1
install stop sign install f.s. lock gate 14 parking spots 25’ 25’ install f.s. lock gate install site id sign 25’ construct 3’ trailhead to lower climbing trail 4’ wide raised bed w/ natural vegetation barrier 4’ wide raised bed w/ natural vegetation barrier to salt lake to alta to wasatch resort storm drain install underground 3’ pressure-pad alarm system around property line existing road easement 10’ quarry silo to be converted into opperation center / storage garage for LCC power plant bay doors remnant concrete structures to remain. Future conversion into storage possible scale: 1/132” = 1’-0” N highway 210 concrete walking path connecting to trailhead 5’ asphalt access road

Rock Quarry Plan

Embed Size (px)

Citation preview

Page 1: Rock Quarry Plan

install stop sign

install f.s. lock gate

14 parking spots

25’

25’

install f.s. lock gate

install site id sign

25’

construct 3’ trailhead to lower climbing trail

4’ wide raised bed w/ natural vegetation barrier

4’ wide raised bed w/ natural vegetation barrier

to salt lake

to altato wasatch resort

storm drain

install underground 3’ pressure-pad alarm system around property line

existing road easement

10’

quarry silo to be converted into opperation center / storage garage for LCC power plant

bay doors

remnant concrete structures to remain. Future conversion into storage possible

scale: 1/132” = 1’-0” N

highway 210concrete walking path connecting to trailhead

5’

asphalt access road