    Purchase Process -

    Vocabulary

    &

    Terminologies

  • 8/12/2019 Purcahse Process Related Vocabulary

    2/9

    Manufacturing Strategies (Del. Lead Time)- ETO

    - MTO

    - ATO

    - MTS

    Boundary Spanners

    Supply Chain Concept

    - Concurrent design

    - Mutual cost benefits

    - Speed of information / EDI

    Supply Chain Components

    - Schematic representation- Flows

    Rise of Material Management / DPC / LM

    2

    Supply Chain ManagementAn

    Overview

  • 8/12/2019 Purcahse Process Related Vocabulary

    3/9

    MPC System

    - 5 Levels (refer schematic diagram)

    Level of detail vs planning horizon

    3 questions at every level (priority, capacity and differences)

    Production Plan (MPS)

    - Chase Strategy

    - Level Strategy

    - Subcontracting- Hybrid

    - Contrast b/w MTS and MTO

    Components of a MPC system

    - Production Planning

    Demand Planning (Forecasting)

    Capacity planning

    Material planning

    - Implementation and Control

    Production activity control (shop floor control)

    - Inventory Management

    Evolution from MRP II to ERP systems

    3

    Manufacturing Planning and Control

    An Overview

  • 8/12/2019 Purcahse Process Related Vocabulary

    4/9

    4

    PURCHASING

    BUSINESS PLAN

    SALES AND OPERATION PLAN

    MARKETING PLAN PRODUCTION PLAN

    MASTER PRODCUTION SCHEDULE(MPS)

    MATERIAL REQUIREMENTS PLAN(MRP)

    PRODUCTION ACTIVITY CONTROL

    PERFORMANCE MEASURES

    (KPIKEY PERFORMANCE INDICATORS)

    CONTINUOUS PROCESS

    IMPROVEMENT

    SALES PLANROUGH CUT

    CAPACITY PLAN

    RESOURCES OK?

    DETAILED

    CAPACITY PLAN

    RESOURCES OK?

    No

    Yes

    No

    Yes

    MRP and Purchasing In Production

    Activity Control

  • 8/12/2019 Purcahse Process Related Vocabulary

    5/9

    MRP

    - Objectives

    Requirements

    Priorities current

    - Inputs

    MPS

    Inventory record

    BOM

    Product tree Parent - Component

    Single level

    Multi level / Indented

    Multiple

    Summarized / Simplified

    Planning bill

    Variation to BOM (where-used and pegging report)

    Uses of BOM

    Nature of Demand

    - Independent (MPS)

    - Dependant (MRP)

    Vertical

    Horizontal

    5

    Material Requirements PlanningAn

    Overview

  • 8/12/2019 Purcahse Process Related Vocabulary

    6/9

    MRP Techniques- Exploding and Offsetting

    Lead time

    An example BOM

    Planned order (receipt and release)

    - Gross and Net Requirements

    Planned order release of parent = gross requirement of component

    Add OHI to the example

    - Releasing Orders

    - Scheduled receipts

    - Open Orders

    - Add scheduled receipts to the example

    - Basic MRP record

    - Planning horizon, time bucket, action bucket

    - Capacity Requirements Planning

    - Low-level coding and Netting

    - Procedure with an example BOM

    - Extending for multiple BOM

    6

    Material Requirements PlanningAn

    Overview

  • 8/12/2019 Purcahse Process Related Vocabulary

    7/9

    Using MRP- Launch Orders

    - Reschedule due dates

    - Reconcile errors

    - Solve material shortages

    - Coordinate with other planners, schedulers, PAC and purchasing functions

    - Planned orders, released orders, firm planned orders- Exception and transaction messages

    Managing MRP

    Suppliers action through purchasing

    Priority changes (expediting and de-expediting)

    Management action (MPS)

    Bottom-up replanning

    System nervousness

    7

    Material Requirements PlanningAn

    Overview

  • 8/12/2019 Purcahse Process Related Vocabulary

    8/9

    Order qualifiers

    Order winners

    Exploding

    Offsetting

    Netting

    Low-level coding

    Bill of Material

    Planning Bill

    Gross and Net Requirements

    Projected available balance (PAB)

    Planned Order Receipt

    Planned Order Release

    Scheduled Receipt

    Open Orders

    Planned Order

    8

    MRP And PurchasingTerminologies

    Released Order Firm Planned Order

    Back Order

    Backlog

    MRP Record

    Time Buckets Planning Horizon

    Action Bucket

    Exception Messages

    Transaction Messages

    Need-By Dates (Due Dates) Promised Dates

    Exception Reports

    Pull-in

    Push-out

    Cancel

  • 8/12/2019 Purcahse Process Related Vocabulary

    9/9

    9