Private Label Opportunity
• Electric Unit Heaters• 2-20 ton Commercial Rooftop (Goodman)• 2-10 ton Commercial Split Systems (Goodman)
– 3 ph/460/230v
• PTAC Units (Goodman)• ??
Tubular Unit HeatersTubular Centrifugal Fan Unit
Heater
Tubular Duct furnace
Tubular Separated Fan Unit Heater
Tubular Separated Centrifugal Fan Unit Heater
High efficiency Unit heater A
High efficiency Unit heater B
Modify current tubular fan unit to blower. Match QVEB. Must add modulation gas controls
Modulation gas controls for blower, fan and duct furnace
Modify current tubular unit by removing the fan. Must meet a minimum of 30-80 degree rise (90 if possible)Duct flanges to be added on inlet and outlet.
Modify current tubular fan unit to make it separated combustion. Modification of burner box is required. New power venter and pressure switch required.
Modify current tubular blower unit to make it separated combustion. Modification of burner box is required. New power venter and pressure switch required.
Modify current tubular to high efficiency
Design new unit with complete new heat exchanger
Engineered ProductHydronic Packaged Rooftop Unit Heating only, 800MBH input, High efficiency 90%+,
Hydronic coil, Heat Net controls, xxxxx CFM, xxxx TSP,
Packaged Make-Up Air Unit Air conditioning and heating, energy recovery section, high filtration section, 100% outside air, turndown 25% or below, Change Mtr system on standard CFM Units, BAS Interface package - Bacnet, Lon, N2, Modbus, 2" filter frame option (Merv 13) (New ASHRAE/ANSI fan standards coming)
Air handler Unit Additions Add heating coil for split system with Hydronic heatingAdd Condenser Section Optional field installed with AHUCurrent unit modifications /additions
1. Blower spring isolation2. Main control board with better logic3. Evap Cooling Section, Cabinet Designed up to 12,000 CFM, bag filter or 12" final filter, 2" prefilter option
4. Add Condenser Secction to Rail - up to 30 Tons (out source Cond Unit)
5. ME & MS units are short on CFM. Ned to adsd top discharge and top return
• Kitchen Systems Make-Up Air Units
• Self Contained 100% OSA -5000 CFM w/ Fixed-plate enthalpic energy exchanger
New Product Development
Misc Project
Find VFD Drive that can handle factory mounted under all conditions
CanFab unit
Flue collars on GG
MS and ME third party label for complete unit
Product Meeting Discussion
• Outsource Electric Unit Heaters• Goodman Cond Units for Space Pak• Energy Recovery Modules
– Calcana & AirXchnage• Hydronic Unit Heaters
– Become at least a me too– Specifier– Unit Mounted Controls– Upgrade Mtrs and junction box– Reznor , Modine & Rettling all becoming a threat
Product Meeting Discussion Topics
• Hydronic Unit Heaters– Production Issues
• Sharp corners and lose fit of meteal• Issue w/ Fan Blades coming off• Issue w/ Vibration
– Upgrade housing for Plastic (polish model)– All engineering done to date has been to take cost out
Product Meeting Discussion Topics
• Tubular unit Heater– Need tubular QVEB, Duct Furnace– Tubular QVEB nearly done
• Moving to separated combustion model next
– Condensing unit heater bimetal control switch to avoid freezing
– Solenoid valve for power outages to dump condensate