CRYOGENICS. R&D ERL Cryogenics. Roberto Than. February 17-18, 2010. Cryogenics System Introduction. e-CX 5 Cell Cavity Cryomodule SRF Gun Cryomodule Cold Cathode Cooling Cryogenic System Operation Summary Cavity cooled in 2K bath @ 23 Torr Warm vacuum pump 4.5K Cryo plant. - PowerPoint PPT Presentation

Citation preview

Page 1: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

R&D ERLCryogenics

Roberto Than

February 17-18, 2010

CRYOGENICS

Page 2: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

Cryogenics System Introduction

• e-CX 5 Cell Cavity Cryomodule• SRF Gun Cryomodule• Cold Cathode Cooling• Cryogenic System• Operation• Summary

• Cavity cooled in 2K bath @ 23 Torr• Warm vacuum pump• 4.5K Cryo plant

2

Page 3: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

e-CX 5 Cell Cavity Cryomodule P&ID

3

FPC interceptEndbore InterceptsTuner Intercepts

Intercept cooling: 3atm, 5K

Nitrogen Shield

550L

RESERVOIR: 550L

Page 4: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

e-CX 5 Cell Cavity Heat Transfer

• Niobium wetted area 1.6 m2. • Nominal surface heat flux: ~25 W/m2

• Kapitza resistance: 1.5 cm2-K/W• Kapitza temperature gradient: ~ 2.4 mK• Interconnect has a crossection area of 205 cm2. • Cross sectional heat flux density is approximately 0.3 W/cm2

• Interconnect is 80 cm tall• Superfluid conductivity gradient at 2K: about 1 mK

4

Page 5: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

e-CX 5 Cell Cavity System Thermal Load

• 2K Helium Load• Cavity

Dynamic Load 40 WStatic Load 6 W (~20W)

• ReservoirLHe Volume 3 WFill valve 1.5 WVac break 0.5 WVent 3 WTotal Load 54 W (~68W)

• Intercepts cooling 3 atm, 5K supply

F.Power Coupler 0.15 (0.3)g/sTransition#1 0.15 (0.3)g/sTransition#2 0.15 (0.3)g/sTuner Total 0.45 (0.9)g/s

Shield cooling: LN2

5

Page 6: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

e-CX 5 Cell Cryomodule Reliefs

6

VOLUME Set Prespsig

LoadkW

ReliefRatekg/s

Req’ Areain2

Relief AreaIn2

MNFA

Helium side

5 0.05 Relief valve

Helium side

8 60Loss of UHV vacuum to air

3.6 5.8 12.7 Disk

UHV side 6-7 25 1.56 2.2 2x 1.4[2 x 2” Disk]

InsulatingVacuum

1.5 85 3.6 10@ 7 psi

6” lift plate

Page 7: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

SRF Gun Cryomodule P&ID

7

FPC’s InterceptsEnd flanges& HTS solenoid Intercepts

Intercept cooling: 3atm, 5K

Nitrogen Shield

160L

Reservoir: 160L

LN2

Cathode Cooling LN2 Loop

Page 8: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

SRF Gun Cavity Heat transfer

• Niobium wetted area ~ 0.25 m2. • Nominal surface heat flux: ~30 W/m2

• Kapitza resistance: 1.5 cm2-K/W• Kapitza temperature gradient: ~ 20 mK• Interconnect has a crossection area of 46 cm2. • Cross sectional heat flux density is approximately 0.3 W/cm2

• Interconnect is 60 cm tall• Superfluid conductivity gradient at 2K: about 1 mK

8

Page 9: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

SRF Gun System Thermal Load

• 2K Helium LoadDynamic Load 7 WStatic Load 8 W

Reservoir 1 WFill valve 1.5 WVent 3 WTotal Load 21 W

• Intercepts cooling 3 atm, 5K supply

F. Power Coupler#1 0.075 g/sF. Power Coupler#2 0.075 g/sTransitions/solenoid 0.3 g/sTotal 0.45 g/s

Shield cooling: LN2

9

Page 10: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

SRF Gun Cryomodule Relief

10

VOLUME Set Prespsig

LoadkW

ReliefRateKg/s

Req’ Areain2

Relief AreaIn2

MNFA

Helium side 5 0.05 Relief valve

Helium side 8 14Loss of

insulating vacuum to air

0.87 1.4 5 [3” Disk]

UHV side 6-7 7.2 0.45 0.9 1.4[1.5” Disk]

InsulatingVacuum

7 75 4.3 9 30[6” Disk]

Page 11: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

SRF Gun Cathode Tip Cooling

11

ATM

LN2 COOLED50WCONVECTION NUCLEATE BOILINGX<10%FLOW: 5 g/s

Page 12: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

Cryo System Diagram

12

Purifier

Subcooler

GAS STORAGE

Main Plant

1660S

300 W

Or

3 g/s

VACUUM PUMP

2 - 4K 2 - 4K

LIN

LHe Storage

LHe supply

Vhe Return

2 - 4K 2 - 4K

FPC2FPC

ENDBORE & SOLENOIDENDEND

E-CX 5-cellSRF Gun

Page 13: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

Cryo System Equipment

Compressor: 50 g/s Sullair with Oil Vapor Removal System300 W or 3 g/s 1660S 4.5K piston expander plantWith Wet-expander pod: 3.5 g/s1000 Gallon (3800 liter) Liquid Helium dewarLHe Subcooler: 200 liter, Plant output from 6K to 4.6KWarm He storage Tank: 43,000 Gal (162 m3) 3500 Liq liters@ 17 atmWarm Process Vacuum Pump: 5.5 to 6 g/s, 23 Torr @cryomoduleVertical LN2 Dewar: 11,000 GalCryogenic Transfer Lines System

13

Page 14: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

Cryo System 2K Capacity

• No 4K to 300K Recovery– Liquefaction Load

• 2K-4K Recovery HX • Reservoir

– Peak Mode– 5-Cell: 400L usable

4 hr @ 4.0 g/s: 92 W– Gun: 110 L usable

3.0 hr @ 1.5 g/s: 35 W

• Peak Mode– Draw down reservoir– No fill from JT valve– 5.5 g/s Vacuum Pump– 128 W @ 2K

• Steady State– Constant level reservoir– Fill from JT valve– 2K-4K Recovery– 5.5 g/s Vacuum Pump– 94 W @ 2K

14

Page 15: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

Operation 2K

• Load Max Min ReLiq• 2K Refrig Load 5.5 g/s 2.0 g/s 0.5 g/s• Intercepts : 1.5 g/s 1.5 g/s 0.5 g/s• Total Liquefaction: 7.0 g/s 3.5 g/s 1.0 g/s• 2500 L Reservoir from Storage Dewar• Plant 3.5 g/s 3.5 g/s 3.5 g/s+50W• Net Plant 2.4 g/s 2.4 g/s 2.5 g/s• Net draw rate -4.6 g/s - 1.1 g/s +2.5 g/s • Continuous 18 hrs 75 hrs 33 hr

15

Page 16: R&D ERL Cryogenics

February 17-18, 2010

R&D ERL

Roberto Than

Summary

• Cryogenic System: 128 W @2K peak for several hrs» 94 W Continuous Duty» Run peak cavity loads for at least 12 hours

• Cryogenic Plant also serves Vertical Test Facility– 40 inch (1m) diameter Vertical Test Dewar– 14 inch (0.35m) & 28 inch (0.7m) dia Vertical Test Dewar

• Status– All equipment in location, warm piping under installation– Subcooler: Delivery July 2010– Cathode Cooling LN2 System: Engineering– Cryogenic Transfer lines: Delivery

Batch1 October Batch 2 Nov 2010– Installation & check out: to March 2011

16