COUNCIL REPORT
Executive Committee Report No. PDS 026-2018
Date: February 26, 2018 File No: 6970-20
To: Mayor and Council From: Siri Bertelsen, General Manager, Planning and Development Services Subject: Planning and Development Services 2017 Fourth Quarter Report
RECOMMENDATION
THAT the Planning and Development Services 2017 Fourth Quarterly Report, be received for information.
REPORT CONCURRENCE
General Manager
n/a
City Manager
The City Manager concurs with the
recommendation of this report.
BACKGROUND
This is the fourth quarterly report for the Planning and Development Services Department for 2017. The report provides Council with statistical information on development activity in the fourth quarter of 2017, as well as an update on major planning initiatives. This report, along with previous reports, will form the base for the 2017 Annual Report.
DISCUSSION
This is the fourth quarterly report of 2017 by staff in order to keep Council informed of development activity taking place within the City. The report contains information on major planning initiatives, land development applications and building permit activity.
Rajat Sharma General Manager, Finance and Corporate Services Signed 2/19/2018 10:55 AM
Report No. PDS 026-2018 Page 2 of 2
SUBSTANTIATION OF RECOMMENDATION
The information presented in the Planning and Development Services 2017 Fourth Quarter Report serves to highlight development activity and trends in Abbotsford, and to update Council on the progress of major departmental initiatives.
Siri Bertelsen General Manager, Planning and Development Services Signed 2/14/2018 8:25 AM
ATTACHMENTS:
2017 Fourth Quarter Report
Planning & Development ServicesFOURTH QUARTER rePort2017
OCTOBER - DECEMBER 2017
Q4Q4ATTACHMENT A
2 Planning & Development Services
Cover image of proposed “The U” Development by District Properties Group on King Street.Image by: Keystone Architechture
table of ContentsPlanning & Development Services ......................................................................... 3
Introduction. ......................................................................................................... 4
Application Process .............................................................................................. 4
Development Applications .................................................................................... 5
Development Inquiry Meetings (DIM)
Land Development Applications Received ............................................................ 6
In-Stream Residential Applications ....................................................................... 8
Single Family (lots), Townhouse (units) & Apartment (units)
In-Stream ICI Applications ................................................................................... 10
Institutional, Commercial & Industrial Floor Space
Approved Residential Applications ........................................................................ 12
Single Family (lots), Townhouse (units) & Apartment (units)
Approved ICI Applications .................................................................................... 14
Institutional, Commercial & Industrial Floor Space
Issued Building Permits ........................................................................................ 16
Number of Issued Building Permits by Quarter ............................................... 16
Value of Issued Building Permits by Quarter ................................................... 17
Number of Building Inspections ...................................................................... 17
Issued Residential Building Permits ....................................................................... 18
Single Family, Townhouse & Apartment
Issued ICI & Agricultural Building Permits .............................................................. 19
Institutional, Commercial, Industrial & Agricultural
Map of Issued Building Permits............................................................................. 20
Current Initiatives .................................................................................................. 22
Source of all data: City of Abbotsford, Planning and Development Services
3FOURTH QUARTER 2017
The Planning & Development Services Departmentconsists of four main divisions: Community Planning, Development Planning, Development engineering and Building Permits & Licences.
Community Planning manages the City’s Official Community Plan (OCP), bringing together land use, urban design and social planning policies, along with overall infrastructure needs into long range land use plans. The division is responsible for the development and implementation of strategies, policies and plans that guide the City’s future growth and development.
Development Planning is responsible for reviewing and processing development applications such as rezoning, subdivision and development permits. These applications are reviewed for compliance with the OCP, Zoning Bylaw and other municipal bylaws and policies.
Development Engineering is responsible for reviewing and processing engineering drawings for development applications, and for environmental services. The drawings are reviewed for compliance with the Development Bylaw and other municipal bylaws and policies.
Building Permits and Licences is responsible for ensuring all building construction in the City meets Building Code requirements for health, life safety and fire protection. Functions include plan checking, building permit issuance, on-site inspections and business licencing.
For more information: www.abbotsford.ca/planning
Planning & Development Services
4 Planning & Development Services
1. INQUIRY
There is a lot of information to consider before making an application, including understanding the relevant City plans, procedures, and bylaws. Development Inquiry Meetings (DIMs) are an opportunity to meet with City staff, discuss ideas, and determine how the City’s plans and policies affect a potential application.
?
2. SUBMISSION & ReVIeW
Once an application is submitted, staff review and refer the proposal to other agencies, if required. Development applications are first reviewed by the Development Application Review Team (DART) for general compliance and to identify requirements from each department. Once the application is reviewed and revisions are completed, the application can proceed to the next step.
3. aPPROVaL & ISSUaNCe
Depending on the type of application, it will either be reviewed by Council or City staff. If an application is supported, and is approved in principle, requirements for final approval must be met. A building permit application will be accepted once the development is approved in principle. The building permit will be issued once the requirements for final development approval and building permit issuance are met.
4. CONSTRUCTION
Once the building permit has been issued, construction can begin. Construction activity must meet the requirements of City bylaws and other government agencies. Applicable inspections are undertaken during the appropriate stages of construction and prior to occupancy of the building.
Application Process
IntroductionThe Planning and Development Services (PDS) 2017 Fourth Quarter Report is a snapshot of how we’ve progressed over the past quarter.
As of Q1 2017, the report uses updated community boundaries to better reflect the framework of the current OCP.
The format of the report follows the major steps in processing development and building permit applications, from initial inquiries to final building occupancy.
This report contains current departmental initiatives highlighting some of the major projects underway in the fourth quarter of 2017, and growth and development activity. The main initiatives for Q4 2017 were Stage 3 of AgRefresh, and Stage 2 for both the City Centre and Historic Downtown Neighbourhood Plans. Staff coordinated 111 Development Inquiry Meetings, received 66 development applications, issued 440 building permits, and completed 3,150 building inspections.
We will continue to build on these achievements and look forward to a busy first quarter of 2018!
For more information: www.abbotsford.ca/stats
5FOURTH QUARTER 2017
Development ApplicationsDevelopment Inquiry Meetings (DIM) ?
D
evel
opment Inquiry M
eetings111
During Q4, staff coordinated 111 Development Inquiry Meetings (DIM), which greatly exceeds the Q4 2016 number (65), and continuing the high volume of DIMs during Q2 2017 (130) and Q3 2018 (131). DIMs are intended to provide preliminary direction and feedback to land owners/developers who are considering development in Abbotsford. Feedback is related to the consistency of their proposal/concept with respect to the Official Community Plan, Development Permit Area guidelines, Zoning and other City regulatory bylaws, as well as anticipated off-site infrastructure requirements.
Approximately 69% of all inquiries (66) included rezoning and/or subdivision of property to accommodate residential development in both single and multi-family style developments. Inquiries related to commercial (10) and industrial (7) represented an additional 15% of total inquiries. Inquiries related to agricultural land (15) represented 14% of DIMs hosted this quarter. Mixed use developments (5) represented 5% of inquiries. There was 1 institutional inquiry.
6 Planning & Development Services
Whatcom County, Washington USA
Land Development Applications received
The total number of all development applications received in Q4 2017 is 66, compared to 47 in Q4 2016. Compared to Q4 2016, applications greatly increased for rezonings by 13. Applications received also increased for subdivisions by 3. and for Agriculture Land Reserve applications by 5. Applications for Development Permit applications decreased by 3 The second OCP amendment application since the Q1 2016 was received.
Tow
nshi
p of
Lan
gley
Highway No. 1
Highw
ay No. 11
Electoral Area G (FVRD)
F r a s
e r R i v
e r
District of Mission
Q4 2017 total:66
Q4 2016 total:47
Sumas Mountain
Sumas Prairie
auguston
Westabbotsford
UDistrict
Bradner-Mt. LehmanMatsqui Prairie
South Poplar
aberdeen
Townline
Peardonville
Fairfiel
Hazelwood
Clayburn
WhatcomImmel-
McMillan
City Centre
Clearbrook
McKee
Sumas Way
SouthClearbrook
Historic Downtown
Marshall - McCallum
7FOURTH QUARTER 2017
Land Development Applications received
18 additional development applications were received in the fourth quarter of 2017, including Accessory Seasonal Employee Residential Use and DP Exemption.
High
way
No.
1
City
of C
hilliw
ack
Q4 2017 - application Type (number of applications)
Notes: A single development may have multiple applications. Symbols may have been moved for greater clarity and may not be in the exact location of the application.
OCP Amendments - 1
Rezonings - 24
Development Permits - 12
Agricultural Land Reserve - 8
Subdivisions - 21
Urban Development Boundary (UDB)
Agricultural Land Reserve
01
11
24
15
12
3
8
18
21
0
5
10
15
20
25
30
Q4 2016 Q4 2017
OCP Amendments Rezonings Development Permits Agricultural Land Reserve Subdivisions
8 Planning & Development Services
In-Stream residential ApplicationsSingle Family (lots), townhouse (units) & Apartment (units)
Whatcom County, Washington USA
Tow
nshi
p of
Lan
gley
Highway No. 1
Highw
ay No. 11
Highw
ay No. 11
Electoral Area G (FVRD)
F r a s
e r R i v
e r
District of Mission
Single Family:• A total of 900 single family lots are in-stream
with 540 under review (UR) and 360 approved in principle (AIP). Of these, 97% (875 lots) are within the Urban Development Boundary (UDB).
• Notable projects include:• 161 lots in Whatcom (Vicarro Ranch)• 123 lots in Clayburn (Straiton Road)• 73 lots in Mckee (Sumas Mountain Road)
Townhouse: • A total of 655 townhouse units are in-stream with
532 UR and 123 AIP.• Notable projects include:
• 190 units on the south side of Marshall Road (Whatcom)
• 167 units on Livingston Avenue (Townline)• 84 units in a combination of stacked and
detached townhouses on Lower Sumas Mountain Road (Whatcom)
apartment:• A total of 1,365 apartment units are in-stream with
820 UR and 545 AIP.• Notable projects:
• 282 unit mixed-use development at the Abbotsford-Mission news office site on Gladys Avenue
• 204 unit mixed-use development at King Road and the King Connector in the UDistrict
• 142 units in 2 six-storey buildings on Gladwin Road
• 140 units on McCallum Road at the Towne Cinema site (in combination with 75 townhouse units)
• 108 unit mixed-use development on Montrose Avenue
• 103 unit building on Eleanor Avenue• 72 units in the Maclure Road Apartments
development• 60 units of rental housing on Old Yale Road
Sumas Mountain
Sumas Prairie
auguston
Westabbotsford
UDistrict
Bradner-Mt. Lehman Matsqui Prairie
South Poplar
aberdeen
Townline
PeardonvilleIndustrial
Fairfiel
Hazelwood
Clayburn
Whatcom
Immel-McMillanCity
Centre
McKee
Sumas Way
Marshall - McCallum
SouthClearbrook
HistoricDowntown
Clearbrook
Gladys Mixed-use(282 units)
Parcel 7 apartments(44 units)
9FOURTH QUARTER 2017
In-stream residential applications (under review and approved in principle) were collected from Development Permit and Subdivision applications.
There is a total of 2,920 in-stream residential lots/units - 69% multi-family and 31% single family.
Mixed use applications include 314 apartment units under review and no apartment units approved in principle, along with a commercial component (see pages 10-11). This represents 23% of all apartment units in-stream.
High
way
No.
1
City
of C
hilliw
ack
Q4 2017 - application Type (number of applications)
Single Family UR (Under Review) - 75
Single Family AIP (Approved in Principle) - 50
Townhouse UR - 10
Townhouse AIP - 3
Apartment UR - 8
Apartment AIP - 4
Mixed Use UR - 1
Mixed Use AIP - 2
Urban Development Boundary (UDB)
Agricultural Land ReserveNotes: A single development may have multiple applications. Symbols may have been moved for greater clarity and may not be in the exact location of the application.
single family540 lots
single family360 lots
townhouse532 units
townhouse123 units
apartment820 units
apartment545 units
0100200300400500600700800900
1,0001,1001,200
Under Review Approved in Principle
10 Planning & Development Services
Whatcom County, Washington USA
Tow
nshi
p of
Lan
gley
Highway No. 1
Highw
ay No. 11
Highw
ay No. 11
Electoral Area G (FVRD)
F r a s
e r R i v
e r
District of Mission
In-Stream ICI ApplicationsInstitutional, Commercial & Industrial Floor Space
Institutional:• No institutional applications were under review
(UR) or Approved in Principle (AIP) in the fourth quarter.
Commercial: • A total of 12,750 m2 of commercial floor space is
in-stream with 11,280 m2 UR and 1,470 m2 AIP.• Notable projects include:
• Two commercial buildings on Clearbrook Road (6,720 m2)
• 4-storey development with 7 retail units and 11 office units on Mayfair Avenue (2,625 m2)
• 2-storey office building on Gladys Avenue (2,021 m2)
• Office/Retail building on Montrose Avenue in Historic Downtown (1,190 m2)
Industrial:• A total of 69,491 m2 of industrial floor space is in-
stream with 20,730 m2 UR and 48,761 m2 AIP.• Notable projects include:
• A manufacturing and distribution facility for Mayne Coatings (34,868 m2) in the Clearbrook industrial area
• A multi-tenant industrial building on Mount Lehman Road (9,332 m2)
• A multi-tenant industrial building on Marshall Road (7,839 m2)
• A processing and storage facility (4,348 m2) south of Marshall Road on Riverside Road.
• Two warehouses on Maclure Road (3,516 m2)
• A multi-tenant industrial building on Marshall Road (3,516 m2)
Woody’s RV World (3,070m2)
Montrose avenue (1,190m2)
auguston
Sumas Mountain
Sumas Prairie
Westabbotsford
U District
Bradner-Mt. LehmanMatsqui Prairie
South Poplar
aberdeen
Townline
PeardonvilleIndustrial
Fairfiel
Hazelwood
Clayburn
Whatcom
Immel-McMillan
HistoricDowntown
Marshall - McCallum
CityCentre
SouthClearbrook
McKee
Sumas Way
Clearbrook
11FOURTH QUARTER 2017
High
way
No.
1
City
of C
hilliw
ack
Note: Symbols may have been moved for greater clarity and may not be in the exact location of the application.
Institutional UR (Under Review) - 0
Institutional AIP (Approved in Principle) - 0
Commercial UR - 6
Commercial AIP - 1
Industrial UR - 5
Industrial AIP - 4
Mixed Use UR - 1
Mixed Use AIP - 2
Urban Development Boundary (UDB)
Agricultural Land Reserve
Q4 2017 - application Type (number of applications)
In-stream ICI applications (under review and approved in principle) were collected from Development Permit applications for commercial and industrial projects and from Rezoning applications for institutional projects.
There is a total of 82,241 m2 in-stream ICI floor space - 84% in the form of industrial floor space and 16% commercial.
Mixed use applications include 4,001 m2 of commercial floor space under review and approved in principle along with an apartment component (see pages 8-9). This represents 31% of all commercial floor space in-stream.
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
Under Review Approved in Principle
commercial11,280 m²121,373 ft²
institutional0 m²0 ft²
commercial1,470 m²15,817 ft²
industrial20,730 m²223,055 ft²
industrial48,761 m²524,668 ft²
institutional 0 m²0 ft²
12 Planning & Development Services
Tow
nshi
p of
Lan
gley
Highway No. 1
Highw
ay No. 11
Highw
ay No. 11
Electoral Area G (FVRD)F r a
s e r
R i v e r
District of Mission
Approved residential ApplicationsSingle Family (lots), townhouse (units) & Apartment (units)
Single Family:There was 1 single family lot approved in Q4 2017. The 5 year average for approved single family lots is 110, while the 10 year average is 157 lots. Based on the number of single family lots in-stream (900 lots), an increase in the number of approved lots is expected in subsequent quarters.
Townhouse: There were 44 townhouse units approved in Q4 2017. The 5 year average for townhouses is 191 units and 10 year average is 152 units. The 5 year and 10 year averages were surpassed in Q3, with another 655 townhouses in-stream.
• Two Notable projects:• 30 units in four 3-storey buildings on Ware
Street at Bourquin Crescent• 14 units on Waterleaf Place near Whatcom
Road
apartment:No apartment units were approved in Q4 2017. The 5 year average for approved apartment units is 302 units, while the 10 year average is 289 units. With 1,365 units in-stream, an increase in approved units is expected in 2018.
Whatcom County, Washington USA
Waterleaf Place (14 units)
Sumas Mountain
Sumas Prairie
Westabbotsford
UDistrict
Bradner-Mt. LehmanMatsqui Prairie
South Poplar
aberdeen
Townline
PeardonvilleIndustrial
Fairfiel
Hazelwood
Clayburn
WhatcomImmel-
McMillanHistoricDowntown
Marshall - McCallum
CityCentre
SouthClearbrook
Clearbrook
McKee
Sumas Way
Mill District Townhomes (30 units)
13FOURTH QUARTER 2017
City
of C
hilliw
ack
High
way
No.
1
Approved residential ApplicationsSingle Family (lots), townhouse (units) & Apartment (units)
Note: Symbols may have been moved for greater clarity and may not be in the exact location of the application.
Q4 2017 - application Type (lots/units)
Approved residential applications in the fourth quarter of 2017 were collected from Development Permit applications.
There were 44 townhouse units and no apartment units approved in Q4 2017. Multi-family housing made up 98% of the approved residential units this quarter.
The OCP targets 75% of growth in existing urban areas and 25% in the New Neighbourhoods. For 2017 year-to-date, 93% of units/lots in approved residential applications are in existing urban areas and 7% are in the New Neighbourhoods.
Single Family (1 lot)
Townhouse (44 units)
Apartment (0 units)
Mixed Use (0 units)
Urban Development Boundary (UDB)
Agricultural Land Reserve
19
135 6425 91
323282
406
134
184
87
308
40
235
681
32
248294
0
100
200
300
400
500
600
700
800
5 yr avg 10 yr avg
2012 2013 2014 2015 2016 2017YtD
2012 2013 2014 2015 2016 2017YtD
Single Family (lots) Townhouse (units) apartment (units)
2012 2013 2014 2015 2016 2017YtD
14 Planning & Development Services
Electoral Area G (FVRD)
Tow
nshi
p of
Lan
gley
Highway No. 1
Highw
ay No. 11
Highw
ay No. 11
District of Mission
F r a s
e r R i v
e r
Approved ICI ApplicationsInstitutional, Commercial & Industrial Floor Space
Institutional:There were no instituational applications approved or in-stream for Q4 2017.
Commercial: There were no commercial applications approved for Q4 2017. There is 12,750 m2 in-stream.
Industrial:There was a total of 32,078 m2 of industrial floor space approved in Q4 2017. • Notable projects include:
• A mini-storage facility (28,383 m2)
• An industrial subdivision with an equipment sales facility on the wetern portion of the site (2,175 m2)
• “Glencoe Electric’s” new office and warehouse development on Peardonville Road (1,520 m2)
The 5 year average is 12,444 m2 and the 10 year average 10,568 m2 for approved industrial floor space. Both averages were surpassed in first two quarters. The 2017 total has more than tripled the previous year total. With 69,491 m2 industrial floor space in-stream, this pace of approved floor space should continue in susquent quarters.
Whatcom County, Washington USA
Glencoe electric Office &Warehouse (1,520 m2)
Sumas Mountain
Sumas Prairie
Westabbotsford
UDistrict
Bradner-Mt. Lehman
Matsqui Prairie
South Poplar
aberdeen
Townline
PeardonvilleIndustrial
Fairfiel
Hazelwood
Clayburn
Whatcom
Immel-McMillanHistoric
Downtown
Marshall - McCallum
CityCentre
SouthClearbrook
Clearbrook
McKee
Sumas Way
Mini-storage facility (28,383 m2)
15FOURTH QUARTER 2017
High
way
No.
1
City
of C
hilliw
ack
Approved ICI ApplicationsInstitutional, Commercial & Industrial Floor Space
High
way
No.
1
Approved ICI applications in the fourth quarter of 2017 were collected from Development Permit applications for commercial and industrial projects and from Rezoning applications for institutional projects.
There was a total of 32,078 m2 of ICI floor space approved in Q4 0217, with 100% in the form of industrial.
There were no mixed use application approved in Q4 2017. With three mixed use applications in progress, staff anticipate more approvals in subsequent quarters.
Note: Symbols may have been moved for greater clarity and may not be in the exact location of the application.
Q4 2017 - application Type (floor spaceInstitutional (0 m2)
Commercial (0 m2)
Industrial (32,078 m2)
Mixed Use (0 m2)
Urban Development Boundary (UDB)
Agricultural Land Reserve
0
10,000
20,000
30,000
40,000
50,000
5 yr avg 10 yr avg
500
m²
5,38
0 ft
²
5,43
7 m
²58
,500
ft²
20,8
81 m
²22
4,68
0 ft
²
12,6
54 m
²13
6,15
7 ft
²
2,80
7 m
²30
,203
ft²
29,2
62 m
²31
4,85
9 ft
²
14,2
44 m
²15
3,05
0 ft
²
14,6
53 m
²15
7,67
1 ft
²
17,1
39 m
²18
4,41
6 ft
²
2,78
8 m
²29
,999
ft²
13,1
39 m
²14
1,37
4 ft
²
2012 2013 2014 2015 2016 2017YtD
Institutional (floor space)
2012 2013 2014 2015 2016 2017YtD
Commercial (floor space)
2012 2013 2014 2015 2016 2017YtD
Industrial (floor space)
7,57
8 m
²81
,539
ft²
52,8
11 m
²15
3,05
0 ft
²
1,04
5 m
²11
,244
ft²
0 m
²0
ft²
0 m
²0
ft²
0 m
²0
ft²
0 m
²0
ft²
16 Planning & Development Services
Issued Building Permits Number of Issued Building Permits by Quarter(New Construction & Improvements)
The total number of issued building permits for Q4 2017 increased compared to Q4 2016. There was a significant increase in total construction value. Between Q4 2016 and Q3 2017, there was a 6% incease in the number of issued building permits, and a 143% ($83.1 million) increase in construction value. The Q4 2017 construction value is 140% higher than the 5 year, and 148% higher than the 10 year, average construction values. This increase can be attributed large projects across multi-family, industrial and agricultural categories.
agricultural building permits decreased by 4. The overall construction value increased by $2.9 million (36%) from Q4 2016 to Q4 2017. The highest valued projects included greenhouses on Townshipline Road ($6.8 million), and a poultry barn on Columbia Street ($1.3 million).
The number of commercial building permits increased by 32 from Q4 2016, and their overall construction value increased by $4.5 million (81%). Notable projects include tenant improvements on West Railway Street ($1.3 million), and two on McCallum Road (both $0.9 million).
The number of single family residential permits decreased by 39 in Q4 2017 compared to Q4 2016. Overall construction value increased by $14.3million (65%). The largest clusters of approved single family building permits can be found in Mckee, Whatcom and Old Clayburn.
The number of multi-family building permits increased by 8 from Q4 2016 to Q4 2017, and the construction value greatly increased by $49.1 million (361%). Notable permits include the second phase of La Galleria for $39.1 million, and the Mill District Apartments on Ware Street for $14.6 million.
The number of industrial building permits in Q4 2017 increased by 22 a compared to Q4 2016, and the construction value increased by $11.5 million (137%). Notable projects include a storage facility on Peardonville Road ($10.0 million), offices on Peardonville Road ($1.8 million), and warehousing on Queen Street ($1.7 million) and Foy Street ($1.7 million).
Institutional building permits decreased by 1 from Q4 2016 to Q4 2017, and the construction value increased from $0.7 million in Q4 2016 to $1.2 million in Q4 2017.
Other includes: blasting, antenna, communication tower, and noise variance permitsNote: Number of building permits and construction values are subject to change
440total issued building permits
22agricultural
137commercial
194residential (single family)
39industrial
22multi-family
17 other
Q4 - 2016
414
27
105
233
14
17
10
8
9institutional
Q4 - 2017
17FOURTH QUARTER 2017
Q4 - 2
015
3,183
Q4 - 2
016
3,075
Q4 - 2
017
3,150
Number of Building Inspections
Issued Building PermitsValue of Issued Building Permits by Quarter(New Construction & Improvements)
other <1% ($305,000)
5 year: $59,233,747 10 year: $ 56,001,519
Q4 - 2016 totAL CoNStrUCtIoN VALUe $58,669,964
Q4 average construction values
Q4 - 2017 totAL CoNStrUCtIoN VALUe $141,888,311
7%($10,122,342)
26%($36,627,134)
44%($62,735,886)
14%($19,911,862)
1%($1,280,575)
agriculturalcommercial
residential (single family) multi-family industrial inst
itut
iona
l
8%($10,905,512)
14%($7,994,957)
10%($5,583,845)
38%($22,263,001)
1%($
773,
800)%14
($8,408,441)
agricultural commercial residential (single family) multi-family industrial
23%($13,609,420)
inst
itutio
nal
other <1% ($36,000)
18 Planning & Development Services
Issued residential Building PermitsSingle Family, townhouse & Apartment(New Construction & Improvements)
Single Family:Single family building permits added 105 new single family dwelling units in Q4 (this includes secondary suites and coach houses). The 5 year average is 306 dwelling units and the 10 year average is 296 dwellings units.
Townhouses: There were 8 new townhouse building permits issued in Q4 2017. With 655 townhouse units in-stream in development applications, staff expect an increase in permits in subsequent
quarters.The 5 year average is 126 units and the 10 year average is 117.
apartment:There were 243 new apartment building permits issued in this quarter. With 1,365 apartment units in-stream in development applications, staff expect an increase in permits in subsequent quarters. The 5 year average is 212 units; and, the 10 year average is 190 units.
Issued residential building permits includes all new construction and improvements of single family dwellings (includes secondary suites and coach houses), townhouses and apartments. Note that building permits are subject to change.
187
95 100134
87
257
240
80
131
499
164
334
470
205
236
395
204
758
0
100
200
300
400
500
600
700
800
5 yr avg 10 yr avg
2012 2013 2014 2015 2016 2017 YtD
Single Family (units)
2012 2013 2014 2015 2016 2017YtD
Townhouse (units)
2012 2013 2014 2015 2016 2017 YtD
apartment (units)
19FOURTH QUARTER 2017
Issued ICI & Agricultural Building PermitsInstitutional, Commercial, Industrial & Agricultural(New Construction & Improvements)
Institutional:There were 9 institutional permits issued in Q4 2017 for 624 m2
of improvements and new construction/floor space.
Commercial: In Q4 2017, 137 building permits were issued for 259 m2 of improvements and new construction/floor space.
Industrial:There were 39 permits issued for a total of 21,332 m2 floor space in Q4 2017.
agricultural:There were 22 building permits issued and 18,421 m2 of agricultural construction in Q4 2017. Two permits for new greenhouses and poultry barns on Townshipline Road and Columbia Street accounted for 74% of the floor space in permits issued and accounted for the large increase for the quarter
The types of construction permits issued included barns, greenhouses, and machine sheds. The 5 year average is 84,073 m2 and the 10 year average is 89,391 m2.
Issued institutional, commercial, industrial and agricultural building permits includes all new and improvement construction/floor space. Note that building permits are subject to change.
0
25,000
50,000
75,000
100,000
125,000
150,000
175,000
200,000
225,000
250,000
275,000
300,000 Agricultural (floor space)
5 yr avg 10 yr avg
94
,88
1 m
²1,
021,
295
ft²
55
,05
4 m
²59
2,59
8 ft²
48
,15
3 m
²51
8,32
1 ft²
11
1,5
52
m²
12
0,7
47
ft²1
10
,72
8 m
²1,
191,
873
ft²
2012 2013 2014 2015 2016 2017YtD
29
8,6
71
m²
3,21
4,89
0 ft²
0
50,000
100,000
5 yr avg 10 yr avg
13
,10
7 m
²14
1,02
7 ft²
7,5
27
m²
80,9
87 f
t²
11
,33
5 m
²12
1,96
6 ft²
30
,68
3 m
²33
0,14
4 ft²
67
,86
9 m
²73
0,26
8 ft²
11
8,9
28
m²
1,27
9,66
2 ft²
45
,40
2 m
²48
8,52
1 ft²
59
,55
8 m
²64
0,83
9 ft²
18
,54
0 m
²19
9,48
9 ft²
37
,43
6 m
²40
2,81
6 ft²
50
,72
4 m
²54
5,79
4 ft²
23
,09
7 m
²24
8,52
8 ft²
2012 2013 2014 2015 2016 2017YtD
Institutional (floor space)
2012 2013 2014 2015 2016
Commercial (floor space)
2012 2013 2014 2015 2016 2017YtD
Industrial (floor space)
2,7
74
m²
29,8
43 f
t²
43
,06
0 m
²46
3,32
4 ft²
2017YtD
34
,41
0 m
²37
0,25
5 ft²6,4
42
m²
69,3
11 f
t²
30
,20
6 m
²32
5,01
3 ft²
47
,71
3 m
²51
3,39
3 ft²
20 Planning & Development Services
Tow
nshi
p of
Lan
gley
Whatcom County, Washington USA
Highway No. 1
Highw
ay No. 11
F r a s
e r R i v
e r
District of Mission
Issued Building PermitsMap of Issued Building Permits by Quarter(New Construction)
Sumas Mountain
Westabbotsford
UDistrict
Bradner-Mt. Lehman
Matsqui Prairie
South Poplar
aberdeen
Townline
PeardonvilleIndustrial
FairfielHazelwood
Clayburn
Whatcom
Immel-McMillan
HistoricDowntown
CityCentre
Clearbrook
McKee
Sumas Way
10,726 m2
1,129 m2
1 SF
3,716 m2
1 SF
15 SF
1 SF
100 m2
2 SF
1 SF
1 SF
2,693 m2
South Clearbrook
1 SF
1 SF
1 SF
1 SF
7 SF2 SF
356 m2
1 SF
223 m2
715 m2
372 m2
1,928 m2
4 SF
1,519 m2
2,737 m2
116 aPT
45 aPT
3 SF
2 SF
559 m2
4,760 m2
247 m2
8 TH
1 SF
1 SF
2 SF2 SF
82 aPT
2 SF
2 SF
2 SF
178 m2
89 m2
2 SF
96 m2
247 m2
1,000 m2
21FOURTH QUARTER 2017
High
way
No.
1
Electoral Area G (FVRD)
City
of C
hilliw
ack
Building permit applications for new construction (with a construction value of $50,000 and greater) approved in the fourth quarter of 2017. Includes new single family dwellings (including secondary suites and coach houses), mixed use developments, agricultural, commercial, industrial, and institutional construction/floor space.
Excludes permits for tenant improvements, blasting, antenna, communication tower, signage, sprinklers, site services, swimming pools, retaining walls and noise variance.
Note: Symbols may have been moved for greater clarity and may not be in the exact location of the application.
Q4 2017 - Building Permit Type (units/floor space of newconstruction)
Agricultural (17,805 m2)
Single Family - SF (91 dwellings)
Townhouses - TH (8 units)
Apartments - APT (243 units)
Institutional (624 m2)
Commercial (0 m2)
Industrial (21,074 m2)
Urban Development Boundary (UDB)
Agricultural Land Reserve
Sumas Mountain
Sumas Prairie
Whatcom
McKee
3 SF
372 m2
1 SF25 SF
1 SF
356 m2
1 SF
1,561 m2
1 SF
8 TH
4,181 m2
22 Planning & Development Services
Current Initiatives
604-864-5510
http://www.abbotsford.ca/plan200K
Å
PLaN 200K is a city initiative to help bring to life Abbotsford’s new official Community Plan as the city grows towards 200,000 residents.
For the full list of plans, studies, and projects:
AgrefreshBuilding on the AgRefresh Stage 2 New Directions Report, for Fall 2017 AgRefresh focused on community and stakeholder engagement to gain feedback on more detailed policy and regulatory ideas being explored for the 11 key agricultural topics under review.
Fall engagement involved a range of initiatives to maximize feedback, including individual meetings, an Agricultural Industry Stakeholders and Community Partners Workshop, four community open house events distributed throughout the rural communities, and an online questionnaire reflecting the information presented at the open houses.
These initiatives provided an opportunity to review the ideas being explored, speak with staff, and provide an important local perspective to help shape policy going forward.
Photo: AgRefresh Open House November 27, 2017 - Bradner Hall
Next steps involve staff review of engagement feedback, analysis, preparation of draft recommendations for Council review, and a follow up with the community on the updated ideas.
For more information, visit: www.abbotsford.ca/agrefresh
23FOURTH QUARTER 2017
Historic Downtown Neighbourhood PlanOn December 18, 2017 a new concept for the Historic Downtown neighbourhood was presented to Council. The concept foundation is based on 4 groups of principles: trees and trails, shopping district, streets and movement, and people places. Within these groups are more specific statements about how the neighbourhood will grow and change in the future, describing everything from where to plant trees, how to highlight historic buildings, using streets for more than just vehicles, and creating plazas as places to attract people to the area. The concept is further described in maps that show how these principles ‘land’ on the ground in the neighbourhood, as shown below for parks and plazas.
Council supported the concept and directed staff to complete an additional round of community engagement with the concept and prepare a draft plan for the neighbourhood.
City Centre Neighbourhood PlanOn December 18, 2017 Council received a concept plan for the future growth and development of the City Centre neighbourhood. The foundation of the concept is based on 4 groups of principles: mix and match elements, connect people and places, green landscapes, redefine South Fraser Way. Within each group are more specific statements about the keys to the successful transformation of the neighbourhood into the heart of Abbotsford’s public, economic, and cultural life.
The concept represents one way of achieving the principles and provides direction regarding future land uses, street networks, parks and plazas, a new design for South Fraser Way, and more.
Council supported the concept and directed staff to move forward into Stage 3 of the plan process. This stage will involve testing the concept with infrastructure modeling and with the community through engagement activities. In addition, a density bonusing study will explore the possibility of a new program to incentivize higher density in the City Centre in exchange for certain amenities. This work will help create a draft plan which is anticipated to be ready by July 2018.
55HISTORIC DOWNTOWN NEIGHBOURHOOD PLAN
Figure 22. Parks, Plazas, and Pedestrian Connections
The engagement will include an online survey, stakeholder meetings and City Committee p r e s e n t a t i o n s . In addition, staff will complete an infrastructure analysis and servicing strategy to identify necessary upgrades and changes required for the plan to work. The draft plan is anticipated to be ready by July 2018.
Planning & Development Services
City of abbotsford32315 South Fraser Wayabbotsford, BC V2T 1W7604-853-2281www.abbotsford.ca