Sheet1ARemoval of Structures3BStructure Excavation6ACTest Piles, furnished and driven6ADConcrete Piles, furnished12CEConcrete Piles, Driven8DFReinforcing Steel17EGMetal Structures2EHStructural Concrete " Class A"20B,F,GIRailing6HJGrouted Riprap, "Class A"47IKInstallation of Pipe Culvert, 450mm2ILEmbankment31KMRubble Concrete3KNGabions72KOAggregate Sub Base Course(Compacted)6J,L,MPPortland Cement Concrete Pavement(Plain)17OQMetal Guardrail5P101(4)ARemoval of Structures30.76%106,078.500.76%103(1)BStructure Excavation6A0.74%102,795.000.74%400(16)CTest Piles, furnished and driven6A1.22%169,335.601.22%400(4)DConcrete Piles, furnished12C3.11%432,298.003.11%400(14)EConcrete Piles, Driven8D2.15%299,036.902.15%404FReinforcing Steel17E3.59%498,895.100.00210897983.37%403GMetal Structures2E0.92%128,315.200.00461062930.46%405(1)HStructural Concrete " Class A"20B,F,G6.06%843,403.000.04242728841.82%401IRailing6H0.78%108,950.000.78%505(5)JGrouted Riprap, "Class A"47I19.63%2,731,018.000.075164245912.11%500(1)KInstallation of Pipe Culvert, 450mm2I0.52%72,702.500.52%104 (1)LEmbankment31K11.70%1,627,814.000.0603775055.66%507MRubble Concrete3L0.64%88,835.500.64%511(1)NGabions72M29.45%4,098,463.500.04908874350.122721858812.27%200OAggregate Sub Base Course(Compacted)6M2.88%401,052.002.88%311(1)PPortland Cement Concrete Pavement17J,O8.96%1,246,230.620.03160915175.80%603(3a)QMetal Guardrail5P6.90%959,927.006.90%100.00%13,915,150.428.65%8.08%16.68%29.36%24.97%12.27%100.00%8.65%16.72%33.40%62.76%87.73%100.00%1,203,048.371,124,088.032,320,757.254,085,559.003,474,004.641,707,693.131,203,048.372,327,136.404,647,893.658,733,452.6512,207,457.3013,915,150.42
Sheet2summary13,915,150.42Project PreparationPile WorksConcrete WorksMetal WorksRoad WorksProtection Works208,873.50900,670.503,735,959.001,696,087.301,647,282.625,726,277.50
Removal of StructuresTest Piles, furnished and drivenStructural ConcreteRailingAggregate Sub Base CourseGabionsM&E: 99,442.50M&E: 149,877.60M&E: 641,215.00M&E: 104,141.00M&E: 395,606.00M&E: 3,384,537.50L:6,636.00L:19,458.00L:202,188.00L:4,809.00L:5,446.00L:713,926.00T:106,078.50T:169,335.60T:843,403.00T:108,950.00T:401,052.00T:4,098,463.50
Structure ExcavationConcrete Piles, furnishedGrouted RiprapMetal StructuresPCCPEmbankmentM&E: 93,885.00M&E: 382,502.00M&E: 2,300,145.00M&E: 126,029.20M&E: 1,133,952.62M&E: 1,600,885.00L:8,910.00L:49,796.00L:430,873.00L:2,286.00L:112,278.00L:26,929.00T:102,795.00T:432,298.00T:2,731,018.00T:128,315.20T:1,246,230.62T:1,627,814.00
Concrete Piles, DrivenInstallation of Pipe CulvertReinforcing SteelM&E: 263,588.90M&E: 66,952.50M&E: 399,524.10L:35,448.00L:5,750.00L:99,371.00T:299,036.90T:72,702.50T:498,895.10
Rubble ConcreteMetal GuardrailM&E: 67,554.50M&E: 947,304.00L:21,281.00L:12,623.00T:88,835.50T:959,927.00