24
SGCC 6.1 Kick-off Project Setup

SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Embed Size (px)

Citation preview

Page 1: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

SGCC 6.1 Kick-off

Project Setup

Page 2: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Introduction

• Tour de Table– Who’s who– Attendance list, e-mails

• Scope of CC 6.1

Page 3: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

What is e-Delivery?

• Cross-border, cross-enterprise business integration– Modern, service-oriented approach – Support standard business processes and structured content– Typically, sender and receiver are business applications– B2G, B2B, G2G communication, used in mature domains

• Electronic mail Cross-border communication with citizen – Email-like exchanges with more unstructured content and natural

language content– Standardized forms with coded values can help alleviate

language barriers

• Common Challenges– Secure and reliable exchange of arbitrary content– Authentication, Signature, Non-Repudiation, Legal validity

Page 4: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

e-Delivery Convergence

http://www.e-codex.eu/about-the-project/technical-background/e-delivery-convergence.html

Page 5: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

• Synchronous/Asynchronous, cross-border vs inside one country

• Hopefully using the same technology

Page 6: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

What’s been done• First meeting with the commission and LSPs in January

2011• Input from PEPPOL, SPOCS and SDOs to e-CODEX e-

Delivery WP in February 2011• First meeting of “Task Force” in Juli • August 2011 publication of “Scenario document”• Consolidation in meeting with the EC in September• e-Government conf in Poznan Nov 2011-- e-CODEX joins

BDX• 2nd Task Force meeting January 2012• BDX TC face2face meeting in Sept 2012• 3rd Task Force meeting in Sept 2012 – EESSI joins Task

Force• BDX TC face2face meeting in April 2012• April 2013 Kickoff e-SENS

Page 7: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Converged Solution

Page 8: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

6.1: e-Delivery & e-Interaction

6.1: e-Delivery & e-Interaction

6.2: Semantics, Processes and

Documents

6.2: Semantics, Processes and

Documents6.3: Identity,

Security and Trust 6.3: Identity,

Security and Trust 6.4: Conformance &

Tests6.4: Conformance &

Tests

5.1: e-Procurement

5.1: e-Procurement

WP1: Project Management (General Coordination, Administrative Management & Advocacy)

WP1: Project Management (General Coordination, Administrative Management & Advocacy)

WP2: Communication & MarketingWP2: Communication & Marketing

WP3: Sustainability and long-term governanceWP3: Sustainability and long-term governance

WP4: Project Legal Expertise CentreWP4: Project Legal Expertise Centre

5.2: e-Health5.2: e-Health 5.3: e-Justice5.3: e-Justice 5.4: Business life-cycle

5.4: Business life-cycle

5.5: New domain

5.5: New domain

WP5: PilotingWP5: Piloting

WP6: Building blocks ProvisionWP6: Building blocks ProvisionWP6: Building blocks ProvisionWP6: Building blocks Provision

e-SENS WP Structure

Page 9: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Project Plan Year 1 – WP5-6 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12

Domain requirements & gap analysisDomain requirements & gap analysis

SGCC Business ModellingSGCC Business Modelling

•D6.1 Executable ICT Baseline Architecture (M6)

SGCC RequirementsSGCC Requirements Analysis & DesignAnalysis & Design

•D5.1 Requirements Framework n°1 (M12)•D5.2 Pilot Lifecycle Management Methodology & Workflow Support Tools (M12)•D5.3 First-wave Pilot Scenarios and Plans n°1 (M12)

Development of cross-domain use casesDevelopment of cross-domain use cases

Requirements Framework & Mapping with Architecture Framework

Requirements Framework & Mapping with Architecture Framework

Pilot Lifecycle Management, Methodology & ProceduresPilot Lifecycle Management, Methodology & Procedures

Pilot Project Planning & ParticpationPilot Project Planning & Particpation

Pilot Scenario Definition & mapping with Building BlocksPilot Scenario Definition & mapping with Building Blocks

Pilot Support & Monitioring ToolsPilot Support & Monitioring Tools

Page 10: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Deliverables

• D6.1 Executable ICT Baseline Architecture R PU Month 6

• D6.2 Enterprise Interoperability Architecture n°1 SP PU Month 15

• D6.3 Enterprise Interoperability Architecture n°2 SP PU Month 24

• D6.4 Architecture Evaluation R PU Month 30• D6.5 Transfer of Operation and Ownership SP

PU Month 36• D6.6 Enterprise Interoperability Architecture n°3

SP PU Month 36

R = Report, SP = Specification / PU = Public

Page 11: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

• Requirements in Terms of MS solutions

• Default Backend Interface

Page 12: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Work assignment for Inception phase (4 months)

• Abstract Business Process Description (Technical Use Case)

• Requirements (Technical) • Stock Taking

– Results from Previous LSPs, OASIS, ETSI– PEPPOL, SPOCS, e-CODEX => e-Delivery

Convergence– Generalize to other domains, Gap Analysis

• Scoping

Page 13: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Later Tasks

• Elaboration phase– Identification of Components (for e-Delivery

Infrastructure)– Specification

• Construction phase– Development

• Transition phase– Deployment and Sustainabilty

Page 14: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Resources & Planning

• 250 PM total / 36 months -> 7 Full-time people per month

• 13 countries

Page 15: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

SGCC internal processes

• Communication– TelCos– Web Conferences

• Change Management– Deliverables Review Cycles, Process– (Jira)

• Risk Management

Page 16: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Tools

• Cooperation– BSCW

• Time tracking

• Development– Jira (Deliverables and Source Code)– Git

Page 17: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Meetings

• Announcement– Who– Agenda– Materials

• Minutes

• How many, When– 2-3 per year– 1st meeting May, 2nd probably Sept

Page 18: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Monitoring

• Work Results / Documents / Deliverables

• Time logging

Page 19: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Mailing lists…[email protected]

uGroups•general: all project members•pd: primary / deputy•aa: admin aspects•info: information•mb: management board•pb: policy board•ab: architectural board•db: domain board

Work Packages•wp1•wp2•wp3•wp4•wp5

-wp5.1-wp5.4•wp6

[email protected]

[email protected]@lists.esens.eu

[email protected]@lists.esens.eu

and so on…

Page 20: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Stakeholders

• … Where to look:

MS

EC

Standards

other initiatives

Page 21: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Taking stock

Page 22: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1

Brainstorm on "Taking stock"

Page 23: SGCC 6.1 Kick-off Project Setup. Introduction Tour de Table –Who’s who –Attendance list, e-mails Scope of CC 6.1