    (Results-Framework Document)

    f

    R F D

  • 7/29/2019 rfd_2012_13

    2/19

    f

    Section 1:Vision, Mission, Objectives and Functions

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy-(2012-2013)

    To upscale and mainstream the use of New and Renewable Energy sources in furtherance of the national aim of energysecurity and energy independence

    Mission

    Develop, demonstrate and commercialize technologies for harnessing new and renewable energy sources in close

    concert with corporate, scientific and technical institutions.

    Replace use of different fossil fuels wherever possible, and increase access to electricity/ lighting in remote and rural

    areas, through Renewable Energy Systems

    Increase the contribution of Renewable Energy in the total energy mix of the country to 6 per cent by 2022, with about 10

    per cent contribution to total electricity mix, in line with IEPR projections.

    Objective

    1 To promote deployment of grid-interactive renewable power generation projects to augment contribution of renewables in

    total electricity mix;

    Vision

  • 7/29/2019 rfd_2012_13

    3/19

    Section 1:Vision, Mission, Objectives and Functions

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy-(2012-2013)

    Human Resource Development in the new and renewable energy sector.4

    Making available necessary fiscal and financial incentives to domestic industry, developers/ investors and users for development/

    deployment of: -Grid interactive / Off-grid renewable power systems to supplement fossil fuels based electricity generation -Standalone

    RE systems/ devices and services to supplement energy needs of cooking, lighting & motive power in rural areas -RE systems and

    services for urban, industrial & commercial applications

    5

    Fostering international cooperation in new and renewable energy sector6

    Information, Publicity, Public Awareness creation in the Renewable Energy (RE) sector.7

  • 7/29/2019 rfd_2012_13

    4/19

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    To promote deployment of grid-interactiverenewable power generation projects toaugment contribution of renewables in totalelectricity mix;

    27.00 Solar power plantscommissioned (includingJNNSM)

    800 MW 720 560 4806408004.00[1] [1.1] [1.1.1]

    Projects sanctioned /auctioned under JNNSM

    100 MW 90 70 60801002.00[1.2] [1.2.1]

    Projects commissionedunder JNNSM

    400 MW 360 280 2403204002.00[1.3] [1.3.1]

    Bio power (Biomass powerand Cogeneration)

    465 MW 418.50 325.50 2793724654.00[1.4] [1.4.1]

    Small Hydro Power (SHP) 350 MW 315 245 2102803506.00[1.5] [1.5.1]

    Wind power 2500 MW 2250 1750 1500200025007.00[1.6] [1.6.1]

    Urban Waste to Energy 40 MW 36 28 2432402.00[1.7] [1.7.1]

    To promote renewable energy initiatives formeeting energy needs in rural areas

    21.00 Installation of Family typeBiogas Plants- No. of plants installed*(subject to additionalbudget allocation,otherwise 1.25 lakh)

    1.50 No. inlakh

    1.35 1.05 0.901.201.504.00[2] [2.1] [2.1.1]

    Installation of BiomassGasifiers for Village energysupply (subject to additionalbudget allocation,otherwise 25 villages)

    50 No. ofvillages 45 35 3040504.00[2.2] [2.2.1]

    Decentralised SPV systems/ Devices

    30 MW 27 21 1824304.00[2.3] [2.3.1]

    Watermills 500 Nos. 450 350 3004005001.50[2.4] [2.4.1]

    Micro Hydel 2000 kW 1800 1400 1200160020001.50[2.5] [2.5.1]

    page : 4 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    5/19

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    Aero generators 350 kW 315 245 2102803501.00[2.6] [2.6.1]

    Wind + SPV hybrid systems 15 No. 13 11 912152.00[2.7] [2.7.1]

    Improved cookstoves 150000 No. 135000 105000 900001200001500001.00[2.8] [2.8.1]

    Capacity added through offgrid wind / hybrid powermicro hydel / bio power /SPV in rural areas

    32.50 MW 29.25 22.75 19.502632.502.01[2.9] [2.9.1]

    To promote renewable energy initiatives tosupplement energy needs in urban areas

    4.00 Installation of SolarThermal systems in urbanhouseholds/ buildings -totalCollectors Area installed

    6.50 Lakhsquaremeter

    5.85 4.55 3.905.206.504.00[3] [3.1] [3.1.1]

    To promote renewable energy initiatives tosupplement energy needs in industry andcommercial establishments

    7.00 Industrial Waste-to energy 20 MWeq 18 14 1216201.75[4] [4.1] [4.1.1]

    Rice husk based powergeneration in Rice Mills andother Industries

    50 Nos 45 35 3040502.33[4.2] [4.2.1]

    Biomass basedcogeneration in otherindustries excluding

    Bagasse

    60 MWeq 54 42 3648602.92[4.3] [4.3.1]

    To promote research, design anddevelopment activities at premier nationalinstitutions and industries on differentaspects of new and renewable energy(NRE) technologies.

    11.00 New R&D projects in : solarphotovoltaic, solar thermal,Bio energy, NewTechnologies

    20 No 18 14 1216204.00[5] [5.1] [5.1.1]

    Percentage of ongoing /new R&D projects meetingthe pre agreed milestones

    40 % 35 25 2030402.00[5.2] [5.2.1]

    Number of new / ongoingcollaborations

    2 No. 2 1 1121.00[5.3] [5.3.1]

    page : 5 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    6/19

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    with leading internationalinstitutions

    Number of new / ongoingcollaborations with privatesector

    4 No. 3 1 1241.00[5.4] [5.4.1]

    Number of newtechnologies / productsdeployed

    4 No. 3 2 1241.00[5.5] [5.5.1]

    3 promising Researchprojects on which theMinistry is working

    (i) 1 MW solar thermalpower projects at SEC(ii) 250 kW gasificationbased power generation(iii) New design ofcommunity cookstove

    3 No. 3 2 1232.00[5.6] [5.6.1]

    New initiatives and management actions 6.00 Number of SPV lightingsystems financed by banksin rural areas

    1 No. ofsystemin lakh

    0.9 0.7 0.60.812.00[6] [6.1] [6.1.1]

    Implementation of LadakhPlan- SPV power plants in 60villages- 1000 Solar thermal waterheating systems- 1000 solar green houses

    100 %progress

    90 70 60801001.00[6.2] [6.2.1]

    Promoting concept ofGreen Campus /Neighbourhoods

    10 No. ofcampuses

    9 7 68103.00[6.3] [6.3.1]

    Development of resource base 4.00 Reassessment of windpotential and follow-up onthe Laurence Berkley report

    40% completion % 36 28 2432401.00[7] [7.1] [7.1.1]

    Reassess the renewablepower potential andundertake thereassessment on

    Start of activitiy in 4areas

    No 4 2 2341.00[7.2] [7.2.1]

    page : 6 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    7/19

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    Eff ic ient Functioning of the RFD System 3.00 Timely submiss ion of Draft forApproval

    On-time submission Date 06/03/2012 08/03/2012 09/03/201207/03/201205/03/20122.0*

    Timely submission of Results On- time submission Date 03/05/2012 05/05/2012 06/05/201204/05/201201/05/20121.0

    Administrative Reforms 6.00 Implement mitigating strategiesfor reducing potential risk ofcorruption

    % of implementation % 95 85 80901002.0*

    Implement ISO 9001 as per theapproved action plan

    Area of operations covered % 95 85 80901002.0

    * Mandatory Objective(s)

    continuous basis

    Reassessment of efficiencyof power generation

    Terchnologywisestatus in 4 areas

    No 4 2 2341.00[7.3] [7.3.1]

    Prepare a draft policy onOffshore wind power andtake it to COS

    1 year 90 70 60801001.00[7.4] [7.4.1]

    Clean Energy projects 2.00 Amount of clean energyprojects posed to MoF

    500 Rs.incrores

    450 350 3004005002.00[8] [8.1] [8.1.1]

    Increasing indigenization 1.00 Percentage of solar PV

    installed capacity withindian module

    30% % 25 15 1020301.00[9] [9.1] [9.1.1]

    Monitoring Systems for installed projects 2.00 System for monitoring andevaluation of project on asample basis on acontinuous basis for off-gridsystems

    To put system inplace

    -- 80 50 50601001.50[10] [10.1] [10.1.1]

    Development of web/SMSbased feedback system forcapturing the performanceof off-grid systems fromvarious stake holder (NGOs/ Public)

    To develop andoperationalise thesystem

    -- 80 50 50601000.50[10.2] [10.2.1]

    page : 7 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    8/19

    Section 2:Inter se Priorities among Key Objectives, Success indicators and Targets

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Objective Weight Action Unit

    Target / Criteria Value

    Weight

    80%100% 70% 60%90%

    Very Good Fair PoorExcellent GoodSuccess

    Indicator

    Identify, design and implementmajor innovations

    Implementation of identifiedinnovations

    Date 06/03/2013 08/03/2013 09/03/201307/03/201305/03/20132.0

    Improving Internal Efficiency /responsiveness / service delivery of Ministry/ Department

    4.00 Implementat ion of Sevottam Independent Audit o fImplementation of CitizensCharter

    % 95 85 80901002.0*

    Independent Audit ofimplementation of publicgrievance redressal system

    % 95 85 80901002.0

    Ensuring compliance to the FinancialAccountability Framework

    2.00 Timely submission of ATNs onAudit paras of C&AG

    Percentage of ATNssubmitted within due date (4

    months) from date ofpresentation of Report toParliament by CAG duringthe year.

    % 90 70 60801000.5*

    Timely submission of ATRs tothe PAC Sectt. on PAC Reports.

    Percentage of ATRSsubmitted within due date (6 months) from date ofpresentation of Report toParliament by PAC duringthe year.

    % 90 70 60801000.5

    Early disposal of pending ATNson Audit Paras of C&AG Reportspresented to Parliament before31.3.2012.

    Percentage of outstandingATNs disposed off duringthe year.

    % 90 70 60801000.5

    Early disposal of pending ATRson PAC Reports presented toParliament before 31.3.2012

    Percentage of outstandingATRS disposed off duringthe year.

    % 90 70 60801000.5

    * Mandatory Objective(s)

    page : 8 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    9/19

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Target Value ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 10/11

    Unit

    FY 12/13FY 11/12 FY 13/14

    Actual Value Actual Value

    FY 14/15

    0 800MW800To promote deployment of grid-interactive renewable powergeneration projects to augmentcontribution of renewables in totalelectricity mix;

    Solar power plantscommissioned (includingJNNSM)

    1200 15004[1] [1.1] [1.1.1]

    -- 90MW100Projects sanctioned /auctioned under JNNSM

    -- ----[1.2] [1.2.1]

    -- 360MW400Projects commissionedunder JNNSM

    -- ----[1.3] [1.3.1]

    444.23 475MW465Bio power (Biomasspower and Cogeneration)

    500 525483[1.4] [1.4.1]

    248.93 350MW350Small Hydro Power(SHP)

    375 400300[1.5] [1.5.1]

    1485 2500MW2500Wind power 2750 30002500[1.6] [1.6.1]

    -- 36MW40Urban Waste to Energy -- ----[1.7] [1.7.1]

    1.51 1.25No. in lakh1.50To promote renewable energyinitiatives for meeting energy needs inrural areas

    Installation of Family typeBiogas Plants- No. of plants installed*(subject to additional

    budget allocation,otherwise 1.25 lakh)

    1.25 1.50--[2] [2.1] [2.1.1]

    30 25No. ofvillages

    50Installation of BiomassGasifiers for Villageenergy supply (subject toadditional budgetallocation, otherwise 25villages)

    35 50--[2.2] [2.2.1]

    -- 30MW30Decentralised SPVsystems / Devices

    35 40--[2.3] [2.3.1]

    page : 9 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    10/19

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Target Value ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 10/11

    Unit

    FY 12/13FY 11/12 FY 13/14

    Actual Value Actual Value

    FY 14/15

    500 500Nos.500Watermills 550 600--[2.4] [2.4.1]

    -- 2000kW2000Micro Hydel 2200 2500--[2.5] [2.5.1]

    75 350kW350Aero generators 400 400--[2.6] [2.6.1]

    -- 13No.15Wind + SPV hybridsystems

    15 15--[2.7] [2.7.1]

    1500 150000No.150000Improved cookstoves 175000 200000--[2.8] [2.8.1]

    -- 32.50MW32.50Capacity added through

    off grid wind / hybridpower micro hydel / biopower / SPV in ruralareas

    35 40--[2.9] [2.9.1]

    -- 6Lakhsquaremeter

    6.50To promote renewable energyinitiatives to supplement energyneeds in urban areas

    Installation of SolarThermal systems inurban households/buildings -total CollectorsArea installed

    6.25 6.50--[3] [3.1] [3.1.1]

    -- 20MWeq20To promote renewable energyinitiatives to supplement energyneeds in industry and commercialestablishments

    Industrial Waste-toenergy

    25 30--[4] [4.1] [4.1.1]

    -- 50Nos50Rice husk based powergeneration in Rice Millsand other Industries

    50 55--[4.2] [4.2.1]

    -- 60MWeq60Biomass basedcogeneration in otherindustries excludingBagasse

    65 75--[4.3] [4.3.1]

    -- 20No20To promote research, design anddevelopment activities at premiernational institutions and industries ondifferent aspects of new andrenewable

    New R&D projects in :solar photovoltaic, solarthermal, Bio energy, NewTechnologies

    20 20--[5] [5.1] [5.1.1]

    page : 10 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    11/19

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Target Value ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 10/11

    Unit

    FY 12/13FY 11/12 FY 13/14

    Actual Value Actual Value

    FY 14/15

    energy (NRE) technologies.

    -- 40%40Percentage of ongoing /new R&D projectsmeeting the pre agreedmilestones

    50 55--[5.2] [5.2.1]

    -- 2No.2Number of new / ongoingcollaborations withleading internationalinstitutions

    -- ----[5.3] [5.3.1]

    -- 4No.4Number of new / ongoingcollaborations withprivate sector

    4 4--[5.4] [5.4.1]

    -- 4No.4Number of newtechnologies / productsdeployed

    5 5--[5.5] [5.5.1]

    -- 3No.33 promising Researchprojects on which theMinistry is working(i) 1 MW solar thermalpower projects at SEC(ii) 250 kW gasificationbased power generation(iii) New design of

    community cookstove

    3 3--[5.6] [5.6.1]

    -- 1No. ofsystem inlakh

    1New initiatives and managementactions

    Number of SPV lightingsystems financed bybanks in rural areas

    2 2--[6] [6.1] [6.1.1]

    -- 100%progress

    100Implementation ofLadakh Plan- SPV power plants in 60villages- 1000 Solar thermalwater heating

    -- ----[6.2] [6.2.1]

    page : 11 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    12/19

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Target Value ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 10/11

    Unit

    FY 12/13FY 11/12 FY 13/14

    Actual Value Actual Value

    FY 14/15

    systems- 1000 solar greenhouses

    -- 10No. ofcampuses

    10Promoting concept ofGreen Campus /Neighbourhoods

    10 10--[6.3] [6.3.1]

    -- 40%40% completionDevelopment of resource base Reassessment of windpotential and follow-upon the Laurence Berkleyreport

    60 80--[7] [7.1] [7.1.1]

    -- 4NoStart of activitiy in 4

    areas

    Reassess the renewable

    power potential andundertake thereassessment oncontinuous basis

    -- ----[7.2] [7.2.1]

    -- 4NoTerchnologywisestatus in 4 areas

    Reassessment ofefficiency of powergeneration

    -- ----[7.3] [7.3.1]

    -- 1year1Prepare a draft policy onOffshore wind power andtake it to COS

    -- ----[7.4] [7.4.1]

    -- 450Rs.incrores

    500Clean Energy projects Amount of clean energyprojects posed to MoF

    500 500--[8] [8.1] [8.1.1]

    -- 30%30%Increasing indigenization Percentage of solar PVinstalled capacity withindian module

    40 50--[9] [9.1] [9.1.1]

    -- 80--To put system in placeMonitoring Systems for installedprojects

    System for monitoringand evaluation of projecton a sample basis on acontinuous basis for off-grid systems

    -- ----[10] [10.1] [10.1.1]

    -- 80--To develop andoperationalise thesystem

    Development ofweb/SMS basedfeedback system for

    -- ----[10.2] [10.2.1]

    page : 12 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    13/19

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Target Value ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 10/11

    Unit

    FY 12/13FY 11/12 FY 13/14

    Actual Value Actual Value

    FY 14/15

    -- 06/03/2012DateOn-time submissionEfficient Functioning of the RFDSystem

    Timely submission of Draft forApproval

    -- ----*

    -- 03/05/2012DateOn- time submissionTimely submission of Results -- ----

    -- 95%% of implementationAdministrative Reforms Implement m itigating strategies

    for reducing potential risk ofcorruption

    -- ----*

    -- 95%Area of operations coveredImplement ISO 9001 as perthe approved action plan

    -- ----

    -- 06/03/2013DateImplementation of identifiedinnovations

    Identify, design and implementmajor innovations

    -- ----

    -- 95%Independent Audit ofImplementation of CitizensCharter

    Improving Internal Efficiency /responsiveness / service delivery ofMinistry / Department

    Implementation of Sevottam -- ----*

    -- 95%Independent Audit ofimplementation of publicgrievance redressal system

    -- ----

    -- 90%Percentage of ATNssubmitted within due date (4months) from date ofpresentation of Report toParliament by CAG during theyear.

    Ensuring compliance to the FinancialAccountability Framework

    Timely submission of ATNs onAudit paras of C&AG

    -- ----*

    -- 90%Percentage of ATRSsubmitted within due date ( 6months) from date ofpresentation of Report toParliament by

    Timely submission of ATRs tothe PAC Sectt. on PACReports.

    -- ----

    * Mandatory Objective(s)

    capturing theperformance of off-gridsystems from variousstake holder (NGOs /Public)

    page : 13 of 19 Generated on : 18/04/2012

  • 7/29/2019 rfd_2012_13

    14/19

    Section 3:Trend Values of the Success Indicators

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Target Value ProjectedValue for

    Objective ProjectedValue for

    Action Success Indicator

    FY 10/11

    Unit

    FY 12/13FY 11/12 FY 13/14

    Actual Value Actual Value

    FY 14/15

    PAC during the year.

    -- 90%Percentage of outstandingATNs disposed off during theyear.

    Early disposal of pendingATNs on Audit Paras of C&AGReports presented toParliament before 31.3.2012.

    -- ----

    -- 90%Percentage of outstandingATRS disposed off during theyear.

    Early disposal of pendingATRs on PAC Reportspresented to Parliament before31.3.2012

    -- ----

    * Mandatory Objective(s)

    page 14 of 19 Generated on 18/04/2012

  • 7/29/2019 rfd_2012_13

    15/19

    Results Framework Document (RFD) for Ministry of New and Renewable Energy(2012-2013)

    Section 4:Description and Definition of Success Indicators

    and Proposed Measurement Methodology

    Pl

    SECTION 4:

    Description and Definition of

    Success Indicators and Proposed Measurement Methodology

    S. No. Success Indicator Unit Definition Proposed

    Measurement

    methodology

    1. Grid-interactive

    Renewable Power

    MW Total installed capacity

    of Grid-connectedRenewable Power

    projects in Megawatt.

    Reports of

    State Utilities/ CentralElectricity Authority/

    NVVN/IREDA

    2. Off-Grid Renewable

    power

    MWeq Total installed capacity

    of non-grid connected

    Renewable power

    j t ti

    Reports of

    State Implementing

    Agencies/ Banks/

    NABARD/ IREDA

  • 7/29/2019 rfd_2012_13

    16/19

    ABBREVIATIONS

    IEPR - Integrated Energy Policy Report ; RE- Renewable Energy;

    SPV- Solar Photovoltaic HRD - Human Resource Development

    7. Electricity Mix % Contribution of

    Renewable energy in

    terms of actual

    electricity generated

    from all renewable

    power projects to the

    total electricity

    generation in the

    country

    To be

    computed from the

    above deployment data

    and reports of Central

    Electricity Authority

    (CEA)/Ministry of

    Power.

    8. Energy Mix % Contribution of

    Renewable energy (in

    electrical &thermal

    forms) to the total

    energy consumption in

    the country

    Do + reports

    of other Energy

    Ministries / Planning

    Commission

    10.

    New Initiatives and

    Administrative Actions

    As specified against each initiative/ action

    Own records

    of the Ministry.

  • 7/29/2019 rfd_2012_13

    17/19

    Results Framework Document (RFD) for Ministry of New and Renewable Energy(2012-2013)

    Section 5:Specific Performance Requirements from other Departments

    The performance under various programmes is critically dependent on other Departments/ Organizations

    as mentioned below:

    State Govt. Departments/Implementing Agencies

    : Policy formulation; submission / clearance of projects; monitoring of

    implementation, etc.

    Ministry of Environment &Forests : Giving clearance for land transfer

    for grid power projects in forest

    areas

    Ministry of Power : Allocation of unallocated powerquota to NVVN

    NVVN : Entering into firm PPAs with

    developers of Solar power projects

    and ensuring timely approvals

    CERC/ SERCs : Fixation of tariffs for Renewable

  • 7/29/2019 rfd_2012_13

    18/19

    Section 6:Outcome/Impact of Department/Ministry

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Outcome/Impact ofDepartment/Ministry

    Jointly responsible forinfluencing this outcome /

    impact with the followingdepartment (s) / ministry(ies)

    SuccessIndicator

    FY 10/11 FY 12/13FY 11/12 FY 13/14 FY 14/15Unit

    21800 29000Capacity added (MW)Creating AdditionalGeneration Capacity (REinitiative) to supplement theconventional Energyinitiatives of the country

    CERC/SERC/Ministry of Power /Ministryof Environment and Forests / StateGovernments and implementingagencies

    34000 40000249141 MW

    20.43Percentage of total powerinstalled in the country

    17.83%

    4No. of surveysTo conduct a sample survey

    for off-grid system ( onutilisation of off grid system)

    State Nodal Agencies, State

    Governments, Implementing AGencies

    6 62 No

    10Number of Research Papersby R & D institutions and filingof patents

    IPR filed Ministry of Industry and Commerce, 15 153 No.

    2No.Commercialization of IPRsfiled as a result of MNREIntervention

    Ministry of Science and Technology,Research Institutions

    3 44 No.

    4150capacity additionThe total capacity of all REsystems installed and itsproportion in the energy mixand electricity mix

    Ministry of Power 4500 500040005 MW

    80%Percentage of systems inoperation

    The %age of off grid systemsthat are operating or thecapacity utilization of all theoff grid systems installed sofar (based on the samplesurvey)

    6 Percentage

    60electrical unit savedLikely annual savings ofconventional fuel/electricitythrough renewable energyrequirement based on

    61 627 billionunits

    18 f 19 G t d 18/04/2012

  • 7/29/2019 rfd_2012_13

    19/19

    Section 6:Outcome/Impact of Department/Ministry

    Results-Framework Document (RFD) for Ministry of New and Renewable Energy -(2012-2013)

    Outcome/Impact ofDepartment/Ministry

    Jointly responsible forinfluencing this outcome /

    impact with the followingdepartment (s) / ministry(ies)

    SuccessIndicator

    FY 10/11 FY 12/13FY 11/12 FY 13/14 FY 14/15Unit

    the norms indicated in Table8of Stategey Paper