Presentasi Magang Toyota.pptx

Embed Size (px)

DESCRIPTION

Presentasi mengenai kegiatan improvement selama magang di divisi PAD

Citation preview

Slide 1

PT PLN (PERSERO) PEMBANGKITAN TANJUNG JATI B

Pembangkit Listrik Tenaga Uap Tanjung Jati B 4 x 660 MWDesa Tubanan, Kec. Kembang, Kab. Jepara, Jawa TengahSEMINAR MAGANGDiPT PLN (PERSERO) PEMBANGKITAN TANJUNG JATI B

SEJARAH SINGKAT PLTU TANJUNG JATI B Kotrak PPA di tanda tangani tanggal 16 September 1994 antara HIPT (Hi Power Tubanan) dengan PLN Kegiatan konstruksi TJB dihentikan pada Juni 1997 (KP 39/1997) (akibat krisis moneter 1997) Rasionalisasi kontrak TJB dimulai maret 1999 Head of Agreement di tanda tangani pada Juni 1999 (PLN / HIPT / SC) Skema finance lease disetujui pemerintah RI pada Oktober 2001 Hasil renego tarif & kondisi pokok disetujui pem. RI 26 November 2001 Izin usaha PT Central Java Power, KMK No 184 / 06 / 2001, 23 April 2002 Penyusunan Settlement Agreement dimulai Januari 2002 Tanda tangan kontrak leasing, 23 Mei 2003 Liquidity Facility dari pem. RI terbit 16 Juli 2003 Settlement Date FLA dicapai pada 31 Juli 2003 Presiden RI, Susilo Bambang Yudhoyono meresmikan pembangkit ini pada tanggal 14 Oktober 2006VISI DAN MISI PT PLN (PERSERO) PEMBANGKITAN TANJUNG JATI BVisiMenjadi pengelola pembangkit kelas dunia yang kompetitif dengan bertumpu pada potensi insaniMisiMenjalankan pengelolaan bisnis unit pembangkit sesuai kontrak FLA PLTU TJB secara dinamis untuk memberikan keuntungan bagi PLN dan Stake HolderMelaksanakan pengelola pembangkit yang best pactice, sehingga didapatkan kinerja yang handal dan efisien sampai akhir masa leasing dan menjaga pasokan energi listrik secara berkesinambunganMengoperasikan pembangkit dengan tata kelola yang excellent secara aman, ramah dan peduli lingkunganMengelola SDM secara profesional dan berkelanjutan sehingga didapatkan SDM yang kompeten dalam mengelola pembangkitSTRUKTUR ORGANISASI PT PLN (PERSERO) PEMBANGKITAN TANJUG JATI BGENERAL MANAGERPLN TJBPLN PUSATMANAJER PRODUKSI I

DEPUTI MANAJER ENERGI PRIMER & PELABUHAN IDEPUTI MANAJER OPERASI & PEMELIHARAAN IDEPUTI MANAJER LOGISTIK IDEPUTI MANAJER OPI

DEPUTI MANAJER PERENCANAAN & IT

DEPUTI MANAJER ENGINEERING

MANAJER ENJINIRING

DEPUTI MANAJER LK2

MANAJER PRODUKSI II

DEPUTI MANAJER ENERGI PRIMER & PELABUHAN IIDEPUTI MANAJER OPERASI & PEMELIHARAAN IIDEPUTI MANAJER LOGISTIK IIDEPUTI MANAJER ANGGARAN & KEU

DEPUTI MANAJER AKUNTANSI

DEPUTI MANAJER HUKUM DAN HUMAS

DEPUTI MANAJER UMUMDEPUTI MANAJER SDM

MANAJER SDM & KEU

SISTEM JAWA - BALIEHV Substation (Existing)Notes :JAWACLGONSLAYAKMBNGBKASIGNDULCWANGCBATUCIBNGCRATASGLNGBDSLNCRBONKLTENUNGARANPWRDISBBRTGRSIKSBLTNPITONKDIRIMADURABALIBLRJADEPOKMRTWRCSKANTJ JATI BBABATGRATITSMYAUEHV Substation (Plan)EHV Lines (Existing)SISTEM 500 KV JAWA-BALI

Dengan beroperasinya PLTU Tanjung Jati B unit 1&2 dan unit 3&4, maka PLTU Tanjung Jati B unit 14 berkontribusi terhadap penyediaan energi listrik sebesar 12% dari kebutuhan sistem JawaBaliMaduraTRANSMISI TENAGA LISTRIKListrik dibangkitkan oleh sistem turbin generator dengan keluaran sebesar 22,8 kV dan ditranformasikan oleh transformator menjadi 500kV yang kemudian ditransmisikan pada sistem transmisi 500kV Jawa-Bali melalui GI SUTET Ungaran, Jawa Tengah

SKEMA PROSES PRODUKSIPROCESS OVERVIEW

SPESIFIKASI PLTU TANJUNG JATI B UNIT 1 & 2UNIT :

Unit MCR (net) : 660 MW per unitUnit Min. Load without oil support : 160 MW per unitHeat Rated at 100 % rated output: 2273 kcal/kWh (ECR)Unit Continuous Auxiliary Power: 56.6 MW (B-MCR)

BOILER :

Operating Pressure: 175 bar a (B-MCR)Main Steam Flow: 2,313 T/H (B-MCR)Main Steam Temp.: 541 oCFeed Water Temp.: 291 oCCoal Mill/Feeders: 5 operasi, 1 stand byCoal Rate : 263.58 ton/h (B-MCR)Burner System: 36 Low NOx BurnersBoiler Efficiency: 88.81 % HHV (ECR)

Carolina-Type 660 MW (net) Radiant Boiler for Pulverized CoalUnit 1 & 2 merupakan natural-circulation, single drum, single reheat, dan top supported Babcock & Wilcox Carolina Radiant Boilers.RB merupakan boiler bertipe drum dengan tekanan, suhu dan kapasitas tinggi.

BOILER

TURBINE :

Type : Three cylinder Impulse type, Tandem Compound Reheat Condensing TurbineMax. T-MCR : 719 MWRated Output: 710 MWHeat rated (at ECR): 1861 kcal/kWhSteam Flow (at T-MCR): 2213.1 ton/hourSpeed: 3,000 rpmSteam pressure: 167 bar absSteam Temperature: 538 oCReheat temp. at comb. heat vlv: 538 oCExhaust pressure: 0.0832 bar absHP Turbine Bypass Capacity: 35 % (at 176 bar)LP Turbine Bypass Capacity : HP Bypass steam flow + desuperheating spray water flow

BOILER FEEDWATER PUMP :

Number : 3 x 50%Capacity : 21.5 m3/min at 174.3 oCDriver Output : 9000 kWDriver Speed : Electric motor driven variable speed

GENERATOR :

Type : 3 phase synchronous gen. totally enclosedStator Wind. Cool.: Direct water cooledStator Core Cooling: Hydrogen cooledRotor Wind. Cool. : Direct hydrogen cooledExcitation System : Static excitation with thyristor rectifierActive Power: 721.8 MWApparent Power: 802 MVAPower Factor : 0.9 (lag) 0.95 (lead)Voltage : 22.8 kVSpeed Rotation: 3,000 rpmFrequency : 50 HzRated H2 Pressure: 4.12 bar

GENERATOR TRANSFORMER :

Rated power : 786 MVA at 65 oC winding temp.Phase : 3Voltage : 22.8/525 kVVector Groups : YNd11Cooling : ODAFTap Changer : NO-LOAD, + 5 %, 5 steps

SUBSTATION 500 kVCONDENSOR :

Condenser vacuum : 0.0832 Bar absInlet C.W. Temp. : 29.2 oCOutput C.W. Temp. : 36.2 oCCirculating water flow: 1,780 m3/mntType circulating water: Sea waterNumber of tubes : 34,000Tube surface area : 27.523 m2

CONDENSATE PUMP :

Number : 2 x 100 %Capacity : 30 m3/minDriver Output : 1500 kW

COAL HANDLING SYSTEM :

Vessel Capacity: 70,000 DWT Ship Unloading rate : 1,500 MT/hour x 2 UnitsRate of coal conveyor: 1,500/1,000 MT/hourRate for staking out : 1,500 MT/hour x 2 UnitsRate for reclaiming: 1,000 MT/hour x 2 UnitsCoal Storage Capacity: 630,000 ton (+ 2 month)

ASH HANDLING SYSTEM :

Fly Ash Transp. Method : Pneumatic VacuumAsh Silo Capacity : 48 hours x 2 unitsBottom Ash Mill Reject: 13,000 kg/hour (Peak)SSC capacity : 18,000 kg/hour (Peak)Ash Storage Area : Landfill + 23 ha

CIRCULATING WATER PUMP :

Number: 2 X 50 %Capacity : 925 m3/mnt

DESALINATION PLANT & WTP :

Desal. Plant Quantity: 3 x 50 %Desal.Plant Type : Reverse Osmosis (R.O)Desal.Plant Capacity : 2,030 m3/dayWTP Capacity : 90 ton/hourDemin.Tank Capacity : 1000 m3 x 3

DESALINATION & DEMINERALITATION PLANTJETTY & SHIP UNLOADER

JETTY & SHIP UNLOADER

CENTRAL CONTROL ROOMTAHUNMWh20077,887,15620088,523,22920098,206,68720109,324,490201110,526,95320127,509,572PRODUKSI KWhKriteria Utama Penilaian Kinerja PembangkitKetersediaanEAF (Equivalent Availability Factor) untuk mengukur tingkat ketersediaan pembangkitGangguanEFOR (Equivalent Force Outage rate) untuk mengukur tingkat gangguan pembangkitSdOF (Sudden Outage Frequency) untuk mengukur jumlah unit shutdown karena gangguanPemeliharaanSOF (Scheduled Outage Factor) untuk mengukur tingkat keefektifan pemeliharaanEfisiensiHeat rate untuk mengukur tingkat efisiensi penggunaan bahan bakar

Statistik Gangguan Tanjung Jati B Gangguan %Boiler Bocor29.14 PA Fan5.95 SSCC33.72 Gangguan 500 kV19.14 Mist eliminator FGD10.91 BFP1.14 Gangguan %frekuensi (kali)Mill/Feeder26.74 23Human Error 0.51 1Airheater5.48 4BFP1.44 1FDF0.16 1Kekurangan batu bara 00SSCC11.23 2PA Fan26.84 1 Kualitas Batu Bara7.44 14Condenser19.20 8Statistik Gangguan Tanjung Jati B 27KEGIATAN SELAMA MAGANG

MentoringClassroom studyOverview side (plant unit)KESIMPULANPT PLN (Persero) Pembangkitan Tanjung Jati B merupakan PLTU dengan bahan bakar utama batubara yang masuk dalam jaringan 500 kV dan 150 kV di Jawa Bali madura.

PLTU memiliki beberapa siklus utama yaitu, siklus bahan bakar, siklus steam, siklus udara pembakaran, siklus air pendingin dan siklus gas buang.

Kinerja unit pembangkit dapat diketahui berdasarkan pemeliharaan, gangguan yang terjadi dan hasil produksinya.

PT PLN (Persero) Pembangkitan Tanjung Jati B meggunakan sistem leasing dengan operator pembangkit dari pihak swasta yang bekerjasama dengan PT PLN (Persero).TERIMA KASIH