7/28/2019 Serc Apdrp 2012 Final
1/76
S.No MonthEnergy Input
Billed and lossesHawal Rainawari K.K.Moulla Khanyar Zakura
Total for
the Division
Input (LU's) 129.51 129.51
Billed (LU's) 38.99 38.99
Losses % 69.89 69.89
Input (LU's) 121.43 121.43
Billed (LU's) 38.28 38.28
Losses % 68.48 68.48Input (LU's) 110.79 110.79
Billed (LU's) 35.70 35.70
Losses % 67.78 67.78
Input (LU's) 94.25 94.25
Billed (LU's) 36.02 36.02
Losses % 61.78 61.78
Input (LU's) 81.35 81.35
Billed (LU's) 29.51 29.51
Losses % 63.72 63.72
Input (LU's) 81.65 81.65
Billed (LU's) 29.73 29.73
Losses % 63.59 63.59
Input (LU's) 89.14 89.14Billed (LU's) 29.39 29.39
Losses % 67.03 67.03
Input (LU's) 0.00 0.00
Billed (LU's) 0.00 0.00
Losses % #DIV/0! #DIV/0!
Input (LU's) 0.00 0.00
Billed (LU's) 0.00 0.00
Losses % #DIV/0! #DIV/0!
Input (LU's) 0.00 0.00
Billed (LU's) 0.00 0.00
Losses % #DIV/0! #DIV/0!
Input (LU's) 0.00 0.00
Billed (LU's) 0.00 0.00Losses % #DIV/0! #DIV/0!
4
5 Aug-12
Form # 1: Monthly Energy-Kashmir
MONTHLY ENERGY INPUT, ENERGY BILLED & LOSSES FOR THE YEAR 2012-113(For Achievement under Triparitite MoU and for progress to SERC)
Apr-121
Jun-12
2 May-12
Sep-126
Feb-13
8
Oct-12
Nov-12
Jul-12
3
7
9 Dec-12
10 Jan-13
11
7/28/2019 Serc Apdrp 2012 Final
2/76
Input (LU's) 0.00 0.00
Billed (LU's) 0.00 0.00
Losses % #DIV/0! #DIV/0!
*
12 Mar-13
7/28/2019 Serc Apdrp 2012 Final
3/76
Form # 2: Monthly Meters-Kashmir
S.No Month
Total consumers
electronic metering level
and % metering at end of
month
Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal fo
the Divisi
Total Consumers 11000 11000.0
Meters Installed 9921 9921.0
% Metering 90.19 90.19
Total Consumers 11082 11082.0
Meters Installed 10333 10333.0% Metering 93.24 93.24
Total Consumers 11137 11137.0
Meters Installed 10821 10821.0
% Metering 97.16 97.16
Total Consumers 11199 11199.0
Meters Installed 10971 10971.0
% Metering 97.96 97.96
Total Consumers 11198 11198.0
Meters Installed 10970 10970.0
% Metering 97.96 97.96
Total Consumers 11191 11191.0
Meters Installed 10963 10963.0
% Metering 97.96 97.96Total Consumers 11203 11203.0
Meters Installed 10963 10963.0
% Metering 97.86 97.86
Total Consumers 0 0.00
Meters Installed 0.00
% Metering #DIV/0! #DIV/0
Total Consumers 0 0.00
Meters Installed 0.00
% Metering #DIV/0! #DIV/0
Total Consumers 0 0.00
Meters Installed 0.00
% Metering #DIV/0! #DIV/0
Total Consumers 0 0.00Meters Installed 0.00
10 Jan-13
Feb-1311
4 Jul-12
9 Dec-12
6 Sep-12
7 Oct-12
8 Nov-12
MONTHLY TOTAL CONSUMERS, ELECTRONIC METERS INSTALLED AND %age ELECTRONIC FOR THE YEAR 2012-13(For Achievement under Triparitite MoU and for progress reporting to SERC)
1 Apr-12
5 Aug-12
2 May-12
3 Jun-12
7/28/2019 Serc Apdrp 2012 Final
4/76
% Metering #DIV/0! #DIV/0!
Total Consumers 0 0.00
Meters Installed 0.00
% Metering #DIV/0! #DIV/0!
Mar-1312
7/28/2019 Serc Apdrp 2012 Final
5/76
Form # 3: Monthly Revenue-Kashmir
S.No Month
Monthly Revenue
Realised, Pure & ED
(Rs. In lacs)
Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for
the Division
Revenue Pure 26.51 26.51
ED 5.82 5.82
Total (Rs. In lacs) 32.33 32.33
Revenue Pure 86.34 86.34
ED 18.95 18.95Total 105.29 105.29
Revenue Pure 13.77 13.77
ED 3.02 3.02
Total 16.79 16.79
Revenue Pure 152.36 152.36
ED 33.44 33.44
Total 185.80 185.80
Revenue Pure 81.25 81.25
ED 17.83 17.83
Total 99.08 99.08
Revenue Pure 59.88 59.88
ED 13.14 13.14
Total 73.02 73.02Revenue Pure 111.97 111.97
ED 24.58 24.58
Total 136.55 136.55
Revenue Pure 0.00 0.00
ED 0.00 0.00
Total 0.00 0.00
Revenue Pure 0.00 0.00
ED 0.00 0.00
Total 0.00 0.00
Revenue Pure 0.00 0.00
ED 0.00 0.00
Total 0.00 0.00
Revenue Pure 0.00 0.00ED 0.00 0.00
10
11
Jan-13
Feb-13
4 Jul-12
9 Dec-12
6 Sep-12
7 Oct-12
8 Nov-12
MONTHLY REVENUE REALISED (PURE AND ED) FOR THE YEAR 2012-13(For Achievement under Triparitite MoU and for progress reporting to SERC)
1 Apr-12
5 Aug-12
2 May-12
3 Jun-12
7/28/2019 Serc Apdrp 2012 Final
6/76
Total 0.00 0.00
Revenue Pure 0.00 0.00
ED 0.00 0.00
Total 0.00 0.00
12 Mar-13
7/28/2019 Serc Apdrp 2012 Final
7/76
S.No Month
Monthly
Connections added
metered and flat rate
(No's)
Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for
the Division
Metered 15 15
Flat Rate 0 0
Total 15 15
Metered 92 92
Flat Rate 0 0Total 92 92
Metered 91 91
Flat Rate 0 0
Total 91 91
Metered 8 8
Flat Rate 0 0
Total 8 8
Metered 8 8
Flat Rate 0 0
Total 8 8
Metered 49 49
Flat Rate 0 0
Total 49 49Metered 1 1
Flat Rate 0 0
Total 1 1
Metered 0
Flat Rate 0
Total 0
Metered 0
Flat Rate 0
Total 0
Metered 0
Flat Rate 0
Total 0
Metered 0
8 Nov-12
10 Jan-13
9 Dec-12
6 Sep-12
7
4 Jul-12
5 Aug-12
Oct-12
Form # 4: Monthly Connection-Kashmir
2 May-12
3 Jun-12
MONTHLY CONNECTIONS ADDED (METERED AND FLAT RATE) FOR THE YEAR 2012-13(For Achievement under Triparitite MoU and for progress reporting to SERC)
1 Apr-12
7/28/2019 Serc Apdrp 2012 Final
8/76
Flat Rate 0
Total 0
Metered 0
Flat Rate 0
Total 0
12 Mar-13
11 Feb-13
7/28/2019 Serc Apdrp 2012 Final
9/76
7/28/2019 Serc Apdrp 2012 Final
10/76
April May June July Aug Sept. O
Domestic 9188 9254 9317 9359 9359 9352 93
N.Dom/Commercial 1667 1683 1675 1695 1695 1695 16
Irrigation/Aggri. 16 16 16 16 16 16 1
State / Central 45 45 45 45 45 45 4
Public Lighting 0 0 0 0 0 0 0
LT Industries 80 80 80 80 79 79 7
HT Industries 0 0 0 0 0 0 0
HT P. Inten. 0 0 0 0 0 0 0
LT Pub. WW 0 0 0 0 0 0 0
HT Pub. WW 4 4 4 4 4 4 4
Gen. Bulk 0 0 0 0 0 0 0
Temporary 0 0 0 0 0 0 0
Total 11000 11082 11137 11199 11198 11191 112
April May June July Aug Sept. O
Domestic 916548.66 1139548.28 501446.74 1681785.06 1134482.76 1194252.874 12768
N.Dom/Commercial 306691.11 350608.15 80592.96 429895.19 353333.33 470740.7407 54365
Irrigation/Aggri. 875.00 0.00 0.00 4901.00 3000.00 2800 15
State / Central 0.00 1062386.29 24193.55 1959298.23 609032.26 331451.6129 12865
Public Lighting 0.00 0.00 0.00 0.00 0.00 0 0
LT Industries 5265.71 10238.10 1223.81 13519.05 10476.19 11904.7619 223
HT Industries 0.00 0.00 0.00 0.00 0.00 0 0
HT P. Inten. 0.00 0.00 0.00 0.00 0.00 0 0
LT Pub. WW 0.00 0.00 0.00 0.00 0.00 0 0HT Pub. WW 0.00 0.00 0.00 205886.34 533902.44 202030.7317 20203
Gen. Bulk 0.00 0.00 0.00 0.00 0.00 0 0
Temporary 0.00 0.00 0.00 0.00 0.00 0 0
Total 1229380 2562781 607457 4295285 2644227 2213181 3333
Metered
Flat Rate
Total
April May June July Aug Sept. O
Domestic 2392192 2974221 1308776 4389459 2961000 3117000 3332
N.Dom/Commercial 828066 946642 217601 1160717 954000 1271000 1467
Irrigation/Aggri. 1750 0 0 9802 6000 5600 31
State / Central 0 6586795 150000 12147649 3776000 2055000 7976
Public Lighting 0 0 0 0 0 0 0
LT Industries 11058 21500 2570 28390 22000 25000 469
HT Industries 0 0 0 0 0 0 0
HT P. Inten. 0 0 0 0 0 0 0
LT Pub. WW 0 0 0 0 0 0 0
HT Pub. WW 0 0 0 844134 2189000 828326 828
Gen. Bulk 0 0 0 0 0 0 0
Temporary 0 0 0 0 0 0 0
Total 3233066 10529158 1678947 18580151 9908000 7301926 1365
Metered
Flat RateTotal
Connections
Description Category
DescriptionYear 2012
Year 2012
Circle-Ist, Srinagar Division:- Electric D
CATEGORIES CONNECTIONS ENERGY SALES AND REVENUE FO
Year 2012
Category
EnergyBilled
Revenue
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Description Category
7/28/2019 Serc Apdrp 2012 Final
11/76
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy Re
in Rs (L
1 Feeder-2 Habak 10.90 2.87 7.23 8.03 73.68 1.87 4.89
2 Feeder-3 Habak 9.47 2.46 6.20 7.01 74.02 1.71 4.46
3 Feeder-5 Habak 17.00 2.83 7.12 14.17 83.38 1.41 3.69
4 Feeder-1 Hazratbal 4.60 4.24 32.73 0.36 7.83 0.07 0.46
5 Feeder-2 Hazratbal 10.31 10.00 25.98 0.31 3.01 2.63 6.87
6 Feeder-3 Hazratbal 9.90 2.14 5.40 7.76 78.35 1.23 3.21
7 Feeder-1 Kathidarwaza 11.80 0.85 2.13 10.95 92.84 0.44 1.14
8 Feeder-2 Kathidarwaza 13.97 1.36 3.43 12.61 90.26 0.70 1.83
9 Feeder-3 Kathidarwaza 1.03 1.02 22.41 0.01 0.97 0.01 0.09
10 Feeder-5 Kathidarwaz 10.77 1.57 3.95 9.20 85.45 0.44 1.15
11 Feeder-1 Rainawari 2.43 2.19 10.05 0.24 9.88 0.08 0.21
12 Feeder-2 Rainawari 2.80 0.49 1.02 2.31 82.50 0.18 0.48
13 Feeder-3 Rainawari 8.75 2.56 6.40 6.19 70.74 0.65 1.69
14 Feeder-4 Rainawari 14.94 3.58 9.03 11.36 76.02 0.83 2.16
15 PHE Pokhribal 0.84 0.84 6.45 0.00 0.00 0.00 0.00
129.51 38.99 149.53 90.52 69.89 12.25 32.3
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy Re
in Rs (L
1 Feeder-2 Habak 9.75 2.88 7.52 6.87 70.46 2.18 5.70
2 Feeder-3 Habak 9.43 2.61 6.81 6.82 72.32 0.95 2.47
3 Feeder-5 Habak 15.53 2.81 7.34 12.72 81.91 2.12 5.53
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF APRIL, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MAY, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
7/28/2019 Serc Apdrp 2012 Final
12/76
4 Feeder-1 Hazratbal 3.49 3.34 30.00 0.15 4.30 3.17 25.36
5 Feeder-2 Hazratbal 10.40 9.95 25.98 0.45 4.33 14.54 37.94
6 Feeder-3 Hazratbal 9.28 2.20 5.75 7.08 76.29 1.67 4.35
7 Feeder-1 Kathidarwaza 8.30 0.89 2.32 7.41 89.28 1.02 2.67
8 Feeder-2 Kathidarwaza 12.73 1.31 3.43 11.42 89.71 1.05 2.74
9 Feeder-3 Kathidarwaza 0.94 0.84 12.94 0.10 10.64 1.30 9.31
10 Feeder-5 Kathidarwaz 10.53 1.54 4.03 8.99 85.38 0.67 1.74
11 Feeder-1 Rainawari 2.64 2.27 10.23 0.37 14.02 0.21 1.28
12 Feeder-2 Rainawari 3.99 0.39 1.02 3.60 90.23 0.18 0.47
13 Feeder-3 Rainawari 8.87 2.51 6.55 6.36 71.70 0.96 2.51
14 Feeder-4 Rainawari 14.38 3.57 9.32 10.81 75.17 1.23 3.22
15 PHE Pokhribal 1.17 1.17 9.39 0.00 0.00 0.00 0.00
121.43 38.28 142.63 83.15 68.48 31.26 105.2
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy Re
in Rs (La
1 Feeder-2 Habak 8.61 3.10 8.10 5.51 64.00 1.13 2.94
2 Feeder-3 Habak 9.09 1.53 3.99 7.56 83.17 0.64 1.67
3 Feeder-5 Habak 14.14 2.85 7.44 11.29 79.84 1.27 3.32
4 Feeder-1 Hazratbal 3.49 3.48 27.80 0.01 0.29 0.03 0.23
5 Feeder-2 Hazratbal 10.64 9.77 25.49 0.87 8.18 0.89 2.31
6 Feeder-3 Hazratbal 9.22 1.96 5.12 7.26 78.74 0.80 2.09
7 Feeder-1 Kathidarwaza 6.50 1.00 2.60 5.50 84.62 1.05 2.74
8 Feeder-2 Kathidarwaza 11.90 1.35 3.35 10.55 88.66 0.28 0.74
9 Feeder-3 Kathidarwaza 0.86 0.84 6.00 0.02 2.33 0.00 0.00
10 Feeder-5 Kathidarwaz 10.31 3.45 9.00 6.86 66.54 0.04 0.10
11 Feeder-1 Rainawari 2.44 1.83 11.00 0.61 25.00 0.00 0.00
12 Feeder-2 Rainawari 1.92 0.21 0.55 1.71 89.06 0.01 0.03
13 Feeder-3 Rainawari 7.91 1.07 2.80 6.84 86.47 0.07 0.17
14 Feeder-4 Rainawari 12.22 1.72 4.50 10.50 85.92 0.17 0.45
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JUNE, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
7/28/2019 Serc Apdrp 2012 Final
13/76
15 PHE Pokhribal 1.54 1.54 12.31 0.00 0.00 1.05 0.00
110.79 35.70 130.05 75.09 67.78 7.42 16.79
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy Rea
in Rs (La
1 Feeder-2 Habak 8.36 2.89 7.54 5.47 65.44 2.68 7.00
2 Feeder-3 Habak 7.38 1.60 4.17 5.78 78.35 1.51 3.94
3 Feeder-5 Habak 13.73 3.59 9.38 10.14 73.82 3.26 8.50
4 Feeder-1 Hazratbal 2.67 2.52 20.10 0.15 5.66 7.76 50.45
5 Feeder-2 Hazratbal 8.75 8.39 21.90 0.36 4.11 8.85 23.10
6 Feeder-3 Hazratbal 7.40 1.82 4.75 5.58 75.41 2.07 5.39
7 Feeder-1 Kathidarwaza 5.14 1.99 5.20 3.15 61.24 1.91 4.98
8 Feeder-2 Kathidarwaza 10.24 2.25 5.88 7.99 78.00 1.86 4.86
9 Feeder-3 Kathidarwaza 0.79 0.76 5.45 0.03 3.51 0.70 12.31
10 Feeder-5 Kathidarwaz 8.14 2.74 7.15 5.40 66.35 1.10 2.88
11 Feeder-1 Rainawari 2.31 1.69 12.10 0.62 26.74 17.15 44.75
12 Feeder-2 Rainawari 1.48 0.31 0.81 1.17 79.03 0.22 0.58
13 Feeder-3 Rainawari 6.20 1.62 4.23 4.58 73.86 1.21 3.16
14 Feeder-4 Rainawari 10.24 2.42 6.32 7.82 76.35 2.09 5.46
15 PHE Pokhribal 1.42 1.42 11.37 0.00 0.00 0.00 8.44
94.25 36.02 126.35 58.23 61.78 52.37 185.80
(For Achievement under Triparitite MoU and for progress reporting to SERC)
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF AUGUST, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JULY, 2012
Total
Total
7/28/2019 Serc Apdrp 2012 Final
14/76
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy R
in Rs (L
1 Feeder-2 Habak 7.25 2.78 18.92 4.47 61.66 2.25 5.8
2 Feeder-3 Habak 6.12 1.69 15.97 4.43 72.39 1.57 4.1
3 Feeder-5 Habak 11.40 3.12 29.75 8.28 72.63 1.93 5.0
4 Feeder-1 Hazratbal 2.65 2.28 6.92 0.37 13.96 0.19 1.2
5 Feeder-2 Hazratbal 7.72 4.45 20.15 3.27 42.36 11.92 31.1
6 Feeder-3 Hazratbal 6.44 2.53 16.81 3.91 60.71 1.78 4.6
7 Feeder-1 Kathidarwaza 4.46 1.42 11.64 3.04 68.16 1.14 2.9
8 Feeder-2 Kathidarwaza 8.72 1.94 22.76 6.78 77.75 1.62 4.2
9 Feeder-3 Kathidarwaza 0.76 0.75 1.98 0.01 1.32 0.57 10.1
10 Feeder-5 Kathidarwaz 7.10 1.55 18.53 5.55 78.17 0.54 1.4
11 Feeder-1 Rainawari 2.07 1.70 5.40 0.37 17.87 0.25 0.6
12 Feeder-2 Rainawari 1.50 0.25 3.92 1.25 83.33 0.16 0.4
13 Feeder-3 Rainawari 5.62 1.37 14.67 4.25 75.62 0.88 2.2
14 Feeder-4 Rainawari 8.12 2.26 21.19 5.86 72.17 1.18 3.0
15 PHE Pokhribal 1.42 1.42 11.37 0.00 0.00 0.00 21.8
81.35 29.51 219.99 51.84 63.72 25.97 99.0
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy R
in Rs (L
1 Feeder-2 Habak 7.39 3.01 7.86 4.38 59.27 2.17 5.6
2 Feeder-3 Habak 6.85 1.82 4.75 5.03 73.43 1.21 3.1
3 Feeder-5 Habak 10.20 3.96 10.34 6.24 61.18 3.51 9.1
4 Feeder-1 Hazratbal 2.50 2.16 5.64 0.34 13.60 0.07 0.4
5 Feeder-2 Hazratbal 7.24 4.52 11.80 2.72 37.57 5.44 14.2
6 Feeder-3 Hazratbal 6.32 2.44 6.37 3.88 61.39 1.87 4.8
7 Feeder-1 Kathidarwaza 4.71 1.55 4.05 3.16 67.09 1.53 3.9
8 Feeder-2 Kathidarwaza 8.10 1.95 5.09 6.15 75.93 1.39 3.6
(For Achievement under Triparitite MoU and for progress reporting to SERC)MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF SEPTEMBER, 2012
Total
7/28/2019 Serc Apdrp 2012 Final
15/76
9 Feeder-3 Kathidarwaza 0.77 0.75 1.96 0.02 2.60 0.65 11.44
10 Feeder-5 Kathidarwaz 6.90 1.54 4.02 5.36 77.68 0.52 1.37
11 Feeder-1 Rainawari 2.87 2.35 6.13 0.52 18.12 0.25 0.64
12 Feeder-2 Rainawari 1.56 0.27 0.70 1.29 82.69 0.17 0.45
13 Feeder-3 Rainawari 6.01 1.33 3.47 4.68 77.87 0.92 2.4
14 Feeder-4 Rainawari 10.23 2.08 5.43 8.15 79.67 1.19 3.1
15 PHE Pokhribal 1.03 1.03 8.28 0.00 0.00 3.17 8.28
82.68 30.76 85.88 51.92 62.80 24.07 72.85
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy Re
in Rs (La
1 Feeder-2 Habak 8.39 3.02 7.88 5.37 64.00 6.25 16.3
2 Feeder-3 Habak 7.81 1.93 5.04 5.88 75.29 2.40 6.27
3 Feeder-5 Habak 11.40 3.51 9.16 7.89 69.21 3.07 8.01
4 Feeder-1 Hazratbal 2.50 2.21 18.17 0.29 11.60 8.18 53.2
5 Feeder-2 Hazratbal 8.10 4.23 23.27 3.87 47.78 7.58 19.78
6 Feeder-3 Hazratbal 6.44 2.21 5.77 4.23 65.68 1.51 3.95
7 Feeder-1 Kathidarwaza 5.21 1.48 3.86 3.73 71.59 1.10 2.87
8 Feeder-2 Kathidarwaza 9.10 1.94 5.06 7.16 78.68 2.25 5.86
9 Feeder-3 Kathidarwaza 0.90 0.88 7.23 0.02 2.22 0.01 0.12
10 Feeder-5 Kathidarwaz 7.40 1.55 4.05 5.85 79.05 0.85 2.23
11 Feeder-1 Rainawari 2.76 2.31 6.03 0.45 16.30 0.00 0.01
12 Feeder-2 Rainawari 1.55 0.27 0.70 1.28 82.58 0.16 0.41
13 Feeder-3 Rainawari 6.31 1.37 3.58 4.94 78.29 1.90 4.96
14 Feeder-4 Rainawari 11.27 2.48 6.47 8.79 77.99 1.06 2.76
15 PHE Pokhribal 1.03 1.03 8.28 0.00 0.00 3.17 8.28
90.17 30.42 114.55 59.75 66.26 39.49 135.0Total
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF OCTUBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
7/28/2019 Serc Apdrp 2012 Final
16/76
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy Re
in Rs (L
1 Feeder-2 Habak 0.00 #DIV/0! 0.00
2 Feeder-3 Habak 0.00 #DIV/0! 0.00
3 Feeder-5 Habak 0.00 #DIV/0! 0.00
4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00
5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00
6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00
7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00
8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00
9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00
10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00
11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00
12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00
13 Feeder-3 Rainawari 0.00 #DIV/0! 0.00
14 Feeder-4 Rainawari 0.00 #DIV/0! 0.00
15 PHE Pokhribal 0.00 #DIV/0! 0.00
0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy Re
in Rs (L
1 Feeder-2 Habak 0.00 #DIV/0! 0.00
2 Feeder-3 Habak 0.00 #DIV/0! 0.00
3 Feeder-5 Habak 0.00 #DIV/0! 0.00
4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF DECEMBER, 2012
Total
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF NOVEMBER, 2012
(For Achievement under Triparitite MoU and for progress reporting to SERC)
(For Achievement under Triparitite MoU and for progress reporting to SERC)
7/28/2019 Serc Apdrp 2012 Final
17/76
5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00
6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00
7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00
8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00
9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00
10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00
11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00
12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00
13 Feeder-3 Rainawari 0.00 #DIV/0! 0.00
14 Feeder-4 Rainawari 0.00 #DIV/0! 0.00
15 PHE Pokhribal 0.00 #DIV/0! 0.00
0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy Re
in Rs (La
1 Feeder-2 Habak 0.00 #DIV/0! 0.00
2 Feeder-3 Habak 0.00 #DIV/0! 0.00
3 Feeder-5 Habak 0.00 #DIV/0! 0.00
4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00
5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00
6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00
7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00
8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00
9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00
10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00
11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00
12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00
13 Feeder-3 Rainawari 0.00 #DIV/0! 0.00
14 Feeder-4 Rainawari 0.00 #DIV/0! 0.00
15 PHE Pokhribal 0.00 #DIV/0! 0.00
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JANUARY, 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
7/28/2019 Serc Apdrp 2012 Final
18/76
0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.0
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy R
in Rs (L
1 Feeder-2 Habak 0.00 #DIV/0! 0.00
2 Feeder-3 Habak 0.00 #DIV/0! 0.00
3 Feeder-5 Habak 0.00 #DIV/0! 0.00
4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00
5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00
6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00
7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00
8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00
9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00
10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00
11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00
12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00
13 Feeder-3 Rainawari 0.00 #DIV/0! 0.0014 Feeder-4 Rainawari 0.00 #DIV/0! 0.00
15 PHE Pokhribal 0.00 #DIV/0! 0.00
0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.0
S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in
Rs (Lac's)Losses (LU's) %age Losses
Energy Realised
(LU's)
Energy R
in Rs (L
(For Achievement under Triparitite MoU and for progress reporting to SERC)
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF FEBRUARY, 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MARCH, 2013
Total
7/28/2019 Serc Apdrp 2012 Final
19/76
1 Feeder-2 Habak 0.00 #DIV/0! 0.00
2 Feeder-3 Habak 0.00 #DIV/0! 0.00
3 Feeder-5 Habak 0.00 #DIV/0! 0.00
4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00
5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00
6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00
7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00
8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00
9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00
10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00
11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00
12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00
13 Feeder-3 Rainawari 0.00 #DIV/0! 0.00
14 Feeder-4 Rainawari 0.00 #DIV/0! 0.00
15 PHE Pokhribal 0.00 #DIV/0! 0.00
0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00Total
7/28/2019 Serc Apdrp 2012 Final
20/76
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
0.00
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
7/28/2019 Serc Apdrp 2012 Final
21/76
0.00
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
7/28/2019 Serc Apdrp 2012 Final
22/76
0.00
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
0.00
Form # 6: En. Aud. Ind.
7/28/2019 Serc Apdrp 2012 Final
23/76
Whether KVAH
Based tariff
implemented
0.00
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
7/28/2019 Serc Apdrp 2012 Final
24/76
0.00
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
0.00
Form # 6: En. Aud. Ind.
7/28/2019 Serc Apdrp 2012 Final
25/76
Whether KVAH
Based tariff
implemented
0.00
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
7/28/2019 Serc Apdrp 2012 Final
26/76
0.00
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
7/28/2019 Serc Apdrp 2012 Final
27/76
0.00
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
0.00
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
7/28/2019 Serc Apdrp 2012 Final
28/76
0.00
Form # 6: En. Aud. Ind.
7/28/2019 Serc Apdrp 2012 Final
29/76
Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for
the Division
16 16
Energy Supplied (LU's) 11.18 11
Energy Billed (LU's) 11.18 11
Amount Billed (Lacs) 84.10 84
Revenue Collected (Lacs) 0.00 0
% of Revenue Collection 0.00 016 16
Energy Supplied (LU's) 11.31 11
Energy Billed (LU's) 11.31 11
Amount Billed (Lacs) 85.93 86
Revenue Collected (Lacs) 65.87 66
% of Revenue Collection 76.66 77
16 16
Energy Supplied (LU's) 9.19 9
Energy Billed (LU's) 9.19 9
Amount Billed (Lacs) 68.01 68
Revenue Collected (Lacs) 53.48 53
% of Revenue Collection 78.64 79
16 16
Energy Supplied (LU's) 9.87 10Energy Billed (LU's) 9.87 10
Amount Billed (Lacs) 73.67 74
Revenue Collected (Lacs) 65.00 65
% of Revenue Collection 88.23 88
16 16
Energy Supplied (LU's) 8.75 9
Energy Billed (LU's) 8.75 9
Amount Billed (Lacs) 65.73 66
Revenue Collected (Lacs) 44.60 45
% of Revenue Collection 67.86 68
16 16
Energy Supplied (LU's) 8.71 9
Energy Billed (LU's) 8.71 9Amount Billed (Lacs) 65.46 65
MONTHLY ENERGY ACCOUNT & REVENUE REALISATION FOR INSTALLATIONS HAVING LOAD 25 KVA & ABOVE FROM APRIL,
2012 TO JUNE, 2012
Form # 7
Energy Account
for the Month of
June, 2012
Energy Account
for the Month of
July, 2012
No. of Consumers
Energy/Revenue
Details
Energy Account
for the Month of
April, 2012
Energy Account
for the Month of
May, 2012
No. of Consumers
No. of Consumers
Energy Account
for the Month of
August, 2012
No. of Consumers
No. of Consumers
No. of Consumers
Energy Account
for the Month of
7/28/2019 Serc Apdrp 2012 Final
30/76
Revenue Collected (Lacs) 95.36 95
% of Revenue Collection 145.69 146
16 16
Energy Supplied (LU's) 10.44 10
Energy Billed (LU's) 10.44 10
Amount Billed (Lacs) 75.74 76
Revenue Collected (Lacs) 8.28 8
% of Revenue Collection 10.94 11
0
Energy Supplied (LU's) 0
Energy Billed (LU's) 0
Amount Billed (Lacs) 0Revenue Collected (Lacs) 0
% of Revenue Collection 0
0
Energy Supplied (LU's) 0
Energy Billed (LU's) 0
Amount Billed (Lacs) 0
Revenue Collected (Lacs) 0
% of Revenue Collection 0
0
Energy Supplied (LU's) 0
Energy Billed (LU's) 0
Amount Billed (Lacs) 0
Revenue Collected (Lacs) 0
% of Revenue Collection 0
0
Energy Supplied (LU's) 0
Energy Billed (LU's) 0
Amount Billed (Lacs) 0
Revenue Collected (Lacs) 0
% of Revenue Collection 0
0
Energy Supplied (LU's) 0
Energy Billed (LU's) 0
Amount Billed (Lacs) 0
Revenue Collected (Lacs) 0% of Revenue Collection 0
No. of Consumers
Energy Account
for the Month of
February, 2013
,
2012
No. of Consumers
Energy Account
for the Month of
March, 2013
Energy Account
for the Month of
Octuber, 2012
No. of Consumers
Energy Account
for the Month ofNovember, 2012
No. of Consumers
Energy Account
for the Month of
December, 2012
No. of Consumers
Energy Account
for the Month of
January, 2013
No. of Consumers
7/28/2019 Serc Apdrp 2012 Final
31/76
Hawal Rainawari K.K.Moulla Khanyar Zakura
No
KVA
Required
(KVAR)
Installed
(KVAR)
Deficiency
(KVAR)
%
Deficiency
Status of KVAR Compensation for Installations having Load 25 KVA & Above as on 30-06-2012(For achievement under Tripartite MoU and for progress reporting to SERC)
Format # 8
Electric Division-IV, Kh
KVAR Compensation DetailsElectric Division-IV, Khanyar. Tota
Di
Connections with load 25KVA & Above
KVAR
Compensation through
Shunt Capacitor
Executive Engine
7/28/2019 Serc Apdrp 2012 Final
32/76
S.No MonthComputerized
BillingHawal Rainawari K.K.Moulla Khanyar Zakura
th
Total Energy Biled (LU's) 38.99
Energy Billed through computer(LU's) 38.99
%age computerised Billing 100.00
Total Energy Biled (LU's) 38.28
Energy Billed through computer(LU's) 38.28%age computerised Billing 100.00
Total Energy Biled (LU's) 35.70
Energy Billed through computer(LU's) 35.70
%age computerised Billing 100.00
Total Energy Biled (LU's) 36.02
Energy Billed through computer(LU's) 36.02
%age computerised Billing 100.00
Total Energy Biled (LU's) 29.51
Energy Billed through computer(LU's) 29.51
%age computerised Billing 100.00
Total Energy Biled (LU's) 30.76
Energy Billed through computer(LU's) 30.76
%age computerised Billing 100.00Total Energy Biled (LU's) 30.42
Energy Billed through computer(LU's) 30.42
%age computerised Billing 100.00
Total Energy Biled (LU's) 0.00
Energy Billed through computer(LU's) 0.00
%age computerised Billing #DIV/0!
Total Energy Biled (LU's) 0.00
Energy Billed through computer(LU's) 0.00
%age computerised Billing #DIV/0!
Total Energy Biled (LU's) 0.00
Energy Billed through computer(LU's) 0.00
%age computerised Billing #DIV/0!
Total Energy Biled (LU's) 0.00
Energy Billed through computer(LU's) 0.00
%age computerised Billing #DIV/0!
Total Energy Biled (LU's) 0.00
Energy Billed through computer(LU's) 0.00
%age computerised Billing #DIV/0!
6
Form # 9
Apr-12
May-12
Jun-12
Monthly detail of Computerised Billed Energy From April 2012 to March 2013
(For Achievement under Triparitite MoU and for progress reporting to SERC)
11
8 Nov-12
1
2
3
4
5 Aug-12
Jul-12
Feb-13
Sep-12
7 Oct-12
12 Mar-13
9 Dec-12
10 Jan-13
7/28/2019 Serc Apdrp 2012 Final
33/76
DiVision:
N.A
17510 N.A
Computer Code: 9386 N
Sanctioned Load: 30 HP
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 N.A 0 N.A 0.00 N.A N.A 273158.28 0.00
2 May-12 N.A 0 N.A 0.00 N.A N.A 278259.49 0.00
3 Jun-12 N.A 0 N.A 0.00 N.A N.A 283437.22 0.00
4 Jul-12 N.A 0 N.A 0.00 N.A N.A 284426.22 0.00
5 Aug-12 N.A 0 N.A 0.00 N.A N.A 289696.45 0.00
6 Sep-12 N.A 0 N.A 0.00 N.A N.A 295045.73 0.00
7 Oct-12 N.A 0 N.A 0.00 N.A N.A 300475.25 0.00
8 Nov-12 305986.21
9 Dec-12 0.00
10 Jan-13 0.00
11 Feb-13 0.00
12 Mar-13 0.00
0
1
2
3
4
5
1
DiVision:
Asstt. Exe. Engineer
KVAH and demand readings will be required for load more than 100KW only.
Rainawari
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
recorded KWH units with power factor = 0.85
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
Name of Installation:- Nazir Ah. Zargar
Category: LT Indust. Supply Type:
Installation No: Meter Rated Current:
EM & RE Circle-Ist, Srinagar Electric DivisiCircle:
Meter Type:
Note:
Capacitor Installed: Y/ Rating of Capacitor:
CT Ratio:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
Circle: EM & RE Circle-Ist, Srinagar Electric Divisi
7/28/2019 Serc Apdrp 2012 Final
34/76
N.A
18334 N.A
Computer Code: 10074 N
Sanctioned Load: 70 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
computed
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 29411.76 25000.00 29411.7647 25000.00 0.85 N.A 1326242.25 104775.00
2 May-12 28235.29 24000.00 28235.2941 24000.00 0.85 N.A 1471497.75 100584.00
3 Jun-12 25882.35 22000.00 25882.3529 22000.00 0.85 N.A 1611640.23 92202.00
4 Jul-12 27058.82 23000.00 27058.8235 23000.00 0.85 N.A 1741556.67 96393.00
5 Aug-126 Sep-12
7 Oct-12
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
94000
1
2
3
4
5
1
DiVision:
N.A
46785 N.A
Computer Code: 9943 N
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Installation No: Meter Rated Current:
Rainawari
Note:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
recorded KWH units with power factor = 0.85
Asstt. Exe. Engineer
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Capacitor Installed: Y/ Rating of Capacitor:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
Electric DivisiCircle:
Category: Central CT Ratio:
Name of Installation:- Director National Institute of Technology
Supply Type:
Installation No: Meter Rated Current: Meter Type:
Name of Installation:- Executive Engineer, UEED
CT Ratio:
Meter Type:
Rating of Capacitor:
Category: LT Water Works
EM & RE Circle-Ist, Srinagar
Supply Type:
Capacitor Installed: Y/
KVAH and demand readings will be required for load more than 100KW only.
7/28/2019 Serc Apdrp 2012 Final
35/76
Sanctioned Load: 1200 KW
S.No
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 295294.12 251000.00 295294.118 251000 0.85 N.A 1639500.0 1517295
2 May-12 275294.12 234000.00 275294.118 234000 0.85 N.A 3186795.0 1414530
3 Jun-12 223529.41 190000.00 223529.412 190000 0.85 N.A 1444530 1148550
4 Jul-12 187058.82 159000.00 187058.824 159000 0.85 N.A 2623080 961155
5 Aug-12 180000.00 153000.00 180000 153000 0.85 N.A 2169705 924885
6 Sep-12 157647.06 134000.00 157647.059 134000 0.85 N.A 954885 810030
7 Oct-12 355294.12 302000.00 355294.118 302000 0.85 N.A 840030 1825590
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
1423000
1
2
3
4
5
1
DiVision:
N.A
75858A N.A
Computer Code: 10039 N
Sanctioned Load: 53 KW
Installation No:
Asstt. Exe. Engineer
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
KVAH and demand readings will be required for load more than 100KW only.
Category: State CT Ratio: Supply Type:
Meter Rated Current: Meter Type:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
Joint Director Poultary
Capacitor Installed: Y/ Rating of Capacitor:
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Circle: EM & RE Circle-Ist, Srinagar Electric Divisi
Rainawari
Name of Installation:-
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
recorded KWH units with power factor = 0.85
Note:
7/28/2019 Serc Apdrp 2012 Final
36/76
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 4096144.25 59845.5
2 May-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 4170480.8 73144.5
3 Jun-12 7058.82 6000.00 7058.82353 6000 0.85 N.A 4261042.1 39897
4 Jul-12 5882.35 5000.00 5882.35294 5000 0.85 N.A 4311041.4 33,247.50
5 Aug-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 4352928.3 46,546.50
6 Sep-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 4311040.1 59,845.50
7 Oct-12 3529.41 3000.00 3529.41176 3000 0.85 N.A 3285376.6 19,948.50
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
50000
1
2
3
4
5
1
DiVision:
N.A
14260A N.A
Computer Code: 10043 N
Sanctioned Load: 300 KW
Asstt. Exe. Engineer
Installation No: Meter Rated Current: Meter Type:
Capacitor Installed: Y/ Rating of Capacitor:
Category: State CT Ratio: Supply Type:
Name of Installation:- Supdtt. JLNM Hospital
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
Circle: EM & RE Circle-Ist, Srinagar Electric Divisi
Rainawari
KVAH and demand readings will be required for load more than 100KW only.
recorded KWH units with power factor = 0.85
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Note:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
7/28/2019 Serc Apdrp 2012 Final
37/76
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 114003.98 96903.39 114003.985 96903.387 0.85 N.A 806473.5 600801.00
2 May-12 115280.00 97988.00 115280 97988 0.85 N.A 1552958.7 607525.60
3 Jun-12 150535.29 127955.00 150535.294 127955 0.85 N.A 2307715.2 793321.00
4 Jul-12 127058.82 108000.00 127058.824 108000 0.85 N.A 0.0 669600.00
5 Aug-12 130588.24 111000.00 130588.235 111000 0.85 N.A 831108.0 688200.00
6 Sep-12 132352.94 112500.00 132352.941 112500 0.85 N.A 1685094.0 697500.00
7 Oct-12 129411.76 110000.00 129411.765 110000 0.85 N.A 2550519.0 682000.00
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
764346.39
1
2
3
4
5
1
DiVision:
N.A
6162SD N.A
Computer Code: 10049 N
Sanctioned Load: 32 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
Installation No: Meter Rated Current: Meter Type:
Capacitor Installed: Y/ Rating of Capacitor:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
KVAH and demand readings will be required for load more than 100KW only.
recorded KWH units with power factor = 0.85
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. EngineerRainawari
Name of Installation:- Joint Director Floriculture, Hazratbal
Category: State CT Ratio: Supply Type:
Circle: EM & RE Circle-Ist, Srinagar Electric Divisi
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Note:
7/28/2019 Serc Apdrp 2012 Final
38/76
A B C D E=D/C F G H
1 Apr-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1395814.38 51068.16
2 May-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1458917.54 51068.16
3 Jun-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1522020.69 51068.16
4 Jul-12
9035.29 7680.00 9035.29412 7680 0.85 N.A 1585123.85 51068.16
5 Aug-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1672950.41 51068.16
6 Sep-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1762094.36 51068.16
7 Oct-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1852575.48 51068.16
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
53760
1
2
3
4
5
1
DiVision:
N.A
90SD N.A
Computer Code: 10040 N
Sanctioned Load: 53 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
COMPUTE
D
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 1,908,727.50 46546.5
2 May-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 1966839.23 66495
Meter Rated Current: Meter Type:
Capacitor Installed: Y/ Rating of Capacitor:
Installation No:
Circle: EM & RE Circle-Ist, Srinagar
Category: State CT Ratio: Supply Type:
Electric Divisi
recorded KWH units with power factor = 0.85
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. Engineer
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Name of Installation:- Joint Director Poultary Briolers
Rainawari
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Note:
7/28/2019 Serc Apdrp 2012 Final
39/76
3 Jun-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 2049288.13 46546.5
4 Jul-12 7058.82 6000.00 7058.82353 6000 0.85 N.A 2107399.86 39897
5 Aug-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 2107399.20 46546.5
6 Sep-12 16470.59 14000.00 16470.5882 14000 0.85 N.A 2165510.93 93093
7 Oct-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 2280409.39 46546.5
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
58000
1
2
3
45
1
DiVision:
N.A
LAWDA2 N.A
Computer Code: 10085 N
Sanctioned Load: 200 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 30588.24 26000.00 30588.2353 26000 0.85 N.A 5665832.5 108966
2 May-12 27058.82 23000.00 27058.8235 23000 0.85 N.A 5848331.0 96393
3 Jun-12 31764.71 27000.00 31764.7059 27000 0.85 N.A 6105722.8 113157
4 Jul-12 32941.18 28000.00 32941.1765 28000 0.85 N.A 6293334.4 117348
5 Aug-12 30588.24 26000.00 30588.2353 26000 0.85 N.A 6583349.8 108966
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Capacitor Installed: Y/ Rating of Capacitor:
CT Ratio:200/5A
Installation No: Meter Rated Current: Meter Type:
Category: State
Name of Installation:- Ex. Engineer LAWDA, Habak
Supply Type:
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Circle:
Rainawari
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
EM & RE Circle-Ist, Srinagar Electric Divisi
recorded KWH units with power factor = 0.85
Asstt. Exe. Engineer
Note:
7/28/2019 Serc Apdrp 2012 Final
40/76
6 Sep-12 31764.71 27000.00 31764.7059 27000 0.85 N.A 6867336.1 113157
7 Oct-12 36470.59 31000.00 36470.5882 31000 0.85 N.A 6049359.0 129921
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
188000
1
2
3
4
5
1
DiVision:
N.A
LAWDA1 N.A
Computer Code: 10084 N
Sanctioned Load: 200 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 9411.76 8000.00 9411.76471 8000 0.85 N.A 840,711.94 33528
2 May-1212941.18 11000.00 12941.1765 11000 0.85 N.A 931176.10 46101
3 Jun-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 1036979.32 41910
4 Jul-12 9411.76 8000.00 9411.76471 8000 0.85 N.A 1137669.52 33528
5 Aug-12 7058.82 6000.00 7058.82353 6000 0.85 N.A 1246555.69 25146
6 Sep-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 1346695.71 29337
7 Oct-12 1176.47 1000.00 1176.47059 1000 0.85 N.A 887032.71 4191
8 Nov-12
Asstt. Exe. EngineerRainawari
Capacitor Installed: Y/ Rating of Capacitor:
Category: State
Installation No: Meter Rated Current: Meter Type:
Circle:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
CT Ratio:200/5A Supply Type:
Name of Installation:- Ex. Engineer LAWDA, Hazratbal
EM & RE Circle-Ist, Srinagar Electric Divisi
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
KVAH and demand readings will be required for load more than 100KW only.
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Note:
recorded KWH units with power factor = 0.85
7/28/2019 Serc Apdrp 2012 Final
41/76
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
51000
1
2
3
4
5
1
DiVision:
N.A
222M N.A
Computer Code: 10060 N
Sanctioned Load: 2017 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12474117.65 403000.00 474117.647 403000 0.85 N.A 7383068 2436135
2 May-12450588.24 383000.00 450588.235 383000 0.85 N.A 10405578 2315235
3 Jun-12348235.29 296000.00 348235.294 296000 0.85 N.A 13280589 1789320
4 Jul-12 421176.47 358000.00 421176.471 358000 0.85 N.A 15513985 2164110
5 Aug-12368235.29 313000.00 368235.294 313000 0.85 N.A 13204624 1892085
6 Sep-12420000.00 357000.00 420000 357000 0.85 N.A 15563393 2158065
7 Oct-12469411.76 399000.00 469411.765 399000 0.85 N.A 13246657 2411955
8 Nov-12
9 Dec-12
Capacitor Installed: Y/
Name of Installation:- Registrar Kashmir University
Category: State CT Ratio:60/5A Supply Type:
Rating of Capacitor:
Installation No: Meter Rated Current: Meter Type:
Circle: EM & RE Circle-Ist, Srinagar Electric Divisi
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. EngineerRainawari
Note:Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
recorded KWH units with power factor = 0.85
7/28/2019 Serc Apdrp 2012 Final
42/76
10 Jan-13
11 Feb-13
12 Mar-13
2509000
1
2
3
4
5
1
DiVision:
N.A
14260 N.A
Computer Code: 10042 N
Sanctioned Load: 90 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
EnergyCharges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 31830.55 27055.97 31830.5503 27055.968 0.85 N.A 431705 167747
2 May-12 32418.79 27555.97 32418.7856 27555.968 0.85 N.A 640283.81 170847
3 Jun-12 31242.31 26555.97 31242.315 26555.968 0.85 N.A 852676 164647
4 Jul-12 63529.41 54000.00 63529.4118 54000 0.85 N.A 0 334800
5 Aug-12 61176.47 52000.00 61176.4706 52000 0.85 N.A 414054 322400
6 Sep-12 58823.53 50000.00 58823.5294 50000 0.85 N.A 812856 310000
7 Oct-12 60000.00 51000.00 60000 51000 0.85 N.A 1196406 316200
8 Nov-12
9 Dec-12
10 Jan-13
Asstt. Exe. EngineerRainawari
KVAH and demand readings will be required for load more than 100KW only.
recorded KWH units with power factor = 0.85
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Note:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Installation No: Meter Rated Current: Meter Type:
State
Capacitor Installed: Y/ Rating of Capacitor:
Circle: EM & RE Circle-Ist, Srinagar Electric Divisi
Category:
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
CT Ratio: Supply Type:
Name of Installation:- Supdtt. JLNM Hospital
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
7/28/2019 Serc Apdrp 2012 Final
43/76
11 Feb-13
12 Mar-13
288167.9
1
2
3
4
5
1
DiVision:
N.A
46827 N.A
Computer Code: 10045 N
Sanctioned Load: 51 KW
S.No Month
KVAH
Unitssupplied
KWH Unitssupplied
KVAH Units
recorded /computed
KWH Unitsrecorded
AV-PowerFactor
Max.
DemandRecorded
KVA
OpeningBalance
Energy
Charges / F.R
Chargesbilled
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 20000.00 17000.00 20000 17000 0.85 N.A 14,361,727.00 113041.5
2 May-12 22352.94 19000.00 22352.9412 19000 0.85 N.A 13600912.63 126340.5
3 Jun-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 13962668 73144.5
4 Jul-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 14053179 59845.5
5 Aug-12 14117.65 12000.00 14117.6471 12000 0.85 N.A 14339378 79794
6 Sep-12 18823.53 16000.00 18823.5294 16000 0.85 N.A 14654571 106392
7 Oct-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 15007429 66495
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
Rainawari
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Note:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
recorded KWH units with power factor = 0.85
Asstt. Exe. Engineer
State CT Ratio: Supply Type:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
Capacitor Installed: Y/ Rating of Capacitor:
Installation No: Meter Rated Current: Meter Type:
Name of Installation:- Supdtt. Mental Hospital
Category:
Circle: EM & RE Circle-Ist, Srinagar Electric Divisi
7/28/2019 Serc Apdrp 2012 Final
44/76
94000
1
2
3
45
1
DiVision:
N.A
5531M N.A
Computer Code: 10030 N
Sanctioned Load: 360 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 129411.76 110000.00 129411.765 110000 0.85 N.A 30794952 731445
2 May-12 137647.06 117000.00 137647.059 117000 0.85 N.A 31696315 777991.5
3 Jun-12 95294.12 81000.00 95294.1176 81000 0.85 N.A 32654465 538609.5
4 Jul-12 92941.18 79000.00 92941.1765 79000 0.85 N.A 32520568 525310.5
5 Aug-12 90588.24 77000.00 90588.2353 77000 0.85 N.A 33170447 512011.5
6 Sep-12 40000.00 34000.00 40000 34000 0.85 N.A 33804101 226083
7 Oct-12 30588.24 26000.00 30588.2353 26000 0.85 N.A 34088922 172887
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
524000
Rainawari
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Installation No:
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Note:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Capacitor Installed: Y/ Rating of Capacitor:
Supply Type:
Electric Divisi
Meter Rated Current: Meter Type:
Circle: EM & RE Circle-Ist, Srinagar
Name of Installation:- Supdtt. Central Jail, Kathi Darwaza
Category: State CT Ratio:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
recorded KWH units with power factor = 0.85
Asstt. Exe. Engineer
7/28/2019 Serc Apdrp 2012 Final
45/76
1
2
3
4
5
1
DiVision:
N.A
5531A N.A
Computer Code: 10031 N
Sanctioned Load: 47.25 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 1200510 73144.5
2 May-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 1290946 59845.5
3 Jun-12 0.00 0.00 0 0 0.85 N.A 1365158 0
4 Jul-12 0.00 0.00 0 0 0.85 N.A 1166358 0
5 Aug-12 0.00 0.00 0 0 0.85 N.A 1167558 0
6 Sep-12 0.00 0.00 0 0 0.85 N.A 1168758 0
7 Oct-12 0.00 0.00 0 0 0.85 N.A 1169958 0
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
20000
KVAH and demand readings will be required for load more than 100KW only.
Rainawari
Note:
Capacitor Installed: Y/ Rating of Capacitor:
Note:
Supply Type:Category: State CT Ratio:
Circle:
Installation No: Meter Rated Current: Meter Type:
EM & RE Circle-Ist, Srinagar Electric Divisi
Name of Installation:- Supdtt. Central Jail
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
recorded KWH units with power factor = 0.85
Asstt. Exe. Engineer
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
7/28/2019 Serc Apdrp 2012 Final
46/76
1
2
3
4
5
1
DiVision:
N.A
420SM N.AComputer Code: 8482 N
Sanctioned Load: 26 HP
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 3170.59 2695.00 3170.58824 2695 0.85 N.A 214162.188 7855.925
2 May-12 3170.59 2695.00 3170.58824 2695 0.85 N.A 227976 7855.925
3 Jun-12 2652.94 2255.00 2652.94118 2255 0.85 N.A 241996 6573.325
4 Jul-12 871.76 741.00 871.764706 741 0.85 N.A 1898 2160.01
5 Aug-12 128.24 109.00 128.235294 109 0.85 N.A 0 317.73
6 Sep-12 280.00 238.00 280 238 0.85 N.A 1 693.77
7 Oct-12 98.82 84.00 98.8235294 84 0.85 N.A 1733 244.86
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
8817
1
Note:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Capacitor Installed: Y/ Rating of Capacitor:
Category: LT Indust.
Installation No: Meter Rated Current: Meter Type:
Circle:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
CT Ratio: Supply Type:
Name of Installation:- Ghulam Mohd. Zaroo
EM & RE Circle-Ist, Srinagar Electric Divisi
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Rainawari
recorded KWH units with power factor = 0.85
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. Engineer
7/28/2019 Serc Apdrp 2012 Final
47/76
2
3
4
5
1
DiVision:
N.A
100-SD N.AComputer Code: 10021 N
Sanctioned Load: 760 KW
S.No Month
KVAH
Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max.
Demand
Recorded
KVA
Opening
Balance
Energy
Charges / F.R
Charges
billed
(In Rs.)
A B C D E=D/C F G H
1 Apr-12 137647.06 117000.00 137647.059 117000 0.85 NA 9060675 758043
2 May-12 181176.47 154000.00 181176.471 154000 0.85 NA 9999662 997766
3 Jun-12 123529.41 105000.00 123529.412 105000 0.85 NA 11399579 680295
4 Jul-12 167058.82 142000.00 167058.824 142000 0.85 NA 12243714 920018
5 Aug-12 121176.47 103000.00 121176.471 103000 0.85 NA 13380311 667337
6 Sep-12 121176.47 103000.00 121176.471 103000 0.85 NA 12200045 667337
7 Oct-12 112941.18 96000.00 112941.176 96000 0.85 NA 12383046 621984
8 Nov-12
9 Dec-12
10 Jan-13
11 Feb-13
12 Mar-13
820000
1
Asstt. Exe. EngineerRainawari
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
KVAH and demand readings will be required for load more than 100KW only.
recorded KWH units with power factor = 0.85
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Capacitor Installed: Y/ Rating of Capacitor:
Note:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Name of Installation:- Ex. Engineer PHE, Pokhribal
Category: State CT Ratio: Supply Type:
Installation No: Meter Rated Current: Meter Type:
Circle: EM & RE Circle-Ist, Srinagar Electric Divisi
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR
7/28/2019 Serc Apdrp 2012 Final
48/76
2
3
4
5
1
Asstt. Exe. EngineerRainawari
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
KVAH and demand readings will be required for load more than 100KW only.
recorded KWH units with power factor = 0.85
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
7/28/2019 Serc Apdrp 2012 Final
49/76
LT3Ph
N.A Name of 33/11KV Sub-Stations:
N.A Feeder No: F-3
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
989.00 0.00 0.00 0.00 0.00 989.00 274147.28 0.00 274147.28
989.00 0.00 0.00 0.00 0.00 989.00 279248.49 0.00 279248.49
989.00 0.00 0.00 0.00 0.00 989.00 284426.22 0.00 284426.22
989.00 0.00 0.00 0.00 0.00 989.00 285415.22 0.00 285415.22
989.00 0.00 0.00 0.00 0.00 989.00 290685.45 0.00 290685.45
989.00 0.00 0.00 0.00 0.00 989.00 296034.73 0.00 296034.73
989.00 0.00 0.00 0.00 0.00 989.00 301464.25 0.00 301464.25
6923 0
1
2
3
Executive EngineerElectric Division-IV, khanyar
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Surcharge on HT consumers for having metering on LT.
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Rainawari
Rainawari
Type: Metered / Flat Rate: Flat Rate
on-IV, Khanyar Sub-Division:-
Sub-Division:-on-IV, Khanyar Rainawari
7/28/2019 Serc Apdrp 2012 Final
50/76
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-3
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
17430.00 23050.5 9525.00 0.00 0.00 145255.50 1471497.8 0.00 1471497.8
17430.00 22128.48 9144.00 0.00 0.00 140142.48 1611640.2 0.00 1611640.2
17430.00 20284.44 8382.00 0.00 0.00 129916.44 1741556.7 0.00 1741556.7
17430.00 21206.46 8763.00 0.00 0.00 135029.46 1876586.1 0.00 1876586.1
550343.88 0
1
2
3
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-2
Executive EngineerElectric Division-IV, khanyar
Rainawarion-IV, Khanyar
Type: Metered / Flat Rate:
Hazratabal
Metered
Surcharge shall include following:
Type: Metered / Flat Rate:
Metered
Rainawari
Sub-Division:-
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Surcharge on HT consumers for having metering on LT.
7/28/2019 Serc Apdrp 2012 Final
51/76
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
30000 0 0 0 0 1547295 3186795 0 3186795.0
30000 0 0 0 0 1444530 4631325 3186795 1444530.0
30000 0 0 0 0 1178550 2623080 0 2623080.0
30000 0 0 0 0 991155 3614235 1,444,530.00 2169705.0
30000 0 0 0 0 954885 3124590 2,169,705.00 954885.0
30000 0 0 0 0 840030 1794915 954,885.00 840030.0
30000 0 0 0 0 1855590 2695620 0 2695620.0
8812035 7755915
1
2
3
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-3
Metered
Kathi Darwaza
Electric Division-IV, khanyar
MAR 2013.
Type: Metered / Flat Rate:
Rainawari
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
on-IV, Khanyar
Executive Engineer
Sub-Division:-
Surcharge on HT consumers for having metering on LT.
Surcharge shall include following:
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
7/28/2019 Serc Apdrp 2012 Final
52/76
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P1325 13166.01 5440.5 0.00 0.00 74336.51 4170480.8 0.0 4170480.8
1325 16091.79 6649.5 0.00 0.00 90561.29 4261042.1 0.0 4261042.1
1325 8777.34 3627 0.00 0.00 49999.34 4311041.4 0.0 4311041.4
1325 7314.45 33,247.50 0.00 0.00 41886.95 4352928.3 0.0 4352928.3
1325 10240.23 4,231.50 0.00 0.00 58111.73 4411040.1 100000.0 4311040.1
1325 13166.01 5,440.50 0.00 0.00 74336.51 4385376.6 1100000.0 3285376.6
1325 4388.67 1,813.50 0.00 0.00 25662.17 3311038.8 0.0 3311038.8
414894.5 1200000
1
2
3
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-1
Executive Engineer
Metered
Rainawari
Sub-Division:-
Type: Metered / Flat Rate:
Rainawarion-IV, Khanyar
Electric Division-IV, khanyar
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Surcharge on HT consumers for having metering on LT.
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Surcharge shall include following:
7/28/2019 Serc Apdrp 2012 Final
53/76
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
7500.00 132176.22 6008.01 0.00 0.00 746485.23 1552958.7 0.0 1552958.7
7500.00 133655.63 6075.26 0.00 0.00 754756.49 2307715.2 0.0 2307715.2
7500.00 174530.62 7933.21 0.00 0.00 983284.83 3291000.0 3291000.0 0.0
7500.00 147312 6696.00 0.00 0.00 831108.00 831108.0 0.0 831108.0
7500.00 151404 6882.00 0.00 0.00 853986.00 1685094.0 0.0 1685094.0
7500.00 153450 6975.00 0.00 0.00 865425.00 2550519.0 0.0 2550519.0
7500.00 150040 6820.00 0.00 0.00 846360.00 3396879.0 0.0 3396879.0
5881405.548 3291000
1
2
3
LT3Ph
N.A Name of 33/11KV Sub-Stations:
N.A Feeder No: F-5
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
2013.
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Surcharge on HT consumers for having metering on LT.
Executive EngineerElectric Division-IV, khanyar
Habak
Rainawari
Type: Metered / Flat Rate: Metered
on-IV, Khanyar Sub-Division:-
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
7/28/2019 Serc Apdrp 2012 Final
54/76
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
800 11234.995 4642.56 0.00 0.00 63103.16 1458917.5 0.0 1458917.54
800 11234.995 4642.56 0.00 0.00 63103.16 1522020.7 0.0 1522020.69
800 11234.995 4642.56 0.00 0.00 63103.16 1585123.8 0.0 1585123.85
800 11234.995 4642.56 0.00 0.00 63103.16 1648227.0 0.0 1648227.00
800 11234.995 4642.56 0.00 0.00 63103.16 1736053.6 0.0 1736053.56
800 11234.995 4642.56 0.00 0.00 63103.16 1825197.5 0.0 1825197.52
800 11234.995 4642.56 0.00 0.00 63103.16 1915678.6 0.0 1915678.64
441722.0864 0
1
2
3
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-3
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
1325 10240.23 4231.5 0.00 0.00 58111.73 1966839.23 0.00 1966839.23
1325 14628.9 6045 0.00 0.00 82448.90 2049288.13 0.00 2049288.13
Sub-Division:-on-IV, Khanyar
Type: Metered / Flat Rate: Metered
Surcharge on HT consumers for having metering on LT.
Executive Engineer
Surcharge shall include following:
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Kathi Darwaza
Rainawari
Electric Division-IV, khanyar
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
7/28/2019 Serc Apdrp 2012 Final
55/76
1325 10240.23 4231.5 0.00 0.00 58111.73 2107399.86 0.00 2107399.86
1325 8777.34 3627 0.00 0.00 49999.34 2157399.20 50000.00 2107399.20
1325 10240.23 4231.5 0.00 0.00 58111.73 2165510.93 0.00 2165510.93
1325 20480.46 8463 0.00 0.00 114898.46 2280409.39 0.00 2280409.39
1325 10240.23 4231.5 0.00 0.00 58111.73 2338521.12 0.00 2338521.12
479793.62 50000
1
23
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-2
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
49560 23972.52 9906 0.00 0.00 182498.52 5848331.0 0.0 5848331.0
49560 21206.46 8763 0.00 0.00 167159.46 6015490.5 0.0 6015490.5
49560 24894.54 10287 0.00 0.00 187611.54 6293334.4 0.0 6293334.4
49560 25816.56 10668.00 0.00 0.00 192724.56 6486058.9 0.0 6486058.9
49560 23972.52 9906.00 0.00 0.00 182498.52 6765848.3 0.0 6765848.3
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Type: Metered / Flat Rate: Metered
Hazratbal
Sub-Division:-
Electric Division-IV, khanyar
Rainawarion-IV, Khanyar
Surcharge on HT consumers for having metering on LT.
Executive Engineer
7/28/2019 Serc Apdrp 2012 Final
56/76
49560 24894.54 10287.00 0.00 0.00 187611.54 7054947.6 1094988.0 5959959.6
49560 28582.62 11811.00 0.00 0.00 208063.62 6257422.6 0.0 6257422.6
1308167.76 1094988
1
2
3
11KV
HTTrivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-2
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
49560 7376.16 3,048.00 0.00 0.00 90464.16 931176.10 0.0 931176.10
49560 10142.22 4,191.00 0.00 0.00 105803.22 1036979.32 0.00 1036979.32
49560 9220.2 3,810.00 0.00 0.00 100690.20 1137669.52 0.00 1137669.52
49560 7376.16 3,048.00 0.00 0.00 90464.16 1228133.68 0.00 1228133.68
49560 5532.12 2,286.00 0.00 0.00 80238.12 1326793.81 0.00 1326793.81
49560 6454.14 2,667.00 0.00 0.00 85351.14 1432046.85 558123.00 873923.85
49560 922.02 381.00 0.00 0.00 54673.02 941705.73 0.00 941705.73
Executive EngineerElectric Division-IV, khanyar
Type: Metered / Flat Rate:
Hazratbal
Metered
2013.
Rainawarion-IV, Khanyar Sub-Division:-
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Surcharge on HT consumers for having metering on LT.
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
7/28/2019 Serc Apdrp 2012 Final
57/76
607684.02 558123
1
2
3
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-1
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
50425 535949.7 0.00 0.00 0.00 3022509.7 10405578 0.0 10405578
50425 509351.7 0.00 0.00 0.00 2875011.7 13280589 0.0 13280589
50425 393650.4 0.00 0.00 0.00 2233395.4 15513985 0.0 15513985
50425 476104.2 0.00 0.00 0.00 2690639.2 18204624 5000000.0 13204624
50425 416258.7 0.00 0.00 0.00 2358768.7 15563393 0.0 15563393
50425 474774.3 0.00 0.00 0.00 2683264.3 18246657 5000000.0 13246657
50425 530630.1 0.00 0.00 0.00 2993010.1 16239667 0.0 16239667
Electric Division-IV, khanyar
Type: Metered / Flat Rate: Metered
Hazratbal
Rainawarion-IV, Khanyar Sub-Division:-
Executive Engineer
Surcharge on HT consumers for having metering on LT.
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
7/28/2019 Serc Apdrp 2012 Final
58/76
18856599.1 10000000
1
2
3
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-1
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
2250 36904.34 1677.47 0.00 0.00 208578.8 640284 0.0 640284
2250 37586.34 1708.47 0.00 0.00 212391.8 852676 0.0 852676
2250 36222.34 1646.47 0.00 0.00 204765.8 1057441 1057441.0 0
2250 73656 3348.00 0.00 0.00 414054.0 414054 0.0 414054
2250 70928 3224.00 0.00 0.00 398802.0 812856 0.0 812856
2250 68200 3100.00 0.00 0.00 383550.0 1196406 0.0 1196406
2250 69564 3162.00 0.00 0.00 391176.0 1587582 0.0 1587582
Executive Engineer
Electric Division-IV, khanyar
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Surcharge on HT consumers for having metering on LT.
Surcharge shall include following:
Metered
Rainawari
Type: Metered / Flat Rate:
on-IV, Khanyar RainawariSub-Division:-
7/28/2019 Serc Apdrp 2012 Final
59/76
2213318.43 1057441
1
2
3
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-3
Demandcharges
billed (In
Rs. )
ED Billed
(In Rs.)
CapacitorSurcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Latepayment
surchar
ge biled
TotalAmount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
1275 24869.13 10276.50 0.00 0.00 139185.6 14500913 900000.0 13600913
1275 27794.91 11485.50 0.00 0.00 155410.4 13756323 0.0 13756323
1275 16091.79 6649.50 0.00 0.00 90511.3 14053179 0.0 14053179
1275 13166.01 5440.50 0.00 0.00 74286.5 14127466 0.0 14127466
1275 17554.68 7254.00 0.00 0.00 98623.7 14438001 0.0 144380011275 23406.24 9672.00 0.00 0.00 131073.2 14785645 0.0 14785645
1275 14628.9 6045.00 0.00 0.00 82398.9 15089828 0.0 15089828
Executive EngineerElectric Division-IV, khanyar
Surcharge on HT consumers for having metering on LT.
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Kathi Darwaza
Rainawari
Type: Metered / Flat Rate: Metered
on-IV, Khanyar Sub-Division:-
7/28/2019 Serc Apdrp 2012 Final
60/76
771489.66 900000
1
2
3
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-3
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
9000 160917.9 66495.00 0.00 0.00 901362.9 31696315 0.0 31696315
9000 171158.13 70726.50 0.00 0.00 958149.6 32654465 0.0 32654465
9000 118494.09 48964.50 0.00 0.00 666103.6 33320568 800000.0 32520568
9000 115568.31 47755.50 0.00 0.00 649878.8 33170447 0.0 33170447
9000 112642.53 46546.50 0.00 0.00 633654.0 33804101 0.0 33804101
9000 49738.26 20553.00 0.00 0.00 284821.3 34088922 0.0 34088922
9000 38035.14 15717.00 0.00 0.00 219922.1 34308844 0.0 34308844
4313892.36 800000
Executive EngineerElectric Division-IV, khanyar
Surcharge on HT consumers for having metering on LT.
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
on-IV, Khanyar
Type: Metered / Flat Rate: Metered
Rainawari
Kathi Darwaza
Sub-Division:-
7/28/2019 Serc Apdrp 2012 Final
61/76
1
2
3
11KVHT
Trivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-3
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
1200 16091.79 6649.50 0.00 0.00 90436.3 1290946 0.0 1290946
1200 13166.01 5440.50 0.00 0.00 74211.5 1365158 0.0 1365158
1200 0 0.00 0.00 0.00 1200.0 1366358 200000.0 1166358
1200 0 0.00 0.00 0.00 1200.0 1167558 0.0 1167558
1200 0 0.00 0.00 0.00 1200.0 1168758 0.0 1168758
1200 0 0.00 0.00 0.00 1200.0 1169958 0.0 1169958
1200 0 0.00 0.00 0.00 1200.0 1171158 0.0 1171158
170647.8 200000
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Executive EngineerElectric Division-IV, khanyar
Kathi Darwaza
Type: Metered / Flat Rate: Metered
Sub-Division:- Rainawarion-IV, Khanyar
Surcharge on HT consumers for having metering on LT.
2013.
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
7/28/2019 Serc Apdrp 2012 Final
62/76
1
2
3
LT3PhN.A Name of 33/11KV Sub-Stations:
N.A Feeder No: F-2
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Billed(In
Rs.)
Surcharge
for metering
on LT side
Late
payment
surchar
ge biled
Total
Amount
Billed
(In Rs.)
Total
Amount due
(in Rs.)
Amount
received (In
Rs.)
Arrears
I J K L M =H+I+J+K+L+ O=G+N P Q=O-P
860 1728.3035 416.24 0.00 0.00 10444.2 224606 0.0 224606
860 1728.3035 399.69 0.00 0.00 10444.2 238420 0.0 238420
860 1446.1315 657.33 0.00 0.00 8879.5 250875 0.0 250875
860 475.2022 196.37 0.00 0.00 3495.2 5393 5393.0 0
860 69.9006 28.89 0.00 0.00 1247.6 1248 1247.0 1
860 152.6294 63.07 0.00 0.00 1706.4 1707 0.0 1707
860 53.8692 22.26 0.00 0.00 1158.7 2892 0.0 2892
37375.8849 6640
Surcharge shall include following:
Type: Metered / Flat Rate:Rainawari
Metered
Rainawarion-IV, Khanyar Sub-Division:-
Surcharge shall include following:
Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP
except for domestic, street lighting and loads where KVAH billing done.
Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.
Electric Division-IV, khanyar
Surcharge on HT consumers for having metering on LT.
Executive Engineer
7/28/2019 Serc Apdrp 2012 Final
63/76
1
2
3
11KV
HTTrivector Name of 33/11KV Sub-Stations:
N.A Feeder No: F-3
Demand
charges
billed (In
Rs. )
ED Billed
(In Rs.)
Capacitor
Surcharge
Bille