65
1 Presented to ERCOT Retail Market Subcommittee March 13, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)

Presented to ERCOT Retail Market Subcommittee March 13, 2002

  • Upload
    sonel

  • View
    21

  • Download
    0

Embed Size (px)

DESCRIPTION

Load Profiling Operating Guides (LPOG). Profiling Working Group Darryl Nelson, Chair. Presented to ERCOT Retail Market Subcommittee March 13, 2002. Summary of Approved Sections. Sections of LPOG Approved by RMS: Change Control Process for LPOG (2) Purpose of Load Profiling (3) - PowerPoint PPT Presentation

Citation preview

Page 1: Presented to ERCOT Retail Market Subcommittee March 13, 2002

1

Presented to ERCOT

Retail Market Subcommittee

March 13, 2002

Profiling Working GroupDarryl Nelson, Chair

Load Profiling Operating Guides(LPOG)

Page 2: Presented to ERCOT Retail Market Subcommittee March 13, 2002

2

Sections of LPOG Approved by RMS:

• Change Control Process for LPOG (2)

• Purpose of Load Profiling (3)

• Guidelines for Load Profile Development (5)

• Request for Changes to Load Profile Methodology (7)

• Request for Changes to Load Profile Models (8)

• kVa to kW Conversion (10)

Summary of Approved Sections

Page 3: Presented to ERCOT Retail Market Subcommittee March 13, 2002

3

Sections of LPOG Approved by RMS:

• Validation of Load Profile IDs (11)

• Requests for Changes to Profile Segment Definitions (12)

• Requests for Changes to Weather Zone Definitions (13)

• Load Profile Dispute Resolution Process (14)

• Access to Load Profiling Materials (18)

Summary of Approved Sections (cont’d)

Page 4: Presented to ERCOT Retail Market Subcommittee March 13, 2002

4

Approval of Approach for 6 sections:

• Profiling Working Group (4)

• Load Profiling Methodology (6)

• Load Profile IDs (9)

• Load Research Samples (15)

• Supplemental Load Profiling(16)

• Load Profile Metering (17)

Goal for Today

Page 5: Presented to ERCOT Retail Market Subcommittee March 13, 2002

5

Brief Overview

• Purpose of Profile Working Group (PWG)

• PWG Responsibilities

• PWG Reporting Structure

• PWG Membership

• PWG Contact Information

Profiling Working Group

Page 6: Presented to ERCOT Retail Market Subcommittee March 13, 2002

6

Approval of Approach for 6 sections:

• Profiling Working Group (4)

• Load Profiling Methodology (6)

• Load Profile IDs (9)

• Load Research Samples (15)

• Supplemental Load Profiling(16)

• Load Profile Metering (17)

Goal for Today

Page 7: Presented to ERCOT Retail Market Subcommittee March 13, 2002

7

Background

• This section details periodic evaluation of Load

Profiling Methodologies

• Requests for changing methodologies addressed in

LPOG Section 6

• No retroactive application of a new methodology for

Settlements

Load Profile Methodology

Page 8: Presented to ERCOT Retail Market Subcommittee March 13, 2002

8

Timing

• ERCOT will evaluate annually

• Special circumstances may warrant a more

immediate review

• Evaluations will be presented to the PWG

Load Profile Methodology

Page 9: Presented to ERCOT Retail Market Subcommittee March 13, 2002

9

Considerations for Evaluations

• Load Profile Model performance

• Methodology performance

• Effect of proposed methodology

• Practical implementation of proposed methodology

Load Profile Methodology

Page 10: Presented to ERCOT Retail Market Subcommittee March 13, 2002

10

Possible Results of Evaluation

• No changes to methodologies

• Modify existing methodology

• Implement alternative methodology

Load Profile Methodology

Page 11: Presented to ERCOT Retail Market Subcommittee March 13, 2002

11

Approval of Approach for 6 sections:

• Profiling Working Group (4)

• Load Profiling Methodology (6)

• Load Profile IDs (9)

• Load Research Samples (15)

• Supplemental Load Profiling(16)

• Load Profile Metering (17)

Goal for Today

Page 12: Presented to ERCOT Retail Market Subcommittee March 13, 2002

12

Assignment of Load Profile IDGeneral:

• TDSPs are responsible for assigning Load Profile ID

• Profile Decision Tree provides direction (on website)

Components of Load Profile ID:

• Profile Type

• Weather Zone

• Meter Data Type

• Weather Sensitivity

• Time-of-Use Schedule

Load Profile IDs

Page 13: Presented to ERCOT Retail Market Subcommittee March 13, 2002

13

Initial Assignment of Load Profile IDs• Profile Type 2 Segments

- Res or NonRes

- Consumption ==> Mar2000 thru Feb2001

• Weather Zone Zip code mapping for 8 WZs

• Meter Data Type IDR or NonIDR

• Weather Sensitivity ERCOT determines

• Time-of-Use NoTOU or TOUxx

where xx = TDSP TOU code

Load Profile IDs

Page 14: Presented to ERCOT Retail Market Subcommittee March 13, 2002

14

Assignment for New ES IDs• Profile Type 2 Segments

- Res or NonRes

- Consumption ==> Default

• Weather Zone Zip code mapping for 8 WZs

• Meter Data Type IDR or NonIDR

• Weather Sensitivity ERCOT determines

• Time-of-Use NoTOU or TOUxx

where xx = TDSP TOU code

Load Profile IDs

Page 15: Presented to ERCOT Retail Market Subcommittee March 13, 2002

15

Validation of Load Profile ID Assignment

ERCOT will validate according to LPOG Section 11

Load Profile IDs

Page 16: Presented to ERCOT Retail Market Subcommittee March 13, 2002

16

kVA Metered Loads

• TDSPs are responsible for providing monthly usage and demand data (if available)

• If kVA only is metered, then the TDSP shall convert kVA to kW for proper assignment of Load Profile Ids

• Any TDSP that measures kVA instead of kW must coordinate with the PWG to determine the power factor that will be used to estimate kW demand.

Load Profile IDs

Page 17: Presented to ERCOT Retail Market Subcommittee March 13, 2002

17

Load Profile ID Assignment for Non-ERCOT

• TDSPs are required to assign ESI Ids for all service delivery points within Texas, not just ERCOT.

• TDSPs then must submit a Profile ID to ERCOT, even though not used in ERCOT settlements

• Profile Ids for non-ERCOT areas must be different from ERCOT Profile Ids.

• TDSPs can submit their own Profile ID names for non-ERCOT ESI Ids

• Complete list of non-ERCOT Profile Ids will be maintained in Profile Decision Tree

Load Profile IDs

Page 18: Presented to ERCOT Retail Market Subcommittee March 13, 2002

18

Load Profile ID Assignment for NOIEs

Gray-box removed; Resource ID issue resolved

• Submit Load Profile Ids for ESI Ids that represent NOIE metering points

• Default values for four of the five Profile ID components

• Only weather zone must be determined

• Profile Decision Tree contains details

Load Profile IDs

Page 19: Presented to ERCOT Retail Market Subcommittee March 13, 2002

19

Assignments for Opt-In Entities

• Opt-in entities are subject to all requirements detailed in this section for assigning Load Profile Ids

• Opt-in entities shall be responsible for assigning and submitting all ESI Ids and their corresponding Load Profile Ids

• Submission at least 120 days prior to effective start date of entry into open market.

Load Profile IDs

Page 20: Presented to ERCOT Retail Market Subcommittee March 13, 2002

20

Processes to Change Profile ID Assignments

Outline

• General info

• Changes from Initial Validation

• Changes from CR disputes

• Changes from Annual Validation

• Changes from Meter Changes

• Changes away from Default Load Profile ID

Load Profile IDs

Page 21: Presented to ERCOT Retail Market Subcommittee March 13, 2002

21

Processes to Change Profile ID Assignments

General info

• ERCOT, a TDSP, or a CR may initiate a change

• Assignments based on criteria in Profile Decision Tree

• All communication via EDI specified by Texas SET, except for alternatives detailed in these LPOG

• Changes to Load Profile ID assignment shall be effective with a specific meter read date

• Known errors in assignment shall be changed retroactively to the meter read date when no error existed or six months, whichever is less

Load Profile IDs

Page 22: Presented to ERCOT Retail Market Subcommittee March 13, 2002

22

Processes to Change Profile ID Assignments

Changes from Initial Validation

• Currently in process

• ERCOT will notify TDSPs of Profile ID discrepancies via an email with attached text file

• Details of process are in Section 11, Validation

Load Profile IDs

Page 23: Presented to ERCOT Retail Market Subcommittee March 13, 2002

23

Processes to Change Profile ID Assignments

Changes from CR disputes

• CRs shall submit any requested change to the appropriate TDSP, in accordance with the procedures of the TDSP

• If TDSP disallows requested change, CR can dispute to ERCOT

• ERCOT makes final determination

• TDSP submits change within 3 business days

Load Profile IDs

Page 24: Presented to ERCOT Retail Market Subcommittee March 13, 2002

24

Processes to Change Profile ID Assignments

Changes from Annual Validation

This subsection is gray-boxed due to on-going discussions within PWG for implementation later this year.

Load Profile IDs

Page 25: Presented to ERCOT Retail Market Subcommittee March 13, 2002

25

Processes to Change Profile ID Assignments

Changes from Meter Changes

• Initial ESI ID creation and meter sets

• Non-IDR to IDR

- IDR Requirement (> 1 MW)

- ERCOT monitors and produces monthly report

- CRs are responsible for requesting installation (30 days)

- TDSPs install IDR once request received

(60 days)

Load Profile IDs

Page 26: Presented to ERCOT Retail Market Subcommittee March 13, 2002

26

Processes to Change Profile ID Assignments

Changes from Meter Changes (cont’d)

• No TOU to TOU

- CR requests TDSP to install TOU meter

- TDSP has until second regularly scheduled meter read date to install

- Available TOU schedules can be found in the Profile Decision Tree

• TOU to No TOU

- TDSP has option to replace TOU meter or leave in place, “virtual meter change”

Load Profile IDs

Page 27: Presented to ERCOT Retail Market Subcommittee March 13, 2002

27

Processes to Change Profile ID Assignments

Changes from Meter Changes (cont’d)

• Demand to No Demand

Gray-boxed while waiting on PRR309 approval

• No Demand to Demand

- CR requests TDSP to install demand meter

- TDSP has until second regularly scheduled meter read date to install

- TDSP communicates to CR when expected meter change will take place

Load Profile IDs

Page 28: Presented to ERCOT Retail Market Subcommittee March 13, 2002

28

Processes to Change Profile ID Assignments

Changes away from Default Load Profile ID

• New ESI ID is initially assigned default Profile ID

- ResLowWR

- BusDemMedLF

• Once 12 months of consumption is available, CR may request a change to the appropriate Profile ID

• Residential ESI Ids can use 7 months from October to April to calculate winter ratio.

• Criteria in Profile Decision Tree must be followed

Load Profile IDs

Page 29: Presented to ERCOT Retail Market Subcommittee March 13, 2002

29

Approval of Approach for 6 sections:

• Profiling Working Group (4)

• Load Profiling Methodology (6)

• Load Profile IDs (9)

• Load Research Samples (15)

• Supplemental Load Profiling(16)

• Load Profile Metering (17)

Goal for Today

Page 30: Presented to ERCOT Retail Market Subcommittee March 13, 2002

30

General Info• Load research sample data is required by ERCOT as the basis for developing and evaluating load profiles.

• In the interest of reducing time of development and lowering associated costs for profiles in an open market, TDSPs and NOIEs provided all load research data to ERCOT used in the initial development of load profiles.

• ERCOT will make use of TDSP and NOIE load research data to the extent such data are available and useful.

• ERCOT plans to develop and arrange for implementation of its own load research samples.

Load Research Samples

Page 31: Presented to ERCOT Retail Market Subcommittee March 13, 2002

31

TDSP Samples

Maintenance of existing samples

• TDSPs are required by Protocols to maintain these samples to accuracy designed.

- Replacing sample points

- Replacing or repairing malfunctioning data collection equipment

- Maintaining and operating data collection and processing systems

- Providing annual reports to ERCOT

Load Research Samples

Page 32: Presented to ERCOT Retail Market Subcommittee March 13, 2002

32

TDSP Samples

Notification to ERCOT

• Any major change to the design of a sample requires TDSP to give ERCOT one year notice

• Whenever practical, TDSPs shall give ERCOT one year notice for the following changes:

- New sample

- Rotating a sample

- Adding supplemental strata

- Bulk replacement of equipment or data collection systems

- Other changes to sample design or implementatiion

Load Research Samples

Page 33: Presented to ERCOT Retail Market Subcommittee March 13, 2002

33

TDSP Samples

General Reporting Procedures

• By April 1 of each year, TDSP will report to ERCOT the status of its load research samples and future plans for these samples, plus provide load research data

• By September 1 of each year, TDSPs will report to ERCOT any major changes to the samples planned for the next year

• When requested by ERCOT, TDSPs will provide load research data within 60 days

• Data provided includes both individual premise and aggregated class estimates.

Load Research Samples

Page 34: Presented to ERCOT Retail Market Subcommittee March 13, 2002

34

TDSP Samples

Required Information

For annual reporting and data transmittal

• Certain fields in data files

• Data dictionary

• Sample design description

• Key stats for each stratum

• Estimates of annual peak load and accuracy measures

• Plans for any future major changes

• Description of any major changes in preceding 12 months

Load Research Samples

Page 35: Presented to ERCOT Retail Market Subcommittee March 13, 2002

35

TDSP Samples

Additional Requested Information

• For each stratum, alternate sample points installed and fraction of intervals with missing or bad data

• For each class sample, definitions of rate classes applicable to the sample

• Description of sample coverage

Load Research Samples

Page 36: Presented to ERCOT Retail Market Subcommittee March 13, 2002

36

TDSP Samples

Availability of Data

Load research data provided to ERCOT from the TDSP will only be available to ERCOT for its use in load profiling.

Load Research Samples

Page 37: Presented to ERCOT Retail Market Subcommittee March 13, 2002

37

TDSP Samples

Creation of New TDSP Samples

• TDSPs that develop a new load research sample shall inform ERCOT of the plan to develop the sample

• TDSPs will provide to ERCOT basic information about the population and sample design

Load Research Samples

Page 38: Presented to ERCOT Retail Market Subcommittee March 13, 2002

38

ERCOT Samples

General Info

According to the Protocols, ERCOT is responsible for developing new load research samples if it determines that existing load research data are insufficient for profile development and maintenance.

Load Research Samples

Page 39: Presented to ERCOT Retail Market Subcommittee March 13, 2002

39

ERCOT Samples

Availability of Data

• ERCOT will provide descriptive information available on load research samples, in support of load profiling, according to Protocols 18.3.1.

• Aggregate data from load research samples will also be made available to market participants by ERCOT

• Gray-boxed language addresses availability of individual sample point data. This issue and possibly this whole subsection (15.2.2) might be superceded by rulings from new PUC Docket No. 25516

Load Research Samples

Page 40: Presented to ERCOT Retail Market Subcommittee March 13, 2002

40

ERCOT Samples

Criteria of Standards

• Samples will be designed to meet a standard of +/- 10% accuracy at 90% confidence

• Review of achieved accuracy include:

- Accuracy of energy within certain time-of-use periods

- Demand at peak hour in each month

- Total energy consumption in each month

- Accuracy of load-weighted average price

Load Research Samples

Page 41: Presented to ERCOT Retail Market Subcommittee March 13, 2002

41

ERCOT Samples

Creation of New Samples

• Gray-boxed language addresses rights of data use by a third party. This issue and possibly this whole subsection (15.2.4) might be superceded by rulings from new PUC Docket No. 25516

• ERCOT will provide to the PWG basic information about the population and sample design

Load Research Samples

Page 42: Presented to ERCOT Retail Market Subcommittee March 13, 2002

42

ERCOT Samples

Guidelines for Installing and Refreshing Samples

• Decision to develop new load research samples will be based on ERCOT’s annual evaluation of models and methods.

• Triggers include:

- Poor model performance in areas that have inadequate load research data

- TDSP plans to discontinue load research programs

- Current models are based on old load research data

Load Research Samples

Page 43: Presented to ERCOT Retail Market Subcommittee March 13, 2002

43

Approval of Approach for 6 sections:

• Profiling Working Group (4)

• Load Profiling Methodology (6)

• Load Profile IDs (9)

• Load Research Samples (15)

• Supplemental Load Profiling(16)

• Load Profile Metering (17)

Goal for Today

Page 44: Presented to ERCOT Retail Market Subcommittee March 13, 2002

44

General Info

According to Protocols 18.7, supplemental profiles should be developed for programs or pricing schemes that encourage a demand response to price in the retail market.

Protocols details the development of two supplemental profiles and allows for development of other future supplemental profiles.

The two supplemental profiles are:

- Time-of-Use ==> currently available to CRs

- Direct Load Control==>available in late 2002

Supplemental Profiling

Page 45: Presented to ERCOT Retail Market Subcommittee March 13, 2002

45

Load Profiling for Time-of-Use

General Info

Per the Protocols 18.7.1.4:

• CRs have the right to offer time-of-use schedules, but only those schedules associated with an existing TOU tariff within a TDSP service territory OR new schedules agreed to by the TDSP.

• Implementation of new TOU schedules subject to ERCOT and Texas SET change control process

• All TOU schedules must approved by PUCT

• Restrictions on TOU schedules may change when metering becomes competitive

Supplemental Profiling

Page 46: Presented to ERCOT Retail Market Subcommittee March 13, 2002

46

Load Profiling for Time-of-Use

Establishing New TOU Schedules

• PUCT approval

• MP submits approved TOU schedule to ERCOT

• ERCOT makes necessary system changes to accommodate new schedule

• Limitation of four TOU periods

Supplemental Profiling

Page 47: Presented to ERCOT Retail Market Subcommittee March 13, 2002

47

Load Profiling for Time-of-Use

Timing of New TOU Schedule Implementation

• ERCOT will implement new schedule within seven business days

• Once TOU meter is installed and programmed to record kWh per the new schedule, the CR may begin submitting ESI Ids with a Load Profile ID reflecting this TOU schedule to ERCOT

Supplemental Profiling

Page 48: Presented to ERCOT Retail Market Subcommittee March 13, 2002

48

Load Profiling for Time-of-Use

Chunking Profiling Methodology Description

Standard load profile is applied to monthly consumption, but energy for each TOU period in the load profile is scaled to equal metered energy for the TOU period.

Supplemental Profiling

Page 49: Presented to ERCOT Retail Market Subcommittee March 13, 2002

49

Load Profiling for Time-of-Use

Evaluation of the Chunking Profiles

• Assess general method based on profiles from other areas

• Assess using load research data within ERCOT

• Assess using data on customer characteristics within ERCOT

• Revisions to TOU Profile methods

Supplemental Profiling

Page 50: Presented to ERCOT Retail Market Subcommittee March 13, 2002

50

Direct Load Control

General Info

• Each direct load control program is required to use a statistically representative load research sample on the DLC population as a load profile, per Protocols 18.7.2

• Unique process to determine DLC load profiles

Supplemental Profiling

Page 51: Presented to ERCOT Retail Market Subcommittee March 13, 2002

51

Direct Load Control

TDSP Programs

Gray-boxed language reflects SB7 directive that investor-owned utilities are not allowed to administer DLC programs, but does this apply to opt-in entities?

Supplemental Profiling

Page 52: Presented to ERCOT Retail Market Subcommittee March 13, 2002

52

Direct Load Control

Responsibilities of CRs

• Costs of installation, maintenance, and processing of load research samples in support of DLC program

• Keep ERCOT up-to-date of ESI Ids in DLC program

• Provide ERCOT with types of loads controlled and control and communication technologies

• Notify ERCOT of changes to information previously provided, e.g. types of loads controlled, definition of dispatch groups

Supplemental Profiling

Page 53: Presented to ERCOT Retail Market Subcommittee March 13, 2002

53

Direct Load Control

Appropriate use of Sponsor Funds for Sampling

• ERCOT will conduct sample design and implementation prudently

• DLC load research data will be used only for development and evaluation of DLC profiles

Supplemental Profiling

Page 54: Presented to ERCOT Retail Market Subcommittee March 13, 2002

54

Direct Load Control

ERCOT Responsibilities

• Sampling

• Validation

• Statistical Validity

• Random Selection

• Accuracy

• AEIC Load Research Manual

• ERCOT requested data

Supplemental Profiling

Page 55: Presented to ERCOT Retail Market Subcommittee March 13, 2002

55

Direct Load Control

ERCOT Responsibilities (cont’d)

• Implementation of load research samples

• Processing load research data

• Verify sample validity of control devices and communication equipment

Supplemental Profiling

Page 56: Presented to ERCOT Retail Market Subcommittee March 13, 2002

56

Other Supplemental Load Profiles

Ordinarily, any other supplemental load profile shall use the same approach as DLC (lagged dynamic method), but these requests will be evaluated on a program by program basis.

Supplemental Profiling

Page 57: Presented to ERCOT Retail Market Subcommittee March 13, 2002

57

Requesting DLC or Other Supplemental Profiles• Only the CR serving the customers on a demand-responsive scheme may request a supplemental load profile to serve those customers

• ERCOT will post a request form to their website

• CR shall provide sufficient information to allow ERCOT to construct a representative sample design that accurately estimates the DLC or supplemental program load

• Once request has been received, ERCOT has 60 days to respond with questions and/or information about implementing the DLC samples

• ERCOT shall implement a new load research sample for DLC or other supplemental profiles within six months of final agreement between CR and ERCOT on sample design

Supplemental Profiling

Page 58: Presented to ERCOT Retail Market Subcommittee March 13, 2002

58

Access to Data

Gray-boxed subsection has been deferred until a later time when it is more relevant.

Supplemental Profiling

Page 59: Presented to ERCOT Retail Market Subcommittee March 13, 2002

59

Approval of Approach for 6 sections:

• Profiling Working Group (4)

• Load Profiling Methodology (6)

• Load Profile IDs (9)

• Load Research Samples (15)

• Supplemental Load Profiling(16)

• Load Profile Metering (17)

Goal for Today

Page 60: Presented to ERCOT Retail Market Subcommittee March 13, 2002

60

Introduction• This section is a summary of major metering issues related to Load Profiling

• Primary uses of metering data are:

- To assign each ESI ID

- To allow validation for Load Profile ID assignments

- To ensure profile models are appropriately specified

- To allow for profile model development

Load Profile Metering

Page 61: Presented to ERCOT Retail Market Subcommittee March 13, 2002

61

IDR Requirement• IDR Requirement is defined in Protocols 18.6

• ERCOT shall monitor ESI Ids demand data to determine if 1000 kW threshold is met.

• ERCOT shall publish a monthly report to each CR

• CR is responsible for requesting an IDR installation within 30 days

• TDSP is responsible for installing requested IDR within 60 days

• Costs will be borne by the appropriate party in accordance with approved TDSP tariffs

Load Profile Metering

Page 62: Presented to ERCOT Retail Market Subcommittee March 13, 2002

62

Demand Meter Changes• TDSPs are responsible to enforce appropriate thresholds and tariffs requiring the installation of a demand meter

• Demand to NoDemand

- CR has the option to keep a demand meter in place for their own billing purposes

- TDSPs have the option to physically remove the demand meter or do a “virtual meter change”

Load Profile Metering

Page 63: Presented to ERCOT Retail Market Subcommittee March 13, 2002

63

Load Research Samples

Any IDRs installed as part of a load research program that is used in support of ERCOT load profiling or TDSP cost allocation/rate design are not subject to the IDR Requirement and may be removed as needed.

Load Profile Metering

Page 64: Presented to ERCOT Retail Market Subcommittee March 13, 2002

64

Supplemental• Metering for supplemental load profiling shall be in accordance with Protocols Section 10 “Metering” and Section 18 “Load Profiling”

• Any TOU metering must be able to collect and record meter data into specified TOU periods approved by the PUCT

Load Profile Metering

Page 65: Presented to ERCOT Retail Market Subcommittee March 13, 2002

65

Approval of Approach for 6 sections:

• Profiling Working Group (4)

• Load Profiling Methodology (6)

• Load Profile IDs (9)

• Load Research Samples (15)

• Supplemental Load Profiling(16)

• Load Profile Metering (17)

Goal for Today