REQUEST FOR QUALIFICATIONS Outfall Expansion – Westside Regional Wastewater Treatment Plant File #: RQ17-378 Date of Issue: September 28 th , 2017 Closing Location: By hand, mail or courier to: Regional District of Central Okanagan Main Floor Reception 1450 KLO Road Kelowna, BC V1W 3Z4 Or email to: [email protected] Submission Date and Time: Proposals must be received prior to 3 pm Local Time October 19 th , 2017 Proponent’s Meeting (non-mandatory): Date: October 11, 2017 Time: 10:00AM (Pacific Time) Location: Pebble Beach Park at the end of Whitworth Road in West Kelowna, BC Regional District Contact: All enquiries must be directed to: Andy Brennan Purchasing Manager 1450 KLO Road Kelowna, BC V1W 3Z4 Tel: 250-469-6170 Email: [email protected]

REQUEST FOR QUALIFICATIONS...Request for Qualifications (the “RFQual”) in order to establish a pre-qualified shortlist of proponents with the necessary experience and resources

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

REQUEST FOR QUALIFICATIONS Outfall Expansion – Westside Regional Wastewater Treatment Plant File #: RQ17-378 Date of Issue: September 28th, 2017 Closing Location: By hand, mail or courier to:

Regional District of Central Okanagan Main Floor Reception 1450 KLO Road Kelowna, BC V1W 3Z4

Or email to: [email protected] Submission Date and Time: Proposals must be received prior to 3 pm Local Time October 19th, 2017 Proponent’s Meeting (non-mandatory): Date: October 11, 2017 Time: 10:00AM (Pacific Time) Location: Pebble Beach Park at the end of Whitworth Road in West Kelowna, BC Regional District Contact: All enquiries must be directed to: Andy Brennan Purchasing Manager 1450 KLO Road Kelowna, BC V1W 3Z4 Tel: 250-469-6170 Email: [email protected]

RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant

Page 2 of 7

TABLE OF CONTENTS

1.0 PURPOSE ............................................................................................. 3

2.0 SCOPE OF WORK .................................................................................... 3

3.0 ANTICIPATED SCHEDULE .......................................................................... 5

4.0 PROPONENT’S SITE MEETING ..................................................................... 5

5.0 ENQUIRIES ........................................................................................... 6

6.0 FINAL DATE AND TIME FOR RECEIPT OF SUBMISSIONS ....................................... 6

7.0 LATE SUBMISSIONS ................................................................................. 6

8.0 AMENDMENTS TO SUBMISSIONS .................................................................. 6

9.0 CONTACTS DURING THE RFQUAL PROCESS .................................................... 6

10.0 NO OBLIGATION TO PROCEED .................................................................... 6

11.0 EVALUATION COMMITTEE ......................................................................... 6

12.0 EVALUATION AND SELECTION .................................................................... 6

13.0 SUBMISSION REQUIREMENT........................................................................ 7 FOR PROPONENTS TO COMPLETE AND RETURN:

APPENDIX A – PROPONENT QUALIFICATION FORM (5 PAGES) ...................................... 8 DRAWINGS & SPECIFICATIONS (FOR INFORMATION ONLY):

EXHIBIT 1 – DESIGN DRAWINGS - OUTFALL EXPANSION WRWWTP ............................... 13

RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant

Page 3 of 7

1.0 PURPOSE The Regional District of Central Okanagan (the “Regional District”) has issued this Request for Qualifications (the “RFQual”) in order to establish a pre-qualified shortlist of proponents with the necessary experience and resources to perform the project outlined under the Scope of Work below. Only those proponents that complete a submission and pre-qualify will be eligible to submit a tender to the upcoming Invitation to Tender (the “ITT”) process that is anticipated to follow this RFQual.

2.0 SCOPE OF WORK The Scope of Work for the project is outlined below. Note: some minor changes to the Scope of Work may occur between the RFQual and eventual ITT process.

2.1 Background: the Westside Regional Wastewater Treatment Plant:

The Westside Regional Wastewater Treatment Plant (the “WRWWTP”) is located at 4261 Gellatly Rd South, West Kelowna, BC. The plant is owned and operated by the Regional District of Central Okanagan, and provides wastewater treatment processing for the City of West Kelowna, the District of Peachland, and Westbank First Nation Reserves #9 and #10. If you require further information on the WRWWTP you can find it at the following website: www.regionaldistrict.com/wastewater

Following treatment at the plant, effluent from the WRWWTP is discharged into Okanagan Lake through an existing 450mm diameter outfall pipe. Due to the growth of the service areas, the Regional District now plans to expand the outfall capacity from the WRWWTP by adding an additional outfall pipe, plus associated works. This work will be referred to as the “Outfall Expansion – WRWWTP” project.

2.2 Outfall Expansion – WRWWTP The Outfall Expansion – WRWWTP project includes the following work: a) Construction of a new 900mm diameter outfall pipe, to run alongside the

existing outfall pipe, from the WRWWTP out to Okanagan Lake. The overall length of the outfall will be approximately 790 metres, comprised of the following segments:

RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant

Page 4 of 7

i. Approximately 310 metres of 900mm diameter C900 DR51 PVC buried effluent outfall from the WRWWTP to the Okanagan Lake foreshore.

ii. Approximately 130 metres of 900mm diameter HDPE buried effluent outfall in the foreshore of Okanagan Lake, breaking out where slope of lakebed is optimal (approximately 5.0m depth). The method for this will be horizontal directional drilling.

iii. Approximately 270 metres of 900mm diameter HDPE submerged effluent outfall on the bottom of Okanagan Lake complete with concrete anchor weights.

iv. 600mm diameter HDPE diffuser section, 80 metres in length. Diffuser section includes concrete anchor weights.

b) All tie-ins and connections for the proposed 900mm outfall and reconnection of the existing 450mm outfall.

c) Construction of a valve chamber at the WRWWTP consisting of a cast-in-place concrete vault containing 450mm and 900mm valves.

d) Construction of a cast-in-place concrete sump connected to the existing UV building.

e) The WRWWTP will remain in operation during construction. Bypass pumping may be required and shut downs will be limited.

f) The foreshore of Okanagan Lake is Archaeological Site DkQv-39. The approach presented in the design is to directionally drill under the Archaeological Site and mitigate surface disturbances to the site.

i. The Regional District has been issued Alteration Permit 2017-0218 under the Heritage Conservation Act as a contingency against the preferred construction approach.

g) All site works including excavation, grading, drainage, asphalt paving and site restoration.

2.3 Place of the Work: The place of the work will be the WRWWTP located at 4261 Gellatly Rd S, West Kelowna, and the area between the WRWWTP and the Okanagan Lake foreshore.

2.4 Detailed Drawings: Detailed Drawings are attached to this RFQual as Exhibit 1. These drawings provide a detailed overview of the Outfall Expansion – WRWWTP project. The drawings will be amended and added to by the time the Invitation to Tender is issued for the Work, but should provide proponents with a detailed overview of the intended works

2.5 CCDC2: The Contractor will enter into a contract for the work with the Regional District using the Canadian Construction Documents Committee - CCDC2 – Stipulated Price Contract (2008), together with Regional District supplementary conditions.

2.6 Consultant: The Regional District has employed AECOM Canada Ltd to perform all design, contract administration and inspection services for this Work. AECOM will perform all duties of the “Consultant” between the Regional District and the Contractor, as defined under CCDC2.

RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant

Page 5 of 7

3.0 ANTICIPATED SCHEDULE The following activities and dates are anticipated by the Regional District and shall be considered by the proponents to this RFQual in the preparation of their submission.

Activity Date

Proponents Meeting: October 11th, 2017 – fixed date

Submission Date for this RFQual: October 19th, 2017 – fixed date

Invitation to Tender issued to pre-qualified Proponents:

October 24th, 2017 – anticipated date

Invitation to Tender Submission Date:

November 9th, 2017 – anticipated date

Notice of Contract Award Issued: November 24th, 2017 – anticipated date

In-Lake Work to be complete:

To be complete by April 1, 2018 - as per the Work Window under the Water Sustainability Act

Substantial Performance: Preference for all work to be Substantially Complete by May 30th, 2018

4.0 PROPONENT’S SITE MEETING A proponents Site Meeting will be held during the RFQual process in order to provide interested proponents with an on-site overview of the work, plus the opportunity to ask questions. The details of the meeting are stated on the front cover of this RFQual.

Interested proponents are strongly encouraged to attend this site meeting in order familiarize themselves with the Work. There will be no site meeting during the Invitation to Tender process, so this will be the only opportunity for proponents to attend the site with the Regional District and the team.

5.0 ENQUIRIES All enquiries related to this RFQual are to be directed, in writing, to the following person. Information obtained from any other source is not official and should not be relied upon. Enquiries and responses will be recorded and may be distributed to all proponents at the Regional District’s option.

Andy Brennan – Purchasing Manager Regional District of Central Okanagan 1450 KLO Road Kelowna, BC V1W 3Z4 Tel: 250-469-6170 Email: [email protected]

RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant

Page 6 of 7

6.0 FINAL DATE AND TIME FOR RECEIPT OF SUBMISSIONS Submissions in response to this RFQual must be submitted as follows:

• Envelope or email should be clearly labelled or titled “RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant RFQual”

• Submissions must be submitted either by email to [email protected] or by hand/mail/courier to Main Reception, Regional District of Central Okanagan, 1450 KLO Road, Kelowna, BC V1W 3Z4

• Submissions must be submitted before 3 PM Local Time on October 19th, 2017.

7.0 LATE SUBMISSIONS Late submissions will not be accepted and will be returned to the proponent unopened.

8.0 AMENDMENTS TO SUBMISSIONS A proponent may amend a submission by giving written notice, delivered to the Regional District Purchasing Manager by hand, mail, or email to: [email protected] at any time up until the closing date and time. Any amendment must be signed by an authorized signatory.

9.0 CONTACTS DURING THE RFQUAL PROCESS Only the Purchasing Manager for the Regional District of Central Okanagan (or designate) is the Regional District’s representative authorized to communicate and otherwise deal with proponents and all proponents must communicate and otherwise deal with that person only. Contact with any other Regional District representative, including Members of Council, officers or employees of the Regional District regarding this RFQual or a proponent’s submission may result in that submission being removed from consideration for this and any future competitions.

10.0 NO OBLIGATION TO PROCEED The receipt by the Regional District of any information (including any submissions, ideas, plans, drawings, models or other materials communicated or exhibited by any intended proponent, or on its behalf) shall not impose any obligations on the Regional District. Although the Regional District fully intends to follow this RFQual with an ITT process, there is no guarantee by the Regional District, its officers, employees or agents, that the process initiated by the issuance of this RFQual will continue, or that this RFQual process or any anticipated Invitation to Tender process will result in a contract with the Regional District.

11.0 EVALUATION COMMITTEE Evaluation of submissions will be by a committee formed by the Regional District and may include Regional District staff, plus the Contract Administrator (AECOM Canada Ltd.)

12.0 EVALUATION AND SELECTION Each proponent’s submission will be scored by the Evaluation Committee against the evaluation criteria listed below. Proponents scoring above the minimum score will be deemed qualified and thus will be invited to participate in the Invitation to Tender for the Work.

RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant

Page 7 of 7

Criteria Scoring Factors Minimum Score

(must be achieved to be qualified)

Ability & Experience of Proponent

• Ability to obtain bonding • Similar projects completed

over last 5 years • Value of largest projects

completed over last 5 years

50 out of 100

Past performance of Proponent

• Feedback from project references*

50 out of 100

Key Personnel Experience

• Project Manager experience • Site Superintendent

experience 50 out of 100

Evaluation of the above criteria will be based upon information provided by the proponent in Appendix A – Proponent Qualification Form, plus feedback from the project references provided by the proponent. By responding to this RFQual, proponents will be deemed to have agreed that the decision of the Evaluation Committee will be final and binding. It is the proponent’s responsibility to ensure that their submission addresses all evaluation criteria to receive full consideration. * The Regional District may contact references provided by proponents at the discretion of the Regional District. Any information obtained from references may be used by the Regional District in the evaluation.

13.0 SUBMISSION REQUIREMENT – APPENDIX A

Only one copy of the submission is required, whether submitting by email, or hand/mail/courier.

Submissions should include just the completed Appendix A (attached hereto). Proponents may attach further information if they wish, but this is not required.

RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form

Page 1

APPENDIX A – PROPONENT QUALIFICATION FORM

Instructions: Proponents should complete each and every section below and return this Appendix A – Proponent Qualification Form as part of their submission. This form is the only submission requirement. Proponents may attach further information if they wish, but this is not a requirement. 1. Proponent Details:

Please provide the following key details for the firm submitting the proposal to this Request for Qualifications: Full Legal Name of Proponent:

Any Other Relevant Name under Which the Proponent Carries on Business:

Street Address:

City, Province/State:

Postal Code:

Phone Number:

Company Website (If Any):

RFQual Contact Person and Title:

RFQual Contact Phone:

RFQual Contact Facsimile:

RFQual Contact E-mail:

2. Legal Structure of Proponent: Please complete the following details regarding the legal structure of your firm:

Year your firm was established:

Type of Company: Corporation: _____

Partnership: _____

Joint Venture: _____

Sole Proprietorship: _____

Names & Titles of Partners, Officers, Principals:

RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form

Page 2

3. Bonding: Please check the box ‘Yes’ or ‘No” for the following questions: Is your firm able to secure the following bonding* to guarantee your work on construction projects:

A 50% Performance Bond for construction contracts exceeding $1.5 million in value: Yes:____ No: _____

A 50% Labour and Material Payment Bond for construction contracts exceeding $1.5 million in value:

Yes:____ No: _____

*note: bonding must be by a surety licensed to carry on the business of suretyship in British Columbia

4. Key Personnel: Please provide details of the most experienced personnel in your employment, some of which you could draw from to fill key positions on this project:

Position Personnel In Your Firm: Number of Years’ Experience in Position:

Highest Value Construction Contract Worked on in position:

Project Managers:

Name: ___________________

$

Name: ___________________

$

Site Superintendents:

Name: ___________________

$

Name: ___________________

$

RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form

Page 3

5. Similar Projects Completed Over Last 5 Years – Details & References:

Please complete the table below, detailing 3 projects your firm has completed over the last 5 years which are the most similar in nature to this Outfall Expansion – WRWWTP project.

Project Title:

Description / Nature of Project:

Location: Total Contract Value: $

Owner Name: Date Completed:

Reference Contact Name: Phone: Email:

Any other comments:

Project Title:

Description / Nature of Project:

Location: Total Contract Value: $

Owner Name:

Date Completed:

Reference Contact Name:

Phone: Email:

Any other comments:

Project Title:

Description / Nature of Project:

Location: Total Contract Value: $

Owner Name: Date Completed:

Reference Contact Name: Phone: Email:

Any other comments:

RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form

Page 4

6. Highest Value Projects Completed Over Last 5 Years – Details & References: Please complete the table below, detailing the 3 highest value projects your firm has completed over the last 5 years. These should be projects and contract values that your firm contracted for and was responsible for performing.

Project Title:

Description / Nature of Project:

Location: Total Contract Value: $

Owner Name: Date Completed:

Reference Contact Name: Phone: Email:

Any other comments:

Project Title:

Description / Nature of Project:

Location: Total Contract Value: $

Owner Name:

Date Completed:

Reference Contact Name:

Phone: Email:

Any other comments:

Project Title:

Description / Nature of Project:

Location: Total Contract Value: $

Owner Name: Date Completed:

Reference Contact Name: Phone: Email:

Any other comments:

RQ17-378 PROPONENT NAME: __________________ Outfall Expansion – Westside Regional Wastewater Treatment Plant Appendix A – Proponent Qualification Form

Page 5

7. Other Information (not part of RFQual Evaluation Scoring):

The following questions are to gain feedback from proponents in order to make improvements to the Invitation to Tender process and project plan. Answers to these questions will not be considered in the evaluation process.

Question: Proponent Answer:

a) Project Timeline: Assuming the contract for the Outfall Expansion – WRWWTP Project is awarded to the successful contractor before November 30th, 2017, do you believe that all in-lake and foreshore works can be completed before April 1, 2018 and substantial completion achieved before May 30, 2018?

b) For the part of the work to install 130 metres of 900mm diameter HDPE buried effluent outfall in the foreshore of Okanagan Lake, the current preferred method is horizontal directional drilling. Are horizontal directional drilling contractors available to complete the work in the timeline provided?

c) Is there any other feedback or comments you would like us to consider on this project?

END OF APPENDIX 1 – PROPONENT QUALIFICATION FORM

RQ17-378 Outfall Expansion – Westside Regional Wastewater Treatment Plant Exhibit 1 – Design Drawings (for information only)

EXHIBIT 1 – DESIGN DRAWINGS – OUTFALL EXPANSION - WRWWTP

The following design drawings are contained in this Exhibit 1:

Drawing # Drawing Title

G-001 Cover Sheet

C-001 Civil Notes and Details

C-100 Plan Profile STA 0+000 to STA 0+330

C-101 Plan Profile STA 0+330 to STA 0+640

C-102 Plan Profile STA 0+640 to STA 0+789

S-001 Structural General Notes

S-002 Structural Standard Details

S-100 Valve Chamber and UV Sump

M-001 Mechanical Standard Details

M-100 Demolition Plan

M-101 Piping Details

PROJECT START DATE ( M / Y )

PROJECT NO.

FILENAME

SHEET NO.

DRAWING NO.

August 2016

60441342

Reg

iona

l Dis

tric

t of C

entr

al O

kana

gan

WES

TSID

E R

EGIO

NA

L W

AST

EWA

TER

TR

EATM

ENT

PLA

NT

Out

fall

Expa

nsio

n

60441342 - C-100 to C-102-JF-HDD.dwg

REV

DES

CR

IPTI

ON

CH

KD

RN

DAT

E ( Y

/M/D

)

VER

IFY

SCA

LE IF

PLA

N S

HEE

T IS

RED

UC

ED30

mm

DR

N B

Y:

DE

S B

Y:

CH

K B

Y:

AP

P B

Y:

SU

ITE

201

, 327

5 LA

KE

SHO

RE

RO

AD,

KE

LOW

NA

, B.C

. V1

W 3

S9T

250-

762-

3727

F

250

-762

-778

9W

WW

.AE

CO

M.C

OM

C-001

CIV

IL N

OTE

S A

ND

DET

AIL

S

RT JF JF MH

AIS

SUE

D F

OR

PR

ELI

MIN

ARY

DES

IGN

RT

SH

2016

/08/

09

BIS

SUE

D F

OR

PR

ELI

MIN

ARY

DES

IGN

RT

JF20

16/0

9/22

CIS

SU

ED

FO

R 7

0% D

ESIG

N R

EVIE

WC

SJF

2017

/03/

14

DIS

SU

ED

FO

R 9

0% D

ESIG

N R

EVIE

WC

SJF

2017

/05/

08

EIS

SUE

D F

OR

RE

QU

ES

T FO

R Q

UAL

IFIC

ATIO

NC

SJF

2017

/09/

27

GENERAL NOTES:

PEBBLE BEACH LANDSCAPING:

BYLANDS IRRIGATION PIPING:

3TRENCH DETAIL

1AIR RELEASE VALVE MANHOLE

2CHAIN LINK FENCE DETAIL

PROJECT START DATE ( M / Y )

PROJECT NO.

FILENAME

SHEET NO.

DRAWING NO.

August 2016

60441342

Reg

iona

l Dis

tric

t of C

entr

al O

kana

gan

WES

TSID

E R

EGIO

NA

L W

AST

EWA

TER

TR

EATM

ENT

PLA

NT

Out

fall

Expa

nsio

n

60441342 - C-100 to C-102-JF-HDD.dwg

REV

DES

CR

IPTI

ON

CH

KD

RN

DAT

E ( Y

/M/D

)

VER

IFY

SCA

LE IF

PLA

N S

HEE

T IS

RED

UC

ED30

mm

DR

N B

Y:

DE

S B

Y:

CH

K B

Y:

AP

P B

Y:

SU

ITE

201

, 327

5 LA

KE

SHO

RE

RO

AD,

KE

LOW

NA

, B.C

. V1

W 3

S9T

250-

762-

3727

F

250

-762

-778

9W

WW

.AE

CO

M.C

OM

PLAN

PROFILEC-100

PLA

N P

RO

FILE

STA

0+0

00 T

O S

TA 0

+330

RT JF JF MH

AIS

SUE

D F

OR

PR

ELI

MIN

ARY

DES

IGN

RT

SH

2016

/08/

09

BIS

SUE

D F

OR

PR

ELI

MIN

ARY

DES

IGN

RT

JF20

16/0

9/22

CIS

SU

ED

FO

R 7

0% D

ESIG

N R

EVIE

WC

SJF

2017

/03/

14

DIS

SU

ED

FO

R 9

0% D

ESIG

N R

EVIE

WC

SJF

2017

/05/

08

EIS

SUE

D F

OR

RE

QU

ES

T FO

R Q

UAL

IFIC

ATIO

NC

SJF

2017

/09/

27

SECTION A-A SECTION B-B STA 0+078 - 0+157

PROJECT START DATE ( M / Y )

PROJECT NO.

FILENAME

SHEET NO.

DRAWING NO.

August 2016

60441342

Reg

iona

l Dis

tric

t of C

entr

al O

kana

gan

WES

TSID

E R

EGIO

NA

L W

AST

EWA

TER

TR

EATM

ENT

PLA

NT

Out

fall

Expa

nsio

n

60441342 - C-100 to C-102-JF-HDD.dwg

REV

DES

CR

IPTI

ON

CH

KD

RN

DAT

E ( Y

/M/D

)

VER

IFY

SCA

LE IF

PLA

N S

HEE

T IS

RED

UC

ED30

mm

DR

N B

Y:

DE

S B

Y:

CH

K B

Y:

AP

P B

Y:

SU

ITE

201

, 327

5 LA

KE

SHO

RE

RO

AD,

KE

LOW

NA

, B.C

. V1

W 3

S9T

250-

762-

3727

F

250

-762

-778

9W

WW

.AE

CO

M.C

OM

PLAN

PROFILEC-101

PLA

N P

RO

FILE

STA

0+3

30 T

O S

TA 0

+640

RT JF JF MH

AIS

SUE

D F

OR

PR

ELI

MIN

ARY

DES

IGN

RT

SH

2016

/08/

09

BIS

SUE

D F

OR

PR

ELI

MIN

ARY

DES

IGN

RT

JF20

16/0

9/22

CIS

SU

ED

FO

R 7

0% D

ESIG

N R

EVIE

WC

SJF

2017

/03/

14

DIS

SU

ED

FO

R 9

0% D

ESIG

N R

EVIE

WC

SJF

2017

/05/

08

EIS

SUE

D F

OR

RE

QU

ES

T FO

R Q

UAL

IFIC

ATIO

NC

SJF

2017

/09/

27

PROJECT START DATE ( M / Y )

PROJECT NO.

FILENAME

SHEET NO.

DRAWING NO.

August 2016

60441342

Reg

iona

l Dis

tric

t of C

entr

al O

kana

gan

WES

TSID

E R

EGIO

NA

L W

AST

EWA

TER

TR

EATM

ENT

PLA

NT

Out

fall

Expa

nsio

n

60441342 - C-100 to C-102-JF-HDD.dwg

REV

DES

CR

IPTI

ON

CH

KD

RN

DAT

E ( Y

/M/D

)

VER

IFY

SCA

LE IF

PLA

N S

HEE

T IS

RED

UC

ED30

mm

DR

N B

Y:

DE

S B

Y:

CH

K B

Y:

AP

P B

Y:

SU

ITE

201

, 327

5 LA

KE

SHO

RE

RO

AD,

KE

LOW

NA

, B.C

. V1

W 3

S9T

250-

762-

3727

F

250

-762

-778

9W

WW

.AE

CO

M.C

OM

PLAN

PROFILEC-102

PLA

N P

RO

FILE

STA

0+6

40 T

O S

TA 0

+789

RT JF JF MH

AIS

SUE

D F

OR

PR

ELI

MIN

ARY

DES

IGN

RT

SH

2016

/08/

09

BIS

SUE

D F

OR

PR

ELI

MIN

ARY

DES

IGN

RT

JF20

16/0

9/22

CIS

SU

ED

FO

R 7

0% D

ESIG

N R

EVIE

WC

SJF

2017

/03/

14

DIS

SU

ED

FO

R 9

0% D

ESIG

N R

EVIE

WC

SJF

2017

/05/

08

EIS

SUE

D F

OR

RE

QU

ES

T FO

R Q

UAL

IFIC

ATIO

NC

SJF

2017

/09/

27

9600mm DIFFUSER WEIGHT DETAIL 10900mm ANCHOR WEIGHT DETAIL

11DIFFUSER PORT DETAIL 12END PORT DETAIL

13DIFFUSER SECTION DETAIL - STA 0+709 TO STA 0+789

EXCAVATION AND BACKFILL:

CONCRETE NOTES:

REINFORCEMENT NOTES:GENERAL NOTES:

S-001

STR

UC

TUR

AL

GEN

ERA

L N

OTE

S

CS

MW JF BdW

AIS

SU

ED

FO

R 7

0% D

ESIG

N R

EVIE

WC

SJF

2017

/03/

14

BIS

SU

ED

FO

R 9

0% D

ESIG

N R

EVIE

WC

SBd

W20

17/0

5/12

CIS

SUE

D F

OR

RE

QU

ES

T FO

R Q

UAL

IFIC

ATIO

NC

SJF

2017

/09/

27

PROJECT START DATE ( M / Y )

PROJECT NO.

FILENAME

SHEET NO.

DRAWING NO.

August 2016

60441342

Reg

iona

l Dis

tric

t of C

entr

al O

kana

gan

WES

TSID

E R

EGIO

NA

L W

AST

EWA

TER

TR

EATM

ENT

PLA

NT

Out

fall

Expa

nsio

n

60441342 S-001.dwg

REV

DES

CR

IPTI

ON

CH

KD

RN

DAT

E ( Y

/M/D

)

VER

IFY

SCA

LE IF

PLA

N S

HEE

T IS

RED

UC

ED30

mm

DR

N B

Y:

DE

S B

Y:

CH

K B

Y:

AP

P B

Y:

SU

ITE

201

, 327

5 LA

KE

SHO

RE

RO

AD,

KE

LOW

NA

, B.C

. V1

W 3

S9T

250-

762-

3727

F

250

-762

-778

9W

WW

.AE

CO

M.C

OM

ABBREVIATIONS

SYMBOLS

1SECTION

ADETAIL

1

STRUCTURAL & MISC. STEEL NOTES:

1ALUMINUM ACCESS HATCH DETAIL

10VERTICAL 316 S.S. LADDER DETAIL

2SECTION

5DETAIL

S-002

STR

UC

TUR

AL

STA

ND

AR

D D

ETA

ILS

CS

MN JF BdW

AIS

SU

ED

FO

R 7

0% D

ESIG

N R

EVIE

WC

SJF

2017

/03/

14

BIS

SU

ED

FO

R 9

0% D

ESIG

N R

EVIE

WC

SBd

W20

17/0

5/12

CIS

SUE

D F

OR

RE

QU

ES

T FO

R Q

UAL

IFIC

ATIO

NC

SJF

2017

/09/

27

PROJECT START DATE ( M / Y )

PROJECT NO.

FILENAME

SHEET NO.

DRAWING NO.

August 2016

60441342

Reg

iona

l Dis

tric

t of C

entr

al O

kana

gan

WES

TSID

E R

EGIO

NA

L W

AST

EWA

TER

TR

EATM

ENT

PLA

NT

Out

fall

Expa

nsio

n

60441342 S-002.dwg

REV

DES

CR

IPTI

ON

CH

KD

RN

DAT

E ( Y

/M/D

)

VER

IFY

SCA

LE IF

PLA

N S

HEE

T IS

RED

UC

ED30

mm

DR

N B

Y:

DE

S B

Y:

CH

K B

Y:

AP

P B

Y:

SU

ITE

201

, 327

5 LA

KE

SHO

RE

RO

AD,

KE

LOW

NA

, B.C

. V1

W 3

S9T

250-

762-

3727

F

250

-762

-778

9W

WW

.AE

CO

M.C

OM

2FABRICATED COVER PLATEAND FRAME DETAILS

4EXISTING WALLREBAR PROTECTION DETAIL

3FLUSH MOUNT HANDLE DETAIL

6TYP. SUMP DETAIL

7TYP. OPENING DETAIL 8TYP. OPENING DETAIL 9TYP. HOIST HOOK DETAIL

SECTION 1

1

VALVE CHAMBER

A

UV SUMP

2

SECTION A

S-100

OU

TFLO

W T

WIN

NIN

GVA

LVE

CH

AM

BER

AN

D U

V SU

MP

CS JF JF BdW

AIS

SU

ED

FO

R 7

0% D

ESIG

N R

EVIE

WC

SBd

W20

17/0

3/14

BIS

SU

ED

FO

R 9

0% D

ESIG

N R

EVIE

WC

SBd

W20

17/0

5/12

CIS

SUE

D F

OR

RE

QU

ES

T FO

R Q

UAL

IFIC

ATIO

NC

SJF

2017

/09/

27

PROJECT START DATE ( M / Y )

PROJECT NO.

FILENAME

SHEET NO.

DRAWING NO.

August 2016

60441342

Reg

iona

l Dis

tric

t of C

entr

al O

kana

gan

WES

TSID

E R

EGIO

NA

L W

AST

EWA

TER

TR

EATM

ENT

PLA

NT

Out

fall

Expa

nsio

n

60441342 - S-100 A.dwg

REV

DES

CR

IPTI

ON

CH

KD

RN

DAT

E ( Y

/M/D

)

VER

IFY

SCA

LE IF

PLA

N S

HEE

T IS

RED

UC

ED30

mm

DR

N B

Y:

DE

S B

Y:

CH

K B

Y:

AP

P B

Y:

SU

ITE

201

, 327

5 LA

KE

SHO

RE

RO

AD,

KE

LOW

NA

, B.C

. V1

W 3

S9T

250-

762-

3727

F

250

-762

-778

9W

WW

.AE

CO

M.C

OM

M-100

PRO

CES

S M

ECH

AN

ICA

LPI

PIN

G D

ETA

ILS

DEM

OLI

TIO

N P

LAN

CS JF JF BdW

AIS

SU

ED

FO

R 7

0% D

ESIG

N R

EVIE

WC

SBd

W20

17/0

3/14

BIS

SU

ED

FO

R 9

0% D

ESIG

N R

EVIE

WC

SBd

W20

17/0

5/12

CIS

SUE

D F

OR

RE

QU

ES

T FO

R Q

UAL

IFIC

ATIO

NC

SJF

2017

/09/

27

PLAN PROJECT START DATE ( M / Y )

PROJECT NO.

FILENAME

SHEET NO.

DRAWING NO.

August 2016

60441342

Reg

iona

l Dis

tric

t of C

entr

al O

kana

gan

WES

TSID

E R

EGIO

NA

L W

AST

EWA

TER

TR

EATM

ENT

PLA

NT

Out

fall

Expa

nsio

n

60441342-M-100 A.dwg

REV

DES

CR

IPTI

ON

CH

KD

RN

DAT

E ( Y

/M/D

)

VER

IFY

SCA

LE IF

PLA

N S

HEE

T IS

RED

UC

ED30

mm

DR

N B

Y:

DE

S B

Y:

CH

K B

Y:

AP

P B

Y:

SU

ITE

201

, 327

5 LA

KE

SHO

RE

RO

AD,

KE

LOW

NA

, B.C

. V1

W 3

S9T

250-

762-

3727

F

250

-762

-778

9W

WW

.AE

CO

M.C

OM

OUTFALLCHAMBERTF-4504

PUMP INLETBASIN

EXISTING UVBUILDING

WASTE OILVAULT

SUBGRADEOUTFALLCHAMBER

·

·

(STAGE 2)

(STAGE 1)

(STAGE 1)(STAGE 1)

(STAGE 1)

(STAGE 1)

(STAGE 1)

(STAGE 2)

(STAGE 2)

(STAGE 2)

M-101

PRO

CES

S M

ECH

AN

ICA

LPI

PIN

G D

ETA

ILS

CS JF JF BdW

AIS

SU

ED

FO

R 7

0% D

ESIG

N R

EVIE

WC

SBd

W20

17/0

3/14

BIS

SU

ED

FO

R 9

0% D

ESIG

N R

EVIE

WC

SBd

W20

17/0

5/12

CIS

SUE

D F

OR

RE

QU

ES

T FO

R Q

UAL

IFIC

ATIO

NC

SJF

2017

/09/

27

A-A

SECTION A-A

PLAN

PROJECT START DATE ( M / Y )

PROJECT NO.

FILENAME

SHEET NO.

DRAWING NO.

August 2016

60441342

Reg

iona

l Dis

tric

t of C

entr

al O

kana

gan

WES

TSID

E R

EGIO

NA

L W

AST

EWA

TER

TR

EATM

ENT

PLA

NT

Out

fall

Expa

nsio

n

60441342-M-101 A.dwg

REV

DES

CR

IPTI

ON

CH

KD

RN

DAT

E ( Y

/M/D

)

VER

IFY

SCA

LE IF

PLA

N S

HEE

T IS

RED

UC

ED30

mm

DR

N B

Y:

DE

S B

Y:

CH

K B

Y:

AP

P B

Y:

SU

ITE

201

, 327

5 LA

KE

SHO

RE

RO

AD,

KE

LOW

NA

, B.C

. V1

W 3

S9T

250-

762-

3727

F

250

-762

-778

9W

WW

.AE

CO

M.C

OM

OUTFALLCHAMBERTF-4504

EXISTINGPUMP INLETBASIN

EXISTINGPUMP INLETBASIN

EXISTING UVBUILDING

EXISTING UVBUILDING

EXISTINGWASTE OILVAULT

UV SUMP

UV SUMP