23
Quick Installation Guide 630 series

Quick Installation Guide 630 series - ABB Group · Quick Installation Guide | 630 series 3 Protective earthing. 4 630 series | Quick Installation Guide Flush mounting 4U. Quick Installation

Embed Size (px)

Citation preview

Quick Installation Guide630 series

3Quick Installation Guide | 630 series

Protective earthing

4 630 series | Quick Installation Guide

Flush mounting 4U

5Quick Installation Guide | 630 series

Semi-flush mounting 4U

6 630 series | Quick Installation Guide

Wall mounting 4U

7Quick Installation Guide | 630 series

Rack mounting a single IED 4U

8 630 series | Quick Installation Guide

Rack mounting two IEDs 4U

9Quick Installation Guide | 630 series

Rack mounting kit for single IED and test switch RTXP

10 630 series | Quick Installation Guide

Ceiling mounting with external display module

33128

Ø 20

M3

38

7,5

LHMI outline

Surface coating onrear side of panelmust be removedØ 15 mm

Hole for GNDconnection

Hole for cable fromIED to LHMI

78

M3

Ø 6,5

M3M3

177 162

18,5

220

Panel drill plan 1:1External LHMI display

630 series | Quick Installation Guide

Wall mounting with external display module

15

Quick Installation Guide | 630 series

Mounting the external display module

16

630 series | Quick Installation Guide17

Quick Installation Guide | 630 series

Mounting the optional cable shield rail

18

630 series | Quick Installation Guide

Rack mounting two IEDs with the optional cable shield rail

19

Quick Installation Guide | 630 series

Notes

20

630 series | Quick Installation Guide

Notes

21

Quick Installation Guide | 630 series

Notes

22

Contact us

1MR

S75

7518

ABB Oy Distribution Automation P.O. Box 699 FI-65101 VAASA, Finland Phone +358 10 22 11 Fax +358 10 22 41094

www.abb.com/substationautomation

© C

opyr

ight

201

1 A

BB

. A

ll rig

hts

rese

rved

.