Proposed Levee for Sibulan River

Embed Size (px)

Citation preview

  • 7/24/2019 Proposed Levee for Sibulan River

    1/9

    CATCHMENTCHARACTERISTIC

    S

  • 7/24/2019 Proposed Levee for Sibulan River

    2/9

    DRAINAGE AREA

    The catchments of the Project are within the Sibulan Rier !alocate# between two mountain $ea%s that form the catchmenthe Sibulan Rier" These are Mt" A$o towerin& '()*+masl an#Sibulan with an eleation of ,-''masl"

    The Sibulan Rier is &au&e# at the Cebulan Gau&in& Station w

    #raina&e area of ,., %m'" Cebulan &au&e is locate# at )( m aboe sea leel

    The #raina&e s/stem of the Project has stee$ slo$es an# a hi&

    He#cor Sibulan 0'"- M1 H/#roelectric Power Project

  • 7/24/2019 Proposed Levee for Sibulan River

    3/9

    Circularit/ Ratio

    Circulator/ Ratio 2

    2 ),-34',"*-5

    23*4*"'3-

  • 7/24/2019 Proposed Levee for Sibulan River

    4/9

    Main Channel Slo$e

    7nl/ ,)8 of Sta" Cru9:s area is classi;e# as leel to leel imatel/? -*8 are stee$l/ un#ulatin& an# rollilan#

  • 7/24/2019 Proposed Levee for Sibulan River

    5/9

    DRAINAGE DENSIT@

    Sibulan rier has a total len&th of '4'44 meters? an# lan# area of ,.-..")- ha"

    Draina&e #ensit/ 2

    2 ,",0(

  • 7/24/2019 Proposed Levee for Sibulan River

    6/9

    !asin Eleation

    The Sibulan Rier has mountainous terrain un#ulatin&towar#s the coast with an eleation ran&e from 9ero to'?004 meters aboe sea leel

  • 7/24/2019 Proposed Levee for Sibulan River

    7/9

    CIMATE The Phili$$ine climate was classi;e# accor#in& to Corona

    classi;cation? which onl/ consi#ers rainfall as &au&e" Thisconsists of four t/$esB

    T/$e I + Two $ronounce# seasons #r/ from Noember to Awet the rest of the /ear"

    T/$e II + No #r/ season with $ronounce# relatiel/ #r/ from NoeA$ril an# wet fro the rest of the /ear"

    T/$e III + Season not er/ $ronounce# relatiel/ #r/ from NoemA$ril an# wet for the rest of the /ear:

    T/$e I +Rainfall more or less eenl/ #istribute# throu&hout the /

    The $roject area is locate# within the boun#ar/ of Daao Can# Daao Del Sur which falls un#er T/$e I"

  • 7/24/2019 Proposed Levee for Sibulan River

    8/9

    an# se Parameters

    The lan# area of Sta" Cru9 $er !oar# of Technical Suran# Ma$s is '.?(34 hectares" Howeer? base# on the F

    A$$raisal an# Assessment Sheets Ma$the Munici$al Assessor:s 7ice the total lan# area of munici$alit/ is '*?.-(".*-- or about ."),8 of the $roarea

  • 7/24/2019 Proposed Levee for Sibulan River

    9/9

    Soil Classi;cation Paramete

    Sta" Cru9 has four