CONSTRUCTION AND COMPLETION OF BEDOK RESERVOIR STATION AND TUNNELS FOR DOWNTOWN LINE STAGE 3
TBM EPB 2111 – 366TIERRA
SHAFT BOTTOM
SEAL EYE
SEAL EYE
HACKING PILE FOR DOME
TBM CRADLE SETTING
TBM DELIVERY
RING B
RING A LOWERING
RING A POSITIONING
RING A AND RING B
MAIN DRIVE LOWERING
MAIN DRIVE LOWERING
MAIN DRIVE
MAIN DRIVE INSATLLING
MAIN DRIVE MOTOR
MAN LOCK LOWERING
MAIN MOTOR AND MAN LOCK
RING A AND RING B
RING A AND RING B
RING C
RING C
RING C
MAIN THRUST CYLINDERS
RING D LOWERING
RING D
RING D
RING D
SCREW CONVEYOR LOWERING
SCREW CONVEYOR
SCREW CONVEYOR
SCREW CONVEYOR
REAR SCAFFOLD
REAR SCAFFOLD
CUTTERHEAD TILTING
CUTTERHEAD LOWERING
CUTTERHEAD LOWERING
CUTTERHEAD
CUTTERHEAD
TBM EPB “TIERRA”
TBM EPB “TIERRA”
HYDRAULIC CONNECTION
ELECTRIC AND ELECTRONIC CONNECTION
BACK UP ON SURFACE
BACK UP ON SURFACE
WELDING WORKS
WELDING TESTS
THRUST FRAME ASSEMBLY
RAILS ASSEMBLY
TEMPORARY RINGS SUPPORT
PIPING
BOTTOM SHAFT
BOTTOM SHAFT
WORK SITE
THANK YOU FOR YOUR ATTENTION