Shruti Jire 511 Interim Report

Embed Size (px)

Citation preview

  • 8/4/2019 Shruti Jire 511 Interim Report

    1/32

    Page | 1

    INTRODUCTION

    Crompton Greave is a much esteemed organization and I am working in its S-3 switch

    gear campus. They have various departments like product design, marketing and sales,

    procurement, inventory management, production plant, logistical operations, warehouse

    management, quality management, IT, Research and development.

    In this project I will be working in all of these departments in my training period. It

    will help me learning all important functions of operations management throughout the

    course of internship.

    I will be learning Product Design and specifications, Procurement management -

    Vendor selection, Vendor management, Inventory management -Scheduling, Stock

    management, Buffer management, Process and production management -Process handling,Production planning, Layout and location, Logistical operations-Inbound logistics, Outbound

    logistics, Packaging and labelling, Warehousing management-Raw material procurement,

    Quality management-Quality checks.

    Inventory Management Project and warehouse management was the live project we

    were working on. Aim of the project was to reduce the current inventory levels using basics

    of operations

  • 8/4/2019 Shruti Jire 511 Interim Report

    2/32

    Page| 2

    Basic functions of Operations

    Product Design and Specification

    Preface

    Crompton Greaves work in two main divisions of product

    We were working at Ambad Divison which has four major departments

    y S1-

    utdoor type instrumental transformers

    y S2-Single pole Railway Appliances

    y S3- Circuit Breaker.

    y S4- ightning Arrestors.

    We were working at S3 division.

    Product

    Consumer

    Electrical

    Appliances

    ndustrial

    Instrumental

    Transformers

    Circuit

    Breakers

    ightning

    arrestors

  • 8/4/2019 Shruti Jire 511 Interim Report

    3/32

    Page|3

    Product Range

    CircuitBreaker

    MediumVoltage

    25KVInterruptor

    25 KV GCB

    33 KVSTD

    33KV40 KA

    72.5KV

    72.5KV40

    KA

    High Voltage

    145 SPDoubleStack

    145 SP SingleStack

    145 SP SPR

    170SP SPR

    170 GO

    84" CAPSW

    84" CSV

    120" CSV

    170 Pole

    145 Pole

    66 Pole

    Extra HighVoltage

    245 SP PN

    245 SP SPSTD

    400 KV WithPIR

    400 KV w/oPIR

  • 8/4/2019 Shruti Jire 511 Interim Report

    4/32

    Page | 4

    Pro

    ssforProdu

    td

    si

    n andsp

    ifi

    ations

    Switch Gear division totally works on customization. So customer requirements

    are the highest priority for product design and specifications.

    1. Custom

    r:

    As mentioned above, all the products are customized, the orders are as per the

    customer requirement and specification, the order process would generally take place

    from customer end by approaching the company for the required number of product.

    2. Ind ntformat:

    Generally, the marketing department receives the order indent from the customer

    which includes all the necessary

    y customer details,

    It includes the customer name, the product type and the number of quantity

    required.y product specification,

    It includes all the precise details and in dept component list of all the

    necessary items required for the customer for the required product

    in a form of soft copy or SAP order.

    Custom r

    Marketin

    department

    y Produ

    tdesi n

    Department

    y Produ

    tion

    y Testin

    Indentformat

    CC

    Feedback

    Feedback

    Customer Order

    Specification clearance

  • 8/4/2019 Shruti Jire 511 Interim Report

    5/32

    Page| 5

    3. Marketing Depart ent:

    It is the department which acts as an interface between thecustomer and thecompany

    for placement of the order of the product. Most often thecustomer initiates his order to

    thecompany through the marketing department by providing the detailed information

    and that detailed information is then CC to all other department. The other function ofthe marketing department is also to present its product catalogue to thecompanies

    giving thecompanies a brief idea about their product and its quality.

    4. Feedback:The feedback process includes the finalization of the design of the product from the

    design department and then it issent to the marketing department so as to forward it to

    thecustomer for the Final approval (Stamp Copy)so that the finalized design and

    specification can besent to all the department of thecompanyto carry out the next

    desired process.

    Design Depart

    ent Functions.

    1. Preparation of Drawings as per customer requirements.

    2. Sending the drawing to the marketing department.

    3. Preparation on comments(Drawing restructure)

    4. Release of Manufacturing Instruction to the Production, Planning and Testing

    department.

    5. Advance information sheet given to the purchase department.

    6. SAP Maintenance (done by marketing department).

    7. Production confirms.

    8.

    Cost Checking.9. Invoice

    10.Discuss with R&D for new development.

    11.To support testing.

    Desgin Marketing Customer

    Stampcopy(Final

    Approval)

    CC to allDepartment

    Planningdepartment

    Done only after SAP

    Maintenance

  • 8/4/2019 Shruti Jire 511 Interim Report

    6/32

    Page|6

    12.To Design a product according to GTA(Guaranteed Technical )

    y General Information

    y Guaranteed Ratings Circuit ratings, Electrical parameter rating, Temperature

    ratings, Coils ratings, etc.

    y Dielectric withstand ofcomplete breaker.

    y Operating Mechanism.

    y Data on SF6 Gas

    y General dimensions

    y Constructional details.

    y Reference drawings.

    y Validated operating conditions.

    y Validated multiple uses.

    13.They also release MI for particular product. MI is detailed manufacturing

    Instructions.

    14.BOM (Bill of material) is also provided by them

    Procure ent function

    After Clearance about Product specification from customer as marketing department sends

    copy of indent to all departments. So after clearance about the design material

    procurement playsvery important role.

    Procurement department is divided into subdivisions according to the functions division

    Vendorselection

    VendorManagement

    Purchaseplanning

    Raw Material

    Purchasing

    Quality

    Assurance

  • 8/4/2019 Shruti Jire 511 Interim Report

    7/32

    Page | 7

    As the product is divided into MV,HV,EHV.People working in this fuctions are also divided

    accrording to product divisions and all of them have to take care of all of the functions

    mentioned above.

    Vendor Selection

    This process is a online process.It starts on online portal of CG.Vendor who wish to provide

    Raw material to CG apply through this portal.It starts with Form 0

    Form 0

    CG confirmationof

    requirements

    FORM 1 supplierinformation asper cg requirements

    Evaluate

    supplier

    Form 2-Selfassessmentbysupplier

    Evaluate Self

    assessment

    report

    Form 2-AssessmentofsupplierBYCG representative

    Suppliermeets CG

    requirements??

  • 8/4/2019 Shruti Jire 511 Interim Report

    8/32

    Page | 8

    1. Form 0This form helps in Supplier introduction to CG. Basic Information about Supplier like

    Name,

    Material description,

    Existing customer,

    contact details,

    Product details

    2. CG confirmationofrequirements Material Manager of concerned division will confirm the requirement by approving form

    0 of supplier. System will generate a reference number and will communicate to supplier

    by email.

    3. Form1Supplier accesses CG website with allotted login and password and submits required

    information as per form 1.

    4. Evaluate SupplierMaterial manager of concerned CG division will assess the information of supplier and

    will approve the supplier for next process, if found suitable

    System will communicate by email/SMS to the supplier the result of initial assessment.

    5. Form 2Supplier will self assess their Quality system & decide whether they are meeting CG

    norms for supply of CTQ or NON CTQ items.

    6. EvaluateselfassessmentreportMaterial manager of concerned CG division will evaluate the self assessment report of

    the supplier and will approve the supplier for the next process, if found suitable

    System will communicate by email/SMS to the supplier the result of this assessment.

    End

    Samplelot acceptance

  • 8/4/2019 Shruti Jire 511 Interim Report

    9/32

    Page | 9

    7. Assessmentofsupplierby CGG representativesCG representatives will visit supplier works for assessment as per form 2 on a planned

    date.

    8. Finalevaluationofthesupplier Supplier will be approved based on score obtained in assessment. For supply of CTQ

    items, minimum, *** rating is required.

    9. Samplelot approval Supplier will send samples of the required item for CGG approval, before start of regular

    supply

    10.Pilotlot approval The first pilot lot (manufactured with full fledged tooling

    will be monitored forperformance at CGG

    11.Performancemonitoring The new supplier will be monitored for performance for first six months.

    Quality Assurance

    Quality assurance of each incoming raw material is a responsibility of vendor as well as

    purchase manager.

    33% of total cost of the raw material is levied on the vendor, if in case he fails to deliver

    the raw material according to the decided quality and the entire lot of the ordered raw

    material is sent back to vendor, so as to send the entire new lot of same raw material as

    well as both side transportation cost.

    Every new lot of raw material which comes in the company from the vendor is checked

    at the stores and a random sample of the raw material is inspected for all physical

    specifications and if any raw material fails the quality check, it is then and there rejected

    and the entire lot is sent back to the vendor with the vendor liable to pay thetransportation cost.

  • 8/4/2019 Shruti Jire 511 Interim Report

    10/32

    Page|10

    Vendor Manage ent

    In CG, vendor management comprises ofvendor audits.

    The integration ofvendors with CG is on contract and thesecontracts areyearly basis,

    and renewed according to the overall rating which vendor gets from the auditor.

    Everysix months there are qualitychecks which arecarried out and according to quality

    reports, the ratings are given to thevendor.

    Qualitychecks and Rating factor for thevendors.

    Critical Performance Indicators are decided by CG policies

  • 8/4/2019 Shruti Jire 511 Interim Report

    11/32

    Page | 11

    According to the guidelines

    y 1 = No evidence of system

    y 2 = System awareness observed and implemented

    y 3 = System is documented & fully implemented

    y 4 = System is documented, implemented & periodically reviewedy 5 = Continuous efforts to improve the system

    For Instance, if you want to rate supplier data it will be rated according to CTQ (Critical to

    Quality

    ratings.

    For example:

    If a vendor is given a rating of2 for its supplier data, then CPK (Critical Performance

    Indicator factors

    > 1.33 for at least 50% CTQ items in last six months for variable data.

    Interpretation is that the data provided by t he supplier is not very reliable as it is varyingconstantly.

    Documentation

    List of documents required from Vendors

    1. Company registration certificate.

    2. VAT registration.

    3. Plant layout.

    4. List of major customers.

    5. Balance sheet.(Financial documents!

    .6. Factory license.

    7. Copy of ISO certification(Optional !

    8. Environmental Certification.(Optional!

    9. OSHAS certification.(Optional!

    Factorsfor vendorselection andretention

    y Financial data.

    y History and background of company.

    y Cost of raw material.

    y Delivery time.

    y Manpower.

    y Technological Potential.

    y Plant Capacity.

    y Availability of other vendor for CG.

    y Geographical Reach

  • 8/4/2019 Shruti Jire 511 Interim Report

    12/32

    Page|12

    Production Planning

    Production planning is a very important function in operations. Planning of production is

    done month wise. According to thecustomers requirement about the product delivery

    the product isscheduled in production.

    Planning departments receivescleared order from marketing then according to

    following factors theystart planning and scheduling.

    1. Plant capacit" y SAP hassheet about UEOB that is Un-Executed Order Booking. These are quantities

    which areyet to be produced.

    y Plant capacity is operated with MOST documents (Maynard Operation Sequence

    Technique) which gives us information about people and project skill matrix.

    Marketingdept

    Productdesign

    productionplanning

    Plant

    capacity

    Materialavailability

  • 8/4/2019 Shruti Jire 511 Interim Report

    13/32

    Page|13

    For Example,

    According to order for the day to be made, workers on the basis of their skills and

    knowledge work on particular division of product. Areas and processes are allocated

    according to flow. If order is less for particular product, workerscan beshifted to other

    product divisions. Skill matrix helps particular product range manager to utilize their

    labours to the highest efficiency.

    y CapacityIt is a Potential to produce a product.

    Capacity utilization refers to the relationship between actual output from installed

    equipments and potential output.

    For current month it is100 Cr.

    y According to financial data, following graph shows thecapacity utilization ofswitch gear

    plant.

    Quantit

    MV

    HV

    EHV

    0#

    10 #

    20 #

    $ 0 #

    40 #

    50%

    60%

    70%

    80%

    90#

    Capcity Utilization

    2007-08

    2008-09

    2009-10

    10labours 7labours

    15labours

  • 8/4/2019 Shruti Jire 511 Interim Report

    14/32

    Page|14

    y According to capacity they plan how many breakers per month.

    2. MaterialA& ailabilit' MArefers to Available inventory. Inventory is divided into Standard and non standard items.

    Requirement of inventory is decided According to production schedule and AIS (Advance

    information sheet).

    AISsheet provides information about all material available in inventory

    According to daily plan, kits for each breaker are drawn from RM warehouse.

    Logistical Operations

    CG logistical operationscomprise of transportation only.

    They mainly focus on inbound and outbound logistics.

    Outbound Logistics is ofvital importance in CG as it dispatches its products to thecustomer.

    Outbound Transportation

    y Countrywide.

    y Export.

    OutboundLogistics.

    Inbound

    Logistics.

  • 8/4/2019 Shruti Jire 511 Interim Report

    15/32

    Page|15

    Countr(

    wide Logistics

    This is a general process for thecountrywide transport.

    Modes of transportation

    y Road.

    y Railway.

    Most of thecases road ischosen as the transportation mode.

    Following are the factors on which transportation mode isselected.

    Reasons for selecting road as a transport mode.

    Clearance for dispatch

    confirmation from marketing that money is received

    Permission to dispatch

    Road and excise permit from Government given bycustomer

    Arrangement ofsuitablevehicle

    According to weight and dimensions of product the, suitablevehicle ischosen

    It also dependent on trasport rate.

  • 8/4/2019 Shruti Jire 511 Interim Report

    16/32

    Page | 16

    1.

    Factors Rating(5=highest,1=lo ) est)

    Cost 4

    Transit time 2

    Reliability 4

    Capability 3

    Accessibility 5

    Traceability 4

    Total 22

    2. The Cost of transportation increases as the product has to be first taken to the railway

    station, loaded onto the railway, unloaded at the receiving end and then taken to the

    customer end. This involves a lot of transportation cost.

    3. Air mode of transport is not selected as the circuit breakers are heavy and its size as well

    as length is quite large. Small Consignments as well at the time of urgency product issent through Air mode. It is the most costliest mode of transport as its charges are Rs.

    200/kg.

    4. Water mode of transport is the cheapest mode of all as it charges are Rs 5 -10/kg but the

    coverage of water transportation network is not feasible due to geographical reasons.

    99% of transport is outsourced to the following companies.

    y Associated Root Corporation.

    y Adhunik Transport.

    y Premier Root Carriers.

    y Shree Roadways.

    Export

    This division handles the outbound logistics ofNasik and Aurangabad Plant.

    25 to 30% turnover of CG is from exports.

    Two Modes of transport

    y Air.

    y Water.

    Road

  • 8/4/2019 Shruti Jire 511 Interim Report

    17/32

    Page|17

    Water Mode

    Generally there are two ways ofsea transportation.

    FOB (Free on Board0

    This is a way of transport where the CG is not responsible for deciding the FreightForwarder

    for the transportation of the Product.

    The process on transportation in FOB is that, CG is responsible to send the product to the

    nearest port that is Neva Seva port-Mumbai and then the product is handed over to the

    Freight Forwarder who takescare of all thecustoms and excise duties, and then forwards it

    to theshipping company to transport it to thecustomer to his desired port. Freight

    Forwarder is responsible for thesmooth transport of the product right from the uploading

    of the product on ship till it reaches thecustomer.

    C1

    F (Cost insurance freight0

    In this type of transport, CG has the responsibility to decide the Freight Forwarder. The

    process on transportation in CIF is that, CG is responsible to send the product to the nearest

    port that is Neva Seva port-Mumbai and then the product is handed over to the Freight

    Forwarder who takescare of all thecustoms and excise duties, and then forwards it to the

    shipping company to transport it to thecustomer to his desired port. Freight Forwarder is

    responsible for thesmooth transport of the product right from the uploading of the producton ship till it reaches thecustomer.

    Sea Transport

    FOB(Free onboard)

    CIF(Costinsurance

    frieght)

  • 8/4/2019 Shruti Jire 511 Interim Report

    18/32

    Page|18

    Process of transportation through Water

    Required documents for the transportation

    y LC (Letter ofcredit) It is a letter from customers bank to CG as a assurance of the

    payment of the product.

    y DO(Delivery order for container) It includescustomer name, finished productweight, details ofshipping company

    y ARE-I It is documents from customs which indicates that thecontainer issealed by

    thecustoms, as in thecustoms has inspected it and approves it.

    y Filing Shipping Bill It hasBill of Lading. This is a very important document as it is a

    proof that cargo is handed over to Shipping Company, as in its now the responsible

    of theShipping Company.

    y Documents by CG Invoice, Packing list, Shipping Marks. Stuffing and Packing is done

    by CG only because as it is good market reputation.

    CG.

    Port.

    Freight Forwarder.

    Shiping Company.

    Freight Forwarder.

    Customer.

  • 8/4/2019 Shruti Jire 511 Interim Report

    19/32

    Page|19

    Qualit Manage ent

    DivisionalQualit2

    Polic2

    y Setting quality objectives & goals for operations as per needs of Divisional business.

    y

    Manufacturing, supplying products and providing services as per the requirements ofthecustomer at minimum cost.

    y Commitment and involving of all employees for promotion ofcontinual

    improvement and customer focus.

    y Planned training to employees, suppliers and customers of the Division.

    y Planned management reviewscovering assessment of opportunities for

    improvement and resources.

    Qualit3

    Divisions

    Qualitysection is divided into four main parts bySix Sigma Drive

    1. Input Qualit4 Assurancey All the incoming raw material is inspected before it is handed over to the

    production department for carrying out production activity.

    y The qualitycheck is done at thestores level.

    y All the raw material go through a certain process which mainlyconsist of physical

    check, critical component check, tolerance test which is done with the help of a

    pre-defined tolerancechart, variouschecklist for different type ofcomponent,

    hardness test which are or basically two types HRC and BHT hardness test,

    spring test and all these test arecarried out through specified design parameters

    for certain types ofcomponents.

    QualityAssurance

    Input QualityAssurance IPQ(Process) Predispatchqualitycheck After SaleServices

  • 8/4/2019 Shruti Jire 511 Interim Report

    20/32

    Page | 20

    y Every measuring instrument goes through calibration process once in a year and

    every instrument has the last calibration date and the due calibration date.

    2. IPQ(InterProcessQuality)y Six Sigma Drive has divided every process in the division into IPQ cells.

    y The Cells are of according to the product ranges and process, each cell has its cell

    owner and has the responsibility to ensure total quality for that product.

    y During manufacturing of product, the errors which occur are noted down on

    yellow card. All the major and minor error which occurs during manufacturing

    are noted here.

    y Not to Move card is placed on the breaker with defects and they all the non-

    conformities are attended by that cell owner in Quality hour. Every morning

    there is a Quality hour where all the issues related to quality are addressed.

    y When all the error is rectified a card known as Read y To Test card is issued by

    the production manager and it is placed the breaker and is ready for testing.y Major and minor errors are occurring in daily productions are taken up by the Six

    Sigma department as a project and the solutions are standardized.

    y Major Failures include Gas Leakage, Arcing Failure and MV Failure.

    3. Pre-Dispatch Inspectiony In this section actual testing of circuits, components, physical and electrical

    aspects of components and physical aspects of the breaker are done.

    y Generally, each breaker takes minimum 2 days for testing.

    y Physical Testing Lengths, Materials, Height are checked according to MI and

    Drawings.

    y Closing coil checks AC/ DC Circuits, Voltage etc electrical parameters are

    checked for used coils.

    y Component checks Physical and Electrical Specification are checked.

    y Pneumatic Operations Component Resistance, Mechanical part, Wire Inter

    phasing, Pneumatic Pressure. Etc

    y After the entire testing process, customer verifies the tested produced so as to

    meet his requirement. The verification is done at CG plant.

    y After customer clearance, the breaker is sent for packing and dispatch.

    4. After Sales Servicesy After the dispatch of the breaker and when the breaker reaches the customer, the

    installation as in erection is done at the c ustomers end by CG representatives and

    engineers.

  • 8/4/2019 Shruti Jire 511 Interim Report

    21/32

    Page | 21

    y Constant track of feedback record is kept by the after sales service team in order to

    maintain quality standard in case of any post installation failures and for servicing

    purpose.

    y Number of after service sales department are set up across the country for providing

    the post sales services and corrective actions in order keep a check on failures and

    have a constant quality standard.

    y Generally a breaker requires servicing after 10-12 years.

    y Service department are categorized into main four regions

    East Kolkata.

    West Mumbai.

    North Delhi.

    South- Chennai.

    y Every failure that occurs post sales services are go through CAPA action sub -module

    (corrective action, preventive action5

    which are predefined actions for failure

    occurrence.

    Head Office

  • 8/4/2019 Shruti Jire 511 Interim Report

    22/32

    Page| 22

    ASSIGNMEN 1-Operational Research

    AIM

    To know and analyze the operational efficiency ofvariousvendors for Crompton Greaves

    Global. This will help us in managing and controlling inventorystocks levels at CG byknowing Vendors potential.

    SCOPE

    Research was performed on all local vendors available in Nasik. It involvesvisiting all local

    vendors personally. There are totally 8 major vendors available in Nasik

    Okay tools

    Turningpoint

    6 edarEnterprises

    R.P.

    Vivek

    Hextech

    MRC

    Bunts ltd.

    Vendor List

  • 8/4/2019 Shruti Jire 511 Interim Report

    23/32

    Page | 23

    METHODOLOGY

    Methodology selected for data collection is Personal Interview

    Interview session was arranged by Crompton Greaves only.

    Reasons

    PI helps in gathering information very fast. Respondent cooperation is very important in this

    type of methodology. Flexibility of questions If the cooperation is good then Information

    collected can be reliable. As we were supposed to perform research on lo cal vendors only

    geographical barriers were not the problem. Vendors are situated in a locality of 1 -2 km

    only.

    So PI is the best suited methodology here.

    MajorQuestions Asked were

    We started with the list of Raw material they sell to CG.

    a7 What are the raw materials components u sells to CG??

    b8 Is CG your only customer??What are the other customers??

    c8 How long you have been CGs supplier??

    d8 What kind of integration you have with CG??

    e8

    What is raw material required for particular component??f

    8 What RM Procurement time for each component??What is the Process lead time??

    g8 What are processes involved in making of one component??

    h8 What is labor count in one plant??

    i8 What is companys turnover??What percentage of turnover it has with CG??

    j8 Any Problems they get from CG side??

  • 8/4/2019 Shruti Jire 511 Interim Report

    24/32

    Page| 24

    Main Findings

    Around 70 9 components are procured from local vendors.

    Vendorscustomer

    Year wise relationship

    Integrations made with vendors by CG are all on Yearlycontractual basis;vendors

    are approved and given ratingseveryyear through vendor audits.

    0 @

    20@

    40 @

    60@

    80@

    100@

    120 @

    T.P Hextech Kedar Okay tools Vivek R.P.

    others

    Semens

    ABB

    CG

    0

    5

    10

    15

    20

    25

    30

    T.P Hextech Kedar Okay tools Vivek R.P.

    years

    years

  • 8/4/2019 Shruti Jire 511 Interim Report

    25/32

    Page| 25

    Percentage of turnover from CG

    Vendor complaints

    Major turnover of all local vendors is with CG. This gives bargaining power to CG but

    if not handled well power can shift to vendors as there are the onlyvendorsforparticular component.

    0A

    20 A

    40A

    60A

    80 B

    100 B

    120 B

    T.P. okay tools R.P kedar vivek Hextech

    Series3

    Series2

    Turnover with CG

    23A

    43B

    34A

    Pr le

    No Problem

    Material Pick up

    Frequent changes in schedule

  • 8/4/2019 Shruti Jire 511 Interim Report

    26/32

    Page| 26

    ASSIGNMEN 2: InventoryManage ent

    Introduction

    Inventory is a stock or a list of goods and materials which can be of following types

    1. Raw material

    2. Work in progress(WIP)

    3. Finished good

    Project AiC

    To reduce Current inventory levels in stores

    To plan new inventory levels and Decidea purchasing cycle for each component.

    Project Phases

    Phase 1

    Secondary Data collection about all raw material componentsname,description,SAP codeetc divided into MV,HV,EHV .

    Data feeding

    there are more than 1300components.

    Phase 2

    Primary data collection through Operational Research

    collection of Lead times ofeach component from vendors andpurchasing manager

    Deriving consumption pattern for next quarter

  • 8/4/2019 Shruti Jire 511 Interim Report

    27/32

    Page| 27

    For exaD

    ple:

    For MV, Mech frame is used in 72.5KV and 72.5KV40KA, total averageconsumption for

    month is123.Calculate EOQ, SS, minimum quantity and maximum quantity

    Solution-

    For EOQ,

    D=123, ordering cost is negligible, Inventorycarrying cost as per given bycompany.

    SQRT (2 X D X ordering cost)

    EOQ=

    SQRT (Inventorycarrying cost)

    EOQ=12

    For SafetyStock,

    Lead time=30, Safety factor of 90E

    =1.247, Avg STD deviation (calculated)= 2.0027

    SS=SQRT (LT) x SF X STDEV

    SS= 5

    Phase3

    Calculating EOQ,SS for each component

    Deciding Minimum and maximum stock level ofeachcomponent

    Phase4

    According to Cost ofeach material we will becalculatingBudget for each quarter for keeping minimum stocklevel considering average month consumption.

  • 8/4/2019 Shruti Jire 511 Interim Report

    28/32

    Page | 28

    For Min level,

    As we didnt want any extra Inventory for the day, we calculate

    Min stock level as Demand

    Min. level=

    (21 that is working days of plantF

    Min. Level= 123/21

    = 5.85

    = 6

    For Max level,

    Max. Level = EOQ

    Max .Level = 12

    Both Min and Max levels are calculated according to CG needs not Standard formulae.

  • 8/4/2019 Shruti Jire 511 Interim Report

    29/32

    Page| 29

    ASSIGNMEN 3: Warehouse Manage ent

    CG has only a raw material warehousestore.

    Main functions of warehouse G anage G ent are

    1. Quality Checks of incoming raw material.

    2. Placing the raw material in respective bins.

    3. Keeping the record ofevery incoming entity

    4. Making kits for particular product according to requirements and orders.

    5. Giving hold up information of raw materials

    6. Keeping and giving stock out information to supervisors.

    Project AiH

    To improve thestore processes and process management techniques.

    To manage Inventory levels in warehouse.

    Project phases

    Phase1

    Understanding thecurrent processes.

    Analyse the processes.

    Phase 2

    Understand what all raw material isstored in warehouse

    Classify them according MV,HV,EHV.

    Then Classify them according to Processes they go through(ifthey go through) like planting,casting etc

    After that according to weights heavy,medium,light Socollecting and lifting them from bins will beeasy for workers.

  • 8/4/2019 Shruti Jire 511 Interim Report

    30/32

    Page|30

    Existing StoreI

    ap

    Phase3

    Analysing the material flow ofstore it should besuch that once a labor putsa cart between two rows all material should be available to him in that placeonly ,so as to decrease his physical efforts and save time

    Current processes in warehouse are not like this.everything is hotchpoch.

    Phase4

    After material flow management assigning bin numbers to each component

    currently CG has bin cards whereentry of incoming and outgoing count iskept bt the work over there is all manual so mistakes in counts lead to extrainventory

    Phase 5

    Implementation

    feedback about improvement

  • 8/4/2019 Shruti Jire 511 Interim Report

    31/32

    Page | 31

    Proposedstoremap

    Proposedrackstructure

  • 8/4/2019 Shruti Jire 511 Interim Report

    32/32

    REFERENCES

    Websites

    y http://en.wikipedia.org/wiki/Inventory

    y http://en.wikipedia.org/wiki/Warehouse_management_system

    y www.inventoryops.com/warehouse_management_systems.htm

    y http://www.accountingformanagement.com/minimum_level_or_minimum_limit.htm

    y www.cgglobal.com

    Books