Reconst. of North Runway 1C19C and Associated Taxiways Y, Y2, Y3, Y4 & Y5 1 1

Runway 1C-19C Reconstruction

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Runway 1C-19C Reconstruction

Reconst. of North Runway 1C‐19C and Associated Taxiways Y, Y2, Y3, Y4 & Y5

1 1

Page 2: Runway 1C-19C Reconstruction

Runway 1C-19C Reconstruction Runway and Taxiway Reconstruction Taxiway Y Widening to Accommodate Larger Aircraft Sanitary Sewer Installation Construct New Service Road

Project Overview

2

Page 3: Runway 1C-19C Reconstruction

Other Project Elements

AOA Fencing and Gate 204 Improvements Staging Area / Batch Plant Improvements & Utilities Maintenance of Air Traffic (MOT) Temporary Displaced 19C Threshold AC Shoulder Rehabilitation Pavement Markings Underdrains and Infield Drainage Improvements Electrical

Airfield Lighting Runway (19C) Status Lights - FAA Facility

3

Page 4: Runway 1C-19C Reconstruction

General Phasing

4

Gate 204 & Staging AreaBB

CCAA

AABBCC

1122

4433

A,B&CA,B&CB&CB&C

CC1212

13013035358484

MM 125125

1&41&4

A,B&CA,B&C

Page 5: Runway 1C-19C Reconstruction

Site Access, Hauling and Storage

5

Contractor Staging, Batch Plant, Storage

Area

Waste Mat. Disposal Area

Work Area

Mat. Crushing, Processing and Storage Area

Temp. Haul Road

Gate 204Construction

Entrance

Page 6: Runway 1C-19C Reconstruction

Staging, Batch Plant & Storage

6

Glide Slope Dr.

UTILITY CONNECTIONS

NEWGATE 204

LOCATION

EXISTING FENCING WHICH CAN BE

REMOVED

EXISTING OVERHEAD

POWERLINES

Page 7: Runway 1C-19C Reconstruction

Gate 204 Installation

Contractor Supplied & Installed Lighting Deadman Cable Fencing Haul Road Guard House Foundation Signs Port-a-Johns Power

7

MWAA Supplied & Installed Card Reader Security Camera Fiber

Contractor Installed Guard House Concrete (Jersey) Barricades (including transportation)

MWAA Supplied Guard House Concrete (Jersey) Barricades

Page 8: Runway 1C-19C Reconstruction

8

Gate 204 Installation

8

Page 9: Runway 1C-19C Reconstruction

Temporary Displaced Threshold

9

Temporary 19C Threshold

Temporary 19C PAPI

BBR/W Length = 6,000-ft

cc

Temporary Displaced Threshold Elements Temporary Marking (Install/Removal) Temporary PAPI Installation Temporary Threshold Lights Temporary Electrical

Cover Distance Remaining Signs Change Light Fixtures

Page 10: Runway 1C-19C Reconstruction

Pavement Reconstruction

10

Soil Cement

Crushed Agg. Base (P-209)#3 Stone Subbase

Fabric

1010

New Shoulder Pavement

Page 11: Runway 1C-19C Reconstruction

New Pavement SectionsWith Soil Cement

PCC18” RWY16” TWY

0.25” Choke Stone

6” CTB

12” Soil Cement

Taxiway Typical Section

Runway Typical Section

11

Page 12: Runway 1C-19C Reconstruction

Taxiway Y Typical Section

New Pavement SectionsWith Agg. And Fabric

PCC18” TXY Y16” TXY Y5

0.25” Choke Stone

6” CTB

6” Aggregate Base Course

5.75” #3 Stone Subbase

Taxiway Y5 Typica Section

12

Page 13: Runway 1C-19C Reconstruction

Drainage Improvements

XXX

X

X

13

Page 14: Runway 1C-19C Reconstruction

14

Sanitary Sewer

NEW 60” MH

NEW 72” MH

NEW 72” MH

NEW 60” MH

BYPASS PUMPING

Page 15: Runway 1C-19C Reconstruction

Reinstall Existing Lights on Existing

Cans

Airfield Lighting and ElectricalNew Conduit

with New Cable

Existing Lights on New Base

Cans

New Conduit

New Fixture on New Base

Cans

15

Page 16: Runway 1C-19C Reconstruction

Runway Status Lights (FAA)FAA Take-off Hold Lights

(THL)

FAA New Conduit and

Cable

FAA Runway Entrance

Lights (REL)

16

Page 17: Runway 1C-19C Reconstruction

17

Service Road

CULVERT A10’x 4’ Box

CULVERT B10’x 4’ Box

CULVERT A30” RCP

17

Page 18: Runway 1C-19C Reconstruction

18