38
Ministry of Land, Infrastructure, Transport and Tourism 1 Runoff Analysis using Runoff Analysis using CommonMP CommonMP Yoshito KIKUMORI, River Dept. NILIM NILIM Sep. 7, 2012 National Institute for Land and Infrastructure

Runoff Analysis using CommonMP

  • Upload
    fisseha

  • View
    70

  • Download
    2

Embed Size (px)

DESCRIPTION

Sep. 7, 2012. Runoff Analysis using CommonMP. Yoshito KIKUMORI, River Dept. NILIM. NILIM. National Institute for Land and Infrastructure. 1. NILIM. What is CommonMP? What can we do with CommonMP? Configuration of CommonMP Building Simple Simulation Project - PowerPoint PPT Presentation

Citation preview

Page 1: Runoff Analysis using CommonMP

Ministry of Land, Infrastructure, Transport and Tourism 11

Runoff Analysis using Runoff Analysis using CommonMP CommonMP

                      

Yoshito KIKUMORI, River Dept. NILIM

NILIM

Sep. 7, 2012

National Institute for Land and Infrastructure

Page 2: Runoff Analysis using CommonMP

22

1. What is CommonMP? What can we do with CommonMP?

2. Configuration of CommonMP3. Building Simple Simulation Project4. River Channel Discharge at Flood Time

(Practice)5. Parameter Sensibility Analysis of Storage

Function Runoff Model (Practice)

NILIM

Page 3: Runoff Analysis using CommonMP

33

1. What is CommonMP? What can we do with CommonMP?1. What is CommonMP? What can we do with CommonMP?

•We can make simulation of hole river basin utilizing CommonMP

・ CommonMP is the Common Platform on which various hydraulic and hydrology models run simultaneously in cooperate with each other.

・ Element Models is various hydraulic and hydrology models which run on CommonMP.

Runoff流出計算

River氾濫計算

CommonMP Element Model

Element Model

inundation

○○計算

NILIM

Page 4: Runoff Analysis using CommonMP

44

•Simulation Project and Element Models have high portablity.

降雨予測

河道計算

CommonMP

Element Model

○○計算

Element Model

Simulation Project

B

A

Building Element ModelBuilding Element Model

Building Simulation Project

Building Simulation Project

From A to B

From B to A

1. What is CommonMP? What can we do with CommonMP?1. What is CommonMP? What can we do with CommonMP?

NILIM

Page 5: Runoff Analysis using CommonMP

55

•Frequently used Element models are already built by NILIM

1. What is CommonMP? What can we do with CommonMP?1. What is CommonMP? What can we do with CommonMP?

NILIM

Page 6: Runoff Analysis using CommonMP

66

•Using element models building by NILIM etc. you can conduct hydraulic and hydrology.

■出力モジュール群

■演算モジュール群

・降雨値・潮位・流入量・放流量・調節のモジュールの算出結果

・流出予測結果のグラフ表示・基準水位との対比・洪水規模の評価

9.グラフ表示のモジュール

11.データ保存のモジュール

・地上観測雨量・レーダ雨量

1.降雨観測値・予測値の入力モジュール

■オフライン入力モジュール群 ■オンライン入出力モジュール群

・観測水位・河口潮位・ダムや排水機場などの  施設の流入・放流量

2.水位観測値等の入力モジュール

※wisef形式のcsvデータを読み込む

・ダム

5.河川管理施設の操作モジュール

・排水機場

・遊水地

・放水路

・水閘門(大規模)

・堰

・放流量手動入力

・貯留関数

4.流出モデルのモジュール

(集中型モデル)

・タンクモデル

・合理式

・有効降雨モデル

・表面流

・表層

・中間層上段

・中間層下段

・地下層

(分布型モデル)

・ニューラルネットワーク

8.調整のモジュール

・定数固定現時刻合わせ方式

・等流・不等流・S-Q関係

6.河道モデルのモジュール

・実績HーQ・H-Q式算定

7.水位ー流量関係モジュール

・面積雨量

3.降水量モジュール

・分布型雨量

・累加雨量、欠測処理

・降雨量手動入力

下記に対し、アラートを行う・雨量、水位・調整のモジュールの出力・誤差評価

10.リスク表示のモジュール

・地上観測雨量・レーダ雨量・観測水位・河口潮位・ダムや排水機場などの施設  の流入・放流量

12.統一河川情報システムの入出力

入力要素

演算要素

出力要素

1つの要素モデル

データ伝送CommonMP仕様

凡例

・準線型貯留関数

・樋門樋管

・内水域

・単相関・重相関

13.水位相関による予測モジュール

・洪水予測モデルチェックマニュアルの誤差評価

14.誤差評価のモジュール

1. What is CommonMP? What can we do with CommonMP?1. What is CommonMP? What can we do with CommonMP?

NILIM

Page 7: Runoff Analysis using CommonMP

77

2. Configuration of CommonMP2. Configuration of CommonMP

NILIM

Page 8: Runoff Analysis using CommonMP

●CommonMP\Execute\bin   for Executable files

●CommonMP\Execute\conf   for Configuration flies

●CommonMP\CommonMPData for Simulation Projecto Files

●CommonMP\Source\HYMCO\OptionImpl Source of Element Model

88

2. Directories and Files for CommonMP2. Directories and Files for CommonMP

国土技術政策総合研究所

Page 9: Runoff Analysis using CommonMP

99

3. Building Simple Project (Practice)3. Building Simple Project (Practice)3. Building Simple Project (Practice)3. Building Simple Project (Practice)

NILIM

Page 10: Runoff Analysis using CommonMP

1010

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Double Click Icon of CommonMPDouble Click Icon of CommonMP

Double ClickDouble Click

Boot of CommonMPBoot of CommonMP

NILIM

Page 11: Runoff Analysis using CommonMP

1111

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Choose Menu [File →Project → New]Choose Menu [File →Project → New]

Bulid New ProjectBulid New Project

NILIM

Page 12: Runoff Analysis using CommonMP

1212

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Project Group and Project Name are necessary. Project Group and Project Name are necessary.

Input of Projct InfoInput of Projct Info

NILIM

Project Gr: AAA_BasinProject Name : Sample

Page 13: Runoff Analysis using CommonMP

1313

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Copy Rain.csv in Input Dir of Project Dir.Copy Rain.csv in Input Dir of Project Dir.

DataData

NILIM

Page 14: Runoff Analysis using CommonMP

1414

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Partical GrPartical Gr

Convergence GrConvergence Gr

BasinBasin

ChannelChannel

User DifinitionUser Difinition

MargeMarge

InputInput

OutputOutput

接続要素接続要素

Placement of Element Model Placement of Element Model

NILIM

Page 15: Runoff Analysis using CommonMP

1515

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

CSV InputCSV Input

Storage FunctionStorage Function

河道貯留関数( S-Q 関係)河道貯留関数( S-Q 関係)

Monitor OutputMonitor Output

Sample ProjectSample Project

NILIM

Page 16: Runoff Analysis using CommonMP

1616

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Choose Input Element , and the place it.Choose Input Element , and the place it.

Placement of Element ModelPlacement of Element Model

NILIM

Page 17: Runoff Analysis using CommonMP

1717

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Input the time series CSVInput the time series CSV

Placement of Element ModelPlacement of Element Model

NILIM

Page 18: Runoff Analysis using CommonMP

1818

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Double click Input Element and click advanced setting for pramenter setting.Double click Input Element and click advanced setting for pramenter setting.

クリックしますクリックします

入力要素モデルをダブルクリックします

入力要素モデルをダブルクリックします

Setting ParametersSetting Parameters

NILIM

Page 19: Runoff Analysis using CommonMP

1919

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Setting ParameterSetting Parameter

NILIM

※: ..\..\CommonMPData\AAA グループ \InputData\Rain.csv

Click “Configuration”Click “Configuration”

Data File(Rain.csv)Data File(Rain.csv)

観測所地点数( 5 )を入力観測所地点数( 5 )を入力

地点指定( 1 )を入力地点指定( 1 )を入力

Page 20: Runoff Analysis using CommonMP

2020

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Basin ElementBasin Element

国土技術政策総合研究所

Placement of ElementPlacement of Element

Page 21: Runoff Analysis using CommonMP

2121

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Sample Storage FunctionSample Storage Function

Placement of ElementPlacement of Element

NILIM

Page 22: Runoff Analysis using CommonMP

2222

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Double ClickDouble Click

Setting ParameterSetting Parameter

NILIM

Time Step : 360secBasin Area : 50km2

Parameter K:43.1Parameter P : 0.31Delay Time : 0.3hrF1 : 0.5Rsa : 80mmBase Flow : 4.8m3/sec

Input parametersInput parameters

Page 23: Runoff Analysis using CommonMP

2323

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Stream ElementStream Element

Placement of ElementPlacement of Element

NILIM

Page 24: Runoff Analysis using CommonMP

2424

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

( S-Q 関係)( S-Q 関係)

( S-Q 関係)( S-Q 関係)

Placement of ElementPlacement of Element

国土技術政策総合研究所

Page 25: Runoff Analysis using CommonMP

2525

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

ダブルクリックしますダブルクリックします

Setting ParameterSetting Parameter

NILIM

各パラメータに任意の値を入力します各パラメータに任意の値を入力します

K: 11.8P: 0.6Tl: 0.3hrTlz:0.3hr

Page 26: Runoff Analysis using CommonMP

2626

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Output ElementOutput Element

Placement of ElementPlacement of Element

NILIM

Page 27: Runoff Analysis using CommonMP

2727

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Placement of ElementPlacement of Element

国土技術政策総合研究所

Page 28: Runoff Analysis using CommonMP

2828

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Conneting ElementConneting Element

NLIM

Page 29: Runoff Analysis using CommonMP

2929

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

接続要素を選択した状態で、「1次元配列時系列情報」を選択し、ダブルクリックします

接続要素を選択した状態で、「1次元配列時系列情報」を選択し、ダブルクリックします

Conneting ElementConneting Element

国土技術政策総合研究所

Page 30: Runoff Analysis using CommonMP

3030

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Conneting ElementConneting Element

NILIM

Page 31: Runoff Analysis using CommonMP

3131

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Connecting ElementConnecting Element

NILIM

Page 32: Runoff Analysis using CommonMP

3232

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Connecting ElementConnecting Element

NILIM

Page 33: Runoff Analysis using CommonMP

3333

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Connecting ElementConnecting Element

NILIM

Page 34: Runoff Analysis using CommonMP

3434

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Monitor OutputMonitor Output

NILIM

Page 35: Runoff Analysis using CommonMP

3535

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Click Model checkClick Model check

ErrotErrot

Model CheckModel Check

NILIM

Page 36: Runoff Analysis using CommonMP

3636

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Setting Simulation PeriodSetting Simulation Period

NILIM

※2007/7/7 10:00 ~ 2007/7/10 23:00

Page 37: Runoff Analysis using CommonMP

3737

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Execution of ProjectExecution of Project

NILIM

Page 38: Runoff Analysis using CommonMP

3838

3. Building Simple Project (Practice)3. Building Simple Project (Practice)

Save ProjectSave Project

NILIM