practices.

> Is trained in rendering first aid.

© SIEMENS AG 2009 C53000-B1176-C220-2 Page - 5

Page 6: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

Please note the following:

The equipment must only be used for the applications described in the catalog and the technical description and only in conjunction with third-party devices and components recommended or ap-proved by Siemens.

Perfect and reliable operation of the product is conditional upon proper transport, storage, installa-tion, and assembly as well as correct operation and proper maintenance.

When operating electrical equipment certain components inevitably carry a dangerous voltage. Se-rious physical injury or material damage can occur if the equipment is not handled properly:

Equipment must be grounded before any connections are wired up.

Dangerous voltages can be present in all circuit sections connected to the power supply.

Even after the power supply has been disconnected there may still be dangerous voltages present in the equipment (charge stored on a capacitor).

Equipment with current transformer circuits must not be operated in the open state.

The limits specified in this product document must not be exceeded; this must also be taken into account in testing and on start-up.

Page - 6 C53000-B1176-C220-2 © SIEMENS AG 2010

Page 7: Power Link  PL CFS2 PLPA

PowerLink 50/100 Equipment Quick Reference

Warning!

The equipment may be supplied by different and from each other independent dangerous voltages. Before opening the equipment and starting the maintenance work, the device must be isolated with the specified circuit-breaker.

This product complies with the directive of the Council of the European Communities on the approximation of the laws of the member states re-lating to electromagnetic compatibility (EMC Council Directive 89/336/EEC) and concerning electrical equipment for use within specified voltage limits (Low-voltage Directive 2006/95/EC).

This conformity has been proved by tests performed according to Arti-cle 10 of the Council Directive in agreement with the generic standards EN 61000-6-2 and EN 61000-6-4 (for EMC Directive) and with the stan-dard EN 60950-1 (for Low-Voltage Directive) by Senton. The device is designed and manufactured for application in industrial environment.

These devices are designed for use in the industrial sector and fulfill the following requirements:

Emitted interference: EN 61000-6-4

Immunity to interference: EN 61000-6-2

For use in residential areas you also need the individual authorization of a national authority or test agency with respect to emitted interference.

The test and connection jacks accessible at the front are not isolated interfaces and are only used for maintenance purposes. The usual ESD measures must be observed in use. This also applies for the use of telephone connection sockets (if present).

All signal and data cables are shielded and connection of the shielding over a large area must be provided at both ends.

������������ ����

��

� � � � � � ��� ��

��������� The products and systems listed here are manufactured and marketed using a DQS-certified quality management system in accordance with DIN ISO 9001 (Certificate Registration Number 000876 QM UM). The DQS certificate is recognized in all EQ network countries (Reg. No.: 876)

Transport and Storage

The limiting values specified below must not be exceeded during transport and storage of Power-Link devices and individual modules. They may only be transported in their unopened original packaging.

If stored in their unopened original packaging there are no additional requirements for the storage room apart from the values for temperature and humidity specified below. If stored unpacked or partially unpacked please ensure that the devices and modules are stored in maintained, dry and dust-free rooms.

Permissible ambient temperature -40 °C to +70 °C

Relative humidity 5 % to 95 %

© SIEMENS AG 2009 C53000-B1176-C220-2 Page - 7

Page 8: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

Installation

CAUTION ! Electrostatic sensitive devices

Electrostatic sensitive devices are protected against destruction by electrostatic charge by means of protective structures at the inputs and outputs. In unfavorable cases, however, plastic floor cov-erings, non-conductive work surfaces, or clothing containing artificial fibers can result in such high charges that electrostatic sensitive devices can be damaged or even destroyed despite the protective networks mentioned. If a device is damaged its reliability decreases drastically, al-though it may be a long time before the effects of the damage are noticeable.

In order to ensure that electrostatic charges are eliminated harmless when working on the system you must observe the following points without fail:

1. Before carrying out any work on the system ground yourself with a wrist strap.

2. When working on modules always place them on a grounded, conductive surface

3. Only transport modules in suitable pro-tective bags.

The following points must also be observed during installation:

DANGER!

The device has to be installed in a locked room, with admission for commissioning personal only. It must be excluded that other persons except the commissioning personal has access to this equip-ment.

ATTENTION!

Sufficient cooling has to be provided!

1. Before installing the device the ground-ing wire must first be laid and connected to ground potential.

2. Connect the grounding wire immediately after installing the device or setting up the cabinet.

3. Use shoe grounding strips.

Warning!

There is a risk of electrostatic discharge up until the grounding wire has been connected even if you are wearing a wrist strap. If possible you should therefore not touch modules and wiring before then.

When dismantling the system the grounding wire must not be disconnected until all work has been completed.

Page - 8 C53000-B1176-C220-2 © SIEMENS AG 2010

Page 9: Power Link  PL CFS2 PLPA

PowerLink 50/100 Equipment Quick Reference

Equipment Manual

Note:

The equipment manual is written for service and operation personnel in the high voltage power line environment. All existing safety instructions in the client's environment have to be observed and only trained and instructed personnel is authorized to work with the equipment.

Installation Procedure

The main steps in the installation procedure are listed below:

Transport device or cabinet to the installation room in its packaging

Unpack and dispose of transport packaging

Check delivery for completeness and for mechanical damage

Secure cabinet to the floor or wall, or install device in cabinet or rack

Connect grounding wire

Plug-in the connecting cables between the amplifier and CF sections

Connect the HF connection

Cable data connections to the main distribution frame or the connector panel

Cable the alarm outputs

Connect the power supply

Note:

PowerLink devices can be supplied as standalone devices or installed in a cabinet together with other system components. In case of delivery in a cabinet the entire cabling of the individually in-stalled devices is installed at the factory up to the connection terminals on the assembly board. In this case the connection points for the cabling can be found in the supplied cabinet docu-mentation.

Grounding

Caution !

The cross-sectional area of the earth wire must be equal or greater to the cross-sectional area of any other control conductor connected to the device. The cross-section of the earth wire must be at least 2.5 mm².

The cross section of the grounding wire and the laying of the wire must comply with the regula-tions applicable for the place of installation.

© SIEMENS AG 2009 C53000-B1176-C220-2 Page - 9

Page 10: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

PowerLink Description in Brief

The PowerLink system permits carrier frequency transmission of speech, data, telecontrol, and teleprotection signals via high voltage overhead power lines and cables.

Carrier frequency equipment must match the particular characteristics of the high voltage line. High interference levels over the transmission link and the high attenuation over longer transmis-sion routes require particularly powerful transmission. The requirements for reliability and availabil-ity are especially high in relation to the transmission of protection signals. For the most efficient utilization of the available frequency range, a high degree of selectivity is necessary.

In opposition to other PLC systems there is no additional hardware required for channel alloca-tion. For the different applications like voice, data or protection signal transmission with the SWT 3000, the equipment can be extended by integrating modules (VFM, VFS resp. VFO) for con-necting a modem or external teleprotection as well as for various telephony services.

DSP System

DP

CSPi

AMP50

RXF

MUXFPGA

iFSK

8

48x

iSWT1

iSWT2

VFO

VFS

VFM

AD

DA

DA

AGC ATT

VF

VF

8x

RS232

RS232

AMP50

TXF

TXF LT100

PLPA CFS-2

analog voice 1...5

rFSK1..2vMUX

X21-1

X21-2

BLSL

fE1

TCP/IPG703.1

VF Voice frequency iSWT integrated SWT 3000 CFS-2 Carrier frequency section VFO VF interface FXO vMUX versatile MUX PLPA PowerLink power amplifier VFS VF interface FXS iFSK integrated FSK channel CSPi Central Signal Processing VFM VF interface E&M DP Data Pump AMP50 Power amplifier 50 W X.21-x sync. digital interface AGC autom. gain control RXF Receive filter RS232 async. digital interface ATT Attenuator TXF Transmit filter aF21…5 analog voice ch. 1 to 5 SL StationLink fE1 fractional E1 interface BL Board Link

Figure 1: PowerLink block diagram

Transmission Mode

The signals are transmitted using the single side band method (amplitude modulation) with sup-pressed carrier

Frequency Range

The transmission is carried out in the frequency range from 24 kHz to 1000 kHz. The frequency positions of the HF send and receive band can be selected regular or inversed.

Frequency Grid

The frequency grid is adjustable to 2.5 kHz resp. 4 kHz. The frequency adjustment is possible in steps of the half grid (1.25 kHz resp. 2 kHz).

Page - 10 C53000-B1176-C220-2 © SIEMENS AG 2010

Page 11: Power Link  PL CFS2 PLPA

PowerLink 50/100 Equipment Quick Reference

Mechanical Construction

PowerLink systems consist of 2 module frames, the carrier-frequency section (CFS-2) and the line equipment section (PLPA). For the PLPA section, a distinction is made between 50 W and 100 W transmit power. The terminals are built to the proven ES 902-C design pattern. The dimensions of these module frames correspond to the 19" mounting system in accordance with DIN 41494 and can be installed directly into 19" swing frame cubicles or mounting frames without any additional fixing brackets.

The modules of a module frame are electrically connected to each other via a backplane with the appropriate sockets and plug connectors. The module frames are connected to each other by plug-in connectors and cables with integral connectors.

CFS-2 Part

The ports for the external interfaces are mainly centralized on a connector panel. It is connected via the backplane with the CFS-2 part, and located between the PLPA and the CFS-2. For VF and telephone channels Sub-D 37 pin, and for RS232 channels Sub-D 25 pin sockets are existing, which are accessible from the front.

The module frame for the carrier frequency section (CFS-2) consists of a 19” module rack. It con-tains the power supply (PSCFS), the central signal processing module (CSPi), and depending on the configuration max. 2 alarm modules, up to 2 integrated SWT 3000, as well as max. 3 VF inter-face modules (VFx) and optional a versatile multiplexer vMUX.

At the right-hand part of the frame, module slots are located for the mounting of the modules CSPi, VFx and vMUX in double-height euro card format. The modules have a common front cover with a cut-out for the service interface and the displays resp. operating elements of the CSPi mod-ule.

Alongside on the left, the slot positions for the power supply and the 2 alarm modules are located.

The mounting positions for the integrated SWT 3000 can be equipped with the processing unit PU3g and 2 interface modules IFC.

Note:

For more details concerning the functional description of the PowerLink and integrated SWT 3000 we refer you to the PowerLink equipment manual.

© SIEMENS AG 2009 C53000-B1176-C220-2 Page - 11

Page 12: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

Installation of the Module Frames

The module carriers are suitable for installation in 19" swing frames or mounting frames. The fas-tening elements which are required are included in the scope of delivery. No special tools are needed for the installation.

Dimensions of the PowerLink System

465 mm (19")

270 mm

Connector panel

4 H

E

13 H

E1H

E =

44,

45 m

m

PLPA

iSWT 3000

iSWT 3000

Figure 2: Dimensions of a PowerLink system

Page - 12 C53000-B1176-C220-2 © SIEMENS AG 2010

Page 13: Power Link  PL CFS2 PLPA

PowerLink 50/100 Equipment Quick Reference

Connecting the Device

Protective Ground Connection

Figure 3: Connection of the PE conductor

Connection of the Supply Voltage

Note:

An easily accessible all pole disconnect device with a contact gap of at least 3.0 mm must be in-cluded/installed in the building-installation-wiring.

The value of the external fuse has to be max. T 16A!

The AC supply voltage is connected to the terminals PE-N-L1. In case of DC voltage the (-) is connected to the N and (+) to the L1 terminal.

The protective earth conductor of the PowerLink must be connected with the housing

PowerLink housing

Earthing bar

Figure 4: Connection of the supply voltage

© SIEMENS AG 2009 C53000-B1176-C220-2 Page - 13

Page 14: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

The Connector Panel

RS232 1&2

RS232 5-8

RS232 3&4

X.21-1

X.21-2

RM1

RM2

SWT1 SC

SWT2 SC

SWT1 DLE

SWT2 DLE

ALARMS / USYNC / BINARY INPUTS / IRIG-B

IP-1

IP-2

X.21-DP

VFX 1

VFX 2&3

FE 1

Station Linkext - PS E&M - int

PLPA-CONTROL TX

RX

+48V

Figure 5: Connector panel of the PowerLink system

The connector panel serves for an easy connection of the interconnection of CFS-2 and PLPA unit as well as the connection of the various interfaces for voice, data, and alarms. The connectors for the protection signaling interface modules are at the rear side.

Interconnection of PLPA Unit and CFS-2

The figure below shows the interconnection of PLPA and CFS-2 section. The SUB-D socket PLPA control has to be connected to the X600 SUB-D plug. The Tx- and Rx- BNC jacks on the CFS-2 have to be connected to the corresponding BNC jacks on the PLPA.

Figure 6: Interconnection of PLPA and CFS-2 section

Page - 14 C53000-B1176-C220-2 © SIEMENS AG 2010

Page 15: Power Link  PL CFS2 PLPA

PowerLink 50/100 Equipment Quick Reference

Interconnection of PLPA Unit and HF-Connecting Board

Overall Connection Diagram

The figure below shows the connection diagram from the PLPA RF connector to the HF connect-ing board:

a b

a b

1 2

1 = 150 Ohm sym.2 = 75 Ohm koax.

ab

surge arrester

HF Connecting board(principle)

In case of 75 Ohm impedance"b" conductor and GND arelinked.

to the HF Connectors for koax. resp. sym. cable

X1 X2 X3

PLPA

RF connector

Figure 7: Overall connection diagram from the PLE unit to the HF connecting board

Note:

Please make sure that the “a” and “b” conductors are not exchanged! In case of 75 Ohm imped-ance the “b” wire and GND are linked.

© SIEMENS AG 2009 C53000-B1176-C220-2 Page - 15

Page 16: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

Commissioning

Warning!

This equipment may be supplied from different and from each other independent dangerous volt-ages.

Before starting the maintenance work the device must be isolated with the specified circuit-breaker.

Switching on the Supply Voltage

After switching on the external supply voltage and with the device switched off (switch S1 en-able/disable Power Supply on CSPi in down position) LED "i" (red) lights up on the PSPA2 power supply unit(s).

Switching on the Device

After switching on the device (switch S1 enable/disable Power Supply on CSPi, located behind the front cover, in upper position) the OK LED (green) must light up on the power supply unit and on the CSPi module.

The RX-AL LED must light up green if the device is connected to the transmission line, receiving properly from the remote station and receive levels are set correctly. Correction of the receive Level is only possible with the PowerSys service program!

Figure 8: Front cover of the PowerLink processor module CSPi (partial covered)

HF out

Reset

enable/disable Power Supply

STEL headsetmicrophone

STEL call/quit

green=STEL

STEL headset speaker

yellow

green

OK

RX

DPFSK

ETH optical (SFP module)

USB

red green

red=TEST

ETH

Note:

For more details concerning the commissioning of the PowerLink and integrated SWT 3000, we re-fer you to the PowerLink equipment manual.

Page - 16 C53000-B1176-C220-2 © SIEMENS AG 2010

Page 17: Power Link  PL CFS2 PLPA

PowerLink 50/100 Equipment Quick Reference

Mounting of Modules in the PowerLink 50/100

Module Slot Positions in the PowerLink

IFC

-x

PSCF2

ALR

CS

Pi

VF

x-1

VF

x-2

VF

x-3

Connector panel

PU

3

ALR

vMU

X

PSPA2 PSPA2

IFC

-x

PU

3

integrated SWT 3000-2

integrated SWT 3000-1

CFS-2 part

PLPA part

Figure 9: Slot positions of the PowerLink modules

Exchanging/Mounting Modules

This instruction applies for exchanging resp. mounting modules in the CFS part. The module posi-tion in the CFS part is shown in the figure 9.

It is not allowed to insert or remove modules in the PowerLink when the power supply is enabled!

Caution: Electrostatic sensitive devices

Before carrying out any work on the system, ground yourself with a wrist strap. Please observe the safety instructions at the beginning of this instruction!

© SIEMENS AG 2009 C53000-B1176-C220-2 Page - 17

Page 18: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

For mounting (exchanging) modules in the PowerLink 50/100 system, please observe the follow-ing instruction:

Remove the cover of the CFS-2 module section (4 screws)

Disable the power supply (move the switch S1 on the CSPi module above PC connector into lower position)

Cover

S1 Power OnOFF

Service Interface Connector

In case of an exchanging module: Remove the existing module and place it on a grounded, conductive surface. Inserting the new module: Unpack the new module from the transport box and insert it into the corresponding slot position. Switch on the power supply (move the switch S1 on the CSPi module into upper position) Close the cover of the CFS-2 modules

In case of exchanging an existing module, the system should work after the power supply is en-abled. When inserting a new module the first time, the system needs a new commissioning (con-figuration, level setting etc.).

Please refer to the corresponding instructions in chapter 4 “commissioning” of the Power-Link 50/100 equipment manual!

Page - 18 C53000-B1176-C220-2 © SIEMENS AG 2010

Page 19: Power Link  PL CFS2 PLPA

PowerLink 50/100 Equipment Quick Reference

Service Program PowerSys

The service program PowerSys is required for commissioning, maintenance, and diagnosis of the PowerLink 50/100 or SWT 3000 units.

The service PC must meet the following requirements:

PC Requirements

IBM compatible

Operating system Windows 2000 (SP2 or higher), Windows XP, or Windows VISTA

Processor Pentium or better (or processor with equivalent performance)

Clock min. 1 GHz System memory 1 GB DVD drive Ethernet interface 10/100Base-T Serial interface RS 232 Printer interface LPTx (optional) Additional needed Software Microsoft .NET Framework

© SIEMENS AG 2009 C53000-B1176-C220-2 Page - 19

Page 20: Power Link  PL CFS2 PLPA

Quick Reference PowerLink 50/100 Equipment

Installation of the Service Program

From program version P3.3.2xx or later multiple installation is possible. Older versions may be removed. With “Start – Control Panel – Software”, uninstall older PowerSys versions with click change/remove.

Note:

Data files stored in older versions e.g. in “C:\Program Files\PowerSys\P3.x.y\DeviceFiles”, are not uninstalled and may be used again after reinstalling the older version.

The service program is delivered on a CD-ROM or DVD. Please run the Setup.exe. The program leads you through the installation.

Figure 10: Start of the setup program for installation of the PowerSys

Note:

Regional settings other than “German” or “English (UK)” may cause problems. It is strongly rec-ommended to switch Windows to one of the above mentioned settings (Start – Control panel – re-gional settings). Reasons for the problems are the different formats for numbers, date, and time.