PREPARED BYRODOLPHE GHOSSOUB

Good Governance For Enhanced Post-War Reconstruction In

South Lebanon

Setting-up Three Local Urban Observatories in the Cazas of

Tyre, Jabal Aamel and Bint-Jbeil

Page 2: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

Funding sources:• Dutch Government• Cyprus Government• Finnish Government

Partners:• Union of Municipalities of Tyre, Bint Jbeil and Jabal Amel• The American University of Beirut (AUB) • Beit Bil Jnub Organization

Project Duration:• September 2007 – December 2009

PROJECT OVERVIEW

Page 3: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

GEOGRAPHIC OUTREACH:

21 villages (7 villages within each Union of Municipalities)

Tyre Jabal Amel BintJbeil

1. Qlaileh

2. Zibqeen

3. Teir Harfa

4. Shiheen

5. Jobbein

6. Jbal el Botom

7. Yarin

1. Markaba

2. Taibeh

3. Adchit el Qouseir

4. Qantara

5. Rob Tlatin

6. Qabrikha

7. Deir Seryan

1. Aitaroun

2. Maroun el Ras

3. Ainatha

4. Bara’chit

5. Tiri

6. Rchaf

7. Kounin

Page 4: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

Middle East Lebanon

Tyre

Bint Jbeil

JabalAamel

ProjectOutreach

Page 5: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

PROJECT MAIN ACTIVITIES1. Provide, through the set up of three Regional Technical

Offices, engineering assistance to around 4,000 affected families whose houses were totally destroyed during the July 2006 War.

2. Build the capacity of the three Unions of Municipalities to improve service delivery.

- Community Projects- Technical Dossiers- Training Program

3. Establish three Local Urban Observatories (LUO) as a planning tool to enhance sustainable development of human settlements.

- Regional Urban Sector Profiles (RUSPs)

Page 6: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

LOCAL URBAN OBSERVATORYDEFINITION

An urban observatory is a:

• Local network of stakeholders

• Data and information resources produced by local network

• focal point for urban monitoring aiming for

SUSTAINABLE DEVELOPMENT

Other

Offices

Universities

DAG

CAS

NGOs

Ministries

Local Urban

Observatory

Page 7: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

LUOs OBJECTIVESThe project seeks to achieve three main objectives:

Objective One: To strengthen the capacity of the Union of Municipalities (UOMs) to produce high quality, timely, city disaggregated data, using standardized methods, classifications and definitions which promote comparability, and foster their dissemination in support of local policy and monitoring processes.

Objective Two: To foster networking and partnerships between national (such as DAG, CAS, DGU, CDR, OMSAR …) and local stakeholders.

Objective Three: To lay the proper ground for the sustainability and the institutionalization of the observatory.

Page 8: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

Crisis(war 2006)

Lack of data

Designation of 3 cazas (7 severely

damaged villages in each )

Creation of 3 RTOs in every

caza

Designation of 3 GIS experts (trained & equipped)

Initiation of Activities

3 LUOs are Born

ADAPTATION TO THE SOUTH CONTEXT

Designation of stakeholders (DAG CAS

and many others)

Page 9: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

MoU

•3 GIS Experts were nominated;

•21 local volunteers in the villages were called to assist in the

implementation of the project;

•Training and equipment were provided to the Experts;

•Workshops were carried out with the Heads of the Unions to select the

needed indicators;

•Networking with main stakeholders (local and national level);

•Visit from our international consultant;

•Visits to the municipality mayors are still undertaken;

•Continuous training and technical assistance is provided;

•Participation in major events related to LUOs.

UOMsSour, Bint Jbeil, Marjaayoun

UN HABITAT

HOW WAS IT DESSIMINATED

Page 10: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

ACHIEVMENTS & OUTPUTS

LUOs

•Offices were equipped (office furniture and hardwares);

•Softwares (Esri Licenses, Map Source etc) and field equipments (Total Staion GPSs) were provided;

•Participation in training (GPS, GIS, Total Station)`and events (GIS Day, Field visit to LUOs of Tripoli and Sin el Fil);

•Collaboration with the stakeholders (DAG, CAS, DGU, CDR, OMSAR );

•Purchase of data from private firms (KA, MAPS);

•Data collection from major stakeholders DAG, CAS, DGU, CDR, OMSAR and others;

•Field work for the correction of the Topo maps;

•Data collection from the municipalities was initiated;

•Data entry.

Page 11: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

PROGRESS WORK

Page 12: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

•Reluctance of the Unions to host the Observatories since the South presents a critical situation (Jabal Aamel caza);

•Difficulty for setting the indicators with the Unions;

•Lack of GIS expertise in the South (the GIS experts were supposed to have 3 years of experience) resulting in time consuming to train the experts and to provide them technical support;

•Internal conflict within each Union and RTO;

•Lack of cash flow for the experts and the Local Volunteers (LV) resulting in lack of motivation;

•21 municipalities represent an extensive area to monitor;

MAIN OBSTACLES

Page 13: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

IMPACTS ACHIEVED•Head of the UoMs approved the LUOs and are convinced of their positive impacts;

•The mayors gained knowledge about the LUOs;

•GIS Experts have full knowledge of the GIS technology and the LUOs;

•The GIS Experts are continuously informed with the latest GIS activities undertaken by the software suppliers (KA);

•The LV developed their Computer skills and knowledge of the LUOs;

•Networking the heads of the UoMs with the army was initiated;

•Willingness of including all the municipalities of the Unions to the LUOs (Sour caza);

•The LUOs are implemented at the UoMs and operational (data entry, map production etc)

Page 14: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

THE REMAINING NEEDS

•Establish official Networks with the DAG, CAS, DGU, CDR, OMSAR and others;;

•Fostering exchange of experience between unions or municipalities;

•Institutionalization of the LUOs within UoMs;

•Search for the remaining sources of data;

•Publication of the collected data through reports and Internet.

Page 15: PREPARED BY RODOLPHE GHOSSOUB Good Governance For Enhanced Post-War Reconstruction In South Lebanon Setting-up Three Local Urban Observatories in the Cazas

UN HABITAT expands its experience to neighboring countries

UN HABITAT plays a central role in the creation monitoring and follow-

ups of the LUOs in Lebanon

Institutionalization of the LUOs (Sin el Fil an already existing LUO, Bint Jbeil, Sour, and Jabal Aamel)

Local Urban Observatory for the Sour Caza (Potential

area);

Web publishing of the LUOs

Implementation of LUOs in new cities & unions with

organized data (ex: Aajaltoun, Jounieh)

Local Urban Observatory for

Beirut Municipality

National Urban Observatory for

Lebanon