REQUEST FOR QUALIFICATIONS Outfall Expansion – Westside Regional Wastewater Treatment Plant File #: RQ17-378 Date of Issue: September 28th, 2017 Closing Location: By hand, mail or courier to:
Regional District of Central Okanagan Main Floor Reception 1450 KLO Road Kelowna, BC V1W 3Z4
Or email to: [email protected] Submission Date and Time: Proposals must be received prior to 3 pm Local Time October 19th, 2017 Proponent’s Meeting (non-mandatory): Date: October 11, 2017 Time: 10:00AM (Pacific Time) Location: Pebble Beach Park at the end of Whitworth Road in West Kelowna, BC Regional District Contact: All enquiries must be directed to: Andy Brennan Purchasing Manager 1450 KLO Road Kelowna, BC V1W 3Z4 Tel: 250-469-6170 Email: [email protected]
RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant
Page 2 of 7
TABLE OF CONTENTS
1.0 PURPOSE ............................................................................................. 3
2.0 SCOPE OF WORK .................................................................................... 3
3.0 ANTICIPATED SCHEDULE .......................................................................... 5
4.0 PROPONENT’S SITE MEETING ..................................................................... 5
5.0 ENQUIRIES ........................................................................................... 6
6.0 FINAL DATE AND TIME FOR RECEIPT OF SUBMISSIONS ....................................... 6
7.0 LATE SUBMISSIONS ................................................................................. 6
8.0 AMENDMENTS TO SUBMISSIONS .................................................................. 6
9.0 CONTACTS DURING THE RFQUAL PROCESS .................................................... 6
10.0 NO OBLIGATION TO PROCEED .................................................................... 6
11.0 EVALUATION COMMITTEE ......................................................................... 6
12.0 EVALUATION AND SELECTION .................................................................... 6
13.0 SUBMISSION REQUIREMENT........................................................................ 7 FOR PROPONENTS TO COMPLETE AND RETURN:
APPENDIX A – PROPONENT QUALIFICATION FORM (5 PAGES) ...................................... 8 DRAWINGS & SPECIFICATIONS (FOR INFORMATION ONLY):
EXHIBIT 1 – DESIGN DRAWINGS - OUTFALL EXPANSION WRWWTP ............................... 13
RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant
Page 3 of 7
1.0 PURPOSE The Regional District of Central Okanagan (the “Regional District”) has issued this Request for Qualifications (the “RFQual”) in order to establish a pre-qualified shortlist of proponents with the necessary experience and resources to perform the project outlined under the Scope of Work below. Only those proponents that complete a submission and pre-qualify will be eligible to submit a tender to the upcoming Invitation to Tender (the “ITT”) process that is anticipated to follow this RFQual.
2.0 SCOPE OF WORK The Scope of Work for the project is outlined below. Note: some minor changes to the Scope of Work may occur between the RFQual and eventual ITT process.
2.1 Background: the Westside Regional Wastewater Treatment Plant:
The Westside Regional Wastewater Treatment Plant (the “WRWWTP”) is located at 4261 Gellatly Rd South, West Kelowna, BC. The plant is owned and operated by the Regional District of Central Okanagan, and provides wastewater treatment processing for the City of West Kelowna, the District of Peachland, and Westbank First Nation Reserves #9 and #10. If you require further information on the WRWWTP you can find it at the following website: www.regionaldistrict.com/wastewater
Following treatment at the plant, effluent from the WRWWTP is discharged into Okanagan Lake through an existing 450mm diameter outfall pipe. Due to the growth of the service areas, the Regional District now plans to expand the outfall capacity from the WRWWTP by adding an additional outfall pipe, plus associated works. This work will be referred to as the “Outfall Expansion – WRWWTP” project.
2.2 Outfall Expansion – WRWWTP The Outfall Expansion – WRWWTP project includes the following work: a) Construction of a new 900mm diameter outfall pipe, to run alongside the
existing outfall pipe, from the WRWWTP out to Okanagan Lake. The overall length of the outfall will be approximately 790 metres, comprised of the following segments:
RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant
Page 4 of 7
i. Approximately 310 metres of 900mm diameter C900 DR51 PVC buried effluent outfall from the WRWWTP to the Okanagan Lake foreshore.
ii. Approximately 130 metres of 900mm diameter HDPE buried effluent outfall in the foreshore of Okanagan Lake, breaking out where slope of lakebed is optimal (approximately 5.0m depth). The method for this will be horizontal directional drilling.
iii. Approximately 270 metres of 900mm diameter HDPE submerged effluent outfall on the bottom of Okanagan Lake complete with concrete anchor weights.
iv. 600mm diameter HDPE diffuser section, 80 metres in length. Diffuser section includes concrete anchor weights.
b) All tie-ins and connections for the proposed 900mm outfall and reconnection of the existing 450mm outfall.
c) Construction of a valve chamber at the WRWWTP consisting of a cast-in-place concrete vault containing 450mm and 900mm valves.
d) Construction of a cast-in-place concrete sump connected to the existing UV building.
e) The WRWWTP will remain in operation during construction. Bypass pumping may be required and shut downs will be limited.
f) The foreshore of Okanagan Lake is Archaeological Site DkQv-39. The approach presented in the design is to directionally drill under the Archaeological Site and mitigate surface disturbances to the site.
i. The Regional District has been issued Alteration Permit 2017-0218 under the Heritage Conservation Act as a contingency against the preferred construction approach.
g) All site works including excavation, grading, drainage, asphalt paving and site restoration.
2.3 Place of the Work: The place of the work will be the WRWWTP located at 4261 Gellatly Rd S, West Kelowna, and the area between the WRWWTP and the Okanagan Lake foreshore.
2.4 Detailed Drawings: Detailed Drawings are attached to this RFQual as Exhibit 1. These drawings provide a detailed overview of the Outfall Expansion – WRWWTP project. The drawings will be amended and added to by the time the Invitation to Tender is issued for the Work, but should provide proponents with a detailed overview of the intended works
2.5 CCDC2: The Contractor will enter into a contract for the work with the Regional District using the Canadian Construction Documents Committee - CCDC2 – Stipulated Price Contract (2008), together with Regional District supplementary conditions.
2.6 Consultant: The Regional District has employed AECOM Canada Ltd to perform all design, contract administration and inspection services for this Work. AECOM will perform all duties of the “Consultant” between the Regional District and the Contractor, as defined under CCDC2.
RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant
Page 5 of 7
3.0 ANTICIPATED SCHEDULE The following activities and dates are anticipated by the Regional District and shall be considered by the proponents to this RFQual in the preparation of their submission.
Activity Date
Proponents Meeting: October 11th, 2017 – fixed date
Submission Date for this RFQual: October 19th, 2017 – fixed date
Invitation to Tender issued to pre-qualified Proponents:
October 24th, 2017 – anticipated date
Invitation to Tender Submission Date:
November 9th, 2017 – anticipated date
Notice of Contract Award Issued: November 24th, 2017 – anticipated date
In-Lake Work to be complete:
To be complete by April 1, 2018 - as per the Work Window under the Water Sustainability Act
Substantial Performance: Preference for all work to be Substantially Complete by May 30th, 2018
4.0 PROPONENT’S SITE MEETING A proponents Site Meeting will be held during the RFQual process in order to provide interested proponents with an on-site overview of the work, plus the opportunity to ask questions. The details of the meeting are stated on the front cover of this RFQual.
Interested proponents are strongly encouraged to attend this site meeting in order familiarize themselves with the Work. There will be no site meeting during the Invitation to Tender process, so this will be the only opportunity for proponents to attend the site with the Regional District and the team.
5.0 ENQUIRIES All enquiries related to this RFQual are to be directed, in writing, to the following person. Information obtained from any other source is not official and should not be relied upon. Enquiries and responses will be recorded and may be distributed to all proponents at the Regional District’s option.
Andy Brennan – Purchasing Manager Regional District of Central Okanagan 1450 KLO Road Kelowna, BC V1W 3Z4 Tel: 250-469-6170 Email: [email protected]
RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant
Page 6 of 7
6.0 FINAL DATE AND TIME FOR RECEIPT OF SUBMISSIONS Submissions in response to this RFQual must be submitted as follows:
• Envelope or email should be clearly labelled or titled “RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant RFQual”
• Submissions must be submitted either by email to [email protected] or by hand/mail/courier to Main Reception, Regional District of Central Okanagan, 1450 KLO Road, Kelowna, BC V1W 3Z4
• Submissions must be submitted before 3 PM Local Time on October 19th, 2017.
7.0 LATE SUBMISSIONS Late submissions will not be accepted and will be returned to the proponent unopened.
8.0 AMENDMENTS TO SUBMISSIONS A proponent may amend a submission by giving written notice, delivered to the Regional District Purchasing Manager by hand, mail, or email to: [email protected] at any time up until the closing date and time. Any amendment must be signed by an authorized signatory.
9.0 CONTACTS DURING THE RFQUAL PROCESS Only the Purchasing Manager for the Regional District of Central Okanagan (or designate) is the Regional District’s representative authorized to communicate and otherwise deal with proponents and all proponents must communicate and otherwise deal with that person only. Contact with any other Regional District representative, including Members of Council, officers or employees of the Regional District regarding this RFQual or a proponent’s submission may result in that submission being removed from consideration for this and any future competitions.
10.0 NO OBLIGATION TO PROCEED The receipt by the Regional District of any information (including any submissions, ideas, plans, drawings, models or other materials communicated or exhibited by any intended proponent, or on its behalf) shall not impose any obligations on the Regional District. Although the Regional District fully intends to follow this RFQual with an ITT process, there is no guarantee by the Regional District, its officers, employees or agents, that the process initiated by the issuance of this RFQual will continue, or that this RFQual process or any anticipated Invitation to Tender process will result in a contract with the Regional District.
11.0 EVALUATION COMMITTEE Evaluation of submissions will be by a committee formed by the Regional District and may include Regional District staff, plus the Contract Administrator (AECOM Canada Ltd.)
12.0 EVALUATION AND SELECTION Each proponent’s submission will be scored by the Evaluation Committee against the evaluation criteria listed below. Proponents scoring above the minimum score will be deemed qualified and thus will be invited to participate in the Invitation to Tender for the Work.
RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant
Page 7 of 7
Criteria Scoring Factors Minimum Score
(must be achieved to be qualified)
Ability & Experience of Proponent
• Ability to obtain bonding • Similar projects completed
over last 5 years • Value of largest projects
completed over last 5 years
50 out of 100
Past performance of Proponent
• Feedback from project references*
50 out of 100
Key Personnel Experience
• Project Manager experience • Site Superintendent
experience 50 out of 100
Evaluation of the above criteria will be based upon information provided by the proponent in Appendix A – Proponent Qualification Form, plus feedback from the project references provided by the proponent. By responding to this RFQual, proponents will be deemed to have agreed that the decision of the Evaluation Committee will be final and binding. It is the proponent’s responsibility to ensure that their submission addresses all evaluation criteria to receive full consideration. * The Regional District may contact references provided by proponents at the discretion of the Regional District. Any information obtained from references may be used by the Regional District in the evaluation.
13.0 SUBMISSION REQUIREMENT – APPENDIX A
Only one copy of the submission is required, whether submitting by email, or hand/mail/courier.
Submissions should include just the completed Appendix A (attached hereto). Proponents may attach further information if they wish, but this is not required.
RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form
Page 1
APPENDIX A – PROPONENT QUALIFICATION FORM
Instructions: Proponents should complete each and every section below and return this Appendix A – Proponent Qualification Form as part of their submission. This form is the only submission requirement. Proponents may attach further information if they wish, but this is not a requirement. 1. Proponent Details:
Please provide the following key details for the firm submitting the proposal to this Request for Qualifications: Full Legal Name of Proponent:
Any Other Relevant Name under Which the Proponent Carries on Business:
Street Address:
City, Province/State:
Postal Code:
Phone Number:
Company Website (If Any):
RFQual Contact Person and Title:
RFQual Contact Phone:
RFQual Contact Facsimile:
RFQual Contact E-mail:
2. Legal Structure of Proponent: Please complete the following details regarding the legal structure of your firm:
Year your firm was established:
Type of Company: Corporation: _____
Partnership: _____
Joint Venture: _____
Sole Proprietorship: _____
Names & Titles of Partners, Officers, Principals:
RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form
Page 2
3. Bonding: Please check the box ‘Yes’ or ‘No” for the following questions: Is your firm able to secure the following bonding* to guarantee your work on construction projects:
A 50% Performance Bond for construction contracts exceeding $1.5 million in value: Yes:____ No: _____
A 50% Labour and Material Payment Bond for construction contracts exceeding $1.5 million in value:
Yes:____ No: _____
*note: bonding must be by a surety licensed to carry on the business of suretyship in British Columbia
4. Key Personnel: Please provide details of the most experienced personnel in your employment, some of which you could draw from to fill key positions on this project:
Position Personnel In Your Firm: Number of Years’ Experience in Position:
Highest Value Construction Contract Worked on in position:
Project Managers:
Name: ___________________
$
Name: ___________________
$
Site Superintendents:
Name: ___________________
$
Name: ___________________
$
RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form
Page 3
5. Similar Projects Completed Over Last 5 Years – Details & References:
Please complete the table below, detailing 3 projects your firm has completed over the last 5 years which are the most similar in nature to this Outfall Expansion – WRWWTP project.
Project Title:
Description / Nature of Project:
Location: Total Contract Value: $
Owner Name: Date Completed:
Reference Contact Name: Phone: Email:
Any other comments:
Project Title:
Description / Nature of Project:
Location: Total Contract Value: $
Owner Name:
Date Completed:
Reference Contact Name:
Phone: Email:
Any other comments:
Project Title:
Description / Nature of Project:
Location: Total Contract Value: $
Owner Name: Date Completed:
Reference Contact Name: Phone: Email:
Any other comments:
RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form
Page 4
6. Highest Value Projects Completed Over Last 5 Years – Details & References: Please complete the table below, detailing the 3 highest value projects your firm has completed over the last 5 years. These should be projects and contract values that your firm contracted for and was responsible for performing.
Project Title:
Description / Nature of Project:
Location: Total Contract Value: $
Owner Name: Date Completed:
Reference Contact Name: Phone: Email:
Any other comments:
Project Title:
Description / Nature of Project:
Location: Total Contract Value: $
Owner Name:
Date Completed:
Reference Contact Name:
Phone: Email:
Any other comments:
Project Title:
Description / Nature of Project:
Location: Total Contract Value: $
Owner Name: Date Completed:
Reference Contact Name: Phone: Email:
Any other comments:
RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form
Page 5
7. Other Information (not part of RFQual Evaluation Scoring):
The following questions are to gain feedback from proponents in order to make improvements to the Invitation to Tender process and project plan. Answers to these questions will not be considered in the evaluation process.
Question: Proponent Answer:
a) Project Timeline: Assuming the contract for the Outfall Expansion – WRWWTP Project is awarded to the successful contractor before November 30th, 2017, do you believe that all in-lake and foreshore works can be completed before April 1, 2018 and substantial completion achieved before May 30, 2018?
b) For the part of the work to install 130 metres of 900mm diameter HDPE buried effluent outfall in the foreshore of Okanagan Lake, the current preferred method is horizontal directional drilling. Are horizontal directional drilling contractors available to complete the work in the timeline provided?
c) Is there any other feedback or comments you would like us to consider on this project?
END OF APPENDIX 1 – PROPONENT QUALIFICATION FORM
RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant Exhibit 1 – Design Drawings (for information only)
EXHIBIT 1 – DESIGN DRAWINGS – OUTFALL EXPANSION - WRWWTP
The following design drawings are contained in this Exhibit 1:
Drawing # Drawing Title
G-001 Cover Sheet
C-001 Civil Notes and Details
C-100 Plan Profile STA 0+000 to STA 0+330
C-101 Plan Profile STA 0+330 to STA 0+640
C-102 Plan Profile STA 0+640 to STA 0+789
S-001 Structural General Notes
S-002 Structural Standard Details
S-100 Valve Chamber and UV Sump
M-001 Mechanical Standard Details
M-100 Demolition Plan
M-101 Piping Details
PROJECT START DATE ( M / Y )
PROJECT NO.
FILENAME
SHEET NO.
DRAWING NO.
August 2016
60441342
Reg
iona
l Dis
tric
t of C
entr
al O
kana
gan
WES
TSID
E R
EGIO
NA
L W
AST
EWA
TER
TR
EATM
ENT
PLA
NT
Out
fall
Expa
nsio
n
60441342 - C-100 to C-102-JF-HDD.dwg
REV
DES
CR
IPTI
ON
CH
KD
RN
DAT
E ( Y
/M/D
)
VER
IFY
SCA
LE IF
PLA
N S
HEE
T IS
RED
UC
ED30
mm
DR
N B
Y:
DE
S B
Y:
CH
K B
Y:
AP
P B
Y:
SU
ITE
201
, 327
5 LA
KE
SHO
RE
RO
AD,
KE
LOW
NA
, B.C
. V1
W 3
S9T
250-
762-
3727
F
250
-762
-778
9W
WW
.AE
CO
M.C
OM
C-001
CIV
IL N
OTE
S A
ND
DET
AIL
S
RT JF JF MH
AIS
SUE
D F
OR
PR
ELI
MIN
ARY
DES
IGN
RT
SH
2016
/08/
09
BIS
SUE
D F
OR
PR
ELI
MIN
ARY
DES
IGN
RT
JF20
16/0
9/22
CIS
SU
ED
FO
R 7
0% D
ESIG
N R
EVIE
WC
SJF
2017
/03/
14
DIS
SU
ED
FO
R 9
0% D
ESIG
N R
EVIE
WC
SJF
2017
/05/
08
EIS
SUE
D F
OR
RE
QU
ES
T FO
R Q
UAL
IFIC
ATIO
NC
SJF
2017
/09/
27
GENERAL NOTES:
PEBBLE BEACH LANDSCAPING:
BYLANDS IRRIGATION PIPING:
3TRENCH DETAIL
1AIR RELEASE VALVE MANHOLE
2CHAIN LINK FENCE DETAIL
PROJECT START DATE ( M / Y )
PROJECT NO.
FILENAME
SHEET NO.
DRAWING NO.
August 2016
60441342
Reg
iona
l Dis
tric
t of C
entr
al O
kana
gan
WES
TSID
E R
EGIO
NA
L W
AST
EWA
TER
TR
EATM
ENT
PLA
NT
Out
fall
Expa
nsio
n
60441342 - C-100 to C-102-JF-HDD.dwg
REV
DES
CR
IPTI
ON
CH
KD
RN
DAT
E ( Y
/M/D
)
VER
IFY
SCA
LE IF
PLA
N S
HEE
T IS
RED
UC
ED30
mm
DR
N B
Y:
DE
S B
Y:
CH
K B
Y:
AP
P B
Y:
SU
ITE
201
, 327
5 LA
KE
SHO
RE
RO
AD,
KE
LOW
NA
, B.C
. V1
W 3
S9T
250-
762-
3727
F
250
-762
-778
9W
WW
.AE
CO
M.C
OM
PLAN
PROFILEC-100
PLA
N P
RO
FILE
STA
0+0
00 T
O S
TA 0
+330
RT JF JF MH
AIS
SUE
D F
OR
PR
ELI
MIN
ARY
DES
IGN
RT
SH
2016
/08/
09
BIS
SUE
D F
OR
PR
ELI
MIN
ARY
DES
IGN
RT
JF20
16/0
9/22
CIS
SU
ED
FO
R 7
0% D
ESIG
N R
EVIE
WC
SJF
2017
/03/
14
DIS
SU
ED
FO
R 9
0% D
ESIG
N R
EVIE
WC
SJF
2017
/05/
08
EIS
SUE
D F
OR
RE
QU
ES
T FO
R Q
UAL
IFIC
ATIO
NC
SJF
2017
/09/
27
SECTION A-A SECTION B-B STA 0+078 - 0+157
PROJECT START DATE ( M / Y )
PROJECT NO.
FILENAME
SHEET NO.
DRAWING NO.
August 2016
60441342
Reg
iona
l Dis
tric
t of C
entr
al O
kana
gan
WES
TSID
E R
EGIO
NA
L W
AST
EWA
TER
TR
EATM
ENT
PLA
NT
Out
fall
Expa
nsio
n
60441342 - C-100 to C-102-JF-HDD.dwg
REV
DES
CR
IPTI
ON
CH
KD
RN
DAT
E ( Y
/M/D
)
VER
IFY
SCA
LE IF
PLA
N S
HEE
T IS
RED
UC
ED30
mm
DR
N B
Y:
DE
S B
Y:
CH
K B
Y:
AP
P B
Y:
SU
ITE
201
, 327
5 LA
KE
SHO
RE
RO
AD,
KE
LOW
NA
, B.C
. V1
W 3
S9T
250-
762-
3727
F
250
-762
-778
9W
WW
.AE
CO
M.C
OM
PLAN
PROFILEC-101
PLA
N P
RO
FILE
STA
0+3
30 T
O S
TA 0
+640
RT JF JF MH
AIS
SUE
D F
OR
PR
ELI
MIN
ARY
DES
IGN
RT
SH
2016
/08/
09
BIS
SUE
D F
OR
PR
ELI
MIN
ARY
DES
IGN
RT
JF20
16/0
9/22
CIS
SU
ED
FO
R 7
0% D
ESIG
N R
EVIE
WC
SJF
2017
/03/
14
DIS
SU
ED
FO
R 9
0% D
ESIG
N R
EVIE
WC
SJF
2017
/05/
08
EIS
SUE
D F
OR
RE
QU
ES
T FO
R Q
UAL
IFIC
ATIO
NC
SJF
2017
/09/
27
PROJECT START DATE ( M / Y )
PROJECT NO.
FILENAME
SHEET NO.
DRAWING NO.
August 2016
60441342
Reg
iona
l Dis
tric
t of C
entr
al O
kana
gan
WES
TSID
E R
EGIO
NA
L W
AST
EWA
TER
TR
EATM
ENT
PLA
NT
Out
fall
Expa
nsio
n
60441342 - C-100 to C-102-JF-HDD.dwg
REV
DES
CR
IPTI
ON
CH
KD
RN
DAT
E ( Y
/M/D
)
VER
IFY
SCA
LE IF
PLA
N S
HEE
T IS
RED
UC
ED30
mm
DR
N B
Y:
DE
S B
Y:
CH
K B
Y:
AP
P B
Y:
SU
ITE
201
, 327
5 LA
KE
SHO
RE
RO
AD,
KE
LOW
NA
, B.C
. V1
W 3
S9T
250-
762-
3727
F
250
-762
-778
9W
WW
.AE
CO
M.C
OM
PLAN
PROFILEC-102
PLA
N P
RO
FILE
STA
0+6
40 T
O S
TA 0
+789
RT JF JF MH
AIS
SUE
D F
OR
PR
ELI
MIN
ARY
DES
IGN
RT
SH
2016
/08/
09
BIS
SUE
D F
OR
PR
ELI
MIN
ARY
DES
IGN
RT
JF20
16/0
9/22
CIS
SU
ED
FO
R 7
0% D
ESIG
N R
EVIE
WC
SJF
2017
/03/
14
DIS
SU
ED
FO
R 9
0% D
ESIG
N R
EVIE
WC
SJF
2017
/05/
08
EIS
SUE
D F
OR
RE
QU
ES
T FO
R Q
UAL
IFIC
ATIO
NC
SJF
2017
/09/
27
9600mm DIFFUSER WEIGHT DETAIL 10900mm ANCHOR WEIGHT DETAIL
11DIFFUSER PORT DETAIL 12END PORT DETAIL
13DIFFUSER SECTION DETAIL - STA 0+709 TO STA 0+789
EXCAVATION AND BACKFILL:
CONCRETE NOTES:
REINFORCEMENT NOTES:GENERAL NOTES:
S-001
STR
UC
TUR
AL
GEN
ERA
L N
OTE
S
CS
MW JF BdW
AIS
SU
ED
FO
R 7
0% D
ESIG
N R
EVIE
WC
SJF
2017
/03/
14
BIS
SU
ED
FO
R 9
0% D
ESIG
N R
EVIE
WC
SBd
W20
17/0
5/12
CIS
SUE
D F
OR
RE
QU
ES
T FO
R Q
UAL
IFIC
ATIO
NC
SJF
2017
/09/
27
PROJECT START DATE ( M / Y )
PROJECT NO.
FILENAME
SHEET NO.
DRAWING NO.
August 2016
60441342
Reg
iona
l Dis
tric
t of C
entr
al O
kana
gan
WES
TSID
E R
EGIO
NA
L W
AST
EWA
TER
TR
EATM
ENT
PLA
NT
Out
fall
Expa
nsio
n
60441342 S-001.dwg
REV
DES
CR
IPTI
ON
CH
KD
RN
DAT
E ( Y
/M/D
)
VER
IFY
SCA
LE IF
PLA
N S
HEE
T IS
RED
UC
ED30
mm
DR
N B
Y:
DE
S B
Y:
CH
K B
Y:
AP
P B
Y:
SU
ITE
201
, 327
5 LA
KE
SHO
RE
RO
AD,
KE
LOW
NA
, B.C
. V1
W 3
S9T
250-
762-
3727
F
250
-762
-778
9W
WW
.AE
CO
M.C
OM
ABBREVIATIONS
SYMBOLS
1SECTION
ADETAIL
1
STRUCTURAL & MISC. STEEL NOTES:
1ALUMINUM ACCESS HATCH DETAIL
10VERTICAL 316 S.S. LADDER DETAIL
2SECTION
5DETAIL
S-002
STR
UC
TUR
AL
STA
ND
AR
D D
ETA
ILS
CS
MN JF BdW
AIS
SU
ED
FO
R 7
0% D
ESIG
N R
EVIE
WC
SJF
2017
/03/
14
BIS
SU
ED
FO
R 9
0% D
ESIG
N R
EVIE
WC
SBd
W20
17/0
5/12
CIS
SUE
D F
OR
RE
QU
ES
T FO
R Q
UAL
IFIC
ATIO
NC
SJF
2017
/09/
27
PROJECT START DATE ( M / Y )
PROJECT NO.
FILENAME
SHEET NO.
DRAWING NO.
August 2016
60441342
Reg
iona
l Dis
tric
t of C
entr
al O
kana
gan
WES
TSID
E R
EGIO
NA
L W
AST
EWA
TER
TR
EATM
ENT
PLA
NT
Out
fall
Expa
nsio
n
60441342 S-002.dwg
REV
DES
CR
IPTI
ON
CH
KD
RN
DAT
E ( Y
/M/D
)
VER
IFY
SCA
LE IF
PLA
N S
HEE
T IS
RED
UC
ED30
mm
DR
N B
Y:
DE
S B
Y:
CH
K B
Y:
AP
P B
Y:
SU
ITE
201
, 327
5 LA
KE
SHO
RE
RO
AD,
KE
LOW
NA
, B.C
. V1
W 3
S9T
250-
762-
3727
F
250
-762
-778
9W
WW
.AE
CO
M.C
OM
2FABRICATED COVER PLATEAND FRAME DETAILS
4EXISTING WALLREBAR PROTECTION DETAIL
3FLUSH MOUNT HANDLE DETAIL
6TYP. SUMP DETAIL
7TYP. OPENING DETAIL 8TYP. OPENING DETAIL 9TYP. HOIST HOOK DETAIL
SECTION 1
1
VALVE CHAMBER
A
UV SUMP
2
SECTION A
S-100
OU
TFLO
W T
WIN
NIN
GVA
LVE
CH
AM
BER
AN
D U
V SU
MP
CS JF JF BdW
AIS
SU
ED
FO
R 7
0% D
ESIG
N R
EVIE
WC
SBd
W20
17/0
3/14
BIS
SU
ED
FO
R 9
0% D
ESIG
N R
EVIE
WC
SBd
W20
17/0
5/12
CIS
SUE
D F
OR
RE
QU
ES
T FO
R Q
UAL
IFIC
ATIO
NC
SJF
2017
/09/
27
PROJECT START DATE ( M / Y )
PROJECT NO.
FILENAME
SHEET NO.
DRAWING NO.
August 2016
60441342
Reg
iona
l Dis
tric
t of C
entr
al O
kana
gan
WES
TSID
E R
EGIO
NA
L W
AST
EWA
TER
TR
EATM
ENT
PLA
NT
Out
fall
Expa
nsio
n
60441342 - S-100 A.dwg
REV
DES
CR
IPTI
ON
CH
KD
RN
DAT
E ( Y
/M/D
)
VER
IFY
SCA
LE IF
PLA
N S
HEE
T IS
RED
UC
ED30
mm
DR
N B
Y:
DE
S B
Y:
CH
K B
Y:
AP
P B
Y:
SU
ITE
201
, 327
5 LA
KE
SHO
RE
RO
AD,
KE
LOW
NA
, B.C
. V1
W 3
S9T
250-
762-
3727
F
250
-762
-778
9W
WW
.AE
CO
M.C
OM
M-100
PRO
CES
S M
ECH
AN
ICA
LPI
PIN
G D
ETA
ILS
DEM
OLI
TIO
N P
LAN
CS JF JF BdW
AIS
SU
ED
FO
R 7
0% D
ESIG
N R
EVIE
WC
SBd
W20
17/0
3/14
BIS
SU
ED
FO
R 9
0% D
ESIG
N R
EVIE
WC
SBd
W20
17/0
5/12
CIS
SUE
D F
OR
RE
QU
ES
T FO
R Q
UAL
IFIC
ATIO
NC
SJF
2017
/09/
27
PLAN PROJECT START DATE ( M / Y )
PROJECT NO.
FILENAME
SHEET NO.
DRAWING NO.
August 2016
60441342
Reg
iona
l Dis
tric
t of C
entr
al O
kana
gan
WES
TSID
E R
EGIO
NA
L W
AST
EWA
TER
TR
EATM
ENT
PLA
NT
Out
fall
Expa
nsio
n
60441342-M-100 A.dwg
REV
DES
CR
IPTI
ON
CH
KD
RN
DAT
E ( Y
/M/D
)
VER
IFY
SCA
LE IF
PLA
N S
HEE
T IS
RED
UC
ED30
mm
DR
N B
Y:
DE
S B
Y:
CH
K B
Y:
AP
P B
Y:
SU
ITE
201
, 327
5 LA
KE
SHO
RE
RO
AD,
KE
LOW
NA
, B.C
. V1
W 3
S9T
250-
762-
3727
F
250
-762
-778
9W
WW
.AE
CO
M.C
OM
OUTFALLCHAMBERTF-4504
PUMP INLETBASIN
EXISTING UVBUILDING
WASTE OILVAULT
SUBGRADEOUTFALLCHAMBER
·
·
(STAGE 2)
(STAGE 1)
(STAGE 1)(STAGE 1)
(STAGE 1)
(STAGE 1)
(STAGE 1)
(STAGE 2)
(STAGE 2)
(STAGE 2)
M-101
PRO
CES
S M
ECH
AN
ICA
LPI
PIN
G D
ETA
ILS
CS JF JF BdW
AIS
SU
ED
FO
R 7
0% D
ESIG
N R
EVIE
WC
SBd
W20
17/0
3/14
BIS
SU
ED
FO
R 9
0% D
ESIG
N R
EVIE
WC
SBd
W20
17/0
5/12
CIS
SUE
D F
OR
RE
QU
ES
T FO
R Q
UAL
IFIC
ATIO
NC
SJF
2017
/09/
27
A-A
SECTION A-A
PLAN
PROJECT START DATE ( M / Y )
PROJECT NO.
FILENAME
SHEET NO.
DRAWING NO.
August 2016
60441342
Reg
iona
l Dis
tric
t of C
entr
al O
kana
gan
WES
TSID
E R
EGIO
NA
L W
AST
EWA
TER
TR
EATM
ENT
PLA
NT
Out
fall
Expa
nsio
n
60441342-M-101 A.dwg
REV
DES
CR
IPTI
ON
CH
KD
RN
DAT
E ( Y
/M/D
)
VER
IFY
SCA
LE IF
PLA
N S
HEE
T IS
RED
UC
ED30
mm
DR
N B
Y:
DE
S B
Y:
CH
K B
Y:
AP
P B
Y:
SU
ITE
201
, 327
5 LA
KE
SHO
RE
RO
AD,
KE
LOW
NA
, B.C
. V1
W 3
S9T
250-
762-
3727
F
250
-762
-778
9W
WW
.AE
CO
M.C
OM
OUTFALLCHAMBERTF-4504
EXISTINGPUMP INLETBASIN
EXISTINGPUMP INLETBASIN
EXISTING UVBUILDING
EXISTING UVBUILDING
EXISTINGWASTE OILVAULT
UV SUMP
UV SUMP