Serc Apdrp 2012 Final

Embed Size (px)

Citation preview

  • 7/28/2019 Serc Apdrp 2012 Final

    1/76

    S.No MonthEnergy Input

    Billed and lossesHawal Rainawari K.K.Moulla Khanyar Zakura

    Total for

    the Division

    Input (LU's) 129.51 129.51

    Billed (LU's) 38.99 38.99

    Losses % 69.89 69.89

    Input (LU's) 121.43 121.43

    Billed (LU's) 38.28 38.28

    Losses % 68.48 68.48Input (LU's) 110.79 110.79

    Billed (LU's) 35.70 35.70

    Losses % 67.78 67.78

    Input (LU's) 94.25 94.25

    Billed (LU's) 36.02 36.02

    Losses % 61.78 61.78

    Input (LU's) 81.35 81.35

    Billed (LU's) 29.51 29.51

    Losses % 63.72 63.72

    Input (LU's) 81.65 81.65

    Billed (LU's) 29.73 29.73

    Losses % 63.59 63.59

    Input (LU's) 89.14 89.14Billed (LU's) 29.39 29.39

    Losses % 67.03 67.03

    Input (LU's) 0.00 0.00

    Billed (LU's) 0.00 0.00

    Losses % #DIV/0! #DIV/0!

    Input (LU's) 0.00 0.00

    Billed (LU's) 0.00 0.00

    Losses % #DIV/0! #DIV/0!

    Input (LU's) 0.00 0.00

    Billed (LU's) 0.00 0.00

    Losses % #DIV/0! #DIV/0!

    Input (LU's) 0.00 0.00

    Billed (LU's) 0.00 0.00Losses % #DIV/0! #DIV/0!

    4

    5 Aug-12

    Form # 1: Monthly Energy-Kashmir

    MONTHLY ENERGY INPUT, ENERGY BILLED & LOSSES FOR THE YEAR 2012-113(For Achievement under Triparitite MoU and for progress to SERC)

    Apr-121

    Jun-12

    2 May-12

    Sep-126

    Feb-13

    8

    Oct-12

    Nov-12

    Jul-12

    3

    7

    9 Dec-12

    10 Jan-13

    11

  • 7/28/2019 Serc Apdrp 2012 Final

    2/76

    Input (LU's) 0.00 0.00

    Billed (LU's) 0.00 0.00

    Losses % #DIV/0! #DIV/0!

    *

    12 Mar-13

  • 7/28/2019 Serc Apdrp 2012 Final

    3/76

    Form # 2: Monthly Meters-Kashmir

    S.No Month

    Total consumers

    electronic metering level

    and % metering at end of

    month

    Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal fo

    the Divisi

    Total Consumers 11000 11000.0

    Meters Installed 9921 9921.0

    % Metering 90.19 90.19

    Total Consumers 11082 11082.0

    Meters Installed 10333 10333.0% Metering 93.24 93.24

    Total Consumers 11137 11137.0

    Meters Installed 10821 10821.0

    % Metering 97.16 97.16

    Total Consumers 11199 11199.0

    Meters Installed 10971 10971.0

    % Metering 97.96 97.96

    Total Consumers 11198 11198.0

    Meters Installed 10970 10970.0

    % Metering 97.96 97.96

    Total Consumers 11191 11191.0

    Meters Installed 10963 10963.0

    % Metering 97.96 97.96Total Consumers 11203 11203.0

    Meters Installed 10963 10963.0

    % Metering 97.86 97.86

    Total Consumers 0 0.00

    Meters Installed 0.00

    % Metering #DIV/0! #DIV/0

    Total Consumers 0 0.00

    Meters Installed 0.00

    % Metering #DIV/0! #DIV/0

    Total Consumers 0 0.00

    Meters Installed 0.00

    % Metering #DIV/0! #DIV/0

    Total Consumers 0 0.00Meters Installed 0.00

    10 Jan-13

    Feb-1311

    4 Jul-12

    9 Dec-12

    6 Sep-12

    7 Oct-12

    8 Nov-12

    MONTHLY TOTAL CONSUMERS, ELECTRONIC METERS INSTALLED AND %age ELECTRONIC FOR THE YEAR 2012-13(For Achievement under Triparitite MoU and for progress reporting to SERC)

    1 Apr-12

    5 Aug-12

    2 May-12

    3 Jun-12

  • 7/28/2019 Serc Apdrp 2012 Final

    4/76

    % Metering #DIV/0! #DIV/0!

    Total Consumers 0 0.00

    Meters Installed 0.00

    % Metering #DIV/0! #DIV/0!

    Mar-1312

  • 7/28/2019 Serc Apdrp 2012 Final

    5/76

    Form # 3: Monthly Revenue-Kashmir

    S.No Month

    Monthly Revenue

    Realised, Pure & ED

    (Rs. In lacs)

    Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for

    the Division

    Revenue Pure 26.51 26.51

    ED 5.82 5.82

    Total (Rs. In lacs) 32.33 32.33

    Revenue Pure 86.34 86.34

    ED 18.95 18.95Total 105.29 105.29

    Revenue Pure 13.77 13.77

    ED 3.02 3.02

    Total 16.79 16.79

    Revenue Pure 152.36 152.36

    ED 33.44 33.44

    Total 185.80 185.80

    Revenue Pure 81.25 81.25

    ED 17.83 17.83

    Total 99.08 99.08

    Revenue Pure 59.88 59.88

    ED 13.14 13.14

    Total 73.02 73.02Revenue Pure 111.97 111.97

    ED 24.58 24.58

    Total 136.55 136.55

    Revenue Pure 0.00 0.00

    ED 0.00 0.00

    Total 0.00 0.00

    Revenue Pure 0.00 0.00

    ED 0.00 0.00

    Total 0.00 0.00

    Revenue Pure 0.00 0.00

    ED 0.00 0.00

    Total 0.00 0.00

    Revenue Pure 0.00 0.00ED 0.00 0.00

    10

    11

    Jan-13

    Feb-13

    4 Jul-12

    9 Dec-12

    6 Sep-12

    7 Oct-12

    8 Nov-12

    MONTHLY REVENUE REALISED (PURE AND ED) FOR THE YEAR 2012-13(For Achievement under Triparitite MoU and for progress reporting to SERC)

    1 Apr-12

    5 Aug-12

    2 May-12

    3 Jun-12

  • 7/28/2019 Serc Apdrp 2012 Final

    6/76

    Total 0.00 0.00

    Revenue Pure 0.00 0.00

    ED 0.00 0.00

    Total 0.00 0.00

    12 Mar-13

  • 7/28/2019 Serc Apdrp 2012 Final

    7/76

    S.No Month

    Monthly

    Connections added

    metered and flat rate

    (No's)

    Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for

    the Division

    Metered 15 15

    Flat Rate 0 0

    Total 15 15

    Metered 92 92

    Flat Rate 0 0Total 92 92

    Metered 91 91

    Flat Rate 0 0

    Total 91 91

    Metered 8 8

    Flat Rate 0 0

    Total 8 8

    Metered 8 8

    Flat Rate 0 0

    Total 8 8

    Metered 49 49

    Flat Rate 0 0

    Total 49 49Metered 1 1

    Flat Rate 0 0

    Total 1 1

    Metered 0

    Flat Rate 0

    Total 0

    Metered 0

    Flat Rate 0

    Total 0

    Metered 0

    Flat Rate 0

    Total 0

    Metered 0

    8 Nov-12

    10 Jan-13

    9 Dec-12

    6 Sep-12

    7

    4 Jul-12

    5 Aug-12

    Oct-12

    Form # 4: Monthly Connection-Kashmir

    2 May-12

    3 Jun-12

    MONTHLY CONNECTIONS ADDED (METERED AND FLAT RATE) FOR THE YEAR 2012-13(For Achievement under Triparitite MoU and for progress reporting to SERC)

    1 Apr-12

  • 7/28/2019 Serc Apdrp 2012 Final

    8/76

    Flat Rate 0

    Total 0

    Metered 0

    Flat Rate 0

    Total 0

    12 Mar-13

    11 Feb-13

  • 7/28/2019 Serc Apdrp 2012 Final

    9/76

  • 7/28/2019 Serc Apdrp 2012 Final

    10/76

    April May June July Aug Sept. O

    Domestic 9188 9254 9317 9359 9359 9352 93

    N.Dom/Commercial 1667 1683 1675 1695 1695 1695 16

    Irrigation/Aggri. 16 16 16 16 16 16 1

    State / Central 45 45 45 45 45 45 4

    Public Lighting 0 0 0 0 0 0 0

    LT Industries 80 80 80 80 79 79 7

    HT Industries 0 0 0 0 0 0 0

    HT P. Inten. 0 0 0 0 0 0 0

    LT Pub. WW 0 0 0 0 0 0 0

    HT Pub. WW 4 4 4 4 4 4 4

    Gen. Bulk 0 0 0 0 0 0 0

    Temporary 0 0 0 0 0 0 0

    Total 11000 11082 11137 11199 11198 11191 112

    April May June July Aug Sept. O

    Domestic 916548.66 1139548.28 501446.74 1681785.06 1134482.76 1194252.874 12768

    N.Dom/Commercial 306691.11 350608.15 80592.96 429895.19 353333.33 470740.7407 54365

    Irrigation/Aggri. 875.00 0.00 0.00 4901.00 3000.00 2800 15

    State / Central 0.00 1062386.29 24193.55 1959298.23 609032.26 331451.6129 12865

    Public Lighting 0.00 0.00 0.00 0.00 0.00 0 0

    LT Industries 5265.71 10238.10 1223.81 13519.05 10476.19 11904.7619 223

    HT Industries 0.00 0.00 0.00 0.00 0.00 0 0

    HT P. Inten. 0.00 0.00 0.00 0.00 0.00 0 0

    LT Pub. WW 0.00 0.00 0.00 0.00 0.00 0 0HT Pub. WW 0.00 0.00 0.00 205886.34 533902.44 202030.7317 20203

    Gen. Bulk 0.00 0.00 0.00 0.00 0.00 0 0

    Temporary 0.00 0.00 0.00 0.00 0.00 0 0

    Total 1229380 2562781 607457 4295285 2644227 2213181 3333

    Metered

    Flat Rate

    Total

    April May June July Aug Sept. O

    Domestic 2392192 2974221 1308776 4389459 2961000 3117000 3332

    N.Dom/Commercial 828066 946642 217601 1160717 954000 1271000 1467

    Irrigation/Aggri. 1750 0 0 9802 6000 5600 31

    State / Central 0 6586795 150000 12147649 3776000 2055000 7976

    Public Lighting 0 0 0 0 0 0 0

    LT Industries 11058 21500 2570 28390 22000 25000 469

    HT Industries 0 0 0 0 0 0 0

    HT P. Inten. 0 0 0 0 0 0 0

    LT Pub. WW 0 0 0 0 0 0 0

    HT Pub. WW 0 0 0 844134 2189000 828326 828

    Gen. Bulk 0 0 0 0 0 0 0

    Temporary 0 0 0 0 0 0 0

    Total 3233066 10529158 1678947 18580151 9908000 7301926 1365

    Metered

    Flat RateTotal

    Connections

    Description Category

    DescriptionYear 2012

    Year 2012

    Circle-Ist, Srinagar Division:- Electric D

    CATEGORIES CONNECTIONS ENERGY SALES AND REVENUE FO

    Year 2012

    Category

    EnergyBilled

    Revenue

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Description Category

  • 7/28/2019 Serc Apdrp 2012 Final

    11/76

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (L

    1 Feeder-2 Habak 10.90 2.87 7.23 8.03 73.68 1.87 4.89

    2 Feeder-3 Habak 9.47 2.46 6.20 7.01 74.02 1.71 4.46

    3 Feeder-5 Habak 17.00 2.83 7.12 14.17 83.38 1.41 3.69

    4 Feeder-1 Hazratbal 4.60 4.24 32.73 0.36 7.83 0.07 0.46

    5 Feeder-2 Hazratbal 10.31 10.00 25.98 0.31 3.01 2.63 6.87

    6 Feeder-3 Hazratbal 9.90 2.14 5.40 7.76 78.35 1.23 3.21

    7 Feeder-1 Kathidarwaza 11.80 0.85 2.13 10.95 92.84 0.44 1.14

    8 Feeder-2 Kathidarwaza 13.97 1.36 3.43 12.61 90.26 0.70 1.83

    9 Feeder-3 Kathidarwaza 1.03 1.02 22.41 0.01 0.97 0.01 0.09

    10 Feeder-5 Kathidarwaz 10.77 1.57 3.95 9.20 85.45 0.44 1.15

    11 Feeder-1 Rainawari 2.43 2.19 10.05 0.24 9.88 0.08 0.21

    12 Feeder-2 Rainawari 2.80 0.49 1.02 2.31 82.50 0.18 0.48

    13 Feeder-3 Rainawari 8.75 2.56 6.40 6.19 70.74 0.65 1.69

    14 Feeder-4 Rainawari 14.94 3.58 9.03 11.36 76.02 0.83 2.16

    15 PHE Pokhribal 0.84 0.84 6.45 0.00 0.00 0.00 0.00

    129.51 38.99 149.53 90.52 69.89 12.25 32.3

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (L

    1 Feeder-2 Habak 9.75 2.88 7.52 6.87 70.46 2.18 5.70

    2 Feeder-3 Habak 9.43 2.61 6.81 6.82 72.32 0.95 2.47

    3 Feeder-5 Habak 15.53 2.81 7.34 12.72 81.91 2.12 5.53

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF APRIL, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MAY, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 Serc Apdrp 2012 Final

    12/76

    4 Feeder-1 Hazratbal 3.49 3.34 30.00 0.15 4.30 3.17 25.36

    5 Feeder-2 Hazratbal 10.40 9.95 25.98 0.45 4.33 14.54 37.94

    6 Feeder-3 Hazratbal 9.28 2.20 5.75 7.08 76.29 1.67 4.35

    7 Feeder-1 Kathidarwaza 8.30 0.89 2.32 7.41 89.28 1.02 2.67

    8 Feeder-2 Kathidarwaza 12.73 1.31 3.43 11.42 89.71 1.05 2.74

    9 Feeder-3 Kathidarwaza 0.94 0.84 12.94 0.10 10.64 1.30 9.31

    10 Feeder-5 Kathidarwaz 10.53 1.54 4.03 8.99 85.38 0.67 1.74

    11 Feeder-1 Rainawari 2.64 2.27 10.23 0.37 14.02 0.21 1.28

    12 Feeder-2 Rainawari 3.99 0.39 1.02 3.60 90.23 0.18 0.47

    13 Feeder-3 Rainawari 8.87 2.51 6.55 6.36 71.70 0.96 2.51

    14 Feeder-4 Rainawari 14.38 3.57 9.32 10.81 75.17 1.23 3.22

    15 PHE Pokhribal 1.17 1.17 9.39 0.00 0.00 0.00 0.00

    121.43 38.28 142.63 83.15 68.48 31.26 105.2

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (La

    1 Feeder-2 Habak 8.61 3.10 8.10 5.51 64.00 1.13 2.94

    2 Feeder-3 Habak 9.09 1.53 3.99 7.56 83.17 0.64 1.67

    3 Feeder-5 Habak 14.14 2.85 7.44 11.29 79.84 1.27 3.32

    4 Feeder-1 Hazratbal 3.49 3.48 27.80 0.01 0.29 0.03 0.23

    5 Feeder-2 Hazratbal 10.64 9.77 25.49 0.87 8.18 0.89 2.31

    6 Feeder-3 Hazratbal 9.22 1.96 5.12 7.26 78.74 0.80 2.09

    7 Feeder-1 Kathidarwaza 6.50 1.00 2.60 5.50 84.62 1.05 2.74

    8 Feeder-2 Kathidarwaza 11.90 1.35 3.35 10.55 88.66 0.28 0.74

    9 Feeder-3 Kathidarwaza 0.86 0.84 6.00 0.02 2.33 0.00 0.00

    10 Feeder-5 Kathidarwaz 10.31 3.45 9.00 6.86 66.54 0.04 0.10

    11 Feeder-1 Rainawari 2.44 1.83 11.00 0.61 25.00 0.00 0.00

    12 Feeder-2 Rainawari 1.92 0.21 0.55 1.71 89.06 0.01 0.03

    13 Feeder-3 Rainawari 7.91 1.07 2.80 6.84 86.47 0.07 0.17

    14 Feeder-4 Rainawari 12.22 1.72 4.50 10.50 85.92 0.17 0.45

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JUNE, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

  • 7/28/2019 Serc Apdrp 2012 Final

    13/76

    15 PHE Pokhribal 1.54 1.54 12.31 0.00 0.00 1.05 0.00

    110.79 35.70 130.05 75.09 67.78 7.42 16.79

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Rea

    in Rs (La

    1 Feeder-2 Habak 8.36 2.89 7.54 5.47 65.44 2.68 7.00

    2 Feeder-3 Habak 7.38 1.60 4.17 5.78 78.35 1.51 3.94

    3 Feeder-5 Habak 13.73 3.59 9.38 10.14 73.82 3.26 8.50

    4 Feeder-1 Hazratbal 2.67 2.52 20.10 0.15 5.66 7.76 50.45

    5 Feeder-2 Hazratbal 8.75 8.39 21.90 0.36 4.11 8.85 23.10

    6 Feeder-3 Hazratbal 7.40 1.82 4.75 5.58 75.41 2.07 5.39

    7 Feeder-1 Kathidarwaza 5.14 1.99 5.20 3.15 61.24 1.91 4.98

    8 Feeder-2 Kathidarwaza 10.24 2.25 5.88 7.99 78.00 1.86 4.86

    9 Feeder-3 Kathidarwaza 0.79 0.76 5.45 0.03 3.51 0.70 12.31

    10 Feeder-5 Kathidarwaz 8.14 2.74 7.15 5.40 66.35 1.10 2.88

    11 Feeder-1 Rainawari 2.31 1.69 12.10 0.62 26.74 17.15 44.75

    12 Feeder-2 Rainawari 1.48 0.31 0.81 1.17 79.03 0.22 0.58

    13 Feeder-3 Rainawari 6.20 1.62 4.23 4.58 73.86 1.21 3.16

    14 Feeder-4 Rainawari 10.24 2.42 6.32 7.82 76.35 2.09 5.46

    15 PHE Pokhribal 1.42 1.42 11.37 0.00 0.00 0.00 8.44

    94.25 36.02 126.35 58.23 61.78 52.37 185.80

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF AUGUST, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JULY, 2012

    Total

    Total

  • 7/28/2019 Serc Apdrp 2012 Final

    14/76

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy R

    in Rs (L

    1 Feeder-2 Habak 7.25 2.78 18.92 4.47 61.66 2.25 5.8

    2 Feeder-3 Habak 6.12 1.69 15.97 4.43 72.39 1.57 4.1

    3 Feeder-5 Habak 11.40 3.12 29.75 8.28 72.63 1.93 5.0

    4 Feeder-1 Hazratbal 2.65 2.28 6.92 0.37 13.96 0.19 1.2

    5 Feeder-2 Hazratbal 7.72 4.45 20.15 3.27 42.36 11.92 31.1

    6 Feeder-3 Hazratbal 6.44 2.53 16.81 3.91 60.71 1.78 4.6

    7 Feeder-1 Kathidarwaza 4.46 1.42 11.64 3.04 68.16 1.14 2.9

    8 Feeder-2 Kathidarwaza 8.72 1.94 22.76 6.78 77.75 1.62 4.2

    9 Feeder-3 Kathidarwaza 0.76 0.75 1.98 0.01 1.32 0.57 10.1

    10 Feeder-5 Kathidarwaz 7.10 1.55 18.53 5.55 78.17 0.54 1.4

    11 Feeder-1 Rainawari 2.07 1.70 5.40 0.37 17.87 0.25 0.6

    12 Feeder-2 Rainawari 1.50 0.25 3.92 1.25 83.33 0.16 0.4

    13 Feeder-3 Rainawari 5.62 1.37 14.67 4.25 75.62 0.88 2.2

    14 Feeder-4 Rainawari 8.12 2.26 21.19 5.86 72.17 1.18 3.0

    15 PHE Pokhribal 1.42 1.42 11.37 0.00 0.00 0.00 21.8

    81.35 29.51 219.99 51.84 63.72 25.97 99.0

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy R

    in Rs (L

    1 Feeder-2 Habak 7.39 3.01 7.86 4.38 59.27 2.17 5.6

    2 Feeder-3 Habak 6.85 1.82 4.75 5.03 73.43 1.21 3.1

    3 Feeder-5 Habak 10.20 3.96 10.34 6.24 61.18 3.51 9.1

    4 Feeder-1 Hazratbal 2.50 2.16 5.64 0.34 13.60 0.07 0.4

    5 Feeder-2 Hazratbal 7.24 4.52 11.80 2.72 37.57 5.44 14.2

    6 Feeder-3 Hazratbal 6.32 2.44 6.37 3.88 61.39 1.87 4.8

    7 Feeder-1 Kathidarwaza 4.71 1.55 4.05 3.16 67.09 1.53 3.9

    8 Feeder-2 Kathidarwaza 8.10 1.95 5.09 6.15 75.93 1.39 3.6

    (For Achievement under Triparitite MoU and for progress reporting to SERC)MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF SEPTEMBER, 2012

    Total

  • 7/28/2019 Serc Apdrp 2012 Final

    15/76

    9 Feeder-3 Kathidarwaza 0.77 0.75 1.96 0.02 2.60 0.65 11.44

    10 Feeder-5 Kathidarwaz 6.90 1.54 4.02 5.36 77.68 0.52 1.37

    11 Feeder-1 Rainawari 2.87 2.35 6.13 0.52 18.12 0.25 0.64

    12 Feeder-2 Rainawari 1.56 0.27 0.70 1.29 82.69 0.17 0.45

    13 Feeder-3 Rainawari 6.01 1.33 3.47 4.68 77.87 0.92 2.4

    14 Feeder-4 Rainawari 10.23 2.08 5.43 8.15 79.67 1.19 3.1

    15 PHE Pokhribal 1.03 1.03 8.28 0.00 0.00 3.17 8.28

    82.68 30.76 85.88 51.92 62.80 24.07 72.85

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (La

    1 Feeder-2 Habak 8.39 3.02 7.88 5.37 64.00 6.25 16.3

    2 Feeder-3 Habak 7.81 1.93 5.04 5.88 75.29 2.40 6.27

    3 Feeder-5 Habak 11.40 3.51 9.16 7.89 69.21 3.07 8.01

    4 Feeder-1 Hazratbal 2.50 2.21 18.17 0.29 11.60 8.18 53.2

    5 Feeder-2 Hazratbal 8.10 4.23 23.27 3.87 47.78 7.58 19.78

    6 Feeder-3 Hazratbal 6.44 2.21 5.77 4.23 65.68 1.51 3.95

    7 Feeder-1 Kathidarwaza 5.21 1.48 3.86 3.73 71.59 1.10 2.87

    8 Feeder-2 Kathidarwaza 9.10 1.94 5.06 7.16 78.68 2.25 5.86

    9 Feeder-3 Kathidarwaza 0.90 0.88 7.23 0.02 2.22 0.01 0.12

    10 Feeder-5 Kathidarwaz 7.40 1.55 4.05 5.85 79.05 0.85 2.23

    11 Feeder-1 Rainawari 2.76 2.31 6.03 0.45 16.30 0.00 0.01

    12 Feeder-2 Rainawari 1.55 0.27 0.70 1.28 82.58 0.16 0.41

    13 Feeder-3 Rainawari 6.31 1.37 3.58 4.94 78.29 1.90 4.96

    14 Feeder-4 Rainawari 11.27 2.48 6.47 8.79 77.99 1.06 2.76

    15 PHE Pokhribal 1.03 1.03 8.28 0.00 0.00 3.17 8.28

    90.17 30.42 114.55 59.75 66.26 39.49 135.0Total

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF OCTUBER, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

  • 7/28/2019 Serc Apdrp 2012 Final

    16/76

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (L

    1 Feeder-2 Habak 0.00 #DIV/0! 0.00

    2 Feeder-3 Habak 0.00 #DIV/0! 0.00

    3 Feeder-5 Habak 0.00 #DIV/0! 0.00

    4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00

    5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00

    6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00

    7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00

    8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00

    9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00

    10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00

    11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00

    12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00

    13 Feeder-3 Rainawari 0.00 #DIV/0! 0.00

    14 Feeder-4 Rainawari 0.00 #DIV/0! 0.00

    15 PHE Pokhribal 0.00 #DIV/0! 0.00

    0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (L

    1 Feeder-2 Habak 0.00 #DIV/0! 0.00

    2 Feeder-3 Habak 0.00 #DIV/0! 0.00

    3 Feeder-5 Habak 0.00 #DIV/0! 0.00

    4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF DECEMBER, 2012

    Total

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF NOVEMBER, 2012

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 Serc Apdrp 2012 Final

    17/76

    5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00

    6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00

    7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00

    8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00

    9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00

    10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00

    11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00

    12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00

    13 Feeder-3 Rainawari 0.00 #DIV/0! 0.00

    14 Feeder-4 Rainawari 0.00 #DIV/0! 0.00

    15 PHE Pokhribal 0.00 #DIV/0! 0.00

    0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy Re

    in Rs (La

    1 Feeder-2 Habak 0.00 #DIV/0! 0.00

    2 Feeder-3 Habak 0.00 #DIV/0! 0.00

    3 Feeder-5 Habak 0.00 #DIV/0! 0.00

    4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00

    5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00

    6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00

    7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00

    8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00

    9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00

    10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00

    11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00

    12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00

    13 Feeder-3 Rainawari 0.00 #DIV/0! 0.00

    14 Feeder-4 Rainawari 0.00 #DIV/0! 0.00

    15 PHE Pokhribal 0.00 #DIV/0! 0.00

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF JANUARY, 2013

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

  • 7/28/2019 Serc Apdrp 2012 Final

    18/76

    0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.0

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy R

    in Rs (L

    1 Feeder-2 Habak 0.00 #DIV/0! 0.00

    2 Feeder-3 Habak 0.00 #DIV/0! 0.00

    3 Feeder-5 Habak 0.00 #DIV/0! 0.00

    4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00

    5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00

    6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00

    7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00

    8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00

    9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00

    10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00

    11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00

    12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00

    13 Feeder-3 Rainawari 0.00 #DIV/0! 0.0014 Feeder-4 Rainawari 0.00 #DIV/0! 0.00

    15 PHE Pokhribal 0.00 #DIV/0! 0.00

    0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.0

    S.No Name of Feeder Energy Pumped Energy BilledEnergy Billed in

    Rs (Lac's)Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    Energy R

    in Rs (L

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF FEBRUARY, 2013

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

    MONTH WISE AUDIT OF INDUSTRIAL FEEDERS FOR THE MONTH OF MARCH, 2013

    Total

  • 7/28/2019 Serc Apdrp 2012 Final

    19/76

    1 Feeder-2 Habak 0.00 #DIV/0! 0.00

    2 Feeder-3 Habak 0.00 #DIV/0! 0.00

    3 Feeder-5 Habak 0.00 #DIV/0! 0.00

    4 Feeder-1 Hazratbal 0.00 #DIV/0! 0.00

    5 Feeder-2 Hazratbal 0.00 #DIV/0! 0.00

    6 Feeder-3 Hazratbal 0.00 #DIV/0! 0.00

    7 Feeder-1 Kathidarwaza 0.00 #DIV/0! 0.00

    8 Feeder-2 Kathidarwaza 0.00 #DIV/0! 0.00

    9 Feeder-3 Kathidarwaza 0.00 #DIV/0! 0.00

    10 Feeder-5 Kathidarwaz 0.00 #DIV/0! 0.00

    11 Feeder-1 Rainawari 0.00 #DIV/0! 0.00

    12 Feeder-2 Rainawari 0.00 #DIV/0! 0.00

    13 Feeder-3 Rainawari 0.00 #DIV/0! 0.00

    14 Feeder-4 Rainawari 0.00 #DIV/0! 0.00

    15 PHE Pokhribal 0.00 #DIV/0! 0.00

    0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00Total

  • 7/28/2019 Serc Apdrp 2012 Final

    20/76

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 Serc Apdrp 2012 Final

    21/76

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 Serc Apdrp 2012 Final

    22/76

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

  • 7/28/2019 Serc Apdrp 2012 Final

    23/76

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 Serc Apdrp 2012 Final

    24/76

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

  • 7/28/2019 Serc Apdrp 2012 Final

    25/76

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 Serc Apdrp 2012 Final

    26/76

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 Serc Apdrp 2012 Final

    27/76

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

    0.00

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 Serc Apdrp 2012 Final

    28/76

    0.00

    Form # 6: En. Aud. Ind.

  • 7/28/2019 Serc Apdrp 2012 Final

    29/76

    Hawal Rainawari K.K.Moulla Khanyar ZakuraTotal for

    the Division

    16 16

    Energy Supplied (LU's) 11.18 11

    Energy Billed (LU's) 11.18 11

    Amount Billed (Lacs) 84.10 84

    Revenue Collected (Lacs) 0.00 0

    % of Revenue Collection 0.00 016 16

    Energy Supplied (LU's) 11.31 11

    Energy Billed (LU's) 11.31 11

    Amount Billed (Lacs) 85.93 86

    Revenue Collected (Lacs) 65.87 66

    % of Revenue Collection 76.66 77

    16 16

    Energy Supplied (LU's) 9.19 9

    Energy Billed (LU's) 9.19 9

    Amount Billed (Lacs) 68.01 68

    Revenue Collected (Lacs) 53.48 53

    % of Revenue Collection 78.64 79

    16 16

    Energy Supplied (LU's) 9.87 10Energy Billed (LU's) 9.87 10

    Amount Billed (Lacs) 73.67 74

    Revenue Collected (Lacs) 65.00 65

    % of Revenue Collection 88.23 88

    16 16

    Energy Supplied (LU's) 8.75 9

    Energy Billed (LU's) 8.75 9

    Amount Billed (Lacs) 65.73 66

    Revenue Collected (Lacs) 44.60 45

    % of Revenue Collection 67.86 68

    16 16

    Energy Supplied (LU's) 8.71 9

    Energy Billed (LU's) 8.71 9Amount Billed (Lacs) 65.46 65

    MONTHLY ENERGY ACCOUNT & REVENUE REALISATION FOR INSTALLATIONS HAVING LOAD 25 KVA & ABOVE FROM APRIL,

    2012 TO JUNE, 2012

    Form # 7

    Energy Account

    for the Month of

    June, 2012

    Energy Account

    for the Month of

    July, 2012

    No. of Consumers

    Energy/Revenue

    Details

    Energy Account

    for the Month of

    April, 2012

    Energy Account

    for the Month of

    May, 2012

    No. of Consumers

    No. of Consumers

    Energy Account

    for the Month of

    August, 2012

    No. of Consumers

    No. of Consumers

    No. of Consumers

    Energy Account

    for the Month of

  • 7/28/2019 Serc Apdrp 2012 Final

    30/76

    Revenue Collected (Lacs) 95.36 95

    % of Revenue Collection 145.69 146

    16 16

    Energy Supplied (LU's) 10.44 10

    Energy Billed (LU's) 10.44 10

    Amount Billed (Lacs) 75.74 76

    Revenue Collected (Lacs) 8.28 8

    % of Revenue Collection 10.94 11

    0

    Energy Supplied (LU's) 0

    Energy Billed (LU's) 0

    Amount Billed (Lacs) 0Revenue Collected (Lacs) 0

    % of Revenue Collection 0

    0

    Energy Supplied (LU's) 0

    Energy Billed (LU's) 0

    Amount Billed (Lacs) 0

    Revenue Collected (Lacs) 0

    % of Revenue Collection 0

    0

    Energy Supplied (LU's) 0

    Energy Billed (LU's) 0

    Amount Billed (Lacs) 0

    Revenue Collected (Lacs) 0

    % of Revenue Collection 0

    0

    Energy Supplied (LU's) 0

    Energy Billed (LU's) 0

    Amount Billed (Lacs) 0

    Revenue Collected (Lacs) 0

    % of Revenue Collection 0

    0

    Energy Supplied (LU's) 0

    Energy Billed (LU's) 0

    Amount Billed (Lacs) 0

    Revenue Collected (Lacs) 0% of Revenue Collection 0

    No. of Consumers

    Energy Account

    for the Month of

    February, 2013

    ,

    2012

    No. of Consumers

    Energy Account

    for the Month of

    March, 2013

    Energy Account

    for the Month of

    Octuber, 2012

    No. of Consumers

    Energy Account

    for the Month ofNovember, 2012

    No. of Consumers

    Energy Account

    for the Month of

    December, 2012

    No. of Consumers

    Energy Account

    for the Month of

    January, 2013

    No. of Consumers

  • 7/28/2019 Serc Apdrp 2012 Final

    31/76

    Hawal Rainawari K.K.Moulla Khanyar Zakura

    No

    KVA

    Required

    (KVAR)

    Installed

    (KVAR)

    Deficiency

    (KVAR)

    %

    Deficiency

    Status of KVAR Compensation for Installations having Load 25 KVA & Above as on 30-06-2012(For achievement under Tripartite MoU and for progress reporting to SERC)

    Format # 8

    Electric Division-IV, Kh

    KVAR Compensation DetailsElectric Division-IV, Khanyar. Tota

    Di

    Connections with load 25KVA & Above

    KVAR

    Compensation through

    Shunt Capacitor

    Executive Engine

  • 7/28/2019 Serc Apdrp 2012 Final

    32/76

    S.No MonthComputerized

    BillingHawal Rainawari K.K.Moulla Khanyar Zakura

    th

    Total Energy Biled (LU's) 38.99

    Energy Billed through computer(LU's) 38.99

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 38.28

    Energy Billed through computer(LU's) 38.28%age computerised Billing 100.00

    Total Energy Biled (LU's) 35.70

    Energy Billed through computer(LU's) 35.70

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 36.02

    Energy Billed through computer(LU's) 36.02

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 29.51

    Energy Billed through computer(LU's) 29.51

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 30.76

    Energy Billed through computer(LU's) 30.76

    %age computerised Billing 100.00Total Energy Biled (LU's) 30.42

    Energy Billed through computer(LU's) 30.42

    %age computerised Billing 100.00

    Total Energy Biled (LU's) 0.00

    Energy Billed through computer(LU's) 0.00

    %age computerised Billing #DIV/0!

    Total Energy Biled (LU's) 0.00

    Energy Billed through computer(LU's) 0.00

    %age computerised Billing #DIV/0!

    Total Energy Biled (LU's) 0.00

    Energy Billed through computer(LU's) 0.00

    %age computerised Billing #DIV/0!

    Total Energy Biled (LU's) 0.00

    Energy Billed through computer(LU's) 0.00

    %age computerised Billing #DIV/0!

    Total Energy Biled (LU's) 0.00

    Energy Billed through computer(LU's) 0.00

    %age computerised Billing #DIV/0!

    6

    Form # 9

    Apr-12

    May-12

    Jun-12

    Monthly detail of Computerised Billed Energy From April 2012 to March 2013

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    11

    8 Nov-12

    1

    2

    3

    4

    5 Aug-12

    Jul-12

    Feb-13

    Sep-12

    7 Oct-12

    12 Mar-13

    9 Dec-12

    10 Jan-13

  • 7/28/2019 Serc Apdrp 2012 Final

    33/76

    DiVision:

    N.A

    17510 N.A

    Computer Code: 9386 N

    Sanctioned Load: 30 HP

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 N.A 0 N.A 0.00 N.A N.A 273158.28 0.00

    2 May-12 N.A 0 N.A 0.00 N.A N.A 278259.49 0.00

    3 Jun-12 N.A 0 N.A 0.00 N.A N.A 283437.22 0.00

    4 Jul-12 N.A 0 N.A 0.00 N.A N.A 284426.22 0.00

    5 Aug-12 N.A 0 N.A 0.00 N.A N.A 289696.45 0.00

    6 Sep-12 N.A 0 N.A 0.00 N.A N.A 295045.73 0.00

    7 Oct-12 N.A 0 N.A 0.00 N.A N.A 300475.25 0.00

    8 Nov-12 305986.21

    9 Dec-12 0.00

    10 Jan-13 0.00

    11 Feb-13 0.00

    12 Mar-13 0.00

    0

    1

    2

    3

    4

    5

    1

    DiVision:

    Asstt. Exe. Engineer

    KVAH and demand readings will be required for load more than 100KW only.

    Rainawari

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    recorded KWH units with power factor = 0.85

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Name of Installation:- Nazir Ah. Zargar

    Category: LT Indust. Supply Type:

    Installation No: Meter Rated Current:

    EM & RE Circle-Ist, Srinagar Electric DivisiCircle:

    Meter Type:

    Note:

    Capacitor Installed: Y/ Rating of Capacitor:

    CT Ratio:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

  • 7/28/2019 Serc Apdrp 2012 Final

    34/76

    N.A

    18334 N.A

    Computer Code: 10074 N

    Sanctioned Load: 70 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    computed

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 29411.76 25000.00 29411.7647 25000.00 0.85 N.A 1326242.25 104775.00

    2 May-12 28235.29 24000.00 28235.2941 24000.00 0.85 N.A 1471497.75 100584.00

    3 Jun-12 25882.35 22000.00 25882.3529 22000.00 0.85 N.A 1611640.23 92202.00

    4 Jul-12 27058.82 23000.00 27058.8235 23000.00 0.85 N.A 1741556.67 96393.00

    5 Aug-126 Sep-12

    7 Oct-12

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    94000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    46785 N.A

    Computer Code: 9943 N

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Installation No: Meter Rated Current:

    Rainawari

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    recorded KWH units with power factor = 0.85

    Asstt. Exe. Engineer

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Capacitor Installed: Y/ Rating of Capacitor:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Electric DivisiCircle:

    Category: Central CT Ratio:

    Name of Installation:- Director National Institute of Technology

    Supply Type:

    Installation No: Meter Rated Current: Meter Type:

    Name of Installation:- Executive Engineer, UEED

    CT Ratio:

    Meter Type:

    Rating of Capacitor:

    Category: LT Water Works

    EM & RE Circle-Ist, Srinagar

    Supply Type:

    Capacitor Installed: Y/

    KVAH and demand readings will be required for load more than 100KW only.

  • 7/28/2019 Serc Apdrp 2012 Final

    35/76

    Sanctioned Load: 1200 KW

    S.No

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 295294.12 251000.00 295294.118 251000 0.85 N.A 1639500.0 1517295

    2 May-12 275294.12 234000.00 275294.118 234000 0.85 N.A 3186795.0 1414530

    3 Jun-12 223529.41 190000.00 223529.412 190000 0.85 N.A 1444530 1148550

    4 Jul-12 187058.82 159000.00 187058.824 159000 0.85 N.A 2623080 961155

    5 Aug-12 180000.00 153000.00 180000 153000 0.85 N.A 2169705 924885

    6 Sep-12 157647.06 134000.00 157647.059 134000 0.85 N.A 954885 810030

    7 Oct-12 355294.12 302000.00 355294.118 302000 0.85 N.A 840030 1825590

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    1423000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    75858A N.A

    Computer Code: 10039 N

    Sanctioned Load: 53 KW

    Installation No:

    Asstt. Exe. Engineer

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    KVAH and demand readings will be required for load more than 100KW only.

    Category: State CT Ratio: Supply Type:

    Meter Rated Current: Meter Type:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Joint Director Poultary

    Capacitor Installed: Y/ Rating of Capacitor:

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Rainawari

    Name of Installation:-

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    recorded KWH units with power factor = 0.85

    Note:

  • 7/28/2019 Serc Apdrp 2012 Final

    36/76

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 4096144.25 59845.5

    2 May-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 4170480.8 73144.5

    3 Jun-12 7058.82 6000.00 7058.82353 6000 0.85 N.A 4261042.1 39897

    4 Jul-12 5882.35 5000.00 5882.35294 5000 0.85 N.A 4311041.4 33,247.50

    5 Aug-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 4352928.3 46,546.50

    6 Sep-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 4311040.1 59,845.50

    7 Oct-12 3529.41 3000.00 3529.41176 3000 0.85 N.A 3285376.6 19,948.50

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    50000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    14260A N.A

    Computer Code: 10043 N

    Sanctioned Load: 300 KW

    Asstt. Exe. Engineer

    Installation No: Meter Rated Current: Meter Type:

    Capacitor Installed: Y/ Rating of Capacitor:

    Category: State CT Ratio: Supply Type:

    Name of Installation:- Supdtt. JLNM Hospital

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Rainawari

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

  • 7/28/2019 Serc Apdrp 2012 Final

    37/76

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 114003.98 96903.39 114003.985 96903.387 0.85 N.A 806473.5 600801.00

    2 May-12 115280.00 97988.00 115280 97988 0.85 N.A 1552958.7 607525.60

    3 Jun-12 150535.29 127955.00 150535.294 127955 0.85 N.A 2307715.2 793321.00

    4 Jul-12 127058.82 108000.00 127058.824 108000 0.85 N.A 0.0 669600.00

    5 Aug-12 130588.24 111000.00 130588.235 111000 0.85 N.A 831108.0 688200.00

    6 Sep-12 132352.94 112500.00 132352.941 112500 0.85 N.A 1685094.0 697500.00

    7 Oct-12 129411.76 110000.00 129411.765 110000 0.85 N.A 2550519.0 682000.00

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    764346.39

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    6162SD N.A

    Computer Code: 10049 N

    Sanctioned Load: 32 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    Installation No: Meter Rated Current: Meter Type:

    Capacitor Installed: Y/ Rating of Capacitor:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. EngineerRainawari

    Name of Installation:- Joint Director Floriculture, Hazratbal

    Category: State CT Ratio: Supply Type:

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Note:

  • 7/28/2019 Serc Apdrp 2012 Final

    38/76

    A B C D E=D/C F G H

    1 Apr-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1395814.38 51068.16

    2 May-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1458917.54 51068.16

    3 Jun-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1522020.69 51068.16

    4 Jul-12

    9035.29 7680.00 9035.29412 7680 0.85 N.A 1585123.85 51068.16

    5 Aug-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1672950.41 51068.16

    6 Sep-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1762094.36 51068.16

    7 Oct-12 9035.29 7680.00 9035.29412 7680 0.85 N.A 1852575.48 51068.16

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    53760

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    90SD N.A

    Computer Code: 10040 N

    Sanctioned Load: 53 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    COMPUTE

    D

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 1,908,727.50 46546.5

    2 May-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 1966839.23 66495

    Meter Rated Current: Meter Type:

    Capacitor Installed: Y/ Rating of Capacitor:

    Installation No:

    Circle: EM & RE Circle-Ist, Srinagar

    Category: State CT Ratio: Supply Type:

    Electric Divisi

    recorded KWH units with power factor = 0.85

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Name of Installation:- Joint Director Poultary Briolers

    Rainawari

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Note:

  • 7/28/2019 Serc Apdrp 2012 Final

    39/76

    3 Jun-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 2049288.13 46546.5

    4 Jul-12 7058.82 6000.00 7058.82353 6000 0.85 N.A 2107399.86 39897

    5 Aug-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 2107399.20 46546.5

    6 Sep-12 16470.59 14000.00 16470.5882 14000 0.85 N.A 2165510.93 93093

    7 Oct-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 2280409.39 46546.5

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    58000

    1

    2

    3

    45

    1

    DiVision:

    N.A

    LAWDA2 N.A

    Computer Code: 10085 N

    Sanctioned Load: 200 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 30588.24 26000.00 30588.2353 26000 0.85 N.A 5665832.5 108966

    2 May-12 27058.82 23000.00 27058.8235 23000 0.85 N.A 5848331.0 96393

    3 Jun-12 31764.71 27000.00 31764.7059 27000 0.85 N.A 6105722.8 113157

    4 Jul-12 32941.18 28000.00 32941.1765 28000 0.85 N.A 6293334.4 117348

    5 Aug-12 30588.24 26000.00 30588.2353 26000 0.85 N.A 6583349.8 108966

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Capacitor Installed: Y/ Rating of Capacitor:

    CT Ratio:200/5A

    Installation No: Meter Rated Current: Meter Type:

    Category: State

    Name of Installation:- Ex. Engineer LAWDA, Habak

    Supply Type:

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Circle:

    Rainawari

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    EM & RE Circle-Ist, Srinagar Electric Divisi

    recorded KWH units with power factor = 0.85

    Asstt. Exe. Engineer

    Note:

  • 7/28/2019 Serc Apdrp 2012 Final

    40/76

    6 Sep-12 31764.71 27000.00 31764.7059 27000 0.85 N.A 6867336.1 113157

    7 Oct-12 36470.59 31000.00 36470.5882 31000 0.85 N.A 6049359.0 129921

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    188000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    LAWDA1 N.A

    Computer Code: 10084 N

    Sanctioned Load: 200 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 9411.76 8000.00 9411.76471 8000 0.85 N.A 840,711.94 33528

    2 May-1212941.18 11000.00 12941.1765 11000 0.85 N.A 931176.10 46101

    3 Jun-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 1036979.32 41910

    4 Jul-12 9411.76 8000.00 9411.76471 8000 0.85 N.A 1137669.52 33528

    5 Aug-12 7058.82 6000.00 7058.82353 6000 0.85 N.A 1246555.69 25146

    6 Sep-12 8235.29 7000.00 8235.29412 7000 0.85 N.A 1346695.71 29337

    7 Oct-12 1176.47 1000.00 1176.47059 1000 0.85 N.A 887032.71 4191

    8 Nov-12

    Asstt. Exe. EngineerRainawari

    Capacitor Installed: Y/ Rating of Capacitor:

    Category: State

    Installation No: Meter Rated Current: Meter Type:

    Circle:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    CT Ratio:200/5A Supply Type:

    Name of Installation:- Ex. Engineer LAWDA, Hazratbal

    EM & RE Circle-Ist, Srinagar Electric Divisi

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    KVAH and demand readings will be required for load more than 100KW only.

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Note:

    recorded KWH units with power factor = 0.85

  • 7/28/2019 Serc Apdrp 2012 Final

    41/76

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    51000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    222M N.A

    Computer Code: 10060 N

    Sanctioned Load: 2017 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12474117.65 403000.00 474117.647 403000 0.85 N.A 7383068 2436135

    2 May-12450588.24 383000.00 450588.235 383000 0.85 N.A 10405578 2315235

    3 Jun-12348235.29 296000.00 348235.294 296000 0.85 N.A 13280589 1789320

    4 Jul-12 421176.47 358000.00 421176.471 358000 0.85 N.A 15513985 2164110

    5 Aug-12368235.29 313000.00 368235.294 313000 0.85 N.A 13204624 1892085

    6 Sep-12420000.00 357000.00 420000 357000 0.85 N.A 15563393 2158065

    7 Oct-12469411.76 399000.00 469411.765 399000 0.85 N.A 13246657 2411955

    8 Nov-12

    9 Dec-12

    Capacitor Installed: Y/

    Name of Installation:- Registrar Kashmir University

    Category: State CT Ratio:60/5A Supply Type:

    Rating of Capacitor:

    Installation No: Meter Rated Current: Meter Type:

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. EngineerRainawari

    Note:Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

  • 7/28/2019 Serc Apdrp 2012 Final

    42/76

    10 Jan-13

    11 Feb-13

    12 Mar-13

    2509000

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    14260 N.A

    Computer Code: 10042 N

    Sanctioned Load: 90 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    EnergyCharges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 31830.55 27055.97 31830.5503 27055.968 0.85 N.A 431705 167747

    2 May-12 32418.79 27555.97 32418.7856 27555.968 0.85 N.A 640283.81 170847

    3 Jun-12 31242.31 26555.97 31242.315 26555.968 0.85 N.A 852676 164647

    4 Jul-12 63529.41 54000.00 63529.4118 54000 0.85 N.A 0 334800

    5 Aug-12 61176.47 52000.00 61176.4706 52000 0.85 N.A 414054 322400

    6 Sep-12 58823.53 50000.00 58823.5294 50000 0.85 N.A 812856 310000

    7 Oct-12 60000.00 51000.00 60000 51000 0.85 N.A 1196406 316200

    8 Nov-12

    9 Dec-12

    10 Jan-13

    Asstt. Exe. EngineerRainawari

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Installation No: Meter Rated Current: Meter Type:

    State

    Capacitor Installed: Y/ Rating of Capacitor:

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    Category:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    CT Ratio: Supply Type:

    Name of Installation:- Supdtt. JLNM Hospital

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

  • 7/28/2019 Serc Apdrp 2012 Final

    43/76

    11 Feb-13

    12 Mar-13

    288167.9

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    46827 N.A

    Computer Code: 10045 N

    Sanctioned Load: 51 KW

    S.No Month

    KVAH

    Unitssupplied

    KWH Unitssupplied

    KVAH Units

    recorded /computed

    KWH Unitsrecorded

    AV-PowerFactor

    Max.

    DemandRecorded

    KVA

    OpeningBalance

    Energy

    Charges / F.R

    Chargesbilled

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 20000.00 17000.00 20000 17000 0.85 N.A 14,361,727.00 113041.5

    2 May-12 22352.94 19000.00 22352.9412 19000 0.85 N.A 13600912.63 126340.5

    3 Jun-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 13962668 73144.5

    4 Jul-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 14053179 59845.5

    5 Aug-12 14117.65 12000.00 14117.6471 12000 0.85 N.A 14339378 79794

    6 Sep-12 18823.53 16000.00 18823.5294 16000 0.85 N.A 14654571 106392

    7 Oct-12 11764.71 10000.00 11764.7059 10000 0.85 N.A 15007429 66495

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    Rainawari

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    recorded KWH units with power factor = 0.85

    Asstt. Exe. Engineer

    State CT Ratio: Supply Type:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Capacitor Installed: Y/ Rating of Capacitor:

    Installation No: Meter Rated Current: Meter Type:

    Name of Installation:- Supdtt. Mental Hospital

    Category:

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

  • 7/28/2019 Serc Apdrp 2012 Final

    44/76

    94000

    1

    2

    3

    45

    1

    DiVision:

    N.A

    5531M N.A

    Computer Code: 10030 N

    Sanctioned Load: 360 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 129411.76 110000.00 129411.765 110000 0.85 N.A 30794952 731445

    2 May-12 137647.06 117000.00 137647.059 117000 0.85 N.A 31696315 777991.5

    3 Jun-12 95294.12 81000.00 95294.1176 81000 0.85 N.A 32654465 538609.5

    4 Jul-12 92941.18 79000.00 92941.1765 79000 0.85 N.A 32520568 525310.5

    5 Aug-12 90588.24 77000.00 90588.2353 77000 0.85 N.A 33170447 512011.5

    6 Sep-12 40000.00 34000.00 40000 34000 0.85 N.A 33804101 226083

    7 Oct-12 30588.24 26000.00 30588.2353 26000 0.85 N.A 34088922 172887

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    524000

    Rainawari

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Installation No:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Capacitor Installed: Y/ Rating of Capacitor:

    Supply Type:

    Electric Divisi

    Meter Rated Current: Meter Type:

    Circle: EM & RE Circle-Ist, Srinagar

    Name of Installation:- Supdtt. Central Jail, Kathi Darwaza

    Category: State CT Ratio:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    recorded KWH units with power factor = 0.85

    Asstt. Exe. Engineer

  • 7/28/2019 Serc Apdrp 2012 Final

    45/76

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    5531A N.A

    Computer Code: 10031 N

    Sanctioned Load: 47.25 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 12941.18 11000.00 12941.1765 11000 0.85 N.A 1200510 73144.5

    2 May-12 10588.24 9000.00 10588.2353 9000 0.85 N.A 1290946 59845.5

    3 Jun-12 0.00 0.00 0 0 0.85 N.A 1365158 0

    4 Jul-12 0.00 0.00 0 0 0.85 N.A 1166358 0

    5 Aug-12 0.00 0.00 0 0 0.85 N.A 1167558 0

    6 Sep-12 0.00 0.00 0 0 0.85 N.A 1168758 0

    7 Oct-12 0.00 0.00 0 0 0.85 N.A 1169958 0

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    20000

    KVAH and demand readings will be required for load more than 100KW only.

    Rainawari

    Note:

    Capacitor Installed: Y/ Rating of Capacitor:

    Note:

    Supply Type:Category: State CT Ratio:

    Circle:

    Installation No: Meter Rated Current: Meter Type:

    EM & RE Circle-Ist, Srinagar Electric Divisi

    Name of Installation:- Supdtt. Central Jail

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    recorded KWH units with power factor = 0.85

    Asstt. Exe. Engineer

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

  • 7/28/2019 Serc Apdrp 2012 Final

    46/76

    1

    2

    3

    4

    5

    1

    DiVision:

    N.A

    420SM N.AComputer Code: 8482 N

    Sanctioned Load: 26 HP

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 3170.59 2695.00 3170.58824 2695 0.85 N.A 214162.188 7855.925

    2 May-12 3170.59 2695.00 3170.58824 2695 0.85 N.A 227976 7855.925

    3 Jun-12 2652.94 2255.00 2652.94118 2255 0.85 N.A 241996 6573.325

    4 Jul-12 871.76 741.00 871.764706 741 0.85 N.A 1898 2160.01

    5 Aug-12 128.24 109.00 128.235294 109 0.85 N.A 0 317.73

    6 Sep-12 280.00 238.00 280 238 0.85 N.A 1 693.77

    7 Oct-12 98.82 84.00 98.8235294 84 0.85 N.A 1733 244.86

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    8817

    1

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Capacitor Installed: Y/ Rating of Capacitor:

    Category: LT Indust.

    Installation No: Meter Rated Current: Meter Type:

    Circle:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

    CT Ratio: Supply Type:

    Name of Installation:- Ghulam Mohd. Zaroo

    EM & RE Circle-Ist, Srinagar Electric Divisi

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Rainawari

    recorded KWH units with power factor = 0.85

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

  • 7/28/2019 Serc Apdrp 2012 Final

    47/76

    2

    3

    4

    5

    1

    DiVision:

    N.A

    100-SD N.AComputer Code: 10021 N

    Sanctioned Load: 760 KW

    S.No Month

    KVAH

    Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max.

    Demand

    Recorded

    KVA

    Opening

    Balance

    Energy

    Charges / F.R

    Charges

    billed

    (In Rs.)

    A B C D E=D/C F G H

    1 Apr-12 137647.06 117000.00 137647.059 117000 0.85 NA 9060675 758043

    2 May-12 181176.47 154000.00 181176.471 154000 0.85 NA 9999662 997766

    3 Jun-12 123529.41 105000.00 123529.412 105000 0.85 NA 11399579 680295

    4 Jul-12 167058.82 142000.00 167058.824 142000 0.85 NA 12243714 920018

    5 Aug-12 121176.47 103000.00 121176.471 103000 0.85 NA 13380311 667337

    6 Sep-12 121176.47 103000.00 121176.471 103000 0.85 NA 12200045 667337

    7 Oct-12 112941.18 96000.00 112941.176 96000 0.85 NA 12383046 621984

    8 Nov-12

    9 Dec-12

    10 Jan-13

    11 Feb-13

    12 Mar-13

    820000

    1

    Asstt. Exe. EngineerRainawari

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Capacitor Installed: Y/ Rating of Capacitor:

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Name of Installation:- Ex. Engineer PHE, Pokhribal

    Category: State CT Ratio: Supply Type:

    Installation No: Meter Rated Current: Meter Type:

    Circle: EM & RE Circle-Ist, Srinagar Electric Divisi

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TR

  • 7/28/2019 Serc Apdrp 2012 Final

    48/76

    2

    3

    4

    5

    1

    Asstt. Exe. EngineerRainawari

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    KVAH and demand readings will be required for load more than 100KW only.

    recorded KWH units with power factor = 0.85

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

  • 7/28/2019 Serc Apdrp 2012 Final

    49/76

    LT3Ph

    N.A Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    989.00 0.00 0.00 0.00 0.00 989.00 274147.28 0.00 274147.28

    989.00 0.00 0.00 0.00 0.00 989.00 279248.49 0.00 279248.49

    989.00 0.00 0.00 0.00 0.00 989.00 284426.22 0.00 284426.22

    989.00 0.00 0.00 0.00 0.00 989.00 285415.22 0.00 285415.22

    989.00 0.00 0.00 0.00 0.00 989.00 290685.45 0.00 290685.45

    989.00 0.00 0.00 0.00 0.00 989.00 296034.73 0.00 296034.73

    989.00 0.00 0.00 0.00 0.00 989.00 301464.25 0.00 301464.25

    6923 0

    1

    2

    3

    Executive EngineerElectric Division-IV, khanyar

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Rainawari

    Rainawari

    Type: Metered / Flat Rate: Flat Rate

    on-IV, Khanyar Sub-Division:-

    Sub-Division:-on-IV, Khanyar Rainawari

  • 7/28/2019 Serc Apdrp 2012 Final

    50/76

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    17430.00 23050.5 9525.00 0.00 0.00 145255.50 1471497.8 0.00 1471497.8

    17430.00 22128.48 9144.00 0.00 0.00 140142.48 1611640.2 0.00 1611640.2

    17430.00 20284.44 8382.00 0.00 0.00 129916.44 1741556.7 0.00 1741556.7

    17430.00 21206.46 8763.00 0.00 0.00 135029.46 1876586.1 0.00 1876586.1

    550343.88 0

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-2

    Executive EngineerElectric Division-IV, khanyar

    Rainawarion-IV, Khanyar

    Type: Metered / Flat Rate:

    Hazratabal

    Metered

    Surcharge shall include following:

    Type: Metered / Flat Rate:

    Metered

    Rainawari

    Sub-Division:-

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

  • 7/28/2019 Serc Apdrp 2012 Final

    51/76

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    30000 0 0 0 0 1547295 3186795 0 3186795.0

    30000 0 0 0 0 1444530 4631325 3186795 1444530.0

    30000 0 0 0 0 1178550 2623080 0 2623080.0

    30000 0 0 0 0 991155 3614235 1,444,530.00 2169705.0

    30000 0 0 0 0 954885 3124590 2,169,705.00 954885.0

    30000 0 0 0 0 840030 1794915 954,885.00 840030.0

    30000 0 0 0 0 1855590 2695620 0 2695620.0

    8812035 7755915

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Metered

    Kathi Darwaza

    Electric Division-IV, khanyar

    MAR 2013.

    Type: Metered / Flat Rate:

    Rainawari

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    on-IV, Khanyar

    Executive Engineer

    Sub-Division:-

    Surcharge on HT consumers for having metering on LT.

    Surcharge shall include following:

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

  • 7/28/2019 Serc Apdrp 2012 Final

    52/76

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P1325 13166.01 5440.5 0.00 0.00 74336.51 4170480.8 0.0 4170480.8

    1325 16091.79 6649.5 0.00 0.00 90561.29 4261042.1 0.0 4261042.1

    1325 8777.34 3627 0.00 0.00 49999.34 4311041.4 0.0 4311041.4

    1325 7314.45 33,247.50 0.00 0.00 41886.95 4352928.3 0.0 4352928.3

    1325 10240.23 4,231.50 0.00 0.00 58111.73 4411040.1 100000.0 4311040.1

    1325 13166.01 5,440.50 0.00 0.00 74336.51 4385376.6 1100000.0 3285376.6

    1325 4388.67 1,813.50 0.00 0.00 25662.17 3311038.8 0.0 3311038.8

    414894.5 1200000

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-1

    Executive Engineer

    Metered

    Rainawari

    Sub-Division:-

    Type: Metered / Flat Rate:

    Rainawarion-IV, Khanyar

    Electric Division-IV, khanyar

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Surcharge shall include following:

  • 7/28/2019 Serc Apdrp 2012 Final

    53/76

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    7500.00 132176.22 6008.01 0.00 0.00 746485.23 1552958.7 0.0 1552958.7

    7500.00 133655.63 6075.26 0.00 0.00 754756.49 2307715.2 0.0 2307715.2

    7500.00 174530.62 7933.21 0.00 0.00 983284.83 3291000.0 3291000.0 0.0

    7500.00 147312 6696.00 0.00 0.00 831108.00 831108.0 0.0 831108.0

    7500.00 151404 6882.00 0.00 0.00 853986.00 1685094.0 0.0 1685094.0

    7500.00 153450 6975.00 0.00 0.00 865425.00 2550519.0 0.0 2550519.0

    7500.00 150040 6820.00 0.00 0.00 846360.00 3396879.0 0.0 3396879.0

    5881405.548 3291000

    1

    2

    3

    LT3Ph

    N.A Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-5

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    2013.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

    Executive EngineerElectric Division-IV, khanyar

    Habak

    Rainawari

    Type: Metered / Flat Rate: Metered

    on-IV, Khanyar Sub-Division:-

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

  • 7/28/2019 Serc Apdrp 2012 Final

    54/76

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    800 11234.995 4642.56 0.00 0.00 63103.16 1458917.5 0.0 1458917.54

    800 11234.995 4642.56 0.00 0.00 63103.16 1522020.7 0.0 1522020.69

    800 11234.995 4642.56 0.00 0.00 63103.16 1585123.8 0.0 1585123.85

    800 11234.995 4642.56 0.00 0.00 63103.16 1648227.0 0.0 1648227.00

    800 11234.995 4642.56 0.00 0.00 63103.16 1736053.6 0.0 1736053.56

    800 11234.995 4642.56 0.00 0.00 63103.16 1825197.5 0.0 1825197.52

    800 11234.995 4642.56 0.00 0.00 63103.16 1915678.6 0.0 1915678.64

    441722.0864 0

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    1325 10240.23 4231.5 0.00 0.00 58111.73 1966839.23 0.00 1966839.23

    1325 14628.9 6045 0.00 0.00 82448.90 2049288.13 0.00 2049288.13

    Sub-Division:-on-IV, Khanyar

    Type: Metered / Flat Rate: Metered

    Surcharge on HT consumers for having metering on LT.

    Executive Engineer

    Surcharge shall include following:

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Kathi Darwaza

    Rainawari

    Electric Division-IV, khanyar

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

  • 7/28/2019 Serc Apdrp 2012 Final

    55/76

    1325 10240.23 4231.5 0.00 0.00 58111.73 2107399.86 0.00 2107399.86

    1325 8777.34 3627 0.00 0.00 49999.34 2157399.20 50000.00 2107399.20

    1325 10240.23 4231.5 0.00 0.00 58111.73 2165510.93 0.00 2165510.93

    1325 20480.46 8463 0.00 0.00 114898.46 2280409.39 0.00 2280409.39

    1325 10240.23 4231.5 0.00 0.00 58111.73 2338521.12 0.00 2338521.12

    479793.62 50000

    1

    23

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-2

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    49560 23972.52 9906 0.00 0.00 182498.52 5848331.0 0.0 5848331.0

    49560 21206.46 8763 0.00 0.00 167159.46 6015490.5 0.0 6015490.5

    49560 24894.54 10287 0.00 0.00 187611.54 6293334.4 0.0 6293334.4

    49560 25816.56 10668.00 0.00 0.00 192724.56 6486058.9 0.0 6486058.9

    49560 23972.52 9906.00 0.00 0.00 182498.52 6765848.3 0.0 6765848.3

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Type: Metered / Flat Rate: Metered

    Hazratbal

    Sub-Division:-

    Electric Division-IV, khanyar

    Rainawarion-IV, Khanyar

    Surcharge on HT consumers for having metering on LT.

    Executive Engineer

  • 7/28/2019 Serc Apdrp 2012 Final

    56/76

    49560 24894.54 10287.00 0.00 0.00 187611.54 7054947.6 1094988.0 5959959.6

    49560 28582.62 11811.00 0.00 0.00 208063.62 6257422.6 0.0 6257422.6

    1308167.76 1094988

    1

    2

    3

    11KV

    HTTrivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-2

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    49560 7376.16 3,048.00 0.00 0.00 90464.16 931176.10 0.0 931176.10

    49560 10142.22 4,191.00 0.00 0.00 105803.22 1036979.32 0.00 1036979.32

    49560 9220.2 3,810.00 0.00 0.00 100690.20 1137669.52 0.00 1137669.52

    49560 7376.16 3,048.00 0.00 0.00 90464.16 1228133.68 0.00 1228133.68

    49560 5532.12 2,286.00 0.00 0.00 80238.12 1326793.81 0.00 1326793.81

    49560 6454.14 2,667.00 0.00 0.00 85351.14 1432046.85 558123.00 873923.85

    49560 922.02 381.00 0.00 0.00 54673.02 941705.73 0.00 941705.73

    Executive EngineerElectric Division-IV, khanyar

    Type: Metered / Flat Rate:

    Hazratbal

    Metered

    2013.

    Rainawarion-IV, Khanyar Sub-Division:-

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Surcharge on HT consumers for having metering on LT.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

  • 7/28/2019 Serc Apdrp 2012 Final

    57/76

    607684.02 558123

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-1

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    50425 535949.7 0.00 0.00 0.00 3022509.7 10405578 0.0 10405578

    50425 509351.7 0.00 0.00 0.00 2875011.7 13280589 0.0 13280589

    50425 393650.4 0.00 0.00 0.00 2233395.4 15513985 0.0 15513985

    50425 476104.2 0.00 0.00 0.00 2690639.2 18204624 5000000.0 13204624

    50425 416258.7 0.00 0.00 0.00 2358768.7 15563393 0.0 15563393

    50425 474774.3 0.00 0.00 0.00 2683264.3 18246657 5000000.0 13246657

    50425 530630.1 0.00 0.00 0.00 2993010.1 16239667 0.0 16239667

    Electric Division-IV, khanyar

    Type: Metered / Flat Rate: Metered

    Hazratbal

    Rainawarion-IV, Khanyar Sub-Division:-

    Executive Engineer

    Surcharge on HT consumers for having metering on LT.

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

  • 7/28/2019 Serc Apdrp 2012 Final

    58/76

    18856599.1 10000000

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-1

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    2250 36904.34 1677.47 0.00 0.00 208578.8 640284 0.0 640284

    2250 37586.34 1708.47 0.00 0.00 212391.8 852676 0.0 852676

    2250 36222.34 1646.47 0.00 0.00 204765.8 1057441 1057441.0 0

    2250 73656 3348.00 0.00 0.00 414054.0 414054 0.0 414054

    2250 70928 3224.00 0.00 0.00 398802.0 812856 0.0 812856

    2250 68200 3100.00 0.00 0.00 383550.0 1196406 0.0 1196406

    2250 69564 3162.00 0.00 0.00 391176.0 1587582 0.0 1587582

    Executive Engineer

    Electric Division-IV, khanyar

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Surcharge on HT consumers for having metering on LT.

    Surcharge shall include following:

    Metered

    Rainawari

    Type: Metered / Flat Rate:

    on-IV, Khanyar RainawariSub-Division:-

  • 7/28/2019 Serc Apdrp 2012 Final

    59/76

    2213318.43 1057441

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demandcharges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    CapacitorSurcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Latepayment

    surchar

    ge biled

    TotalAmount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    1275 24869.13 10276.50 0.00 0.00 139185.6 14500913 900000.0 13600913

    1275 27794.91 11485.50 0.00 0.00 155410.4 13756323 0.0 13756323

    1275 16091.79 6649.50 0.00 0.00 90511.3 14053179 0.0 14053179

    1275 13166.01 5440.50 0.00 0.00 74286.5 14127466 0.0 14127466

    1275 17554.68 7254.00 0.00 0.00 98623.7 14438001 0.0 144380011275 23406.24 9672.00 0.00 0.00 131073.2 14785645 0.0 14785645

    1275 14628.9 6045.00 0.00 0.00 82398.9 15089828 0.0 15089828

    Executive EngineerElectric Division-IV, khanyar

    Surcharge on HT consumers for having metering on LT.

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Kathi Darwaza

    Rainawari

    Type: Metered / Flat Rate: Metered

    on-IV, Khanyar Sub-Division:-

  • 7/28/2019 Serc Apdrp 2012 Final

    60/76

    771489.66 900000

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    9000 160917.9 66495.00 0.00 0.00 901362.9 31696315 0.0 31696315

    9000 171158.13 70726.50 0.00 0.00 958149.6 32654465 0.0 32654465

    9000 118494.09 48964.50 0.00 0.00 666103.6 33320568 800000.0 32520568

    9000 115568.31 47755.50 0.00 0.00 649878.8 33170447 0.0 33170447

    9000 112642.53 46546.50 0.00 0.00 633654.0 33804101 0.0 33804101

    9000 49738.26 20553.00 0.00 0.00 284821.3 34088922 0.0 34088922

    9000 38035.14 15717.00 0.00 0.00 219922.1 34308844 0.0 34308844

    4313892.36 800000

    Executive EngineerElectric Division-IV, khanyar

    Surcharge on HT consumers for having metering on LT.

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    on-IV, Khanyar

    Type: Metered / Flat Rate: Metered

    Rainawari

    Kathi Darwaza

    Sub-Division:-

  • 7/28/2019 Serc Apdrp 2012 Final

    61/76

    1

    2

    3

    11KVHT

    Trivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    1200 16091.79 6649.50 0.00 0.00 90436.3 1290946 0.0 1290946

    1200 13166.01 5440.50 0.00 0.00 74211.5 1365158 0.0 1365158

    1200 0 0.00 0.00 0.00 1200.0 1366358 200000.0 1166358

    1200 0 0.00 0.00 0.00 1200.0 1167558 0.0 1167558

    1200 0 0.00 0.00 0.00 1200.0 1168758 0.0 1168758

    1200 0 0.00 0.00 0.00 1200.0 1169958 0.0 1169958

    1200 0 0.00 0.00 0.00 1200.0 1171158 0.0 1171158

    170647.8 200000

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Executive EngineerElectric Division-IV, khanyar

    Kathi Darwaza

    Type: Metered / Flat Rate: Metered

    Sub-Division:- Rainawarion-IV, Khanyar

    Surcharge on HT consumers for having metering on LT.

    2013.

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

  • 7/28/2019 Serc Apdrp 2012 Final

    62/76

    1

    2

    3

    LT3PhN.A Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-2

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Billed(In

    Rs.)

    Surcharge

    for metering

    on LT side

    Late

    payment

    surchar

    ge biled

    Total

    Amount

    Billed

    (In Rs.)

    Total

    Amount due

    (in Rs.)

    Amount

    received (In

    Rs.)

    Arrears

    I J K L M =H+I+J+K+L+ O=G+N P Q=O-P

    860 1728.3035 416.24 0.00 0.00 10444.2 224606 0.0 224606

    860 1728.3035 399.69 0.00 0.00 10444.2 238420 0.0 238420

    860 1446.1315 657.33 0.00 0.00 8879.5 250875 0.0 250875

    860 475.2022 196.37 0.00 0.00 3495.2 5393 5393.0 0

    860 69.9006 28.89 0.00 0.00 1247.6 1248 1247.0 1

    860 152.6294 63.07 0.00 0.00 1706.4 1707 0.0 1707

    860 53.8692 22.26 0.00 0.00 1158.7 2892 0.0 2892

    37375.8849 6640

    Surcharge shall include following:

    Type: Metered / Flat Rate:Rainawari

    Metered

    Rainawarion-IV, Khanyar Sub-Division:-

    Surcharge shall include following:

    Capacitor surcharge @ 10% for not installing capacitors on all loads more than 5 KVA/HP

    except for domestic, street lighting and loads where KVAH billing done.

    Late payment surcharge of 1.5 % per month on energy, demand charges and / or minimum charges.

    Electric Division-IV, khanyar

    Surcharge on HT consumers for having metering on LT.

    Executive Engineer

  • 7/28/2019 Serc Apdrp 2012 Final

    63/76

    1

    2

    3

    11KV

    HTTrivector Name of 33/11KV Sub-Stations:

    N.A Feeder No: F-3

    Demand

    charges

    billed (In

    Rs. )

    ED Billed

    (In Rs.)

    Capacitor

    Surcharge

    Bille