POWER-WIN ENERGY SOLUTIONS PVT.LTD
DEVELOPING & NURTURING RESOURCES…
1
PART 1
INDUSTRY SCENARIO
2
ELECTRICITY DISTRIBUTION FLOW 3
Indian State Utilities have suffered losses as high as 30% in the past 5
years which is equal to about 1.5% of our country's GDP.
About one-third of that loss is technical, but the rest is either
given away for free or at subsidized rates to farmers, or lost
to pilferage.
MAJOR LOSS SEGMENT
The distribution network is estimated to be the highest segment for accountable losses.
More than 20% of the losses arise in the distribution network which is the connecting point of electricity to consumers in various parts.
Theft of electricity is also a major part of the losses causes within this distribution network segment.
4
5
CAUSE
Variation in Supply Voltage
Unbalanced Load
Wide use of Low PF Equipments
Tampering to Supply/Load Frequency
Losses due to overloading and low voltage
Losses due to poor standard of equipment.
TECHNICAL LOSSES
RELATIONSHIP BETWEEN LOSS & SAVING
6
LOSS SAVING
REALITY CHECK?
Are you in an industry where the load or demand for electricity is high? Does your organization require air-conditioner and lighting 24*7 ? Are there any installations which are running on under utility ? Is any machine in use, old and creating losses ? Do you want a longer life for your machinery ? IS YOUR ELECTRICITY BILL HIGH ?
If your answers are Yes for the above questions, then we have a unique software solution awaiting.
7
POWERWIN™-ADVANCE POWER SAVER
We at M/s. Power-win Energy Solutions Pvt. Ltd. an ISO 9001:2015 manufacturing & marketing company are working in the field of Energy Conservation.
As we can see the losses being generated in our country, there is a need to bridge the gap between the losses and the savings. The higher the loss, more is the chance to save.
We have invented and developed this unique technology used in ‘Powerwin™-Advance Power Saver, which saves Energy\Power\Electricity Bills up to 25% based on the nature of load & condition of supply parameters.
The Power Saving is achieved by On line simultaneous monitoring and controlling of Power. This is a PATENTED TECHNOLOGY PRODUCT.
We are into this business from last 15 years and vast experience in Energy Management systems and its implementation in Domestic, Commercial & Industrial segment.
8
POWERWIN™-ADVANCE POWER SAVER (Patented Technology)
9
OUR CONTROL ACTION 10
Acute Voltage Regulation & Maximum PF improvement at load side.
Excess Kw
control
Excess Kva
demand control
Our 3 in 1 control action provides the need of the hour system, required in industries consuming large amount of electricity and hence paying exorbitant amount as electricity bills
Reducing your bills in our own special
way
WHAT IS THE DIFFERENCE? 11
POWERWIN™- Advance Power Saver uses Static
devices so wear and tear is negligible.
Only Capacitor Banks, don’t give the desired reduction in bills as Powerwin™-Advance Power Saver does
Only Transformers based don’t give the desired reduction in bills as Powerwin™-Advance Power Saver does
USAGE
POWERWIN™-ADVANCE POWER SAVER
TRANSFORMER LT Panel
LOAD
Connect the POWERWIN™
Advance Power Saver
for Regulation of
Power
Machine works
better as it gets
the accurate
supply
12
Installation diagram before POWERWIN™-Advance Power Saver
13
• An appliance takes supply to work.
• This supply is not filtered and hence it is not letting the appliance work at the optimal and perfect condition.
• This causes damage to the appliance in the long run and leads to wear and tear issues
14 Installation diagram after POWERWIN™-Advance Power Saver
• The POWERWIN™-Advance Power Saver comes with a voltage regulation and a power factor corrector.
• When both these work in
tandem, they produce the optimal supply required for the appliance.
• This in turn provides longevity in life and reduces the energy consumed by these appliances.
POWERWIN™-UNIQUE SELLING POINTS
► POWERWIN™ uses PATENTED TECHNOLOGY, which works on feedback, so that the correction in voltage and the improvement in Power Factor is done with great accuracy and precision. This in turn reduces the line losses drastically due to the reduction in reactive power
► POWERWIN™ has NO COMPETITOR to compete with in the technical specifications aspect & its performance as well.
► POWERWIN™ is available from 5Kva to 500 Kva.
15
POWERWIN™-UNIQUE SELLING POINTS
‘Powerwin™ also increases the life of all types of appliances by reducing line current & line losses. This increases the Efficiency & Reliability of the Appliances or Equipments used.
‘Powerwin™ uses Electronic and Static components, which ensure a
very high reliability resulting in to a high degree of accuracy in operational conditions; subsequently assures more than 25 years life.
16
KEY FEATURES
High Power Saving % Economical Short payback Reliable Low maintenance Long life span Web based monitoring and control GSM/ GPRS monitoring system
17
TECHNICAL SPECIFICATIONS
Model
Capacity
Mains ON/OFF
Changeover Switch
Size(in mm) LXBXH
Weight (Approx.)
TPPS -5 5Kva 6A,MCB 10A,Rotary 325X230X200 6kg
TPPS -7 7Kva 10A,MCB 16A Rotary 350X230X225 7kg
TPPS -10 10Kva 16A,MCB 25A Rotary 375X250X250 9kg
TPPS -15 15Kva 20A,MCB 32A Rotary 400X320X280 14kg
TPPS -25 25Kva 32A,MCB 40A Rotary 350X350X550 23kg
TPPS -35 35Kva 50A,MCB 63A Rotary 350X350X600 32kg
TPPS -45 45Kva 63A,MCB 80A O\L 450X450X680 45kg
TPPS -60 60Kva 80A,MCCB 100A O\L 450X450X730 53kg
TPPS -75 75Kva 100A,MCCB 125A O\L 500X500X830 65kg
TPPS -90 90Kva 125A,MCCB 160A O\L 500X500X880 80kg
TPPS -110 110Kva 150A,MCCB 200A O\L 550X550X950 95kg
TPPS -150 150Kva 200A,MCCB 250A O\L 600X600X1050 130kg
TPPS -200 200Kva 280A,MCCB 320A O\L 600X600X1150 170kg 18
1) ETDC - Electronics Test and Development Center, Dept. of Electronics, Ministry of IT, Govt. of India, Pune, (Maharashtra)
2) EQDC - Electronics Quality Development Center, Dept. of Electronics, Govt. of India, Gandhinagar, (Gujarat)
3) ERDA - Electrical Research and Development Association, Govt. of India, Baroda, (Gujarat) 4) NSIC - National Small Industrial Corporation, Govt. of India, Rajkot, (Gujarat)
19 LIST OF ACCREDITATIONS
PART 2
SAVINGS &
APPRECIATION
20
Koradi Thermal Power Station: KTPS, Nagpur is biggest thermal power plant of capacity approx. 3800
MW in Maharashtra; which is state Govt. undertaking enterprises. For Koradi Thermal Power Station.
We have installed our Powerwin-Advance Power Saver for live demonstration purpose in CT Motor and noted the data 5-days before and after installation of Powerwin™-Advance Power Saver.
We have achieved 21.83% saving in Power. Please see graphical comparison for Power consumption before and after installation of Powerwin™-Advance Power Saver.
21 CASE STUDY-1
KORADI THERMAL POWER STATION, NAGPUR
22 CASE STUDY-1
KORADI THERMAL POWER STATION, NAGPUR
0.00
200.00
400.00
600.00
800.00
1,000.00
1,200.00
1,400.00
1,600.00
1,800.00
KWH
Direct
Saving
%Saving Calculations:
% Energy Saving= (Direct Consumption – Saving Consumption) x 100
Direct Consumption
= (2015.00 –1 583.00) x 100 2025.00
21.83%
CASE STUDY-1 PERFORMANCE REPORT
KORADI THERMAL POWER STATION, NAGPUR
23
CASE STUDY-2 WATER PUMPING STATION,PMC, PUNE
Water Pumping Station, Pune Muncipal Corporation, Pune : Pune Muncipal Corporation having its biggest Water Treatment and
Water Supply plant at Warje, which is local body. We have installed our Powerwin-Advance Power Saver for live
demonstration purpose on Water Pump /Motor and noted the data 7-days before and after installation of Powerwin™-Advance Power Saver.
We have achieved 14.71% saving in Power. Please see graphical comparison for Power consumption before and after installation of Powerwin™-Advance Power Saver.
24
CASE STUDY-2 WATER PUMPING STATION,PMC, PUNE
25
0
2
4
6
8
10
12
14
DIRECT
SAVING
TIME
%Saving Calculations:
% Energy Saving= (Direct Consumption – Saving Consumption) x 100
Direct Consumption
= (158.40 –135.00) x 100 158.4
14.71%
CASE STUDY-2 PERFORMANCE REPORT
WATER PUMPING STATION,PMC,PUNE
26
CASE STUDY-3 TRENT LTD. MUMBAI
Trent Ltd. , Mumbai Renowned company with a chain of retail readymade cloth showroom. We have
installed more than 300 Kva Powerwin™-Power Saver in West Side showrooms on PAN India basis.
In West Side, we have achieved 16% saving in Energy/Power and noted the data
reading for 8-days before and after installation of Powerwin™-Power Saver. Please see graphical comparison for Power consumption before and after installation
of Powerwin™-Power Saver for Mix (Lighting plus Air-conditioner ) Type of load.
27
CASE STUDY-1 TRENT LTD. MUMBAI
563612 628 597 603
712 739645 625 632 641
468 510 532 501 493601 635
545 523 532 549
Direct Powerwin
28
%Saving Calculations:
% Energy Saving= (Direct Consumption – Saving Consumption) x 100
Direct Consumption
= (636.09 – 535.36) x 100 636.09
15.83%
CASE STUDY-1 PERFORMANCE REPORT TRENT LTD. MUMBAI
29
CASE STUDY-1 TRENT LTD. MUMBAI
30
WNS Global Services Pvt. Ltd, Mumbai
Renowned IT company where a total of 5000 Kva Powerwin power saver has been installed on PAN India basis.
For WNS, we have achieved 17% saving in Energy/Power and noted the data 8-days
before and after installation of Powerwin™-Power Saver. Please see graphical comparison for Power consumption before and after installation of
Powerwin™-Power Saver for Mix (Lighting + Air-conditioner + Computer) Type of load.
CASE STUDY-4 WNS GLOBAL SERVICES PVT. LTD
31 CASE STUDY-4
WNS GLOBAL SERVICES PVT. LTD.
With the similar working the % Energy saved comes up to 17.28%
APPRECIATION LETTERS 32
33
CLIENT LIST
CLIENT LIST 34
Be smart Add value Empower your business
35
THANK YOU… M/S. POWER-WIN ENERGY SOLUTIONS PVT LTD POWERWIN HOUSE, EL-51, J-BLOCK, MIDC BHOSARI, PUNE CITY, MAHARASHTRA STATE, INDIA-411 026 CONTACT: +91-20-27130444/0555 Website : www.powerwingroup.com
E-mail : [email protected]
36