Qualification Status List ALSEP Array A2 Configuration NO. ATM 986 REV. NO. PAGE I OF 27 DATE 5 March 1971 In compliance with the requirements of NASA contract NAS 9-5829, this document provides a Qualification Status List (QSL) for use as Section 3 of the ALSEP Array A2 Acceptance Data Package (ADP\. As of the date of publication, the information herein rdlects the status of qualification following the systems level tests which have been completed on the ALSEP Array D system configuration. The ALSEP Fail- ure Analysis Reports which are possible constraints to the close out qualification status are discussed in Section 1. 2. As of the date of publication, the information hp,·ein reflects the status of the Array A2 Qualificationr There are four major changes which distinguish the Array AZ experiment package: substitution of a Bendix transmitter, a new solid state timer (RSST), re-design of the MDX, and the addition of the HFE to SP 2. Prepared by: '/;}d., !}'. T. Baker ALSEP Reliability R . db A b ev1ewe pproved y: __ .d'- __ ,,. __ 4 _____ _ Group Engineer ALSEP Reliability S. J. Ellison Manager A L_S EP Reliability

Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Embed Size (px)

Citation preview

Page 1: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Qualification Status List ALSEP Array A2 Configuration

NO.

ATM 986

REV. NO.

PAGE I OF 27

DATE 5 March 1971

In compliance with the requirements of NASA contract NAS 9-5829, this document provides a Qualification Status List (QSL) for use as Section 3 of the ALSEP Array A2 Acceptance Data Package (ADP\.

As of the date of publication, the information herein rdlects the status of qualification following the systems level tests which have been completed on the ALSEP Array D system configuration. The ALSEP Fail­ure Analysis Reports which are possible constraints to the close out o£ qualification status are discussed in Section 1. 2.

As of the date of publication, the information hp,·ein reflects the status of the Array A2 Qualificationr

There are four major changes which distinguish the Array AZ experiment package: substitution of a Bendix transmitter, a new solid state timer (RSST), re-design of the MDX, and the addition of the HFE to SP 2.

Prepared by: '/;}d., !}'. T. Baker ALSEP Reliability

R . db A b !~~ ev1ewe y:_J:.::_~~~~~~~~~,·· pproved y: __ .d'-__ ,,. __ 4 _____ _

Group Engineer ALSEP Reliability

S. J. Ellison Manager A L_S EP Reliability

Page 2: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Qualification Status List ALSEP Array A2 Configuration

NO.

ATM-986

PAGE 2

REV. MO.

OF

DATE 5 March 1971

CONTENTS

1. 0 INTRODUCTION

1. 1 HARDWARE LIST FOR ARRAY A-2

1. 2 OUTSTANDING FAILURE ANALYSIS REPORTS

2, 0 HARDWARE CHANGES, QUAL SA, SB TO ARRAY A -2 CONFIGURATION 12

3. 0 QUALIFICATION TEST HISTORY 24

3. 1 QUALIFICATION TEST HISTORY

3. I. 1 3. 1. 2 3. I. 3

BxA Transmitters Dual 9 0 Channel Multiplexer Converters Resettable Solid State Timer (RSST)

3. 2 SUBPACKAGE #2 ASSEMBLY

3. 2. 1 Heat Flow Experiment (HFE)

4. 0 QUAL A2 TEST REPORT LIST

APPENDIX A QSL SHEET COMPARISON CRITERIA

APPENDIX B QUALIFICATION STATUS LIST SHEETS

24

24 24 24

24

24

26

A-1

B-1

Page 3: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Reference Section

3. 1

3. 1. 1 3. I. 2

3. 1. 3

3. 2

3. 2. 1

ALSEP Array A2 QSL Data Sheets

CONTENTS (Cont'd)

SUBPACKAGE II! SP f/1, Antvnna Assembly Central Station Compon<·nts FiltPr Diplex<•r Diplexcr Switch Command Receiver Com.mand Decoder Data Processor Transmitter 90 Channel Multiplexer Power Distribution Unit Power Conditioning Unit C/S Timer (RSST) Passive Seismic Experiment PSE Sensor Assembly PSE C/S Electronics Shroud, Thermal Control PSE Gnomon Assembly

Solar Wind Experiment (SW) Lunar Seismic Magnatomett•r (LSM)

SUBPACKAGE //2 RTG Assembly RTG Shorting Plug ALHT PSE Leveling Stool Heat Flow Experiment (HFE) Suprathermal Ion Detection Experiment (SIDE)

NO.

ATM 986

PAGE 3

DATE

Shed

Bl B2 (B3-B12) B3 B4 B5 B6 B7 B8 B9 BlO Bll

REV. NO.

OF

Bl2 (Bl3-Bl6) Bl3 B14 Bl5 Bl6 Bl7 Bl8

Bl9 B20 B21 B22 B23 B24 B25

Page 4: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Qualification Status List ALSEP Array AZ Configuration

NO.

ATM 986

PAGE 4

REV. NO.

OF

DATE 5 March 1971

l. 0 INTRODUCTION

In compliance with NASA Contract NASA 9-5829 requirements, this document provides a Qualification Status List (QSL) for use as part of the ALSEP Flight 2A Acceptance Data Package.

Because of the similarity of this Array to previously qualified arrays, complete system qualification was not required. Those new components, which were identified at the FTRR/FACI for Subpack I on 27-28 October, 1970, as being qualified on a component qualification level are as follows:

(1) 90 channel multiplexer (2) BxA transmitter (3 \ RSST Timer

The FTRR/FACI held at Bendix on 16 December 1970 dictated that requalifi­cation rationale of the HFE SN 6 would be accomplished by successful com­pletion of HFE SN 2 qualification on Array D subpack 2 qualification. The ALSEP Array D Subpackage 2 QAR Minutes, 9721-276, state that HFE is considered to have passed qualification testing.

Changes to Array A2 hardware previously qualified by the ALSEP Qual SA, SB, and SC Program are reviewed in Section 2. 0, and other comments concerning qualification by similarity are provided in Section 3. 0.

l. 1 HARDWARE LIST FOR FLIGHT 2A/ARRAY A-2

The following is a hardware list for the Flight 2A Array A-2 configuration that was reviewed at the FTRR as the basis for establishing the hardware qualified on an individual basis versus configuration items considered qualified by Qual SA, Qual SB, and/or Qual SC Programs.

Page 5: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

NO. REV. NO.

Qualification Status List ALSEP Array A2 Configuration

ATM 986

Central Station Electronics

Antenna and Cable

Diplexer Filter

Diplexer Switch

Command Receiver

Command Decoder

Coax Cabling

90 Channel Multiplexer

Data Processor

Transmitters

Timer, RSST (Gulton)

Power Distribution Unit

Power Conditioning Unit

Wire Harness (including terminal boards) Assembly

Astronaut Switches

Flat Cable Connectors

Special HFE Terminal Board

Special Multiplexer Terminal Board

Thermal Plate Assembly

Thermal Bag Assembly

PAGE 5

OF

DATE 5 March 1971

Qualified As :

Qual SA

Qual SA

Qual SA

Qual SA

Qual SA - Address Change Qual by Similarity

Qual SA

Separate Component Qual Program

Qual SA - Data Format Change Qual by Similarity

Separate Component Qual Program

Separate Component Qual Program

Qual SA

Qual SA

Qual SA - HFE Changes Qual by Similarity to Qual SA and Qual SB Harness

Qual SA

Qual SA

Qual by Similarity to Existing Terminal Boards

Qual by Similarity to Existing Terminal Boards

Qual SA

Qual SA

Page 6: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

NO. REV. MO.

Qualification Status List AL.SEP Array A2 Configuration

ATM Q86

SP-1 Structural/Thermal

Primary Structure

Connector Front Panel Layout

HFE Astromated Connector

PDM

Side Curtains

Curtain Cover

Rear Curtain

Rear Curtain Cover

Specular Reflector and Masks

Sunshield Assembly

Dust Detector Reel

SP-1 Experiments

PSE

LSM

SWE

DTREM

PAGE 6 OF

DATE 5 March 1971

Qualified As:

Qual SA

Qual SA

Qual by Similarity to R TG on Qual SA

Qual SA

Qual SA

Qual SA

Qual by Similarity with Qual SA with Verification from EDM

Qual by Similarity with Qual SA with Verification from EDM

Qual SA

Qual SA

Qual SA

Qual SA - Changes Qualified by Similarity

Qual SA - Changes Qualified by Similarity

Qual SA

Qual by Similarity to Qual SA

Page 7: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

~space ···.,stems Division

SP-2

Fuel Trans. Tool

Dome Removal Tool

Unv'l Handling Tool

Qualification Status List ALSEP Array A2 Configuration

Qual SA

Qual SA

Qual SA

IU:Y, I"'U,

ATM 986

PAGE 7 OF

DATE 5 March 1971

RTG Cable Stowage Assy Qual SA

Carry Bar Upper Qual SA

Carry Bar Lower Qual SA

Boom Attach Assy Qual SA

Aiming Mech Pkg Qual SA

Subpallct As sy Qual SA

HFE Subpallet Qual SD

HFE Qual SD

Shorting Plug Qual'd by Components Similarity

Pallet Insert Assy Qual SA

Pallet Brkt Assy Qual SA

Subpackage Assy Qual SA

IPU Generator Qual SA

SIDE Qual SA

HFE SN 6 Qual D

Reflector Qual SB

Page 8: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Qualification Status List ALSEP Array A2 Configuration

MO.

ATM 986

PAGE 8

REV. NO.

OF

DATE 5 March 1971

1. 2 OUTSTANDING FAILURE ANALYSIS REPORTS

The below listed FRs against Flight ZA ALSEP configuration are being processed for Failure Analysis Reporting as of the date of Publication for this QSL. All previous failure analysis reports against ALSEP Qual SA, Qual SB, Qual C and Flight ZA ALSEP hardware have been closed by MSC review and approval actions.

1. FR-285, PSE Sensor S/N-3, Flight Spare

KSC DR #F-ASI-0007 reported PSE pressure below minimum value of 332 during periodic KSC pressure checks. A linear regression analysis established that the leak rate is within specification and that PSE S/N-3 was acceptable as a spare. An Interim FAR #285 was issued 11/25/70. The Interim FAR #285 recommended that the S/N-3 PSE Sensor continue to be used in support of integrated system on Arrays A2 and D as explained in Bendix Letter 70-970-3965. Following use of the sensor in support of AZ and D test programs, it will undergo modification to a later flight configuration. Follow-ing modification and test, a final FAR will be prepared.

Status:

Action:

Open

(1) Interim FAR issued on 11/25/70. {2) Final FAR by BxA Scheduled for

5 /l/71.

2. FR-All, Command Receiver S/N-8, Flight AZ Spare

BxA DR #AB8040 reported 35 KC IF bandpass shift and abnormal S/N ratio during T/V test at BxA. BxA troubleshooting per DR #AB8040 determined that the anomaly was due to a clear oily film on the inside of the receiver cover. After removal of the grease and completion of functional tests at BxA, the receiver was considered flightworthy. An Interim FAR #A 11 was issued on 12/2/70. The re-acceptance test of the S/N 8 receiver was stopped after completion of the ambient baseline portion of the acceptance test due to other test priorities.

Page 9: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

"'"'· Qualification Status List ALSEP Array A2 Configuration

ATM 986

Status:

Action:

PAGE 9 OF

DATE 5 March 1971

Open

(l\ Interim FAR issued by BxA on 12/2/71. (2) Completion of acceptance test is scheduled

with T /V test to be completed by 5 March. (3) Completion date of BxA FAR is scheduled

for 3/10/71.

3. FR-Al5, PSESensorS/N-7, FlightA2

During A-2 System T/V testing the S/N-7 PSE failed during the lunar night IST. PSE Sensor temperature data was identical to the PSE short period seismometer data, except for a different data sampling rate. Based on troubleshooting and visual mech­anical inspection, the failure was isolated to the Schjeldahl connector J35. Reference FAR 244B for a similar problem on the same PSE. FR-A15 notification to MSC was issued 12/11/70. An Interim FAR #A-15 was is sued on 1/11/71 to describe the J35 connector rework and change of connector potting to a softer material. The final FAR A 15 Revision A describes reliability analysis of the originally defective connector and inspection procedures which were developed during failure investigations.

Status:

Action:

Open

(11 Interim FAR issued by BxA 1/11/71. (2) Final FAR issued by BxA 2/12/71. (3 \ LSPO returned comments and questions

to be incorporated in later revision. (4\ Revision B FAR scheduled for 3/10/71.

4. FR-Al6, LSMS/N-7, FlightA2

During A2 System T /V test per test procedure 2345114, Subpackage I, the Lunar Surface Magnetometer LSM S/N-7 exhibited a failure. With digital filter in, all science should be saturated, was near zero and oscillating. With filter out saturation is obtained.

Status:

Action:

Open

LSPO FIAR (GFE experiment') and closeout was scheduled for 2/25/71. However, a waiver request initiated by MSC is still pending approval.

Page 10: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Qualification Status List ALSEP Array A2 Configuration

MO.

ATM 986

REV. MO.

PAGE l 0 OF

DATE 5 March 1971

5. FR-Al9, LSM S/N-7, Flight A2

During A2 IST per TP 2346320, the LSM experienced site survey anomalies and troubleshooting which led to the replacement of the 7: axis string cable.

Status:

Action:

Open

LSPO FIAR (CFE experiment) and "Technical Agreement'' closeout action expected by 3/15/71.

6. FIAR #AA-EH-OOODl, HFE S/N-3, Array D (Qual)

BxA DR #AB7496 disclosed that all probe heater current values were 0. T. during PIA prior to Array D qual. vibration test. Troubleshooting isolated the fault to test points which were ex­posed to shorting due to damaged conformal coating.

Status:

Action:

Open

(1) Final FIAR issued by BxA on 2/11/71. (2) LSPO closeout was scheduled for 2/25/71,

however, MSC comments and questions were issued by MSC on 2/22/71 for BxA revision of the FIAR. The Revision "A" FIAR is scheduled for completion by 3/15/71.

7. FIAR #AA-EH-OOOD2, HFE S/N-4, Array D - Flight 5

ADL TWX 9/22/70 notified that test data at ADL disclosed 0. T. failures of both probes # 1 and #2. Test troubleshooting has been conducted at ADL and it has been established that the gradient bridges shorting ratio has shifted down but has been stabilized at new values.

Status:

Action:

Open

(1) Final FIAR issued by BxA on 2/11/71. (2) LSPO closeout was scheduled 2/25/71. (3) By telecon on 2/25/71 LSPO informed

BxA that a closed FIA R is in process.

Page 11: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Qualification Status List ALSEP Array A2 Configuration

MO.

ATM 986

PAGE 11

REV. NO.

OF

DATE 5 March 1971

8. FIAR #AA-EH-OOOD3, HFE S/N-3 Array D (Qual)

BxA DR #AB8566 was issued as a result of PIA after Array D qual. level vibration to report the probe H 1 data output 0. T. BxA isolated the failure to the probe as a 3 O% reduction in the resistance of one bridge arm. The defective probe has been sent to the subcontractor (A. D. Little\ for evaluation testing prior to any decision on des true­tive analysis.

Status:

Action:

Open

(1 \ BxA status letter issued 2/2/71. (2\ At the Array D SP #2 QAR on 2/19/71,

BxA was directed to continue the failure analysis.

(3 \ Final FIAR is to be scheduled following ADL testing to be completed 12 March 71.

9. FIAR #AA-EH-OOOD5, HFE S/N-2, Array D (Qual\

BxA DR #AB 8593 was is sued as a result of Qual D previbration PIA to report the HFE S/N-2 0/T conditions on probe #l. The anomaly was traced to a flatpack gate assembly #A72 on the P-1 00 board. The flatpack was sent to WSTF for laboratory diagnosis on 12/4/70. Further troubleshooting has indicated the flatpack replacement resulted in the failure (open' of a plated thru hole at the logic input pin of the flatpack.

Status:

Action

Open

(11 Final FIAR issued by BxA 2/11/71. (2) LSPO closeout expected 2/25/71. (3 \ LSPO informed by telecon on 2/25/71

that a closed FIAR is i:l process, however, additional information was later requested.

(4 \ Supplemental information to be provided by 3/10/71.

Page 12: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

NO. REV. NO.

Qualification Status List ALSEP Array A2 Configuration

ATM 986

PAGE 12 OF

DATE 5 March 1971

10. FIAR #AA-EH-OOOD7, 90 Channel Multiplexer S/N-16, Array D- Flight 5

During PIA, channels 85 through 90 of the S/N-16 MUX displayed excessive leakage. Troubleshooting per DR f/AB-9403 isolated the problem to an AMI MX02D HEX MOS FET gate. The replacement displayed similar characteristics. Failure analysis at the vendor has been completed. The cause of the original failure could not be deter­mined due to damage to the MOS gate upon rcn10val. Cause of the replacement's failure has been deter1nined to be a crack in the glass seal allowing solder flux to enter the device. Corrective action will be to change manufacturing procedure to inspect for dan1aged parts immediately before and after placement on board.

Status:

Action:

Open

(l \ TWX notification to MSC on 12 January 1971.

(2\ FIAR analysis and CAR status issued 11 February 1971.

(3) Memo 9721-2041 issued 15 February 1971 to request reliability participation on part removal MRB.

(41 Final FIA R to be issued after QA response to Reliability.

11. FIAR #AA-EH-OOODB, SP #2 Structure, Array D (Qual\

During Y -axis sine vibration, exces sive1y high g-levels were recorded on the up sweep for design limit vibration. Per DR #AB-9464, trouble­shooting isolated the failure to the 2339101 pallet assembly skin to honeycomb bonding.

Status:

Action:

2. 0 HARDWARE CHANGES

Open

{1 \ TWX notification to MSC 2/12/71. {2 \ Final FIAR by BxA scheduled for

I 2 March l 9 7 1.

The following hardware changes were made to Array A2 from Flight l and Flight 2 configurations. The Applicable C RD/Justification for each change is included with the new part number:

Page 13: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

su :KAGE I ATM 9S6 Page 13

CONFIGURATION DIFFERENCES

Flt~-i {Flt. 2) A -2

PART NAME Part Number Part Nwnber

Subpackage I

Sunshield Assy Mod.

Primary Struct.

Central Station

Thermal Plate

Harness Assy

Transmitter

Multiplexer

Timer

Dust Detector

PSE Sensor/ Shroud

2334848

2335136

2335088

2330399-2

2330351-2

2331250-2

2330527

2330524

2330626

2330370-2

2338460-ZC

Reflector Assy 2330177

Thermal Bag 2330333J

Thermal Curtain 2335582B

Thermal Curtain 2 335609B

2344986

2344990

2338947

2344957-1

2344955

2344956-1

2345250

2338900

2338511

2341440

2338460- *

Not used

2330333K

2335582F

2335609F

APPLICABLE CRD's/JUSTIFICATION

Part number change due to Configuration Differences

Thermal Mod. as result of Off-Equator Deployment

Thermal Mod. as result of Off-Equator DeploYJUent

Part Number change due to Configuration Differences

Part Number change due to New Timer

Part Nwnber change due to New Timer

Bendix Design

MOS-FET Mod

Solid State Timer Design

Modification for MSC Requireme:1ts

CRD 57822 *New dash no. to be assigned after determination o: Flight Configuration

Deleted as result of Off -Latitude Thermal Mod.

CRD 57563

CRDs 57 399, 57 455, 57607. 58928

CRDs 57401, 57456, 57608, 58929

w co

Page 14: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Subpackage I - (

Flt:ITFit.l) A-2 PART NAME Part Nmnber Part Number

Insulation 2335617

Insulation 2335618

Spring 2335628-

Spring 2335629-

Spring 2335630-

Shroud & Gnomon 2338016D Assy

Adapter,PSE 2338083-Socket

Terrni:1al Stud 2338174

Tab, Right angle 2338527

Handling Socket 2338211A

Diode Board Assy ---

Girdle & Lanyard 2338794C

Radiation Barrier 2338798-

Decal, PSE ---

Pad, Hook & Pile ---

Insulating strip ---

Spring Clip ---

2345636

2344959

2335628A

2335629A

2335630A

2338016J

2338083A

2338211 B

2338535-1

2338794-ZG

2338798A

2338922-9

2338924

2338925

2338926

~uration Differences

APPLICABLE CRD' s /JUSTIFICATION

Thermal Mod.

Thermal Mod

CRD 57715

CRD 57716

CRD 57717

CRDs 57469, 57500, 57595. 57627, 57857

CRD 57754

Parts deleted due to Tiiner change

Parts deleted due to Tiiner change

CRD 57723

Provodes Multiplexer Channel Protection

CRDs 57408, 58566

CRD 58635

Astronaut request

AT:T\1[ 986 I \14

Thermal Mod as result of Off -Latitud~; deployment

Thermal Mod

Thermal Mod w ..,0

Page 15: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

PART NAME

Velcro Pad & Hook

Curtain Assy

Shroud Mod Kit, PSE

Label-Arrow, PSE

Compass Quad:, PSE

Bracket As sy

Gnomon, left hand

Gnomon, right hand

Cover, Sun Compass

Guard Assy, Left

Guard Assy, Right

Retainer, rear

Brkt. , Conn.

Subpackage I - Cm

Flt. ((:Fit. 2) A-2 Part Number Part Nwnber

2338928

2338935

2341623

2341624

2341625

2344952

2344970

2344971

2344985

2344991

2344992

2344993

2330ll7 2345132

\ . ration Differences

APPLICABLE CRD's/ JUSTIFICATION

Thermal Mod

Thermal Mod

ATM 986 ge 15

Maintain Low Backc.Face Temperature of the Aluminized Teflon Portion of Thermal Shroud

Off-Latitude Deployment

Off -Latitude Deployment

Thermal Mod

Off-Latitude Deployment

Off -Latitude Deployment

Thermal Mod

Thermal Mod

Thermal Mod

Thermal Mod

Redesigned for new Timer (P27)

~ 0

Page 16: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

PART NAME

Handling Socket

Spacer, Conn.

Conn.

Lacing Tape

Guide Fastener

Plug, Retainer

Protective Strip

Command Receiver

Flat Pack

Subpackage I - Configurat.

Flt:·~C(Flt. 2) A-2 Part Number Part Number

2338115

2334549

095-9031-0015

50DOF17VF 721 -H

2335931-1 2335931-7

2334676

2335148

2330523- 2330523A

SL3539-4 SLl 0456

Discrete Assy, 2330855F 2330855G D/P

Thermistor Assy 2330446C

Thermistor 2331253D

Operational Amp. , 2334686G PDU

2330446D

2331253G

2334686J

Arr-986

1ifferences p ).6

APPLICABLE CRD' s/ JUSTIFICATION .~~~---------------------

Additional Part Added for Removed of New Rear Curtain Retaining Bracket (Thermal Mod}

Additional Quantity (2) added for P27 (New Timer)

Additional QUantity added for P27 (New Timer)

Old part not available

Height Changed to accommodate new Bracket-Thermal Mod

Quantity decreased by one (l) for Thermal Mod

Removed as result of Thermal Mod

CRD 57477 {Potting hole covers)

Part number changed to identify unique Bl testing of a 9041 Flat Pack

CRD 53271 (Burned-in thermistors)

CRD 53271 {Burned-in thermistors)

CRDs 5 3271, 56098, 56099

CRDs 53271, 55333 (Added Alternate Relay 2338517)

..r: .....

Page 17: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Subpackage I - Configure. Differences

Flt. 1 (Flt. 2) A-2 PART NAME Part Number Part Number APPLICABLE CRD's/JUSTIFICATION

Exp. Drive, PDU 2330472K

CIS Cont. Ckt. PDU 2330467N

Inverter Module 2330036B Base, PCU

Cover Assy No.1 2330039B Inverter Module

Transistor Mod. 2330040B

Cover Assy No.2 2330056B Inverter Module

C/B Regulating 2333563A Module

Transformer 2333584B

Transistor 2 3 34459-

2330472L CRD 55332 (Added alternate relay 2338517)

2330467P CRD 55331 (Added alternate relay 2338517)

2330036C CRD 53331

23300390 CRDs 53271, 53329

2330040C CRD 53326

2330056D CRDs 53271, 53330

2333S63B CRD 53271

2333584C CRD 55990

2334459A CRD 53327

A'T'-- !186 P. )7

Flat Pack SL 7275-2 U5B770931XB1 Part number changed to identify unique Bl testing of a 709 Amplifier

Thermistor GB25PM2 2335661-1 CRD 53271

Thermistor GB42MM62 2335661-2 CRD 53271

Thermistor GB42PM62 2335661-3 CRD 53271

RF Cables 2330528-4, 2334698-l ,-2 New Transmitter 5, & 6

,J>.. N

Page 18: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

ATM 986 Subpackage I - Confi~ ion Differences p ~8 ..

Flt. f(F"'lt. 2} A-2 PART NAME Part Number Part Number APPLICABLE CRD's/ JUSTIFICATION

-~- .r:-

Wire List 2331251

Wire Diagram 2331252

Cable Diagram, 2335171 Test Config.

Battery, Timer 2334476

Multi -Format Comrrnuator, D/P

Digital Data Proc.

PSE Se~:>or

Base A:;sy,

Sensor

Heater

2330846-l

2330521 J

2341604 A

2341603 -

Sensor 2341606 Electronics P. C. Brd. Assy.

P. C. Brd.Spacer 234206-1

P.C.Brd.Spacer 234206-2

P.C.Brd.Spacer 234207

P. C. Brd. Spacer

P. C. B rd. " Z" 234540

W/L 2344956 New Harness for Timer Change

2344988 New Harness for Timer Change

z34691a New Timer & HFE Addition

Solid State Timer Used

2330846-4 CRD 58758

2330521 L CRD 58775

2341604-502 D (Heater Mod) CRDs 57662, 57709 58715

2341603-502 E (Heater Mod) CRDs 57662, 57409. 58669, 58715 & 58795

2344709-l

2341606-502 D CRDs 57662, 57696, 58669 & 58795

2344701-1

2344701-2

2344702

2344712

2 344700 *" VJ

Page 19: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

ATM 986

Fit. l{:f._.;it-.-2>'

Subpackage I - Config .on Differences Pc '9

A-2 -----------·-------------------------~ ____ . Part Number Part Number APPLICABLE CRD's/JUSTIFICATION

P. C. Brd. "W" 2338'/86 -

P. C. Brd 234572

Capacitor, 47MF Qty. of 1 CSR13F476K2552

Transistor Qty. of 3 S2NZ10Z

Transistor Not used

Transistor Qty. of 4 2N2222A

Resistor, Z. 5K 238038

Resistor, R38 & Not used R39

Schematic, 11 W" 2338787 Brd.

Heat Sink Not used

Heat Sink Not used

Heat Sink Not used

Wiring Diagram 2341608

Wiring List

Cable Assy, SIDE

2341607

2333508A

2338786-501 A CRD 58669

2344707 CRD 58669

Qty. of 2 Heater Mod

Qty. of 4 Heater Mod

JAN TX2N3499 Heater Mod

Qty. of 2 Heater Mod

Not used Heater Mod

Select at Test Heater Mod

2344708 Heater Mod

2344713 Heater Mod

2344714 Heater Mod

4055 Heater Mod

2 341608 -501B CRD 58782, 58669

2341607 B CRD 58718, 58782

2333508 B CRD 58730

Page 20: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Flt. 1 (Flt:. 2) PART NAME Part Number

Connector Dust Not Used Cover (P27}

Insulating Strip 2330673

Fastener, Hook 2330330-1

RF Cable 2330670D

RF Cable 2330671E

Antenna Wire 2.334491 Cable Stowage Assy.

Pin, Ant. 2334495A Wire Cbl. Stowage

Dust Cover Not Used Mod Kit

Dust Cover, Not Used S/PI

Subpackage I - Co

A-2 Part Number

2345637

Not Used

Not Used

2330670E

2330671F

2334491J

234495B

2.339421

2339428

~uration Differences ATM986 p ~0

APPLICABLE CRD' s /JUSTIFICATION

Removes Possibility of Foreign Material Entering Connector.

Removed From Left Thermal Curtain Per CRD

Removed From Left Thermal Curtain Per CRD

58939

58940

58945

58946

CCP-2.71

CCP-271

>l \.

Page 21: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

FACI PART NAME Part Number

Sub-Pkg. II 2334849 AC

Aiming Pkg. 2335354 E

Aiming Mechanism 2330309 -

Shorting Plug 2335520 F

Bolt. Internal 2332986 -.

Upper Hal£, Carry Bar 2335471 B

Spring, !Lock 2335474 A

Lower Half, Carry Bar 2335476 E

Post-Carry Bar Stowage 2338118 -

Universal Handling Tool 2338102 A

Handling Socket 2338390 -

Handling Socket, PSE Stool 2338117 A

Handling Socket, Aiming Mech. 2338114 -

Handling Socket, Rtg. cable 2338116-

) '--~·-

Su.wr'ACKAGE II

CONFIGURATION DIFFERENCES ATM 986 Page 21·

A-2 Part Number

2339080 B

2335354-1 F

2338987

2.338017

2332986 A

2335471 c

2340985 A

2335476 F

2.338118 A

2338102 B

2338390 A

2338117 B

2.338114 A

2.338116 A

CCP/MSC Auth.

262

245

245

250 250 A

050012

OS0012

245

245

2.45

245

245

245

APPLICABLE CRD's/ JUSTIFICATION

Redesign For HFE

57928

Addition of 180° Slot (Ref. CRD 57928)

Central Station Harness Assy. provides Mu: Channel Protection

56244 Used on Flt. 4 and Flt. 3

57700

Provide more positive locking CRD 57700 & 57796

57704

57759

57763

57756

57753

57757

57755

Page 22: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

...... -·-·· r-- ------------

Subpackage II · .1£iguration Differences ATM 9~6 ··Page 22

FACI PART NAME Part Number

Adapter, EHT Socket 2338119 -

SIDE 2338104

Housing Assy, Shorting Plug 2335598

Housing, Shorting Plug 2335627

SIDE ICD (Mechanical) 2323521 J

Pallet Assy. 2334901 M

Lanyard, Shorting Plug -Ammeter, Shorting Plug 3204-367

Pedestal Assy, SIDE 2335362 B

PSE Stool 2335945

Lanyard, SIDE, Boyd Bolt Not used

ALSD ICD 2332263

Cable Assy, SIDE 2333507 c

Riser PSE Stool 2335945 A

Dust Cover -Dust Cover -

A-2 Part Number

2338119 A

2338104

2338008

2338020

232352.1 K

2339081

2339198

2339470

2335362 c

2344723-501

2339487

2332263 F

2333507 D

2344728 A

2339468 D

2339449 A

CCP/MSC Auth.

245

229

262

250

250

255

272

265

271

271

APPLICABLE CRD' s / JUSTIFICATION

57764

Change source nan1e from Marshall Labs to time zero

Different Shorting Plug used (Mux. Channel Protection)

Different Shorting plug used (Mu.x. Channel Protection}

57804

Modified For HFE

Added per CRD 58632 to 2338017 (C)

58773

58708

CCP-265

58854

58732 MSC LTR EH2 L193/B201

Redesign of Stool

Page 23: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

.... ~

Cask Dome Removal

Tool

Pin Lever

Pallet Insert

HFE Sub Pallet

Astromate Conn.

Subpackage II - Configuration Differences

FACI A-2 CCP/MSC

.L-u:M 986 Page 23

Number Part Number Auth. APPLICABLE CRD' s / JUSTIFICATION Part 1\

2337954 D 2337954 E 58936

2338125 A 58937

- 2339081 262 HFE Add it ion

.. 2339130-101 262 HFE Add it ion

... 2339160 c 262 HFE Add it ion

··c: ~ --..

Page 24: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Qualification Status List ALSEP Array A2 Configuration

.......

ATM-986

PAGE 24 OF

DATE 5 March 1971

3. 0 QUAL TEST HISTORY

3. 1 SUBPACKAGE #1 ASSEMBLY

With exception to those areas discussed below, Subpackage 1 was successfully qualified under the Qual SA Program. The QSL sheets pro­vided in Appendix B for Subpackage 1 reflect the Qual SA test results ex­cept where noted on the applicable sheets or discussed herein.

3. 1. 1 BxA transmitters, P/N 2345250, S/N 26 and S/N 27 (on A2) were qualified under the Qualification Test Program performed on the A-2 Qualification Unit Transmitter, P/N 2344600, S/N 23 and S/N 21. ATR 266 details the history of the A-2 Transmitter Qualification Test Program. The details of the qualification testing are itemized in the Appendix QSL Sheet B-8.

3. 1. 2 Dual 90 Channel Multiplexers and 8 Bit A/D Converters, Model 2338900, S/N 11, were qualified under the Qualification Test Program performed on S/N 7 unit. ATR -236 details the history of the Qualification Program conducted for S/N 7. The details of qualification testing are itemized in the Appendix QSL Sheet B-9.

3. L 3 Resettable Solid State Timer (RSST), S/N 005, was qualified under the Qualification Test Program performed for RSST S/N 002. The duly apprmn~d qualification test procedure covering this test is 13877-992. The details of the qualification testing are itemized in the Appendix QSL Sheet B-12.

3. 2 SUBPACKAGE #2 ASSEMBLY

The qualification of Subpackage #2 was initially accomplished as a result of Qual SA system level tests which are itemized in Appendix B, QSL sheets provided in Appendix B for Subpackage #2. The major change in Subpack #2 for A -2 is the inclusion of the HFE and the SP #2 qual is as stated below.

3. 2. 1 Heat Flow Experiment (HFE). The HFE was originally environ-mentally and functionally qualified as a result of system level testing on the Qual SB Subpackage # 1 configuration. The requalification for Array A -2 Flight Unit S/N 06 was accomplished on the Array D SP #2 Qualification Program. HFE S/N 2 was used to qualify HFE in this qualification program. Figure 1 shows the status, sequence and configuration of the Array D SP #2 Qualification Program. The system level parameters for this qualification are listed in Appendix B, QSL Sheet B-24, are those which are identified

in the test procedure of Figure I and BxA document TM 598~ Revision 3.

Page 25: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Tt·::.t Co::iig ..... r<ition

Z333~tJO-~ S·~b?ac~a.ge

Ir.cl"rl:r:g: HFE S/';'; 3 AL5D 5/N 3

F.Z Assy

Qi.:AL!}·;r· J , ~ '" ·-r·· _):\ :. \ ")1 ':-, PH.\5 i

d:rt.J1et~·ci ..... --

lr~F~:-_- PL·\ I' j'::;~ )PT\ '::)/;..:.. 5 tPo""t ::.::~ !

L~ _____ _ _ 1 I •.·i,·on) C./':'-1 3 !

~_:_333o6~j . tT.? 2335Jo'i1l ~ . ---,-_-

E ,l~b~e~y-~d~ir;g

1'. '6 S t

19-

0! icpnz ~/''. · cp,;2 c;~•l' IVihrdtion .: .. J Pro~s SP#Z- S/Nl6 1\'c•d:·,ca:i•m I!! p)\~ ~·~-et·;.,.

1

loTRR I fMASS PROPSl~cc-;:pt-:- v~·b'_ f[;;,~Li·;,-;~ '"';\!agneticd-r~"hock___ jl'l;~(l Bo:t- --l · '0--a, p-=:-~~ · : ____ ___ _ _ .~__ . ·'·' 1 -----~ - · ~- · ·' ·''r, 1 97G3-359 • ep. I -~-· - ~ ·' 1b ~ " - ~ ,, 0 rpf2 "'N'li> SP 2 S/".16 . <;p,? SI'"L, ' ~. ',, •. . _l . _J TP 233?J2n I TPZ3-±70b2. [TP 2346.!2.81 TP 2333049 j iTP 2346329 ~-~--p-gE:~ \ 128 Oct. 1979

~llOJlr.g ~!ech. Funct. SIN 4

· -i'-:PZTI~

----- O'CALIF:CA -f-ION EVENTS, PHAS:-:: II

:2.·=.~~_::-~~Test Configuration

.!3339:J;).2 S<lbpackage #2 Ascy

.Lnc-lucii:-,~:

D\.7-EFS W/0 Astromate Conn.

:-;o·i-E: ALSD has bee:: deleted from Array D

~rTIOO:.ficahons I I Ito 5? ii2 I ' f---------. j L_ __ l_j I Stow SP #2 I W/DVT-HFE

,L_ i !

F>re:c:);;-a:I;

;,;:;;:·::" d l (HFE ::-pr:;,._--,' I I S/NZ ~ p5rruar =:j

Events Completed

_______ ...__ _______ ----------- ------.---:---:::~:-:---::---:

[

--________ q_1,0~l::I_c::~·~l(?~-~VEN~_PHA5'0.!I --------·---~- :h?ack~ge .,z Test Confi~t:<ration

233>?1:!0-2 '>1bpackage 112 Assy

bch:d:~.g: HFE - S/N 2

:\OTE: AL5D has been deleted frc.m Array D

R etes1 Events Con1pleted ... \1agne,lC Preas n I'eot Comp. l'O.:t. 1 70

I, -·all HFE- I f !iF•, · PIAJ' 1 ..... ~~ .... LP,Jsr-tS/N 2 on I ~.r.\':r0n) _j ISP "'2 I 5 "'2 ' ~ TP-z?-33069 !

fMOSs~ro;>$1l Acc<'pt. ~ib. r~s-_. l,indt Shock I~O\';:r:: II I QAR ~ SP ff2 - SP i/2 • nbr.l~ton SP 1;2 - \<>clhcat,:q'l. S/X ill6 S/~ 16 _J 5P~~ - S!Nl6 S/N 16 5P~2 -5/N !6 118-19 Feb 197 ~~3i93'.Ji ~~ ~ ·~ . ~ f-,..,=;-,---cc7·;- n ~~ ~ ' 'n ~~' '~M

DR <i4o4 Repair P;ti1et DR 9• l3 Replac: Esna Nuts (I'oydoolt)

Figure 1 - , P fl A v D SP #2 Q:'/ • :FICA7<0N PP CCi,,. 'v! STAT U.S.' 5EQ'C'ENCE/CONFICURA TTON

)..~ TJ.v~ 9~;6

Page 25

Page 26: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

TP

IST-2333034C Replay- 2333034D

2333060A

2333087

2337925

2337938

2337939

2337940

233794I & 2337941A

2333034D

2333049

2333049

2338178

2334335 -Environ. 2333032B-IST

2334346-Design Limit Baseline IST

2338600-Modified IST Vib. & Mod.

Qualification Status List ALSEP Array A2 Configuration

NO.

ATM 986

REV. NO.

Section 4. 0 QUAL TESrr ~"~l':PO'"<T

LIST

PAGE 26 OF

ATR

48

4I

33

43

42

69

30

40

49

68

79

39

70

97

83

DATE 5 March I971

SUBJECT

Baseline Integ rated System Test

System Crosstalk

System EMI

Central Station Power Dissipation

Mass Properties, SP #I

Mass Properties, SP #2

Acceptance Vibration, SP #I

Acceptance Vibration, SP #2

Post Vibration Integrated System Test

Magnetic Properties Subpackage #I (Stowed)

Magnetic Properties Subpackage #2 (Stowed)

Stray Field Magnetic Properties (Deployed)

Thermal/Vacuum Acceptance

Design Limit Vibration SP #I

2334348-Design Limit 23330I5-SIDE Modified PIA 85 Design Limit Vibration Subpackage #2

Page 27: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

I r.u. tn:v. rev.

Qualification Status List ALSEP Array A2 Configuration

ATM 986

PAGE 27 OF _Z_7 __

TP

2334328-Shock 2338600-Mod. IST

2334331-Shock 2333015 -Post Test Veri

fication SIDE -PIA 2333057 -(page 7 only) RTG

Resistance

2334343 -Acceleration 2338600-Modified IST

233433 0-Accele ration 2333015-SIDE PIA 2333059- RTG Functional

2334345-System Test 233861 0-Environment

233 8617 -IST 2338610-(Sec. 6.9)

Environment

ATR

87

89

91

93

102

104

266

236

DATE 5 March 1971

SUBJECT

Qualification Shock Test Subpackage #1

Subpackage No. 2 Shock

Subpackage #1 Acceleration Qualification

Subpackage #2 Acceleration Q ualifi cation

Mission Simulation

Design Limit Thermal Vacuum Test

Transmitter

9 0 Channel MUX

Page 28: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Qualification Status List ALSEP Array A2 Configuration Appendix A

NO.

ATM 986

PAGE AI

REV. NO.

OF A7

DATE 5 March 1971

APPENDIX A

QSL SHEET COMPARISON CRlTEHIA

The qualification status defined in the Appendix B QSL Sheets {BxA format 970-12) is presented in a manner to compare ALSEP equip­ment specified environment or parametric requirements to the stress levels achieved during Qual SA or previous programs.

The qualification status has been established by the qualification testing accomplished at BxA and is reflected on the applicable QSL sheets by the listing of the appropriate test procedure, test reports and remarks relative to each test or to prior qualification tests.

Qualification testing of ALSEP for vibration shock, and accelera­tion was required at the system level only. That is, all equipments that comprise ALSEP were subjected to design limit levels for a stowed con­figuration, simulating the mounting of ALSEP into the LM compartment. The qualification vibration levels are depicted in Figures 1 through 5. These levels are in accordance with those specified by NASA Letter TD3/ L023/ 68/B- 26 (JAC ).

The qualification testing of Qual SA required testing to qualify the Array SA sunshield and astronaut switches. For the induced environ­ments test, a Subpackage #1 was employed with mass simulators used for the previously qualified experiments"

The qualification levels for the Trans1nitter, RSST and Multiplexer at the component levels are as indicated on each applicable item QSL sheet in Appendix B.

The SP#2 and HFE requalification was accomplished per BxA TM-598, Rev. Band the TP 1 s listed in Figure I, in Section 3. 0. The qualification vibration levels for Array D SP#Z are the same as the above Figures for Qual SA with the following exception. Figure 6 shows the Earth Launch Boost Vibration I_,cvcl for the X Axis perforrned to Qualify SP/!2, Array D.

Page 29: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

··wa1~,t~aoe . ~DhllaiM

10.-0

..0.:: fl$ Q,)

0.. 11119 1.5 I

c 0 .... ... nl Po< fJ -tl u· 0

< .... 5. I:: -

5

,, ~! .. ';?!!;

!;,, '·7f'~~:~: . ,._"'

'I

Qualification Status List Appendix A

NO.

ATM 986

. PAM A2

UV. NO.

MTI 5 March 71

---!

I I

' I r

' ' I I '

lZ

"' '

Sweep· R6t'C'J : 3/4 ·Octave I Minute ($ .. lOp .. 5 ~). g ... peak · Tolera.nce +10%

, , I

Frequency - Hz

Figure 1

·I

I f

t I I 0

,

..

Page 30: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

Ai811011p 8100 . ...-~ Dhfitllon

Qualification Status List Appendix A

A3 PAGI 011'

DATI 5 March 71

Test duration 2. 5 minutes power spectral denBity tolerance I} db

,

(JJ

0. u -..!.----------N 0.0 I

10

,

I I J

9 db/ octave

200 400 600 1300 2000

' . . •Frequency .... Hz ·.,

, Subpackage 1 . Earth Lat.tp.ch Boost. Phase Random Vibration Sp,ectrum besign Limit. x ... A:d$ only

...

Page 31: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

'fl a.· u -N 00 I

.... ..... en c

. 1

Qualification ,Status List Appendix A

1140. I IIV. wo.

ATM 9861

PAGII A'i

OF

DATI! 5 March 71

Test Duration 2. 5 Minutes Po wet Spectra¥1 Density t.oleranc e +3 db

~ . 01 - - - - - - - -- - ---I Q

I I I I I I I I

I l

Frequency -Hz

Subpackage 1 & Z Earth Launctt·Boost Phase Random Vibration Spectrum Design Limit,-' Y -Axis only

Figure 3

9 db/ octave

I I I I I I

' I

00

Page 32: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

~ace ·~~

Qualification Status List Appendix A

ATM 986

F'AGII! A5

DATI 5 March 71

1 Power Spectral Density Tolerance~_3 db Test duration 2. 5 min~tes

9 db/ octave

c:l) • 01 - - ._ - - - - - - -- - - ,..--------...1 ~ I (j

~ ,. tl()

c:l)

c: Q)

Q ..-< rd ,...

..... ~ . 001 0.

(f)

,... Q)

~ 0

11.

Frequency 1-Hz

Subpa~kagt~ 1 & Z

I

'

I

' I

I I

80~ l 00 1000 2000

Earth Launch-Boast Phast Rand9ftl Vibration Spectrum Leve:l. Z·Axis only

Figure 4

,.

..

Page 33: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

_/A .. ~

~~

. 1

. 01

ID 0. (.) --N WI I

>. ... .... Ill s:: ~

0 -Ill '"' .... ... (.) Q)

0. (/)

'"' Q)

~ 0 ~

. 000\

Qualification Status List Appendix A

ReV. MO.

ATM 986

PAGE A6 OF A6

DATE 5 March 71

Test Durat~n 12'; 5 nnnute" Power Spectral'Denafty t-3 db

12 db/ octave

------ ,-I I

1 I I I I 1 I I I I I t

I I I I ' J I I I I I

I I I I t

I I I I . t

' I

' 10 .. 20 l 100·. ;llt1 2000 #

Frequency -Hz

. . Subpa~fi 4 &t Z . < -Lunar Def!Jcent Random lSi'~loft Spectrum

~ign tdimit. .AU Axe~-f ·

F.igure 5'

Page 34: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

::"'-.

"' t:T, ,.:.:-.

N

te I ?.

+> •..-!

(J)

r:; ~)

Q

Qualification Status List A LSEP Array A2 Configuration Appendix A

NO.

ATM 986

A7 PAGE-

I REV. NO.

A7 OF

DATE 5 March 1971

NOTE:: IgnOl'<' possible indicated out-of•tolcrance condition~,; caused by X- Y plotter bg below 100Hz.

I~~~~~ _ _: __ ~p_.:~:~~r<:..lJ?~~:_::i!:Y __ :I~~~~:_:~~~-::_: :Uclo; except that at a.ny ;~ivcn tinw during ihc test run a rnaxhnum of three (S) channels arc allowed a -l 6~ -3dB tolerance (all other channels

within ±3 dB}. grrns to] crz•.ncc: . :1:10% grms Level: 6. 4g ±_ 10% =64. 0 (.+ 6. 4) mV Test Duration: z.. 5 1ninutcs

.\ 3 - -- - - - - - -- -- - -

21 d 6/ oc:n;vt.[

1

I I I I 1 21 J 8 OC..TI1Vlt

I I I

C ·~ ) \ -· -- - -· . -- I l

-~-~~~ kB/oww/2' .o z ·-· -- ·-- ·-· ,_ ! I I I I

. 01

• CD\

I I I I I

I l I I

I

l

I

I l

.I

I

I I I I I I

I 280 1 600 I 1 1 (~e F) 1 (O;:t~) I

_________ . __ _j _ _j_j _ _j_ __ !_j__ ____ .

I 0 ISS £30 4-00 1300 eCOO

200 I

Frequ.ency-Hz

f~a.rth l_;;:n{nch·Boost!Phasc J.'t;tndorn Yjbration .1:_)pcctrum De sign Limit Oualifica tion Level. X 1Axi-?··

Figure 6

Page 35: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST -ALSEP PROGRAM- AS~F:I-tBLY, su BPACKAC;E #I lDate 3 iS ;71 ~~o. A T\l-" Oi, jRev. No.

!Analyst l Page of Pages

Env i ronn1ent Stress Level Verification of Stress Level Capability

Item and/or Document Remarks l'\omenclature Parameter Requirement Capability Agent Location Reference Date '(

See Note I.

5'-'~>?at. :-.age •1 E"VIROc:\IENTAL

ExA 23->4986, Tt.:r:-:ort..'rat·1re: TP2334335 Successfully Qualified

S/N 16, Ope :rating -300°F to +250°F -300°F to +250°} Bx.<\ Ann Arbor, Micr TP2333032 6/IO/bB on QSA

F1ight 2-A !\on-Operating -65°F to +160°F F:xt<'rnal SP #I ATR-60, 70 Earth ·300°F to +Zo0°F Cc;nditions BSR-2367, 237& Qualified on Qa M0cn

SA Qual Pr'' ~ ~~~1 rt! 2334&48, S/!'<3 Operating

-12 BxA Same Same as above 6/I0/68 Test level limited by lest

10 Torr Tested to ' 1\onpOperati~g __ SL to J0-12. Torr 5 x 10-6 Torr equipment capabilities

Humidity Designed to meet Operating N/A BxA Same N/A N/A NIA

1\on-Ooerating IS- JOO'", Requiren1ents -Vibration

Operating ,:; I A 1 Testt'd to Design TP2334343

Successfully Qualified on See appendix A Limit V:b levels ATR-82, 83

?'on-O?erating BxA Same 6/28/68 Qual SA herein. indica ted in DSR -2402, 2403

Launch 1.: Flight Figures l-5

Lunar Landing -Acceleration Tested to H. Sg TP2<34H3

Operating NIA I 111in~:te (hrat.icn B"A Same ATR _q(l, 91 7/4;(8 ··.ctr.J(' as above

t~un-Operating 14g-axis (',1Ch axi~. ''·SR-Z4l2, l413 Si: ,,.-,k_ 1 (•sted tn 1 S± Il-)l33432ts

c :>·-~ !"?: ~ ~!lt! ~/A ~!' II m5 saw- PYA Sa rr1c ATR-8t•, 87 b/2l.1 / t•B _...;_:unc as above

~>,n~OtJ~rating 1 ':c- I I ms · •'•!h f';;J.C"h axis l\S R- 240 h, 240/ Salt Spray :;: • .>, \ :~o 1 e.5t Rc:o·Jir('d Sar.d i: Dust ~-:.,t rfcfh.1•ri ~-o :est Rl'G .:rL"d F .;ng-"s' " .~ :~.) Te~t R(.'aJii't.'d Acvustical !'\oise :~ •t <!efi~-:cd -::o Test Reg,·Jtr-ed Rain :\'A :\o Te~uired Radiation LED-S20 130W lftt B> >\ ,\:-~n Arbor ~1ic 1 1 TP 2337912 6/10 't->R ~rr Ot'~ .. rotir.£, T('r1t:""'("rature ExC>lC1~i.~Jn Proof :..;; A ,,. ~~ ... • R~·c .. rerl

PARAMETRI!;; Tested as part Capetble of start-

Functional nf the integrated up and operation

6/!0/68 Qualified on QSA s.y~tem in space lunar surface TP2334345

Performance "in1·11ation

BxA Ann Arbor, t-.tich TP2338610 8/7/68

ALSEP TM--:;2 , ~1.· rnUer ATR, 101-102 --

G"11\ ,.,

Sheet...1,U_ of _zs __

I

Page 36: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

·. 1 • .., :::. -; •, \ r \1 · , · '' \ · .-...

_:~_ned) !:>l R O. ,I. Fa~~· __ ,lf --- i- .1~_• QUALIFICATION STATUS LIST·AlSEP PROGRAM 1·1'.\t. K.\( ,L I, A>~ fL:'~:';:\ :\SSL~-11\LY

Rl·\·i=--~·d I :, l 11'< 1 r ~~- .

I I I t Vcriflc-atlon of Stress Lt..!vt·l Capability 1

!::nv1 ronnv:nt

and/or

ParanH:ttr

Stress Ll'\'el

lt(.;[l,

l'·~)lT\t:nclatu re

Ar.:• "·" A-.,, rr :,1-,·

a: _.. ·:·t !"':::a

Dxr\ 23?u307,

s :-: 1 1, FlL''t 2-ll ~A Q~al 5 =" 4

• d ~) ~ ('

B ·:A 2314522,

s " 11, ?light 2 -A

":\ Q·aal

2 "030), s :-: 4

\ .... ~. -: '"'R ·~1n1 \a 1 r>,_..:; ~- ~ :·

--::7 ~ 3

-.:_-\ ~333354-l, ' ;; f:, :- li~ht 2-A

·:.\ Q·:al

233535-t s :--: 3

'lV-12

r.:\ \' IP o~:~.! E:\TA L Tt.:Il1tJt..>raturt::

Operating !':vn-Operating

Earth }..!Jon

PrtssL:rt"

C•peratmg :'\un-Operating

HcHnidity Operating :-\un-Opcrating

Ytbrat1on

Operating

Requircrncnt Capability

Tc.stt•d in SpJ.t.:e

o c I Siin'..d~ttic•n - 25° F to+ 300 !· Ch~mber for

o o temp t•xcursions -65 F to+ 160 F of_-. lOQOF to C\1:\ +'"O"F

-I 2 J:-,10 mm:k~ S>;:~i. L to 10-· mmH··

\"crif1ed to Sxlo-b T,_)rrs 1n

Sp~cc Sin1 Ch;"ln1

Ag<'nt

BL'ndlx Aerospace Systems

BC'ndix Aerospace

Systems

o,.,,,:ncd to nwc, nendix Ae.rospace ::-:.;A IHumid1ty Ht•q'mt Systems 15'". tu IOO<:c H!l

Te~ted in stowedl BendL"'< Aerospace :--;I A I confh.:.uratic•n to Systen1s

!\on-Opt: rating H··fcr to ATR-lf \·ibr"ltH)n desi~n

Launch & Flight \{:dcndum 1 lll:1lt~ Indtc\tcrf

Lunar Lar.ding 1n F1c~ 1 thru t;

Location DoLun1ent

Reference

Ann Arbor, Mic·li1P 23Hll5

ATR-(0. 70 I\S R -? 3 1:1, Z 3 7 b

Ann Arbor, Michl T 1'2334335 ATR-(•0, 70 BSR-Z3.Q~

Ann Arbor, l\fi.:h !'-:/A

Ann Arbor, ~:;chiT. P. 23HH6

ATR-f2. 83 !}S[\ -2402, 2403

Accclt:ratiun Tf·S!t~d ir: :->tO'\Pt1

r \.'!' H:-.. Acrospil.CC Ann Arbor. ?\:ic-1~ fP 231 n-~' Opei"ating ::.!:\ ~ctt~j'1~~;,!c~n 1-l ·:·s:f'ms .-\TF .. -')~~. r..lJ

~on-Operating :\TR-16, i'H!d. 1 ~ .... ~~ ,. :1. 15 ...... !\ -2 ~12. 2·tl3 sr.r_,('k I e~tt·d Hi ··tO.'."t ,; :~cndix Af'rospa\..'C Ann .~\rbor, rdll-i {p .~ ~ \..f L~8

._(>r;fc~ Ir,•tH 1 l1 S rstC'n\S Operating :\';)n-Opt!rati!l:g

~~~trj s;r~~

c:; .-\ .\TR-11>, _.\,ho.

,\

~ 1")_ =:.2t'

I ,:..u,ustical 'i\oise ;.;_}_.\

Rd.in 1:-..:.\

l>;~±~:,llnlS 1 l.\ tin"lt'~ <'.t ;,,.;..,.

A.TF.-::-.~~. ?.i 2-!'"'t-. Z~()(

E>,Ct'Ld!' Ht.•C B··~d J .... , -.r,·~·~:, '-'··lltbf:dd. lc!:ch Dv1"11.:n \" ... ·nf.

Date

~!.ty- June

1%8

'!\/A

June -July

1968

July 10'-S

.. T._J\•

!O,S

_r .d' t: 1 "'t~ 7

Reu:.arks

Qt:aliii(:atl~''l ~'f the An!·"~'la ·\~s\· ba.<=. lJ,.l,, ;t, ~o.CJ1~l~;! ... h,·r~

at svstem levt"l d·,Hirq,! Qual SA.

-·:·-· ~~ ... ,: J.:- ·.-.~ b·.· t·:-st eq..::. ::-:::e~ ~ -:.:-3· ~:.~ ·: ~ • ~ "! ~

In stowe': ..:o:~::...:~:rctio:<. tl·t> airr:ing n1ech ·1:isni is n~o·.! ·f>~: on~- P=2. F~-fer to AT\t-77, for' -A'.i.~ 1' ·· :.,'i" \ i'·r.1t\,•·.-.

-· .. : .. llf''.t: ':-rtlo L·. "" 1: ~('('~t F!·,::t:;;('

i \ \. : . : ~. .·\ . .., . ~ F"::c.:s~3~:;~:.\~g~ ~~~~~~~~~~~~-!

~adiati.''~ I.FD-;~0 Fx\. t·t·ds: Re' Bt•ndix Rt~search L<lb~ ~-'Uthfit~ld, ~1iLh ( Dv~q;n Verif. I J>J.ne 1967 ! Vt_:::·:e~; A:-. .,:·. ':'iS I ..::.:J::losic·n Proo~ ~..: _1 A

l'AH;,;.!ETR!C

E- :~-!~·--:Power

(E:f. Bt>?...r:l\\idth

T -a:-.smlt/ Re~ei·:c)

lnp'lt YSWR @Trc,r.smitter f 0 •

@Rece1·:er £0

~~!::1nnum Puwer

-12. 5 dbm 2.7°(c, II. 7 db 270\Q 11. 0 db

]. 25: l 1. 5: I

1. Sw CW

-12. 5 dhm 290@. 11. 7 db 31°@1).0 db

1. 25: I L 50:1

I. Sw CW

Bend1x ReseZtrch L'b•l Southfield, Mich De.sicll Veri£. R<'port ~40l8

Bendix Research Labs( Southfield, Mich.( Design Verif. Report #4028

1-hndlino Capab:lit\' I @Tr,nsmJtter f 1 @Transmitter f I Bendix Research LabsJ Southfield, Mich J Design Yerif. 0 0

~.1-~xanum Aiming Error

I. Jl, 0 RMS 0. 75° RMS Design Venf.

Report #4037

Jlffie 1967

Fe::.t t::1\·i ro·'.r:':'""' ·.tal f•.;:'.l·~ic-':a: t\·;:;·~ :''.!Ce-::-:'..:1~-.;

pyr!orn:t.·d o~. t:,e an:\~n"la at-scn1bly at Hx I\Psrar(·h

on a 12 ~--..per Tt-1 2\; ...... z·l and C.oct:.mt···t('r: lJy RPport B?.L=-1•20

Sheet~ of ---

Page 37: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUAliFICATION STATUS liST-AlSEP PROGRAM O:~TRAL S'~ATIOX J.:LI-:C i JW:,ICS co:-t I'0:->1::-> rs

j'>ate3571 F··AT\!-'·,,·p~.-•.

1.\n;tly:.t R.l.ntt'l 1 f'af,'-' ___ ,f ___ Fa!..'·

Item !'omenclature

F::ter, D1plexr-r

b,.\ · Z33U52.5

::;; "\ ot F'li~ht 2-A

')A (Jual, :..,, . •

970-12

Environment and/or

Paramt<ter

£X\' IRO;o.;!\!E"'TAL Ten)perature:

Operating ]\;em-Operating

Earth 1\L,on

Pressure Operating

f-_.:"'·•n_- Operating H'-lmldlly

Stress Level

RequircnH:nt

-25L\F to tlc0°F

-t>5°F to t I t•0°F

<'..10-12 Torr ~ n t 1 1 . ~ T ,, r r

Capability

OK per req1n

OK per reqm

1 x !o·5 Torr UK

Operating IOOo/o Rli at 1600 ]\;on-Ooeratin 5 t -. I 0D"c R. !! I OO')o RH at 120°!

Agent

Rantec

Wyle Labs

Wyl•e Labs

VeJ·if1c~1ti~m of Stres~ Le,·~.·l Capability

Location

~labasas, Calif

I Segundo, Calif

·.!Segundo, Calif

Document Reference

Rantec

#o6279-QTP

Date

2/19/67 2/6/67

2/20/67

2/8/67

Reli1arks

I. Qualitll-t':'·~-. \·er~i·J,•d

in SP*='l Q.;~i S_'l.. tt?-FOt

I ·r (Qua1ifi('d in s\·st{·n; tr'

::- ··: ! t + • r r v)

XA

v.·)ratir_)n-l);..··r -·.:· ~-' 'l. -----

:-.:-.Jr.-Opt:rrt.t::.L~

Acct..> h. raticn

!\un -O?erati~g Shock

Operating ]\;on-OperatinE_

Salt Spray

R-o;.loon: IS t'2 '50 cp;, 0. 2g ''-jPUK p<'r reqm . ...::tn··:S t,"> 20 cp::; ,l 4 :n. n . ..\. 20

"~1.1 cps vg

>~ .\ OK per reqm ..:: ; :: s (.'>,""!. <t" \..;

'.;: . .\ 10!-: po•r re<;;n, ~n t:'s ea. ;,xl~

:-; ·' l'<t.-\

2/ )3/67

2/10/67

' 2/9/67

Sand & Dust '.; .> '.-\ T T l T T

See rE'n~o rk l

See rPr~~ark

St:>e rer-:a rk

I F "'g'' s .\ '"' I T I I _j - ·-1 .'.coustical ]\;oise '; .-\. ; .~ I I 1 I -~--- --1

Ram :;,.\ :.-\ --1 Radiatir.~n :F.~.1J

Explosion Proof PARA!-.IETR!C

vs.·:R

Insertion Loss

Isolation betv.een Ch~nnds

? ~'it lt•.·ri ~t fo::-c. i;?.db

:' .. ·\ l'o: I A

1.3b:l !-.l-1xall ports

0. 8 db Max

50 db f r to fLO

KO db ft to fr

I. 22:1 max 33 ~1c 1-!i.l

0. 73 db max

90 db min 7 100 db min

-B-unKe·rtla mo

Rantec

Rantec

Ran tee

""~n,1_~1 P:~ rk Ccd! ·1 ob..':i"Q-QTP

Calabasas, C•llf.

Calabasas, Calif.

Calabasas. .Calif.

66279-PTP-D

66279-PTP-D

66279-PTP-D

2.,. .!..2 i t•7

Before and

?.fter each l : environment~ I test

1/16/67 to 2/23/67

1/16/67 to 2/23167

IJ

Q•.:.alif1er! as pa· t nf a1

i!·.tec.··a'Pd S\'Stf"~"': 1•· .;.t•

spa ... t" si:!1.'dat\t'::, i'.u~· ... r d·_tnn.: Q.:al 5 A

TP 2333032

PTF-iO. 70 .r·:!1E> l Q, ..(

Sheet_li.L_ of ---

Page 38: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

. ..

QUAlifiCATION STATUS LIST ·ALSEP PROGRAM C I '; T H A! S T •\ I i 0' F I F C. ! ; ~ I- • II

COl\! PO;.;~:~; rs

En;. 1 ronn1ent and/or

Paran1eter

Stress Ll'vel Vl·rift1:ati'-m of Stress Level Capabdity

Itt-n1

~;:.~menclature

D~pi t·xer ..... ,i BxA ·~330526, ~ ;.: 9, Fli~ht ~-A

SA Qual, S ':-< 5

97J.l2

E~: "liP u;-:~.! E:": TAL I en ?erature:

Opt• rating !\on-Operating

Earth l\1 .. 1l)n

Fressurc;! Operating Non-Operating

Humidity Operating '!'\ un ~Operating

V1~rattl1 n -:..'r~,r-it·

l'cn:·Operating

R equiren1ent Capability

-Z5°F to -!boo;.-( OK per reqm.

-oS°F to -1 o0°F I OK per reqm.

10-lZTorr 30 tu I. 3 Torr

!3 tu lOO""o R. H. '\I.\

1 x 10- 5 Torr OK

lOO'"o RH at !&On 1007, RH at 120''

~~ :tnJ.l"'n1: IS to2 l :;o c-ps, 0. 2g I 1Ps OK per reqn1

'-.,lnt:; 5 to 2.0 c.p~ C'. ~ "'- D .. -\. ~0 tP lOO cps, 8'~~

Agent Location

Rantec aiabasas, Calif

Wyle Labs 1£1 Segundo Calif

Wyle Labs f:l Segundo Calif

Acct·leration

Operating XGn-Operating

Si--.ock

~/A . ' ~ 23~'s e" ""15 I J,

OK per reqm.

Operating ;.;tA OK pt:'r reqm ;-\on- Operating 20 ~':-; ea 2Xh

S;;.lt Spray :\ .-\ ;.;j.-\

s..~nci t.: D•1st .-\ :.:. . A F .f'\:;'1'5 ·;,tA "-' .-\ Aro•1stical !'\oise ::I \ ;.;.'A Ra1n :.; I.-\ ;.; ! ·" Radiation R :'ld1~ted <'!t fo:~ t 50 db Explosion Proof :.:,; .-\ I:--:; A

PARAMETRIC vsv; R 1.36:1\!~x fl.2l:lmax

Insertion Loss 0. 7 db !t!ax

Isolation between 120 db ~1m Port Channels !\ to Pori B or

vice ver..;.a

** 2119 rnc and 2277 me

( 130 !tic min)

0. 63 db max

22 db min

\

Bunker Ramo C>noga Perk Cal·

Rantec alabasas, Calif

Rantec alabasas, Calif

Rantec alabasas, Calif

Docurnent Reference

66279-QTP

66279-QTP

....

66Z79:_QTP

66279-PTP-S

66279-PTP-S

66279-PTP-S

I •:.'. • ; - 1 ~- ·\ ; " ' I . '· . :\llalyttt R:tntt•t I Pa~t.' ___ Ld ___ .i-·.1:.:_\ :-.

Date

2/19/67 2/6/67

2/20/67

2/8/67

2/13/67

2/l0/o7

2/9,67

2/22/67

Before and after e!3ch environmenta test

1/16/67 to 2/23/67

I/ 16/67 to

2/23/67

Remarks

l. Q\lilhit,·~1\,·n '"·eriilerl in

SP= 1 Q~1a! 5A t(;> st.

Qualified in S\·stem to 5 x 10-f- Tr,rrs

See rerr:a rk l

::-:ee rt::':.:a rk

See re!~-:ar~ 1

: Qua lifierl as part of a ~1 \i=-:tegra~ed s·:s:em ir: tiH•

I space sin-:.·.!--~tion ch.-+.n;bt"r

dt~rinL Q·:a! SA

/

Sheet_B-l- of ---

' '

Page 39: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QIJALIF!CATION STATUS LIST ALSEP PROGRAM CTc;TRAl Sl ,\T!O'; l'l ,.,. ·, nn::Ic S

CO:\!l'Oc-;F:" IS

~ ; 71 I ··-·-!-- . --~--~\1 ' ' ~. -

·•lrr'n ,T,), , ! .1~~-------·-~ -- --- ·---- -·

I1~'n1

~·~1n1enclat~re

( _':-- .:;ta ~1d

?~·~ e:·:er

Bx.-\ •2330523, 5 ~; I I. Fli~ht 2-A

SA Qual, S/N 4

170 12

E.:n'> lfuDll•t nt and I ()r

Paranwh.:r

L:-<VIRU~M~:',; fAL Tcn.pt.eraturc:

Operating

!\on-Operating Earth r,.!Jon

Pressure Operatmg !'on-Operating

Humidity

Operating I'on-Operatin)!

Vtbration Opnating ?\ A !\on-Operating

Launch & Flight Lunar Landing_

.Sire~~ Lt\~·1

Req_HirL·n,._·nt Capabdity

-10°f to +140"f-i·l0°F to tl40°F

-o3''F to+ 160''fJ.6S°F to tl60°F ':'>;/\

1 x Io-12 rnm llxl0"5mmllg

Sea Levd-!O"ti, m lxlo· 5mml-ig

lS~o- lOOa-o

')et..' Appcndi-...: A

15~, • 1 OO')'o

'//A , OG - peak 20 - 100 cps

Ac-celerati.:m ~~ /:\

Operating ':'./A ,4-.;- 1 min. l\un-Operating .>TR-16, Add. 1 0~ch nf 3 ax<·s

Shc·ck ~I A 0?Pra.ting \: ',-\ ZOG - 1 Orns rise

~~-O?erating ATR-Io,.•dd.•• e;chof3ax<>s

Agc·nl

Philco·Ford

\''

\'~,_·nf11 ;ill"n ol ~tr,·:-~ 1 1 ._ ,.J Cilp,thdLty

L1.Jtatiun

Palo Alto, California

Dt.•cunoen! Rt.'ft>rcnt·e

Qualification

Test R Pport RN-DAJ664

1\.

VI

Datl·

March 1968

--·- -- ----- . ---~ ;

Ren:arks

\lso q·.<aiifit·d ',11 ~ ~ ~ r(·tt'l:rt

n•ents tn Q•.1al S.\ test

Qual~f:~·d in Systcrn to S x I~~-· Torr<>

?\o tf·s~ing rPquir€'d a! s-. .;:tt•1z1 Ie\·el. QualifiE"d as a ~ub­as~f'rnbh·.

OJ.al:fieC a-::;. rt o: ... ., ... 't•!ll

fur S;' l' 111 )Jr ·,. __ ,, I. t·: '

Te::;t i:-1 thP Sto\•;ed

Conft_·•.Jra~ i')!l • Q!..H l S:\

I Sait ~.pray :\,\ ~ t r Sar.<.i ;. Doo\ ::ot !J,.;,,.,, ·! • ~1.-\ I I --, 1 I I F,cr•2 .• s ' .\ ?\/A l ------i

Ae~,_ ... ~ttcal ?~uis(: ~:1,1 D1·!-lJH'd 1~/A __l

~:~.:; tp~~:::._ ... c :.rt

Ra1n ' ' >l/A Radtation I '\ \ 1':':/A

-·Explusion Pruof '-;.-\--:;/A PARAMETRIC

Pf'r~"H:l'la~JCf'

Spt·Llfl,-ation

F,_.~::ctional

Perfor:nanc~

E:vl: Pf"rforrnance

Per AL1!0700

Te.«t(·d a .. Jt•ct of Intf"gratcd Sy~tPr'":l 1:1 Spac~ Sin1ulation C:han1bPr.

_L I

Testf'd As ;)art of Integrated Systen1

l

Philco- Ford

BxA

llxA

Fa lo Alto,

California

Ann Arbor. l\1ichi~an

l

Qualification TP.-:t RPp\~rt RN-DA 1f,•·--!

TP z:nJo>z ATR-60, 70 BSR-230. 237•·

TP 23>30H/ ATR-27, 33 BSR-2300, 2320

~.!arch I a,_,o

!\fay-Jc.ne jgc8

-:-\ <' ~ (' ..: ~ ! ·-. r c> ; r f', ·

Pl:ii.:~· Fnrrl Q·;,a l

Qual S.\ test

Qual S.·\ test

Sheet..--.!li.... of

Page 40: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUAliFICATION STATUS LIST-AlSEP PROGRAM Fa •'' ·-I j '· ']" · ['~, --=l 'J ., I ,.--,. ,. •'t\, _, •

.\nal)~t J.t..L ,.~ -." CF;-.lTHAL STATION ELECTRONICS C0l\IPONF"1S

Item !" utTiencla tu re

<..'on"'.n:;an~ DecoC.er

l'h.\ =2.' ,,_);(h)

~ >· ~

?li:.!!"-.t Z-A

SA Q-;a I, sj;o-; 2

HC-12

En\.· i ronn• ent

and/or Parameter

C<V!RCJ~<:--!EC\TAL 'I er::--.?~:.'rature:

Operating

Stress Lt:v~_·l

Requin.>n'.cnt Capability

0 t' -22 Ftu•l;~ F

0 0 -2l F to +15~ F I N,·n·l'p~rating I 0 0 I _ 0 0

Earth-t>5 F to +lbO F-bS F to +160 F M >un ;; '-\ :S I -\

Pressure Operating l"o.n-Operati!'_£

ft•stcd in Spare :-:.irn. Ck1n1bcr to

Hunlllilty

Operating Non- Operating

Vibration Operating Non-Operating

Launch & Flight L'J.nar Landing

1 :x 10-ll tnn,J!..:

"''Lt<~lxlO!:n:~H}:;xlO-t1 T~)rr

'.;I_!>,

I:; ... _, to lOO~o

Lk ~i~rwd to nH'L't

l! un1idi tv Re­laui rcn1t.'nts Ie~ted to SV#l

\;/A 'Dt:tiJ.gnLimitTes Refer to ATR-16 Le,·els Refer to .\d(lt·ndurn I fit.; ;_ae s l through

Vcrificatlt..'n of Stress Lcvt·l Capatnlity

Agent

Bt•rulix At·rosp.tct·

Bendix .Aerospace

Bendix Aerospace

Bendix Aerospace

Location Document Peference

rp 2334335 \nn Arbur, MichjATR-•-0, 70

Bc;R- 2363, 21/h

.''-nn Arhor, Mich' PSR- 23b3. 23i6

AnnArbor, l\!ich~ N/ . .1,

AnnArbor. ~1hhJTP2;34~-l6

ATR-~2- R3 r;sH-2402. 2403

Date

May-June pi_,f;

\!ay- June

1%~

N/.:\

Ju':le IO~R

ragt..• __ ,,f ___ Fa ... , !"

Ren1a rks

Qqa}ifit'd ins~ =1 ch•ri:·~

Q lrtl S.·\ lt·ot

Test Li>,·el Li1~ntt·d bv Eq~liprT'.t·nt C:\r:-,:.,ility

~~J lt.>sting n"q·.1ire-d.

Qu;~lifi{'d to f"\·si:::n Li it Test Lt·'.els :or _')Jbp ..._ :... , ._:,· "'l (:: t!·e s~owed .. : n:i:::·:r -~i •. •1l

!urint: Q ... ll ~--\

Qu-.lif:t'd ~o l•t. ~:.::·1 :· ·i·.

July 1?68

Acceleration j f•·stt:d to I~=' ~~33434.3.

~perattng. ':~:.--: 14:tl_~l~hn_Dur BendixAr-roP.pac.e AnnArbor,\1h' _ .. ~TR-..,Yn,'_. 0 1 I J~lv ~--::-~stL~\-clsiN"li? ~-~!J;'J-Operatlng · .. :·~1~-' r: 1 -.·.:-~'PSln.\ ·s 1 ~R--4~;, Z-~1! }J,_.S lj..-.t-t·e; s~, ....... ~·: ,-.~r:.- .: --1

Sr.ock :t·:--~t·dtu l .1 1 ,_:_:,;.;,j._d Operating .-\ ± 2 ~ 11 n1s SJ.v .. ·- Bendix Aerospat:e Ann Arbor, ~Hch .\TR-~r. ~~ !\on-Operating _\ ~·-!t· -\~~'1. l tut•t'"' )t~:o.1E:>!:)i:lA· s 1~,~~-2--t·)•-. 2--tn"7

c_:::~tllf:cd ~o ~ .· Test Levels ior ...; ? , :

S,1lt Spray I~ :\ I . 1 .\ I H('ndlx A\•ro~<"-"ll ('

Sanrl f.- D·1 ~ t F11r.c•1s Acoustical 1'\oise Rain Radiation Explosion Proof

PARAMETRIC

Functional Per fonnance

EM! Performance

. \, ·: ···<! i)c·--1 : t-.:-..lt·(•t

'-;'.-\

:\ ,: :)!'TiLd

.-'. :'~ t A

•t ~ 1 P ~ iiH ri I. H. 130 w/ftl

"/A

ft•St('d as part ~~f Integrated Systen1 in spac l'l Simulation Chambt:>r

Tested as part of Intt_,grated System to A L 770 000

n1•11 \!X .\••1~<1~;> II'

I~t"Hii"'< Ac~ ro .. t\ lL't'

!':t~-;1rlix Ae ro!--p.(t ('

HPnrlix Ar ro~p...,r:e B<·nrli.x At.~rosp:1ce

Bendix Af!rospace

Bendix Aerospace

Bendix Aerospace

-\;-~ A r F;--;-y:·-. -\ll, ~

\nr .. \r 1 r!", \::,

:'\nn Arl·or. \h~,.

·\·~, .\r''•'f, ~,:1\

.-\n11Arl•or, },~)(-~

AnnArhor, :O.!hCI; I' 2334335 Ann Arbor, !>.-He:

Ann Arbor, Miclol fP l33303l

\TH-60, 70 P.SR-l3b7, 237h

AnnArbor, Michl TP23330R7 ATR-27, 33 BSR-2300, 2320

:O.!;;y- June l'H•t

~lay-June l~t~{Qtnlifil'd ,·i::. I::!(·~r~H~·rl. '-.-.-~!·

Ii:ern1al Va~-·~·~:n Test :•Jr -t

S1n1ulated L·.::-1ar :>.tisSltlr. .j 1r•

Q>al SA

~,~ay- June J0h8 ISameasabn·,·e

Sheet~ o{ ---

Page 41: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST·ALSEP PROGRAM l'f·.:" l 1\.-\ L S1.-\ I JON ELECT RO:'\ICS l Ol\1 i 'Uc: 1.:\ IS n.lt\ 1 11 .\1 \' l-------,. .-\nalyst _r. ~~

Item Nomenclature

:ta Pr·,r!>'ssor

,~,.~\ <~~30j2l,

~ :-; ... f"!ight 2-A

SA Qnal, S/:-1 3

970-12

En\·l ronmcnt

ar.d/or

Parameter

Stress Level

Requiren1cnt AI. 310'·>00

Capability Agent

Ec;\"IRO:\l\!ENTAL 1t:r:-.p..;rature:

Operating -22''y tot I <;s''r I-2Z°F to +158°F !Bendix Aerllspace

!\ .•n -Op,•rating Earth ~1J..._~n

Pressure Operating !\'on-Operating

Humidity Operating !\'on-Operating

Vibration

Operating

-b~°F to +l8SuF ( ... n5uF to +185°F

' ·\

- 1 2 lx10 m~j~lg 'c\tn tn lx!O l">nfl;

':!A I ;O""., to lOOcr'o

~:A

[P,l··d is sp.tre '- hdnlbt"r to <;xio-6Torr

Dcsi;..:twrl to n1 et..•t h:1r:1idity

rt·qll:rt'lrtf·nts

rested to SIP ~1 Dt>sign Lin1it

?'on-Operating rJ,_('fC'r to ATR-16 'Test Levels. Re Launch & Flight \ddendum 1 ft•r to figures 1 Lunar Landi~ •hrn 5.

Systenl s Din Sinn

Verification of Stress Lt>vel Capability

Location Document Reference

T. P. 2331335

.-\n•1 Arbor. \1ichl ATR-60, 70 P."'n -.~ ~f1?, 2376

N'A

T. P. 23343~6 ,\TR-~!, R3 ,.,,!{- 2402, 2403

Acceleration l ITestcd to H ±I~ I I l IT.!·' Z O'·lol3 Operating '-:/A l Min Dnr:.tion .-\ i'J:-90, 91 :"·)n-Operating \ fR-16 . .-\(~..-1. l ;; t5_nlr•..;, i.'<l• A--d~. ___ T-~-1\- 2.-tl2.L.Z.DJ

S':c-ck- Ieskd to IS± 2~ J_ Jf.l'. 2.0'4'UI Operating ":\/A 11 ms sawtooth .\TH-Rf, ;7

. !\'on-Operatin 'T ~- 16, .·\del. I 1 tinws ea. A."< is. __ ·- I\SR ~ 2406, 2-107 Salt Spra·; •. · ·\ 'Ci/A Sar.d (_;, D.lSt ",, '- D•·ti·

F •r.e·1s :\!A Acoustical !'\nise : 1),. I '~

Ra:n --~-i~~--~~~·/rA~-----1~--------------------+----

Date

May-June

191>8

):-:,/fl.

June-July 196R

if

Fa~\ --· J ~ ' -

Ren1arks

Successfully tested rrwdel

on Oual SA rnu<l~l

Test le\·c·l Ln.::, 111 ent Cai'" bi l

No te-sting: rf'q\li red

_-_,,-Q('::,i,:.··

-! st·.· _, t::! < o:~;' _ :;;! ·: "::.

I

\ l y

_j.,-

f Raciation ,J, ,, .. ,, 1 :.o ,, , a~ JH Lam ===rr:·p-:-rn4ili-=l\!;;y-June 'c8 1 Explosivn Proof :\ t\; A -I

PAP.-\.METRI.l;, ·e Td.:)le 1

~ "t.'t B-"

E!>.II Performance

T·· :l(·d 1.s · ~·:--t S'}·stcrn in S 1.

Chan1ber

f Integrated Simulation

T~sted as part Inte~rat.-d Syct·tm

i

i l

r. P. 233303z .-\fR-6r,7o IlSR-231>7, 2376

TP23330R7 ATR-27, 33 BSR-2300, 2320

l\!.1 ;--J ;ne 1968

May-June 196~

fi~(·rr. al t:;t:r-.

"'i:!· "d.:- •

ing Q•.1a1 e>A

Same as

: l

above

t

: ·~< ~.

T··=-: ;· rl

~: :r-

~---· -~-----------~--------------~--------~----------~--------;--------------------1

Sheet-!2l_ o! ---

Page 42: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

\\.. n.~t· ,:-; .. \ . ' P'· '-· !\ ·. '\\,,,1\'-'1'···· -,-7 I OUALIFICA TION STATUS LIST·ALSEP PROGRAM .. l ]\,- "'

An,1ly~tT. Fox I Page I of I Fa.gt.·s

Environn1ent Stress Level Verification of Stress Level Capability

Item and/or Docun1ent Rt>Jnarks l':omf_•nclature Pararntter R equi rcn1cnt Capability Agent Location Reference Date

Transn:itter £:'\\'IR0:"\~!£1\'TAL Ten:pcrature: Ann Arbor Qualification I -12 -71 Suc~.~f"s~fulh· q~!ailfieod

BxA • Z3·Hb00, Operattng -22'Fto +l''l'F -22"Fto +158'F BxA Michi~an Test Report at c0n1ponent l('vel

Qual t'nits, l\'on-Operating '

ATR 266

S/N 21, 23, 24 Earth -63'Fto +200'F -6S'Fto t200'F Moon :>;.A N/A

Pressure -l2 -5

Flh:ht 2-A Operating lxlO tdrr_ lx!O _5

torr BxA Ann Arbor TP 2345106 9-21-70 Test Le\'el Lincited B)'

!\on-Operating _,

Mkhican Equipment Capallllity Fli~ht Model i60tolxln tp,.,. lxlO torr s·;-.;u Humidity s.:':-i 27 Operating 95..-, at J.tO'F 95"',at 140'F B'xA Ann Arbor NIA N!A No Test Required

!\on- Operating_ ~1ichi~<tn

Vibration Operating Per Pet- TP2H5118 5-18-70 S"'e first rencark !\on-Operating T:\1 511 TM 511 BxA Ann Arbor. TP 2345104 9- 17-70

Launch & Flight ~.Hchigan

Lunar Landing Acceleration

Operating :\;A N/A BxA Ann Arbor N/A N.'A No Test Rec;l:i:-ed

Non-Operating r..1i'-'higan

Sl-. ,ck Cperatiag ?-~;A N/A BxA Ann Arbor TP 2345105 2-18-70 See- fl rst "'l"en-a rk !\'cm-Op(·rating .!..0..:~llnt5f'( ~Og pt•ak, }j n"l"!cc ~1id·d(!an

Salt Spray :; A l'\·A Xo T c st P.·:·r.:· .... -: Sand & Dust ;.; A ;.; A "<o ! . ~·- " F•.•ngus :":A ~rA :'\o f•:!"t !~·- ... Acoustical Noise ;-.;A ;.; A :'\'~1 ~ c ~ t F. (" :: 1'

Ha1n :; A l'\ A Xo TeFt Rf'n ·.··v·i Radiatiun :; A N·A !\o Test .R ea!:I :-t:.·d Explosion Proof '; A N A ~Q Test Ht.•G·:~r~·.J

PARAMETRl&;

Flln(.:tiunal Per Per Ann Arbor Qualification

Perforrnance AL--!10-!00 AL--110400 BxA Michigan Test Report 1-12-71 See first rerna rk ATR 266

EM! PPr Per Ann Arbor Qualification Perforn"lanr(:' F l'Und

Performance AL-.JI0-!00 AL-410400 BxA Michigan Test Repart I -12-71 Acceptable In A.-~ ATR 266 S}·sten1-level Te~t

-- --~---· -.. ·---·- ---·--... -· .. -·----·-- --~------·-·-

970· 12 Sheet...liL_ of ---

/

Page 43: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST ALSEP PROGRAM Date 3/5/71 F\o. :\T\t_ns;,, p{cv, t<t,. -·-

Analyst Bak., r I Page .......Lof --l.._ Pa~es •.

Environment Stress Level Verification of Stress Level Capability

Item and/or Document Remarks Nomenclature Parameter Requirement Capability Agent Location

Reference Date

ENVIRO:"MENTAL During dt':O:;I!n l\n1:.t T 'y tt•:o:t, Ten1pt!rature: Qualification thermal platp !"~:tyt•d for two

A2 Multiplexer- Operating -Zl'F to+l58'F -22'F to +158'F BxA Ann Arbor, Mich T~st R~port 7 July 1970 hours at 3'-"<:>ragf' tf~mp. of

ADC Non-Operating ATR 236 +l40'F. All C S components BxA•2' ''1000, Earth

operat(~d !Eat i~frtr torily. t-.1oon s;:; 7 Qual

Press~1re Qn.-dificat ion s " 11 Fli~ht lxi0-5

mm of lxi0-5

mm of ZA Operating BxA Ann Arbor, Mich Test Report 7 July 1970 T<>st l<>vel lim\tPd by

Non-Operating Hg. Hg. ATR 236 equ;pmt'nt caoabil 'ty. Hurr1idity N/A N/A Qualification

Operating :gt;o;o humiclity ·:•95'\', humidity BxA Ann Arbor, Mich TPst Rf'port 7 July 1970 ~;o t('st requir,~d.

~'\on-Operating fn" I cv,·Jp fnr I ·vrlP ATR 236 Vibration

Operating Per P<>r Qualification

I ~'\on-Operating AL-410300 AL--110300 BxA Ann Arbor, Mich T<>st Report 7 July 1970

Launch & Flight ATR Z36 Lunar Landing '

Acct!h:ration 14.0 (l's a ion;.! 14.0 (i 1 s dlong Qualification ' Operating t'al h of thr(•t• each of thr('e BxA Ann Arbor, Mich T<>st Report 7 July 1970

Non-Operating rtXt'f: st Prtd •. ax' o o! 'n~v. ATR 216 Shock 20 C>-pcak 11 20 G-pcak: I 1 Qualification

Operating mscc :::.a,dooth mEcc ~awtooth BxA Ann Arbor, 1\!ich T c' st Report 7 July 1970 :\on-Operating Dcr ~ ff.. ~'ITIJ- 8]!1) trol!l -~""ID-SlQ]} cTR 2"\f,

Salt Spray :'<,A " A ~,;o !rst r~·q'l:rt"~.

&~nd i,o Dust c; A :>-:."A :-:o tv~t r~·C'!:;t·--:.

Fungus c; A N A :-<o tt>f~ r.·a·~:r(·ri.

Acoustical Noise :\ A N 'A :-<o t1·f~ TP9,'!;Tt·~.

Rain " A NIA ~<o tf.>St r~·g'.!~f{·rL

Radiation :.;:A :>-:/A :-;o test requirt>d. Exp1osiun Pro;:,f :\!A N/A :\'o tt_,st req_u:red. PARAMETR!~

Functional PPr Per Qualification Performance Al-410300 AL-410300 BxA Ann Arbor, Mich Test Report 7 July 1970

ATR 236

EMI I Per Per Qualification Performance AL-410300 AL-410300 BxA Ann Arbor, Mich Test R<>port 7 July 1970

ATR 236

-..

970 11 , .. Per M1L-STD-810A Sheet~ o£ ---

Page 44: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST·ALSEP PROGRAM CE'ITRAL STATIO;-.; El.ECTRO:-:rcs C0~\1'001!-::-lTS

IDdtC 3/5/71 I'"' AT\\·":·' 1F· '. '- '• J~r.alyot ~1 Fa&~ __ of ___ 1-':~c• s

Item Nomenclature

Power Distribution L"r•:t .PDl"l

'.hA 2'3'•4~0-2

sj-::, l 0 Flight 2 -A

.'>A Qual, 5/:C.: 4

970-12

Environn-.ent and/or

Parameter

El':VIRO:\~.\ENTAL Ten~yerature:

Operating !'\on-Operating

Earth :t\L'~ .. ..1n

Pressure Operating Non-OperatinJl

HJrr.idity Operating ~on-Operating

Vibration

Strcs~ Le\·cl

RequirenH~nt

-22°Fto +158°F

-65°Fto+I60°F

"' .\

Capability

-22°F to+ I S8°F

-65°Fto +160°F

_12

1 ~st~d in Sp.1ce lx 10 mmH~ ISit~nll. Chombcr S-/Lto lxlo-l-nln1 to ~xio-6 forrs

H" IDesi~ned to meet :J/ A !-hmidity Re-I:;·,..) to 1000""0 quirements

Operating t:J/A Non-Operating Refer to ATR-16

Launch !< Flight \dde:~dum 1 Lunar Landing

TestedtoS/P•d Desi~n Limit Test Levels Refer to fig I thru 5

Acceleration Tested to 14 Operating ~/:\ ± lg 1 h1ir". Dur-

l :\em-Operating \TR-16. _.\dd. 1 :":'"· ;t:mesca Shock J,_-~'t.·d to 1 S

Operating ~;' :\ ± .2~. 11 mo ::iJ.w-~;on-Opt:rating ·\TR-16. :\del. t tL'C_t!: 3 tirncs ea

Salt 5?r''Y t; .\ I'·; .-\ ~Sanr: j •• O·;st [~·•t D('1L1ed ~)•·:;:t:~1ed tn ~1··Pt'

Ft....ng•1s -t:\ "'l.'A

Aco~:.stical !\oise [;( ~ D~:fi·1o;.>d

Rain [; A N;A

\'-.·niicatiun uf Stress Levt>l Capa0illty

Agent

Bendix Aerospace Systems Division

Ccndix Aerospace Systems Division

I

Location I

Ann Arbor. Michigan

Ann Arbor, Michi~an

Document Reference I

TP 2334335 A TR-60, 70 BSR-2367, 23761

TP 2334335 I ATR-60, 70 BSR-2367, 237&.

;,fA

TP 2334346 ATR-82,R3 BSR-2402, 2403

TP 23J4S.f3 ATR-Qf), 0 1 ~~;o;R-2412, 2413 fP ~J3-i328 A TR- 0(·, 0( I BSR- 240 6, Z-l•c7

Date

May-June 1968

May-June 196q

N/A

July 1968

July 106q

July-Aug 106q

Ren1arks

l. Qualified in ~P" l d•.trin~ Q;;al S:\

Test Level Lin1itt!d by Equ1.ptne:1t C D'~:!it\·

No testing required

Qualified at St;bpa.ck,,~c(S P•·: i

Design Limit Test Lnch ic r a Stov.:ed Cor.flgUrhtion rl...:.rin~Z.Q_:.n1 ...;. \

I

~ ~~0 tt'<:tin:? ~' ':·:·r,,r:

~0 tC"~:.t-i-;-: TC'J'::r•. ·'!

~adiation_ rot Defined tested to 130wift~ fR I I I I I Explostvn Proof < ':\ ... ~/A

PAR!c!\:ETRIC

F·n~c ti(!nal PPrforrnancc

EM! Performance

T(•sted :1.s part {f lntcc.ratcd SystPm in S?ac,J Simulation Chamber

Tc>l<•'l as part t£ Integrated

Syst"'m t" AL77f 000

BxA

BxA

Ann Arbor. !\Hch:l~rtn

Ann Arbor, Michigan

TP 2'133032 ATR-60, 70 BSR-2367, 2376

TP 2333007 ATR-27, 33 BSR-2300, 2320

~tay-.Tune

196q See first ren~ar}

See first re

Sheet~ of ------

Page 45: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST ·ALSEP PROGRAM CENTRAL STATIO:'>! F:Lt:CTRO:-.:Ics CC'~II'O:-.:LNlS

rD"t'3/5/71 r:~~-~~~~-:-.--r~··· l\

F\nalyst J. T:f Paf.:t.' --"f ___ J ct'-,!e!-

!terr. >:orr.cnc la t..J. re

:'ower Co:1di:ion ... l:":k; •.·:. :?.C.~·. I

233Co,:.C-3,

S ·:-; 9, Flight 2-.-\

~A O~al, S,-:\ 3

9;"0-12

Environn1cnt

and/or Parameter

Stress Level

R equircnlent AL 410100

Capability

Io:C\ \' !R Oc:~.a;;>;TAL _ 2 2"F tu + 1 'i~°F -2 2 °F to+ 158°F

Agent

Bt..•ndix Aerospd1...t.

Systems Division T'""P""ature; o o o o I Operatmg .~; Fto+I~O F -65 Fto+l60 F J ~<-·n~Op~rating

Earth ~!.·,•n

Fr<·ssure 1::;,.,, L,•,·d to I l'<'St<·d to I I Operating Ix!0-ll Torr 5xlo-b Torr ;>;em-Operating

Hunoidity I I Desi~ned to I I Operating meet humidity :\on-Operati~g 15 to LOO_~a rcaui rerncnts ·

vl~iratu;n .\TH.-16 Tf':-.tvd to I · " S/P•l D<·si~n Operatmg .-\dden. "I L' -

1. ·re<'

liTH S ~ \. ]':on-Operating Levels(Rder to '!

La•Jnch & Flight Fig I thru 5) Lunar Landing '

Venticalilm of Stress Le\·(·1 Capability

Location

;\.:,;L i't T;.h.,IT J

~lie h.

Document Reference

r. P. 23H33; ATE-60, 70 BSR-2167, 237(,

1. 1~. 2.) J4 ~ b

ATH-60, 70 FlSR-2367, 2.376

N/A

T. P.llH346 A l'H-82. ~-~

BSR-2402, 2403

Date

l\Lw-June 1968

N/A

July I•lt.B

Ren1arks

Qualiiierl :r. 5·,l~,~~a~-~a~l·

~"l !iyStt!nl le·. t·1 tt·~ts

perfortTH•ri on t..::·:al SA

1 t.:~l lt:n~l lHTllt•:d fJj 'I!. ~t Equipment Capab1llty

Testi::g >:•,)t P eq\:i re-d

QuaLLI;;'c!. at S, ~ :~a~·:-:a~f· r'-1 L'l•·::-1~11 t ~n~.;, 1 • ::-t J.,·\ t.'l..:

~or 1 stG'-\e . ..: ~ ·1-::·::-J.r~-1:;...:·~1

in Qc:al SA

Acceleration .\I H-16 Testt•d to I T. P.l334343

Operd.ting .\d•i•·n.•l \hl~,lrpin ATR- 0 0,qJ l)ulyl%8 l"l[)es;£'' .J:" .P;·a· ~:c.n-Operating uur.t! . .t.m. ""tnnt'~ ' DSH. 2-+l., :411: : . J

\'e:·i:.ier1 a! S ·. :.'a.cf.:.a~e

Shc.ck ,\ rR-lt:o rest,·d to I i T. P.ll34328 Operating ,\d•l.-n. "1 l <-t 2~, 11 ms ~ t .\TR-86, 87 July 19(-8

·,·f::-::ie-1 a:~. ;:a. ~-a,:e

Desi~:; .~:r:;-:t ·:-t~s! a·,: C\.m-O;oerating l t1!'1es c.1ch P..<;J< _ ,~

salt'S?~ay :; .. -\ -;-.; 1:\ J ~r.J ;,;, D;J.St "\. !J, 1! ~., --'=.- _J__ -.!. .•0 .c~:. t·c .;~,.,:

F.n~J'lg ~\/·\ KIA

~c··us_~ical_...!_'::_oise I C\vt Ddnwd 1-;-.;yp I 1 :,, ! ,.,, 'c '• ·: Ram -;-.;, .-\ ~ill

I Radtatiun I:; ,t QdtnJ•d I I'>YD I I I I I I Exolos1on Proof ):ot Dt->flnt'd t~ I A ~ET.R.&

Fu!"!ctional Perfurn1ance

E~!l

Performance

Tested as part (11 ~ntq:::.rated Sys­tem in Space Sin 11lation Chamber

Tested as part •·4 Integrated Systt>m to AL770(ooo

BxA

BxA

.·\nn Arbor. !<lie h.

:\nn Arbor, Mich.

T. P. 2333032 .-\TR-60, 70 BSR-2367, 2376

T. P. 2333087 ,\TR-27, 33 BSR -2300,2320

~fay- Tune-1968

~tav- !une 19l~

See first ren1ark

See first remark

.-Sheet-'".l.l - of ----

Page 46: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST·ALSEP PROGRAM

!tern 't'on'lenclature

Env i ronn1ent and lor

Parameter

RSST SYSTEM El\V!RO:\MENTAL l3H77 -001-01-01 Ten,pcrature: BxA 2 338511 Operatmg , !'\on-Operating

5':\ 002, Qual Earth

Stress Level

Requiren1cnt Capability

-22•F to +Jss•Fi!ZZ•F to +l58•F

Verification of Stress Le\ el Capability

Agent

Gulton Industries

Location Document Reference

Albuq., N. Mex.l 13877-992

~te 3/5/71 l':o.ATM-9Rf> Rev. 1'\o.

Analyst Lee Page __ l_of __ !_ Page•

Remarks Date

I '13/70 Note 2

-6s·F to +~oo·F 5/:\ 005, Flight 2-:\ !\bon I I I J J Not<> J 1

970· J2

Prcss~re < I X I 0 -I 2mmllc < 50 X I o- 2mmrrnl Gulton Industries I Albuq •• N. Mex.l 1 3877-992 I I !13 70 I Note 2. 1\ote 3

Operatmg _ R ''1 !\on-Operating Sl. to< 10 nnii

Humidity Operating !'\on-Operating

Vibrat1un

Operating !'\on-Operating

Launch & Flight Lunar Landing

Salt Spray Sand ~~· D~tst

F'!ng'JS

~1cal 1'\oise Rain Rtidiativn £yp)osi(Jn Proof

~!ETRIC

'0 ~. 13 to lC:o-··

n a ~l. :t

n.a

a_ a __ -na !)_ ':"<

n.-

as g-ivPn in

\t!L-1-Zio'·OO. and XASA MSC-ASI-'0-E:.ll -lOA

as ciYP~ in .\UL-I-.!ff 00. and :'\ASA :-.!SC­AS !'0- F.~.!l-1 OA iS('L' r:otcs.)

::OTES: !. z. 3.

Certifrate of compliar.L! and Culton test Th('se l''n\·ironments \'-T e verified by Gul The s eci!ied "req'..lire ·ent'' levels were Gulto on 12 January JG 0.

I .. ---+-

Gulton lndustriPs Albuq., !J. ?\1C'x I 3P.77- 994 '21 70

Note 3

T'\ote 2 Testing perfornH"'d a! Sparton S. \\·., ,\Jbuq .. N. !\lex.

0-"ott"' 2 Te~t:r:c ?t'rfor:~;pr1 a: AETL. I ... A .. Cai::orr;a

Testinc pl•rforrnt'd at ~ta nri. Electronirs. Chicago. [JJ •

ata on (il\' to verify catahiHty _2

on Industries on l/13 70 toQTP l3R77-9l'2 exce;>t press:nl: '>:hich was telted to 5 x 10 mrr.!lg. ot required to bt• vt•rifjPd by the Culton t.sST qualifiratior~test per agree~ent at the QTRR held at

Sheet BIZ of ---

. ~

Page 47: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUAliFICATION STATUS liST-ALSEP PROGRAM 1'.-xssrn: st:rs;.nc r.xPF.RI~!ENT ; ) l ~ ~ 3/;., '7 l

Analy~t

,p .\.r:-~:\t\. ~-· 1 I" ,

Item !':orr.enclature

J>Sr: Ser<sor .\ssf'mblv ~·~..:~~4~=­

BxA • 23-!1604 S,':\' 1-502. rli~r.t 2 -A

SA Qual !31-H·-l~

S. :--; 3 & 2

Q7Q.)2

Env i r .. Jnrn~nt and/or

Parameter

E:"\\' ;Ro'<~!E="TAL Ternp~rat"J.re:

Opcrattng :-<l)n-Operating

Earth ~.1 JOn

Press·.1re Operating ?\on-Operating

H~tnidity

Operating ;-~. ·n-Operating

Vt:....ratum

Operating

Stress Lt•vcl Verihcatiun of Stress Levl·l Capabihty

R equircn1ent Capabiltty Agent

107° to L'.5°F Test~d is ~pace ~o:;°F to lt>!)°F ::lttnulat1on I Bend1x Aerospac£' :-'.tnu• as Ch,l.mlw r Cor S'(Ste l'llS Dn 1. sion

Opt•rating Ten1perarurc

1 x 10 ·l ~mm Hg I Vertfied to

I lr-R II <;xJO-<;Torrstn

x ) rnrn g ~;)ace S1m. Chan'-

?\ot applicable ;o-!Ou~R.IL

;)l'signed lo 1\!eet Humidt ty ")on 111 rPrn,.>nt"

""\Pt :\pplicable I l'C'st~d 1n Stowed Hefer to :\TR-ll· Conf1gnration to

Location

Ann Arbor,

~11.-higan

DocuinPnt Reference

T I 3022 TP23H335 A TR-60, 70 l\SH -Zlo 7,l37(;

1 N/A

TP2334H6

Date

11 ~:-an 6'1

June l OJ l%!l

~lA

6/28/68 0 · ATR-82, 83 !-<on- peratm~ .\ddendurn 1 \'tbration [)eS\gu nsn- ~-j0~,:'-10< Launch & Fhght 1.; 1._.,, hvhc.,t.:rl +------Lu:oH Land:_:.'JL_ i 'J.· ,, TP23HH3

Pa~e __ ,,f ___ Pa,e.t.~

Ren1arks

~ucccs ~fnlh· tt·~te-"i on lh~A Uua1 SA r-:-... u,:t'i

Test level lim1te-:l by test eq';ipn""ient ca-oabilih·

"' ·\ See iir'3t rPI: ark

-------------------------~---

7 i-t/6 8 Ac~ii;:;~- . . r~sted ,., St"wcd ATR-··r, I

0 •. :\otArpllcablt> (OtL(<e'lratJ,mt·) J)SR-'-l)2J-IJ5. -+-:pera.tng ·~ . , -----

!'~Cin-Operating \ TR- 1•1 .-\d L 1 l·l ± 1··. ~. ~.1::-'l. I Pl3343~H 1--h. - . I,.,,_,•dt:t.>t,;wed \!R-'>h,51 6;24;6il S .. nck ',ot -.mLg·:ral:<•n to ' · _

~e(~ firs"" rt·•· ar'.t:

Sr·P first tf·:'::'i r;... ('·,crating ·, 1 , 1 JS ± z, lln" I>.'> -• 4· ·,2 1r, ===t= ------

~ ~.~~i:~- ;tt: i";~ ==£-----~--------.Acv.l~tlcal :'\oise , ....... , \

Rain Fa<itation -~·:)~~i;:111·;ddr ---------1---------1 Ex .. lusion Proof :~ut :\~)~h a' le -----~·-. ---~----------

.fARAMETRI~ L u -+-- -F· . .~:---.ctiur.al ------·-

Perforrnance

F::',H

P~·rf0rmancc

T•~stC'd as part '1f Integrated Systt·m in Sp~c.'.' Sitnulation Chamber

Te~t··•l ao.; part (if intl;'grated ..;ystc·m

BxA

BxA

TP 2333032 ATR-60,70 BSR-2367,2376

-TP 2333087 ATR-27, 33 BSR-2300, 2320

I June 10 19<o 8 See first rer:lctrk

I April 196R See flr!'t re,~·a.rk

She<t__8.1_ of ---

~ -~. - ... . .. -----···"""' . - -..,..,.~-----------

Page 48: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

r)ale 3/5/71 QUALIFICATION STATUS LIST·ALSEP PROGRAM PASS!VIc SEISMIC EXPERIMENT

JAnaly;:;.t

!tem

!'omenclature

PSE Central Station .Elt''- tronic s

B~.\ •2~34~-~_l

S,':\ I, Flight 2-A

SA Qual, S ·:-; I

Environrr.ent and/or

Parameter

£):V!RO:--.-:-.IENTAL Tc::n'perature:

Operating l':vn-Operating

Earth l\! :~""~n

Fret: sure Operating !':or.-Operating

Hum1dity Operating !':en-Operating

Vibration Operating !':on-Operating

Launch & Flight L'J.nar Landing

Acceleration Operating ~:~n-Operating

St-.ocK

Operating -:-<.-..r-:-Opeyating

Stress Lt.:'\·cl

R equircnH!nt

l07°F to 12S°F -b';°F tel lbn°F Sarn~ a5

C'pe ra ti ·~~

Capabllity

Tested 1s Space Simulation Chamber for Temperature

1 x IO.:j_nnn II~ I \',•rifiesl !c>

1 x 10 .smm Hg 5 x 10-"Torrs in Soarf' Stm. Chan,

!'>t't .\pplicable

:\ot \pphcable !~eft."r to.-\ TH.-h. .-\dd~ndum I

"ot Applicable -\ r;\ -It-. Add 1

:--~ot

.-\p-;-Jlt.·al,}p

! :' -I•·. \dd. I

Designed to ~Iet~t Hun1idity

I I\e.(h.:._.:.renu:.nts

rested l n St~)Wf'd Con:1g•.uatton to Vibratlun I1e~nt-:n Lt!:1lts fnd1catc>d in Figs. l Thru :;_

Tested on Sto\VPc!

Confi~uratllln to 14 ± l £! 1 ~,;,:1.

rc<>tt•d ln S;O\\'{'(~ •. :on:•~-trallC"'n tl)

l s __ ± .:u 1 ~rn.:; ~ : li:"'t' :' ! .1. •• \ '\::

Vcnficatiun o{ Stress Lt.-.•el Capabtbty

Agent

Bendix Aerospace Systems Division

Location

Ann Arbor, M1chigan

I

I

Document I Reference

-----fPB34335

ATR-60, 70 I BSR -2 36 7, 2376

!'> 1.-\

TP233-IH<>

ATR-82,83 BSR-2.J02,2-103

TPZ> 34 343 .-\TH-~0,9!

PSR .2~ I 2, 2-+13

TP23H128 \ TR -'>f., ~7 DS R -~..;0€-. 2407

Date

Jun<' 10 19b8

b

N/A

6/Z8_u8

7 /.J/6 8

6/24/68

-F''·' AT\!-~'''· J Fa~::t· __ ! --- Pa~··:-

I Ren1arks

I Successfully tested on BxA Qual SA model

v

C\ i c\

Sarc ... ·ssiull;. T{':3'.··d. U::c!~ :---:-.

Successfully Tt'sted. Q· .• sl :--\

Succe~sf:.:.ll._.- ~~s~··::. 'J . ..; ....... · ..

~ Sal• ~?:-ay ~" D·1!'it

F :r~ .-\c .... J...lStical :-;uise

:-ti ,,,

~~i I ·;Jl .... ,:.ohh· ,~·", ~~~',r~·;,,;~~ ·-tl-------+1---+1-----~1 ) ~!:, I '

": _• 1• ' !.; ·-!. ~ ;J)•lr·

970-12

ham '·ca'olt• ~ \pplj,a;,J.c__ F:aC~ativn 1), ··+JlCdtoi\!ce

t;;:xplvsiun Proof r-:ot .-\oollcable £0ARAUETRIC

Fu.r.ct;.onal ?er!ormance

£;\!! Per!onnance

Tested as part I>! the integrated system in the :-.hace simulation chamber

TestNl as part p! the integrated systcn\

BxA Ann Arbor, Michigan

BxA Ann Arbor, Michigan

TP 2333032 I June I 0, ATR-60-70 196 3 See first re-n~a rk

BSR-2367,2376

TP 2333087 I April ATR-27, 33 1968 BSR -2300, 232n

See first rerr~ark

She~ t .Ja:i_ C't ----

Page 49: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

··'

!Date 3 s 17 I 1:-.:o. !Rev. :-.:o.

QUALIFICATION STATUS LIST ·ALSEP PROGRAM AT~!-O>b

!Analyst I Page of Pa~es

Environment Stress Level Verification of Stress Level Capabihty

Item and/or Document Remarks J';ornenclature Paratneter F equirement Capability Agent Location Re(erence Date

S h r CJt~d, Thermal E};\'JRO:-.:i.!ENTAL Earth Sciences llu!(hes Aircraft Engineering See Note Below Cor:~r'-)1

Ten1perature; Divisiqn -Teledyne Space Siinulation Report No.

p :--;233,016-501, Operating -300- +250'F -300- +250'F during DVT thermal Laboratory 640-0263-0053 S Feb. 1968 S :-; IU, Flt. 2-A !';on-Operating

vacuum tests El Segundo, Cal. Earth 1-.L•on

~.\Qual Pressure

Z334A67, Operating I x IO-I 2

mm H!! I x I0-7mm Hg " " " " s/~; s & 9

F N0n-Operating SarTl.e as opcr. Humidity Designed to Mecl

Operating :\ot arpltcable Humidity Non-Operatine ~l'-·-lrr·-r<. H. ~~l'l 'tirt•rn.-nt5

Vibration H;:g3

;Ht. Bunker Ramo DVT Report Operating Sec Rcrnarks 23 -'·' \). Jll4 Earth Sciences Corporation ENY -R -Z363 Nov. 1967 Non-Operating 58-IOO 12cbloct Division - Tcstmg Lab

!00 -200 0. 39 Launch & FltgH

~~g=·ma~~~cJ9' 1 T eled )'TIC Canoga Park1

L mar Landins; Coli f. Acceleration : :c•t app!i .. ~a blc

O?erating 'I " " " ..

!\on-Operating H _A 14 g 1 > Shuck 20:..:± 10 l

Ope·rating ;'>:ot apoLc,hle ~:1'-t: tnoth lll r--:1 F('"l: ri f:e .,

" " .. !\' .. ln-Operat~ 21'± 1 ,. i "' .. •' . "' .

Sa.lt Spray '·' t ,... "'"')• 1: .·:l\ 1' I\: • on•X ·ohl.• Sar.d & D..1st -~~o .1 .c: "" .. F·:r.£!115 ,. •I "' ·" ,., '

' '" ·--1--·-----~-=--=-~ Accustical Noise ·: lt a•v)l:,·c:t!)lC' :-;ot annLcable Rain :<ot ao~)~:.:ablf~ :-;ot annlicabl• Radiatlon l'C))_<;?) h.<; on.•..!•~ Explosion Proof :-~ot aoolicable Not aoolicable '

PARAMETRI!;;

>OTE: PSE Shr" jld qualified on Su package •1 in~tallat101 j per tc st and cport references hown on SP# 1 Shel't n 1.

970-ll ~

Sheet~ of ------

Page 50: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALifiCATION STATUS LIST·ALSEP PROGRAM Date :\,J. JR,_·v. ~u. ~

3 ~ 71 ~~ ~

Analyst Fagc __ ,.{ ___ Pa~t·s

Item l'omenclature

PSE Gnomon As SPm

BxA= 2 33801.-50 I, S,:.; 10, Fl:~ht 2-A

~A Qual 2BS016,

970-12

£nv 1 ronn1t:nt and/ or

Parameter

E='ViRO~Ml::l'TAL Ten:.r::erature:

Operating !'on-Operating

Earth 1\1__,vn

Frt·s~ur~

Operating l'on-Operati~

HtJmlrLty

Opt~ rating

1-- l'c·n-Operating Vib:ratlon

Operating l'on-Opera!tng

Launch & Flight Lt:r.ar Landi~_g

St rt..: S!- Level

Requirement

107'Fto 125"F -65' F to 160" F San1e as ope rating

X JO-J 2nunJlg

-S X 10 I1"!tl1H~

'-:fJt apnl\(·;1hlr

:-;,,t anplicab1c Reft·rtoATR-16 .\ddendum 1

Capability

T" sted •n Spau• Sin1ulation Chamber !or Ten)perature

\. ,. rificd to 5 S. 10-;TOQfS iP. ~'):-\,.!,Sip~. C!l~n

·), 1._'n ·I to

~kPt Hnn,idltv l' t~~:·ti r,~~1wnt ~

I ~,;st~_·d in Sto .. ,·~,.·rl Configuratiu;, to Vibration ne~ign Li1nit~ Indi.catcJ in Figs. I thru 5.

Agent

Bendix Aerospace Systems Division

Verification of Stress Level Capability

Location

Ann Arbor, Michigan

Document Reference

TP2334378 ATR-160 BSR-2570

N/A

TP2337905 ATR-149 BSR-2546

Acceleration Tcst,,d in Stowed T P2337915 0 · , 1. .. , , S :\hshawauka,

16,

peratmg . ;\ot app tcable Conttguratton to B"1 D ::odiar.a ATR- __ .. ~.?r.-Operatlng .\TI',-lb, .\drl. 1 14·!:1".1-.!in. BSR-Zot{

::,;;.ocK ~\tJt lc~tyd Pl ~tc;v.·ed Bendix J\prosoact... Ar~n Arbor, rPZ337917

Date

12/30;bK

N/A

12/19;'6i'l

1/15/69

I 17:69

Remarks

Successfullr Tested at Svsten1 Leve] as a Result oi Qual SB Test Prograrn

):,A

Suc:::es:;:fully T£>sted at System Level as a Rt'S'..~lt

of Qual SB Te~t Progran-:

Oper-ating arpla:able 15~ 11~' 1{j'11~~~ 11 to Systen1s Divi;ion !-.1ic/-:igan :\TR -16_1

I- l'c•C":.:_<_?pcrating .\1 ;: -Ii· Aced. 1 1 ··!'-:", •·:" !\•·u BSR -25 tl ---+·----------------i Salt Spray ~r)t an·)lu.:abl('" 0:t'l. arol:.::ablf'

Sand & D·Jst ILE·'-;"o. . r),,,;gnedtoi\kd I I I I I ----j F· .... r.£_•.s ""<ot a:'":l~l:cablf' :-\ot annli,~abl.-. ,:,__{.(_,; ~-tt< al r-;visc I· .ut illl~~~l=--~~~~i~ht, ..

Ratn t------------------f---------------+---------------+-------------r~--------------------------1 ~diatiun _ .. E~p}? __ sio_fl Proof

PARAMETB.ll;_

Sheet~ of ---

Page 51: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST·ALSEP PROGRAM

ltcn1

Nomenclature

Solar Wind Sp,'ctrometer B"A •2330658 Flt •I S/);.8 =-,. --? S!!\;-9

Fit =ZA Sr~-1 SA Qual, S, N 6

970-12

F:nvt rr)nnH'nt

and/or Pararneter

E~:VIFO);ME);TAL 1en-.pcrature:

Operating Non-Operating

Earth MJon

Pressure Operating Non-Operating

Humidity Operating Non-Operating

Vibration Operating Non-Operating

Launch & Flight

Stress Level

Requirement Capability

- 300' F to +250' f1-300' F to +250' F

-65' F to +160'F l:-iot Yet T .. sted _',[)0°f:' tn +?t;O""'d_'l.(JO"t=' tn +Jt;() 0

Sf•a LP\'('1 -1 (1-12 Torr

l'i - !OO"j

\A

LT.l\-8

Tt•st to 5 x 10-6 Torr

N,'A 15 - 40"",

Lunar Landing I L fA- 8

Tested in Stowed Configuration to Design Limit

Ll'vd lndkatt•d in f"igUTPS 1-'J.

Acc~leratton

Operating 1:: A Non-Operating

sha<:k Operating Non- Opera tin~::

Salt Spray Sand ;, D•;st

:.TA-8

.• A :..TA-8

A .-\

);ot Y<'t Test~d

LTA-3 D R

Funcus 1:. A

Acoustical Noise L: A Rain Radiation

1-::-~osion Proof PARAMETRIC

Functi0nal Perfonnance

A ;_;:D-520 130w .. ft2 ~. A

T£>st.•ri as part oflinte-grated system in Space ~imulation Chamber

EM! Performance !Tested as part ofjintegrated system

Agent

BxA

BxA

BxA

BxA

Bl\!SD

BxA

BxA

BxA

BxA

Verlfi .. ation of Stress Level Capabihty

Location

I Ann Arbor, !-.1ichigan

I Ann Arbor, 'di<-hil!an

Ann Arbor, :\!ichil!an

:\nn Arbor,

I

Document Reference

TP233303l ATR-60 PCD "'"

N/A

TPZ334346 \~1cl:in~,n __ _gR-RO

~-tishawauka TP2334343 I Inr!iana

Ann ArLor, TPZ3343Z8 I ~!ichigan

/Inn Arbor, Mich.! 2334335

TP 2333032 I ATR-60, 70

BSR-2367, 2376

Ann Arbor, Mich.! TP 2333087 ATR-27, 33 BSR -2300,

2320

IDatt> 3/5/71 1-c--~~--~----~,

:'\:u.AT\1-u:-.r· ~Rt..'\'. 7\u.

!Analyst T Pagc __ of Par.:~·s ~

Ren1arks Date

ll\!ay 1968 I Qual SA Test.

BxA facilitif'S will not allow May 1968 testing to bPiow 5 x I0-6 Torr

(Qual SA testl

!\'o t~sting: planned to N A I oor, Je,·ei

June 1968 Design Limit Tr·st.

I July 1968 I Design Limit Test.

I June 1968 } Design Limit Test.

~!a 1968 Qual SA Test

Qualified contingt.~nt 8;7 .:68 on P. I. re,·ie"· of SW<: data.

I 4 il 9 60

Sheet....!D.l_ of ---

Page 52: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS liST-AlSEP PROGRAM ' JDate""{_....__ 71 F\'\)·AT"t-cl)-.r· . _p~t'V. !\" .. _\.

jAnalyst I Page __ <>{ fagt:s -Stress Level Verificativn of Stress Level Capability

En._ ironment Item and/or Docun1ent Ren1a r-ks

!\ on1enclatu r e Para1ncter Requirement Capability Agent Location Reference Date

Lund. r Sur fa(_ c }~;-~VIP()~\ ~dENTAL

~~at.:. nctometer Tenlperature: Tested in tni~:don

BxA o2330657 Operating -oOO'Fto2SO'F TP23H345 Sin1ulation Testin~.

F}(o}S·;\0-3 Non-Operating Not Yet Proven BxA Ann Arbor, June 1968

Flt , 2 s ';-.; 4 Earth -GS'Fto+!60'F htichigan A TP.-60, 70 Mvon _300'Fto+250'F BSR-2367 237(1

Flt ·2-A 5/~ 7 Pressure I o-12 Torr TP2333032

SA Qual, Operating Sea Le\·el 5 x 10-

6 Torr BxA Ann Arbor, A TR-60, 70 June 1968

S1N.!. Non-Operating Jo-12 Torr r-lic hi)!a n BSR-2367 2376 Hum1dity Designed to mPt :'\o testin~ planne~ to

Operating Humidity Ann Arbor, 100-· Je,·el. Non-Operating 15 - I 007o Rcaui r€"ll)cnts BxA ~.1ichi 'an ::-<'A ~'A

Vibration Tested in Stowed Tested sto\Vf"d - durin.: Operating :-i'A Configuration to design limit tPst.

Non-Operating LTA-1 DR De"i~n Limit Ann :\rbor, June 1968

LannC"h & Flight _·\TF 16 Add I L,,vds lndkate•l ?-.til hi!,!an TI'23HH7

Lunar Landing LlA- J D. R in Figs. ! -5. BxA -· Acceleration T!Jl1,3-+3-!3

Uperatlng :~ A Tc•tcd to 14± l~ HI\ lSD ~ti~ha\ ... ·aka, /\"lF'-'~0.91 July l9t·8 Te~ted stov.erl- d~Jri·•t.:

Non-Operating ATR lb Add I 1 min Duration l·~diana BSR-2412, 2413 desi~n lin~it tc•st.

Sh•>ck Operating ~; A T~st<•rl to 15±lf! A.,n Arbor, TP23'412" June 19t-F- Teste~ stowPd- r!'.Jri'"':::: :"on-Operating .\TR 16 l'.dd 1 1 I ms Sawtooth Bx:\ ~'~ichigan A TR-~(·, 1'7 desi~~ 1in1.it test

Salt S;)ray ·;.A S:::.n.-J f~ D·; bt .. ·\ F·~n~::us :.; A --Acousttcal 1'\oise :\ .-\ --.Rain :; .\ Radiation I.F:D-520 130w'ft~ BxA i\nn Arbor 1\licl: 2~''i4335 Ma·I068 Qual 5A Test Explosion Proof ~.; A

PARAMETR{!:;

Functional Tested as part o integrated BxA TPZ333032 June 1968 Qualified contin"ent on I'erforman{.e "ystC'nl in Space imulation A TR-oO, 70 resolution of l·H-132,

'~ham her BSR-2367, 231~ Di ~ita 1 fi.lte r rn.a Httnc tion in LSM

EMl Tested as part o BxA TP2333086 April 1968 Performance integrated systcn A TR-27, 33

BS R-23 00, 23 20

-

-

-970-12 Sheet-illL of ---

Page 53: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

.-QUALIFICATION STATUS LIST·ALSEP PROGRAM- A;;SF:\!IILY Sl'I1PACKAGE Hl.

~Date 4/24 '70 ~No. AT~t-",-:;' IRev. ~l,,

jAnalyst J Page __ uf --- Fagt'!;

Item ?\"Qm.enclature

pa. ka~e 112 2x.-\ .233-j(hO,

s :\ 15, Fl,c:,t ~-A

SA Qual 23484Q, '>. '•; l

•7: 12

En\·ironn'lent

and I i.JT

Parameter

E!'\VIRO'\l\!ENTAL Tt;"nlpt:rature:

Operating Non-Operating

Earth

l\L'l'~n

Pressure Opt! rating N•m-Op,!rating

Humidity

Operating ]\;on- 0_llera tirl_g

Vtbration Operating !'\on-Operating

Launch !. Flight Lunar Landing

Acceleration Operating !'on-Operating

Stress Level

RequircnH.>nt Capability

(l "1 0 "'--3QO Ftot2;o -300 Fto+27011" -l·5°F to +lt>0°F (See note 11

- 3<10°F to z;o"r I -l00°F to +Z<iC'IF

-12 ltl Torr

-12 :;T, tr> 10 Torr

Y.'A 1 =:. -1 ° 1' ...

:\'A :? pfer to

CF 10fl•l"l

'\ A CTl"•l OUl

Tested to I -(J

~x111 Torr

Designed to ~feet lh:midity I llcqilite' Tested in Stow~ Configuration tc

Desi£:.n Lin".it I Levels Indicate

Fi~Jlres I 51 Tested to 14.:_ 1.: ea.._ h axis

Agent

BxA

fix A

nxA

13xA

[lxA

Vt..•riftcation of Stress LevPl Capability

Location

Ann Arbor, ~Hchigan

Ann Arhor, ~tichb . .!an

Ann Arbor, rhi ~~an

Ann Arbor~ Michi~an.

Ann Arbor,

i-.1ichi: .. 'an

Document Reference Date

T PZ 33433 '(E'\V'•

TPZ333032(1ST\ I b/!0/68 ATR-bO, 70

J'.SH-23(,7, 2371,

San1e as above

N.'A

TF23343~8

ATR-84, g; l),SR 2-1-0·~. 240.;

TF2334J30 A'l R-oz, 93

b/10/68

N/A

6/28/68

7,1i../C.8

S!:.•ck le5~ to l~ "'-c; ... ,·:<·:Jnc .\ ., 1

.- T11

l3~·~~~l ,.

Rema:rks

Qualllied in Qual SA test progran1

Test level Jin,t:ed hy test equipment capahilities.

See first ren~ark See :\vtt: ,,c-l>l\V

3e-efn~~~e .,;~-

2c: each ax~ ;-:vn-Opcra.tin CPIC't•')'~J] .. ;eac.laXlS BxA A.~n!:r!n'"'r. , .. \-:-R-'38,8Q I'J/30'tl8 Salt Spray ·~·~"------~,,~,u·r~~~-~Z~1un~s~~z~~~~l~c~-----------·---+~~~--~--------------------J

. ,._, J (' St f~ cq :1 r'L'"1 ~ :~ I' (1 '·. ~I''~

.o .!. est ~· ('0 .: !"t:'l

~& D•!St I,.,~ ")rji:<·1 I I I " ",, Fung1S ~

Acousttcal Noise I '~·-~t.....J.....efi~~ed Rain Radiatitm Explc;SH•n Proof

PARA!\!ETRIC

FunLtional Performance

':' .\ ~.Eu- ;z·1

"[('stc•d as part<""·!·

an inte~ratcd 5":-·:-­

tern in space sir· '.llation chan1:-.)er

13·1 w/f~ 2 I. R

Capable of Dc­pltJyrnent and operation on Lunar S~rface

BxA

BxA

Ann • .-\ r:-:-or !\,1 ichi~an

Ann Arbor, Michigan

See first iteln a~Jt·ve

See first itcrr ... a~~bve

~OTE:: ALSEP 5~ •2 with HF E S, ~;~z subscquentlr rfqualified for physical 't'vironments prr !f.·· Array D SP >2lQualification Test Plan, TM 593, RPv 13, Minutes, BxA}; . 9703B-26 dated 19 F bruary 1971, t),\:' Board Meeting ,fJted that the Array D. P .. z configurattr, was qualified co tingent on satisfactor>· loscout of actiunLtcinS.

:o :-est Hl•g :~rt::d ~':o :est if'qt:)!'t•'!

:-:ee li rst ret~ .u r~: ~<o Test Req·urt'(~

See first ret·~ar\1.

Sheet~ of ------

Page 54: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIF'CATION STATUS LIST-ALSEP PROGRAM SL'llPACKAGE II, RTC; ASSI~I-I!'LY Date 3 5 i' l r: .. A:\·--·" r· . b t"\ •• ~''

Analy•t F.W i !'a C.\..' .. , ~-<.1~ ,. _ ...

En\· i ronrnent Stress Level Vcnflcation of Stress LL•-,..] CapaLtlity

Item and/or Komenclature Parameter Agent Location

Document Remarks R equi r-en1ent Capability Reference Date

EJ'\'IRO;'<MENTAL R.,dioi>otope Temperature:

QualihcdtlVn at 1.ssen1!J:\ lt" ··i

The riT';)C lee tric Operating BxA Ann Arbor, TP 2334335 May-June was performed by G. E. Re ~·e r

r;~;;,t:rator !'on-Operating I000°F to 1140° 11700 F 1\!ichi!(an ATR-60 1D68 to test reports ,\:0.::-Q

ti·:. -:-. G) Earth BSR-2387 Doc. :-lo. 6300-~81,

I\ bon -380°F to H0°F S00°F .\~SQ Doc. No. 6300-lRS

; ··.~E.. !r-l7£3(l')779 Pressure Sxlo- 5 torr

~.~od. 21 Operating Sea Level to Test le\·el limlit'd b'!-· test

";.; t32000&, l"on-Operatin~ • ln-12 16xlQ-8 toor BxA ~.\'i~n'~~l'.?r' eqtnpment t.:ap:tbility

flicht ~-A Humidity De st~ned to n1eet Operating 15 to 100'\'o humidity require N/A Nl:\ N;A N/A

No tt:>stlng require-d

F"d ,··'J'<Ulc, 1'\,>n-Opt>rating "it'tlfS

4 7l'l1l'l'400G I, Vtbration Gcnt'"r;ll Etc~ tric ~ '; t ~ ~ 0007' Operating ATR-16 Refer to Table I Valley For!!c General GE Doc. il~300 Qualifierl at ~~:!1pa.!·ka.12:e ?

Fii~~t 2-A Non-Operating Addendum I Technolo!(y Center Elect ric Doc. •6300-288 Jan 1968 Design limit lcvc'l in H.e

Launch & Flight Philadelphia, Pa. stowed config·.lrat:er', Q al -, .. \

SA Ql!al, Lunar Landing !1c:er to ATF -~-1. ~.;

~!od 15 Acct:leration Operating .\Tlt-16

7. SG 3 to 4 min BxA

Ann A rhor, TP 2'34330 each axis

June l9t8 Sue<. es s!ulh I ._~sterl, Q·...:al :-.; \ !\on-Operating \drl(>ndum I

\~i.chlgan .-\·: :C-02. qJ

Shock 15 G each axis i Operating -\ TR-16 BxA T!' 23~4331

t:on-Oporating .-\d<lendum 1 11 msec± 10% ATR-~8. go ~~\.!;'.(' J. u i.:8

H.·· '-2 0-' 2 0' Salt Spray :; '.\ :'-;'.\ N/.\ ~ .\ "'.' Sand i: D11st ·;;n c; E - ·u~.· o. '""' :--IYD Fung•1s 'I \ Ni 1\ Nl.-\ N'.\ Nl.\ .Aco·Jstical Noise ,-n NYO r.-.: PI d p,. .. :-JYD Rain "' \ N/A N .\ N/-\ N/A Radiati0n 'iYD !\!Yn r. <' Ph' PPn NYn '":'t>e line 1 Explosion Proof :-IYD NVn r: J;' Phil PPn< NYD

PARAMETRI!:;

-

__ ...... Sne .. t~ o! ---

Page 55: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

J).lt' S'_. P PAr·KAca· tT. R TC SlH'R T!~(", P:.~·c. UUALIFICATION STATUS LIST·ALSEP PROGRAM ' 3 ~I

Analyst

Item l'ornenclature

• : 1.:J ::-:-orting

: )~\!;:! .-\ ~:;·y

:-··xA z:,300li, ': ~.

Fli.:ht Z-A

ee ~>:rte l.

SA Q·~al 2335520, sit-: 1

970·11

Envi r ... ~nn1cnt

and/or Paraineter

E:\ \: IFo:-:~!E!\:TAL Tt!n1Ft.:rature:

Operating 1'\on-Op.,rating

Earth Moen

Pressure Operating :'\on-Operating

H·Jmidity Operating ~on-Ooeratin2

Vibration

Operating Non-Operating

Launch & Flight Lunar LandinJZ

Acct:leratic..n Operating ?\on-Operating

Shucl-: Operating ~ ::.r.- Operating

Sai: S?ray Sar:d (;. D·1st

F":cg:cs Acvustical Noise Ra1n Radiation Explosion Proof

PARAMETRIC

Stress Ltvel

Rcquiren1cnt Capability Agent

Bendix Aerospace

-300°F to +50°F ~-300°F to +L50°J-I System

-o0°F to Ho0°F -b0°F to+l60°F

l :<1 0- llTc•ors ~Lto lx!O-ll

:-;!A

XIA

'l.e'cr to Fig. 1-5

Tested to ';x!0-

0 Torrs

Llt:"~l~l.ed to m~E""t Humidity Rt>quirem('nts

rt'sted in sto'.\~d configuration to Ot'Sit.!,n Li111it h-vt.~ls indicated ·,y Fig. 1-<;

Vcrlficatton of Stress L·~~-el Capability

Locahon

Ann Arbor ~Hchigan

~/A

,\nn Arbor ~tichig<tn

Document Reference

TPd34335 TPL33303Z .-'\ TR-60, 70 BSR-db7, 2376

If

~·A

TP2334348 ATR-84,R5 B;'H-2404. 2403

Date

JUiw 11&8

':-II A

July 1968

: ~ / • .l..

LT-\-3D'R

• 1.' :-- •. \ d t 0 1 4 ± l ~ l rni;:; duratin:-:. TP2334330 June l9b8 -:..~i"''('~ ,;: a'":!:-; _.1..Tg_oz. q~

t!~tcd ~u l-- :t 2!2 2 5.)4351

:' '.\ :1 rn~ t:a\\'.tHlth '.'1i:-~",·~9 -1 U.ne 19t8

!. '_\- 3 :J 'p •in;t~..- ~~~ a"ls. '':-;tz -240~. 240" .\

: ~ ·~ :),. :";.:-:.(· d

:' ·\ :<ut D(·rirn·d :; '.-\ ~~()t Dt·:"ined !R l30W/ftz ~·\ /.\

!'\ate 1: Quali!itd on Qual SA confieuration as R:<,.-\ 233<'~~ .-\ssembly ReY:I;ioh C whic;, i identical to Bx.:J l338017 Assembly use4 on Array B and

-.'·L-,:.,.--..~:;i~ .. ~!'"'---no<--:~-----

r··\i\·-·-· !··'· ', Pa!!"_. --~! ---- i'a&.:t'~

Ren>arks

Sllccessf~llh• :~sted

on Qual S.\ model.

Capability li:o•:tc·d l,y to·st F:quipnu•nt Capa.h1i1ty

No testing required

5uccessfulh· Tcs•ed, Q;.al s,~

-I ,.•

She.,t___llll_ of ---

Page 56: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST·ALSEP PROGRAM S\.:BPACKAGE •2, APOLLO 1.1':'<".·\R lL\l'llLl~~G TOOL IALI!Tl D.ttt: j S I J f"\il). A T\1 ~'} ·" • p~ t'v, 1\~•.

!Analyst .1 rs I Page c>f Fa~'$

F.nv i ronr." ent Stress Lt::vcl Verification of Stress L~:vel Capab11ity

Jt.,m and!or Nomenclature Agent Location

Document Remarks Fa ran1t:ter Requirerr1ent Capability Reference Date

El\:VlRO:\"l\1ENTAL ~-.. ~-F7 Ten1r-crature: See ~otes Belo''-''

"'EB V41 Jll65, Operating i '" "1005, l\:on-Operating I di,<ht 2-A Earth

I I

J\lx,n

SA Qual, Pressure S:·:-; l Operating I

' ]'lon-Operatinl! Humidlty

Operating I I l'>on-Operatinl!

V1bration I

Operating I Non-Operating i

Launch & Flight

L1m~ r Landing I l Acceleration

Op(;rd.ting

!':on-Operating Shock

Vpcratir..g ~:, __ ;n. Opr.:rating v

Salt Spray Sand & D·Ht F lDE'.lS

Acvust1cal 1\oise Rain Radiation Explosir.Jn Prou£

PARAMEIRl~

;--;ote I: The A .HT mass simula nr rather than a ight configuration mod I was used for th

Bx..-\ Q ·al SB system le' '1 dynamic tests.

Note 2: Refer o ~p- 2 QSL Shee for shock, ~ibration and accelerat on environment

levels ·.vt . .:l. appl\· to l mterlace quallll· a lion.

-

I I I I

910-12 Sheet...lUL. of ---

===::c ..... """""""""'·"·'"'"""""'"'""""""""""""'"'"""

Page 57: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST·ALSEP PROGRAM !Date 3/8,71 j:\u. A I ;\I OHt jRc,·. ;\u.

11-'l,'t~¥~~ Brent I Page __ of-- Pagt•s

Itenl Nomenclature

f'Si·: LeYelin~ Stool Asst>mblv p;;; 23HOQ BxA •23->4723, S/:\ i, Fli(!ht 2-A

SA Qual 2335945 5/); I

970-12

E:Y.-! rvnn,ent and/or

Parameter

£;\\'IHO::ME!"TAL Temperature:

Operating !';on-Operating

Earth }..1.)on

Stress L•:v<>l

Requirement

I 07 F to 12'i F -~5-F to 160 F an1e as

Ppe rating

Capability

fes!ed in Spa,-e Sin-n1la t ion Chamber for Temperature

Pressure II x lo-llmm !11.:1\'erified to Operating I x Io-Rmm H~ 3 x 1•>-STnns in }:on-Operating "Pa<"P Sin~. Ch~~rr

Humidity I l!'e•icn<'d to Operating .~.:ot App1i('abl,. '.'_!PP!. I!unlirlity !'\on-Operating __ ~ .... a~:i rcnW''t ~

Vi'::Jration :\o~ Applh-ahle Tt>sted in Stowed Operating :'~efer to AT R-1 b Cor.figuration to r-:on-Operating Addendum 1 \'ihration D~sign

LauJ>ch & Flight Limi~s ln•licated L·1nar Landina 1n T-'i>•s-. 1~1:;.....,..

Accclt:ratlon I 1Tes~ in Stowed Operating :":at ... -:-oniie_l! ra~ion to !'on-Operating .·\')pli .... a~~lC> 1.4.±_li!_.l '.rin

Shock . ~:<ot .-\p?li' a:,le I Ps•~;·rl in ~·owt.~~! Operatlng ·\·: ;{-}t·-.\·:,l 1 1 .~:m ra'Ion to ~on-O:~erating l "">7":;, 1 .•• } \rr;s.\v;c:

"':c1• .-':.,o:Jli,·a '\le

V,·rificativn "f Stress Level Capability

Agent

BendLx Aerospace Systems Division

Location

1\nn Arbor, Michigan

Document Reference

TP2334335 AT R-60, 70 BSR-2367 2376

N/A

TP2334~-<8

Date

May-June 1968

I N/A

11 T R-84, 85 I July-Aug BSR--:'.404, 24<JS 1968

TP2334330 AT R-92. 93 7/4/68

TP233433! AT~-88, 89 6/24/1:8 F\S R-240R. 2.400

Remarks

Qualification Accomplished at the System Level. QS.o\

! I I ;

~~~~~~~------~'--! ~-'-------l-~~~~~--~~----------------------+----------------+----------------+-------------4-------------------------------1 :o· .'.Jpli· a·)Ie .o\pnlJ, ,,:.1•· __ ________ -~-~--------·- -·-

1 Acoustical Noise _'io• /\pph~ a~·le Rain '\ot A D:>li<-a '>le Radiation I L!.D-?20 ll'esi~ned to :..lee: Explosion Proof ~-:ot Applk .. -hle -- !\o_t-~p_li<ai>le

PARAMETRIC

~ I I I I I I I ---1

Sheet~ of

Page 58: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

QUALIFICATION STATUS LIST-AlSEP PROGRAM lDatc 1 5 '71

'Analyst JTS lr-;o. - r AT!\i-0$6 Rev. No.

I Page __ of ___ Pages

Item t\onocnclature

H e·at Flow Experi­r:--...... ::.t 2145-J.30, ·' :-.; {l,

Fll~:,t 2-A

~:3 Qual 2330661, s :-; 3

ar.d s;J Qual 2345430, s :-; 2

~

970- ll

Env i ronrncnt and/or

Paranlt~ter

EKY!RO);!\!E);TAL T~n~pa.:.rrtt•.1re:

Operating !'on-Operating

Earth M.•vn

Pressu:t"e Operating t-;on-Operating

Humidity Operating

!\'on- cpe_l'~!i.ro& Vibration

Operating !'!on-Operating

Launch & Flight Lunar Landi!lg

Acceleration Operating

he =--:on-Operating ~~1'·' K

(•f·t·r;t~i--:g

1\on-Cpnrating Salt Spray

~nd &_Dust F·~ng'JS~ --

Stress Level

R equi ren1cnt Capability

-300'F to +2SO'f1-300'F to •250'

-65'F to -160'Fj!'ot Tested -300'f' to "~50'

S ~a Level to Jo-12 TORR

1 5 to 1 oo·~

N/A

LTA-3D/ll LL\-3D/R

:\.A

Sx 10" 7 TO!l.R Desi~nt .. d to 1\!eet Humirlity R equi ren1ent Tested without failur.: to le,•f>ls

-.h '•\T In f]Q!i.ri'S

1 - s:1, 1, 3, -1, :;, ~:...rr?.v f)

ATF-!c ADD. Ill~g ±I"., mil"~

;-;'A l~.:..:-2~; ~a'.\tC'~1tl'1 15±;:\! .~awtoot~l

... \ ,\,A

:: A

Agent

BxA

BxA

BxA

BxA

BxA/B:-.lSD

BxA

Vcriflcation of Stress Level Capability

Location ' Document Reference

---Ann Arbor, I TP23Hj87 Michigan ATR-160

BSR-2570

TP2H-!387 Ann Arbor, I ATR-lbO !\: i chi G!;!' BSR-2570

Ar.n Arbor, J:\iA ?l.fichigan

TP2337905 Ann Arb0r, ATR-149 ~Hchigan BSR -2546

~!ishawa1.1ka T})2337Ll J 5

lnJiana ATR- It-t B<:H-2~74

TP~3379 17 Ann Arbor, I ATR-li.J 1\:it..:hitan BSH -2571

Date

Dec 19 68

Dec 1968

N/A

o~~ J9t,q

Dec !9 t3

Jan 19r.g

Remarks

Qual SB Test

BxA facilitif"s will not allow testi~g to below 5 x I 0 TOR P

No test required

Qual SD Dt:>sign Lln.it I t>st

Array D .. SeE> :--:otP 1 & 2

Qual SB Design L:r.1it Tt>~t

Qual 58 :1~si£n Arrav IJ- .St'«' ~~( .. ·~, 1 ~ ~

Acoustical N'oise I :~.A

Rain Radiation Explosion Proof

PARAMETRIC functional :Jerformance

:.;:A :>:,A :>:,A

Test<'d as part systen1 in the cha:nber

of integrate<! Space Sinlulatio.

flxA Ann Arbor, l\Hchigan

Tl 0 2f3,(-!0 i!\lo•J. IST) ATR-U·3 BSR-2573

Jan 1969 Qual SB Test

l:"ote I:

~ot<.> 2:

Sj:; 02 'f'bsoqu<'ntly n·qu.lified on SP"2 as nott>din Array D Qu~lilcat!o~ As.s .. ss':"e1' R":view Boarr M;n 11tes 971J3B-2i, dated 19 F<'br· orv 1971. TP 21 1(.32R is th .. docum,•nt ' 1\'o•nng th~ Dn11·, Ltmtt VJbratton '"stmg for Si-' 2 Array D, and TP 23.;; ~9 is th<· docunH·lt covC'ring the ShoC'k r q~tirt·mt·nts of Sl' 2. Array D.

Design 1 ::>it (x, y, z) with t '" s. N-2 HFE on Arra D SP"2 were pe or~ed January 1p11 at the foiiotdng levels: ~· '"' ~ . / . _. . •"• ~ - -~ . - - ..

b. c. d.

L f.lB random ( J. 0 mlnl Lun r descent randoml(12. 5 min) Shot.¥ (l 5)

3.0( 37. 5( o.o

IIIJio

min. min. min.

Sh.,et..li.:.:l__ o{ ---

Page 59: Qualification status list ALSEP Array A2 configuration€¦ ·  · 2013-12-06Qualification Status List ALSEP Array AZ Configuration NO. ATM 986 PAGE 4 REV. ... and SC Program are

~._,,

CUALIFICATION STATUS LIST-ALSEP PROGRAM Date 3 ·s '71 r•o. ATM-981> IRP\· .• No.

Analyst I Page of Pages

Em,.i ronn1cnt Stress Level Yerif>cation of Stress Level Capability

Item and/or Nomenclature Agent Location

Document Remarks Parameter Requircn1ent Capability Reference Date

Supra thermal £]';V JRO:'\J\!ENTAL Ten1pcrature: TP 2333032

Ion Detector and Operating -300°F to +250°F -300°F to +250°!: ATR-60, 70 May 1968

Cold Cathode Non-Operating -65°F to +160°!:' BxA ~nn Arbor, Mich BSR-2367, 2376 June 1968 Qual SA Test Subpackage

Gange Experiment Earth -300°F to +250°F -300°F to tZ50°F #2 BxA 2338104, • !-.bon s.~ 7, - Pressure TP233032 Test level limited by Flight 2-A Tested to

"! Operating 10-1 2 Torr 5 x 10-6 Torr

BxA Same ATR-60, 70 June 1968 te•t equipment capacity

SA Qual 2330660, Non-Operatinil SL-lo-12 Torr BSR-2367, 2376

S/N 1 Humidity Designed to

1'\ o testing pia nned Operating NIA meet humidity BxA Same N/A Non-Operatinl! !5"1, to l OO""o requiremc:-nts

to I OO"'o level

- Vibration r csted in stowe~ TP Z3H348 Operating N/A configuration to ATR-84, 85 Non-Operating design limit BxA Same BSR- 2404, 2405 · June 1968 Qual SA Test Subpackage

Launch & Flight !C 314105 le\~cls indicated #2 Lunar Landing in Fi!,!ure-s 1 .. 5

Acceleration Tested to 14_t1g TP-2334330

Operating NIA 1 rninut c dura- DxA Sun1c ATR-'12, B

July 1968 0'1>1 SA Test Subpackage Non-Operating JC 314105 tiPn ~2

s;,,,ck 1 estell to l ::-..:_l.t: 1 p ~.l3-15Jl

Up·: r>.ting NIA ll ms sawtooth BxA Same A TR-88, 89 June 1968 Q·,al SA Test Subpackage :Kon-Operating !C 3H!Oo each axis flSR-2408, 240' #2

Salt Spray "i r\

Sand & Dust ;-.: i A :<ot cicfint ,1 .,o ~es 1:1~ Jar.ne(J

Fungus NiA Acc.ustical N"oise :~~~t dc-fi:1ed ~..:o Te~tin?: Planned Rain :\'A '

Radiation LED-520 130 W'ft2 (!Rl BxA Same TP 2334335 }.fay 1968 Qual SA Test Subpackage •2 Explosion Proof N/A

PARAMEfBI!;(

Refer to RAS 100 '.Rice Univcrs ity CEI Specification)

Integrated T P 2333087 SIDE S/N 2, Proto used

EM! Per!ortnAnce Teot"d as part o ATR-27, 33 in ASE EM! requal System BxA Same

BSR-2300, 2320 April 1968

completed I 0-19-69 per TP 2338180

Per RICE Tested as part TP 2333032

Functional Specification of Integrated TP 2333035 May-June

Performance System BxA Same ATR-60, 70 1968 See firot re ... ~rk BSR-2367, 2376

"""""' , .. Shee~ of ,

-----·-~ ~

~'~~~-- - -