REVISED PERT-CPM DIAGRAM BAR CHART S-CURVE 1 1 N LF ES L E G E N D: CRITICAL PATH ACTIVITY DUMMY EVENT NO. - N EARLY START - ES LATE FINISH - LF REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG MARCOS HIGHWAY (PHASE II) (DUE TO TIME EXTENSION NO. 1) REPUBLIC OF THE PHILIPPINES NATIONAL CAPITAL REGION DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 2ND STREET, PORT AREA MANILA CONSTRUCTION DIVISION PROJECT AND LOCATION: BRIDGE - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG MARCOS HIGHWAY (PHASE II) SHEET CONTENTS: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED: SHEET No.: CEFERINO A. LONDINA AUTHORIZED MANAGING OFFICER EDGARDO S. RAMOS ENGINEER III PROJECT ENGINEER III EDWIN M. LUZON CHIEF, CONSTRUCTION DIVISION ADOR G. CANLAS, CESO IV REGIONAL DIRECTOR SUBMITTED BY: JUBY B. CORDON, CEO ASSISTANT REGIONAL DIRECTOR REVISED PERT - CPM 1 2 2 S 0 0 4 70 70 6 116116 3 39 39 10 222222 11 232232 7 162191 1 2 2 2 9 9 5 100100 9 191 191 14 240 240 8 177191 13 237240 12 232240

REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM ...storage.googleapis.com/request-attachments...REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR

  • Upload
    others

  • View
    26

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM ...storage.googleapis.com/request-attachments...REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR

REVISED PERT-CPM DIAGRAM

BAR CHART

S-CURVE

1

1

N

LFES

L E G E N D:

CRITICAL PATH

ACTIVITY

DUMMY

EVENT NO. - N

EARLY START - ES

LATE FINISH - LF

REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM

BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG MARCOS HIGHWAY (PHASE II)

(DUE TO TIME EXTENSION NO. 1)

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

2ND STREET, PORT AREA MANILA

CONSTRUCTION DIVISION

PROJECT AND LOCATION:

BRIDGE - REHABILITATION/MAJOR REPAIR OF

PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ)

ALONG MARCOS HIGHWAY (PHASE II)

SHEET CONTENTS:PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED:

SHEET No.:

CEFERINO A. LONDINA

AUTHORIZED MANAGING OFFICER

EDGARDO S. RAMOS

ENGINEER III

PROJECT ENGINEER III

EDWIN M. LUZON

CHIEF, CONSTRUCTION DIVISION

ADOR G. CANLAS, CESO IV

REGIONAL DIRECTOR

SUBMITTED BY:

JUBY B. CORDON, CEO

ASSISTANT REGIONAL DIRECTOR

REVISED PERT - CPM

1

2 2

S

0 0

4

70 70

6

116116

3

39 39

10

222222

11

232232

7

162191

1

2 2

2

9 9

5

100100

9

191191

14

240240

8

177191

13

237240

12

232240