147
BTS3900 GSM V300R008 Site Maintenance Terminal User Guide Issue 03 Date 2008-07-15 Part Number Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd

Site Maintenance Terminal User Guide

Embed Size (px)

Citation preview

  • BTS3900 GSMV300R008

    Site Maintenance Terminal User Guide

    Issue 03Date 2008-07-15Part Number

    Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

  • Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For anyassistance, please contact our local office or company headquarters. Huawei Technologies Co., Ltd.Address: Huawei Industrial Base

    Bantian, LonggangShenzhen 518129People's Republic of China

    Website: http://www.huawei.comEmail: [email protected] Copyright Huawei Technologies Co., Ltd. 2008. All rights reserved.No part of this document may be reproduced or transmitted in any form or by any means without prior writtenconsent of Huawei Technologies Co., Ltd. Trademarks and Permissions

    and other Huawei trademarks are the property of Huawei Technologies Co., Ltd.All other trademarks and trade names mentioned in this document are the property of their respective holders. NoticeThe information in this document is subject to change without notice. Every effort has been made in thepreparation of this document to ensure accuracy of the contents, but the statements, information, andrecommendations in this document do not constitute a warranty of any kind, express or implied.

    Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

  • Contents

    About This Document.....................................................................................................................11 Introduction to the Site Maintenance Terminal...................................................................1-1

    1.1 Definitions Related to the Site Maintenance Terminal...................................................................................1-21.2 Logical Objects of the BTS.............................................................................................................................1-21.3 Software Window of the Site Maintenance Terminal System........................................................................1-3

    2 Getting Started with the Site Maintenance Terminal.........................................................2-12.1 Configuration Requirements for the Site Maintenance Terminal PC.............................................................2-22.2 Starting the Site Maintenance Terminal System.............................................................................................2-3

    2.2.1 Setting the IP Address of the Site Maintenance Terminal PC...............................................................2-32.2.2 Connecting the Site Maintenance Terminal PC to the BTS...................................................................2-42.2.3 Locally Logging In to the BTS..............................................................................................................2-4

    2.3 Exiting the Site Maintenance Terminal...........................................................................................................2-63 Using the Site Management Rights........................................................................................3-1

    3.1 Site Management Rights.................................................................................................................................3-23.2 Obtaining the Site Management Rights..........................................................................................................3-23.3 Releasing the Site Management Rights...........................................................................................................3-3

    4 Managing Sites...........................................................................................................................4-14.1 Viewing Site Resources..................................................................................................................................4-34.2 Forcibly Loading Software..............................................................................................................................4-44.3 Activating Software.........................................................................................................................................4-54.4 Resetting a Site Hierarchically........................................................................................................................4-84.5 Monitoring Environment.................................................................................................................................4-94.6 Testing Transport Performance.....................................................................................................................4-114.7 Querying Alarm Delay Time.........................................................................................................................4-134.8 Testing the RF Specifications.......................................................................................................................4-144.9 Querying the Ring Topology Parameters......................................................................................................4-164.10 Viewing the Bar Codes...............................................................................................................................4-174.11 Managing the Site Board Parameters..........................................................................................................4-194.12 Testing the E1 BER.....................................................................................................................................4-204.13 Managing the RET Antenna........................................................................................................................4-21

    5 Managing Cells...........................................................................................................................5-1

    BTS3900 GSMSite Maintenance Terminal User Guide Contents

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    i

  • 5.1 Managing Cell Attributes................................................................................................................................5-25.2 Managing Cell Extended Attributes................................................................................................................5-55.3 Changing the Cell Management State.............................................................................................................5-75.4 Performing the Cell Performance Test............................................................................................................5-8

    6 Managing BTs.............................................................................................................................6-16.1 Changing the BT Management State..............................................................................................................6-26.2 Re-Initializing a BT.........................................................................................................................................6-36.3 Performing BT Tests.......................................................................................................................................6-46.4 Viewing the Channel Status............................................................................................................................6-46.5 Setting the TRX Full Power Emission............................................................................................................6-5

    7 Managing RCs.............................................................................................................................7-17.1 Managing RC Attributes.................................................................................................................................7-27.2 Managing RC Extended Attributes.................................................................................................................7-37.3 Changing the RC Management State..............................................................................................................7-57.4 Re-Initializing an RC......................................................................................................................................7-67.5 Obtaining the RC Power Mode.......................................................................................................................7-77.6 Obtaining the Auto Power Adjustment Type..................................................................................................7-8

    8 Managing Channels...................................................................................................................8-18.1 Managing Channel Attributes.........................................................................................................................8-28.2 Changing the Channel Management State......................................................................................................8-38.3 Performing the Loopback Test........................................................................................................................8-4

    9 BBU Operations..........................................................................................................................9-19.1 Configuring a Board........................................................................................................................................9-39.2 Querying Board Information...........................................................................................................................9-49.3 Querying Board Extended Information...........................................................................................................9-59.4 Resetting a board.............................................................................................................................................9-79.5 Resetting a Board in Power-Off Mode............................................................................................................9-89.6 Testing a Board.............................................................................................................................................9-109.7 Setting the BTS Clock...................................................................................................................................9-119.8 Performing Loopback Test of Board Communication Links........................................................................9-139.9 Querying Board Alarms................................................................................................................................9-159.10 Querying Board Parameters........................................................................................................................9-179.11 Querying Port Attributes.............................................................................................................................9-18

    10 DRFU Operations...................................................................................................................10-110.1 Viewing Board Information........................................................................................................................10-310.2 Viewing Board Extended Information........................................................................................................10-410.3 Resetting a Board in Power-Off Mode........................................................................................................10-710.4 Resetting a Board........................................................................................................................................10-910.5 Starting a Board.........................................................................................................................................10-1210.6 Testing a Board.........................................................................................................................................10-14

    ContentsBTS3900 GSM

    Site Maintenance Terminal User Guide

    ii Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • 10.7 Changing the Board Management State....................................................................................................10-1610.8 Performing Loopback Test on Board Communication Links...................................................................10-1910.9 Viewing Board Alarms..............................................................................................................................10-2210.10 Viewing Board Parameters......................................................................................................................10-2410.11 Setting the Antenna Mode.......................................................................................................................10-28

    11 DRFU Configuration.............................................................................................................11-111.1 Adding a DRFU..........................................................................................................................................11-211.2 Deleting a DRFU.........................................................................................................................................11-411.3 Adding a Ring.............................................................................................................................................11-611.4 Dividing a Ring...........................................................................................................................................11-811.5 Displaying In-Position Boards..................................................................................................................11-1011.6 Detecting In-Position Boards....................................................................................................................11-1111.7 Setting a Breakpoint..................................................................................................................................11-1311.8 Canceling a Breakpoint.............................................................................................................................11-15

    BTS3900 GSMSite Maintenance Terminal User Guide Contents

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    iii

  • Figures

    Figure 1-1 Logical structure of a BTS..................................................................................................................1-2Figure 1-2 Site Maintenance Terminal System Software Window......................................................................1-3Figure 2-1 Communication failed dialog box......................................................................................................2-5Figure 2-2 Site Maintenance Terminal System window......................................................................................2-5Figure 2-3 Set Communication Port Parameter dialog box.................................................................................2-6Figure 3-1 Site Management Right dialog box....................................................................................................3-3Figure 3-2 Site Management Right dialog box....................................................................................................3-4Figure 4-1 View Resource dialog box..................................................................................................................4-3Figure 4-2 Software Download dialog box..........................................................................................................4-5Figure 4-3 Software Activation dialog box..........................................................................................................4-7Figure 4-4 Software Activation dialog box..........................................................................................................4-7Figure 4-5 Site Reset Hierarchically dialog box..................................................................................................4-9Figure 4-6 Environment Monitor dialog box.....................................................................................................4-11Figure 4-7 Transport Performance Test dialog box...........................................................................................4-13Figure 4-8 Query Warn Delay Time dialog box................................................................................................4-14Figure 4-9 RF Specification Test window.........................................................................................................4-16Figure 4-10 Ring Topology Parameter Query dialog box..................................................................................4-17Figure 4-11 Bar Code Query dialog box............................................................................................................4-18Figure 4-12 Site Board Parameter Management dialog box..............................................................................4-19Figure 4-13 Site Board Parameter Management dialog box..............................................................................4-20Figure 4-14 E1 BER Test dialog box.................................................................................................................4-21Figure 4-15 RET Antenna Manage dialog box..................................................................................................4-22Figure 5-1 Cell Attributes Management dialog box.............................................................................................5-4Figure 5-2 Cell Extended Attributes Management dialog box.............................................................................5-6Figure 5-3 Change Cell Management State dialog box........................................................................................5-7Figure 5-4 Cell Test dialog box............................................................................................................................5-8Figure 6-1 Change BT Management State dialog box.........................................................................................6-2Figure 6-2 BT Reinitialization dialog box...........................................................................................................6-3Figure 6-3 BT Loop Test dialog box....................................................................................................................6-4Figure 6-4 View Channel State dialog box..........................................................................................................6-5Figure 6-5 TRX Full Power Emission dialog box................................................................................................6-6Figure 7-1 RC Attributes Management dialog box..............................................................................................7-3Figure 7-2 RC Extended Attributes Management dialog box..............................................................................7-4

    BTS3900 GSMSite Maintenance Terminal User Guide Figures

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    v

  • Figure 7-3 Change RC Management State dialog box.........................................................................................7-6Figure 7-4 RC Reinitialization dialog box...........................................................................................................7-7Figure 7-5 Get RC Power Mode dialog box.........................................................................................................7-7Figure 7-6 Get Auto Power Adjustment Type dialog box................................................................................... 7-8Figure 8-1 Channel Attributes Management dialog box......................................................................................8-3Figure 8-2 Change Channel Management State dialog box.................................................................................8-4Figure 8-3 Channel Loop Test dialog box............................................................................................................8-6Figure 9-1 Board Configuration window.............................................................................................................9-4Figure 9-2 Board Management window...............................................................................................................9-5Figure 9-3 Board Information dialog box............................................................................................................ 9-5Figure 9-4 Board Management window...............................................................................................................9-6Figure 9-5 Board Extended Information dialog box............................................................................................9-7Figure 9-6 Board Management window...............................................................................................................9-8Figure 9-7 Board Reset window...........................................................................................................................9-8Figure 9-8 Board Management window...............................................................................................................9-9Figure 9-9 Board Reset window.........................................................................................................................9-10Figure 9-10 Board Management window...........................................................................................................9-10Figure 9-11 Board Test dialog box.....................................................................................................................9-11Figure 9-12 Board Management window...........................................................................................................9-12Figure 9-13 Clock Setup dialog box...................................................................................................................9-13Figure 9-14 Board Management window...........................................................................................................9-14Figure 9-15 Loop Test dialog box......................................................................................................................9-15Figure 9-16 Board Management window...........................................................................................................9-16Figure 9-17 Board Alarm Information dialog box.............................................................................................9-16Figure 9-18 Board Management window...........................................................................................................9-17Figure 9-19 Parameter Management dialog box................................................................................................9-18Figure 9-20 Board Management window...........................................................................................................9-19Figure 9-21 GTMU port property window.........................................................................................................9-19Figure 10-1 Board Management window...........................................................................................................10-3Figure 10-2 Topology Management window.....................................................................................................10-4Figure 10-3 Board information...........................................................................................................................10-4Figure 10-4 Board Management window...........................................................................................................10-5Figure 10-5 Topology Management window.....................................................................................................10-6Figure 10-6 Board Extended Information dialog box........................................................................................10-6Figure 10-7 Board Management window...........................................................................................................10-7Figure 10-8 Topology Management window.....................................................................................................10-8Figure 10-9 Choosing Power Off Reset.............................................................................................................10-8Figure 10-10 Board Reset window.....................................................................................................................10-9Figure 10-11 Board Management window.......................................................................................................10-10Figure 10-12 Topology Management window.................................................................................................10-10Figure 10-13 Choosing Reset...........................................................................................................................10-11Figure 10-14 Board Reset window...................................................................................................................10-11

    FiguresBTS3900 GSM

    Site Maintenance Terminal User Guide

    vi Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • Figure 10-15 Reset dialog box.........................................................................................................................10-11Figure 10-16 Board Management window.......................................................................................................10-12Figure 10-17 Topology Management window.................................................................................................10-13Figure 10-18 Choosing Opstart........................................................................................................................10-13Figure 10-19 Opstart dialog box......................................................................................................................10-14Figure 10-20 Board Management window.......................................................................................................10-14Figure 10-21 Topology Management window.................................................................................................10-15Figure 10-22 Choosing the path to be tested....................................................................................................10-15Figure 10-23 Board Test dialog box.................................................................................................................10-16Figure 10-24 Board Management window.......................................................................................................10-16Figure 10-25 Topology Management window.................................................................................................10-17Figure 10-26 Choosing Management state.......................................................................................................10-17Figure 10-27 LOCKED dialog box..................................................................................................................10-18Figure 10-28 UNLOCKED dialog box............................................................................................................10-18Figure 10-29 Choosing Management state.......................................................................................................10-19Figure 10-30 Channel0LOCKED dialog box...................................................................................................10-19Figure 10-31 Board Management window.......................................................................................................10-20Figure 10-32 Topology Management window.................................................................................................10-21Figure 10-33 Choosing Loop Test....................................................................................................................10-21Figure 10-34 Loop Test dialog box..................................................................................................................10-22Figure 10-35 Board Management window.......................................................................................................10-23Figure 10-36 Topology Management window.................................................................................................10-23Figure 10-37 Board Alarm Information dialog box.........................................................................................10-24Figure 10-38 Board Management window.......................................................................................................10-25Figure 10-39 Topology Management window.................................................................................................10-25Figure 10-40 Choosing Parameter Management..............................................................................................10-26Figure 10-41 Viewing the operational parameters...........................................................................................10-26Figure 10-42 Viewing the configuration parameters........................................................................................10-27Figure 10-43 Setting the parameters................................................................................................................10-27Figure 10-44 Viewing the operational parameters of a path............................................................................10-28Figure 10-45 Board Management window.......................................................................................................10-29Figure 10-46 Topology Management window.................................................................................................10-29Figure 10-47 Choosing Set Antenna Mode......................................................................................................10-30Figure 10-48 Set Antenna Mode window........................................................................................................10-30Figure 11-1 Board Configuration window.........................................................................................................11-2Figure 11-2 Topology Configuration window...................................................................................................11-3Figure 11-3 Deploy DRRU window..................................................................................................................11-3Figure 11-4 Deploy DRRU window..................................................................................................................11-4Figure 11-5 Topology Configuration window...................................................................................................11-4Figure 11-6 Board Configuration window.........................................................................................................11-5Figure 11-7 Topology Configuration window...................................................................................................11-5Figure 11-8 Delete DRRU window....................................................................................................................11-6

    BTS3900 GSMSite Maintenance Terminal User Guide Figures

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    vii

  • Figure 11-9 Board Configuration window.........................................................................................................11-7Figure 11-10 Topology Configuration window.................................................................................................11-7Figure 11-11 Add Ring window.........................................................................................................................11-8Figure 11-12 Board Configuration window.......................................................................................................11-9Figure 11-13 Topology Configuration window.................................................................................................11-9Figure 11-14 Divide Ring window...................................................................................................................11-10Figure 11-15 Board Management window.......................................................................................................11-11Figure 11-16 Board Management window.......................................................................................................11-12Figure 11-17 Topology Management window.................................................................................................11-12Figure 11-18 On-Site Topology Management window...................................................................................11-13Figure 11-19 Board Management window.......................................................................................................11-14Figure 11-20 Topology Management window.................................................................................................11-14Figure 11-21 Choosing Set Breakpoint............................................................................................................11-15Figure 11-22 Board Management window.......................................................................................................11-16Figure 11-23 Topology Management window.................................................................................................11-16Figure 11-24 Choosing Cancel Breakpoint......................................................................................................11-17

    FiguresBTS3900 GSM

    Site Maintenance Terminal User Guide

    viii Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • Tables

    Table 2-1 Hardware requirements........................................................................................................................2-2Table 2-2 Software requirements......................................................................................................................... 2-2Table 4-1 Parameters available in the Software Download dialog box................................................................4-4Table 4-2 Parameters in the Software Activation dialog box...............................................................................4-6Table 4-3 Parameters in the Site Reset Hierarchically dialog box.......................................................................4-8Table 4-4 Parameters in the Environment Monitor dialog box..........................................................................4-10Table 4-5 Parameters in the Transport Performance Test dialog box................................................................4-12Table 5-1 Parameters in the Cell Attributes Management dialog box..................................................................5-2Table 5-2 Parameters in the Cell Extended Attributes Management dialog box................................................. 5-5Table 7-1 Parameters in the RC Attributes Management dialog box...................................................................7-2Table 7-2 Parameters in the RC Extended Attribute Management dialog box.................................................... 7-4Table 8-1 Parameters in the Channel Attributes Management dialog box...........................................................8-2Table 8-2 Parameters in the Cell Extended Attributes Management dialog box................................................. 8-5Table 9-1 Parameters in the Clock Setup dialog box.........................................................................................9-11Table 9-2 Parameters in the Loopback Test dialog box.....................................................................................9-14Table 10-1 Parameters in the Loop Test dialog box.........................................................................................10-20

    BTS3900 GSMSite Maintenance Terminal User Guide Tables

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    ix

  • About This Document

    PurposeThis document describes the procedures for installing the BTS3900 GSM Site MaintenanceTerminal. It also describes the functions and interfaces of the different parts of the BTS3900GSM Site Maintenance Terminal. In addition, it provides instructions for common BTS3900GSM operations.

    Product VersionThe following table lists the product version related to this document.

    Product Name VersionBTS3900 GSM (referred to as BTS3900 inthis manual)

    V300R008

    Intended AudienceThis guide is intended for the engineers who maintain the BTS through the site maintenanceterminal. The engineers should have a basic knowledge of radio communication and IPtechnologies, and be familiar with Windows operations and the BTS. This document is intendedfor:l System engineersl Field engineersl Shift operatorsl Network operators

    Change HistoryFor changes in the document, refer to Changes in BTS3900 GSM Site Maintenance TerminalUser Guide.

    Organization1 Introduction to the Site Maintenance TerminalThis describes the definitions, functions, logical objects, and software window of the SiteMaintenance Terminal. The Site Maintenance Terminal is used to commission, maintain, andtroubleshoot a BTS.

    BTS3900 GSMSite Maintenance Terminal User Guide About This Document

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    1

  • 2 Getting Started with the Site Maintenance TerminalThis describes how to connect the Site Maintenance Terminal PC to the BTS, log in to the SiteMaintenance Terminal System, and exit the Site Maintenance Terminal, after the SiteMaintenance Terminal application is installed.3 Using the Site Management RightsThe operations of the site management rights involve obtaining the site management rights andreleasing the site management rights.4 Managing SitesThe site management involves viewing site resources, querying the delay in reporting boardalarms, resetting the BTS, testing whether the boards in a site operate normally and whether theconnection of transmit links is normal, monitoring and managing the environment parametersin a site, viewing the board parameters of the BTS, testing the RF specifications, and viewingthe settings of parameters in a ring network and the bar codes of a site.5 Managing CellsThe cell management involves managing cell attributes and cell extended attributes, testing allthe BTs and RCs of a cell so that they can be locked or unlocked, and checking whether the BTsand RCs are functional.6 Managing BTsThe BT management involves locking or unlocking a BT, resetting a BT, performing the RCself-test, view the status of the channels on a specified BT, and enabling a specified RC totransmit signals at a predefined power level.7 Managing RCsThe RC management involves setting the attributes and extended attributes of an RC, lockingor unlocking an RC, resetting an RC, and adjusting power of an RC automatically.8 Managing ChannelsThe channel management involves viewing and setting channel attributes, locking or unlockinga channel, and checking the quality of a channel by testing the parameters such as the bit errorratio (BER) and transmit power.9 BBU OperationsThe BBU operations involve the query, configuration, and test operations associated with theBBU. You can query the board settings, board information, board extended information, boardalarms, and port attributes. You can also perform operations such as board reset, power-off reset,self-test, clock configuration, loopback test, and parameter management.10 DRFU OperationsDRFU operations include the viewing, setting and testing of the DRFU parameters. You canview the board information, board extended information, and board alarms. You can alsoperform operations such as the board reset, power-off reset, operation start, self-test, loopbacktest, parameter management, and antenna mode configuration.11 DRFU ConfigurationThis describes how to perform various operations on the DRFU based on the actual requirement,such as adding or deleting an DRFU, adding or removing a ring, displaying in-position boards,detecting in-position boards, setting and canceling a breakpoint.

    About This DocumentBTS3900 GSM

    Site Maintenance Terminal User Guide

    2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • Conventions1. Symbol ConventionsThe following symbols may be found in this document. They are defined as follows

    Symbol Description

    DANGERIndicates a hazard with a high level of risk that, if not avoided,will result in death or serious injury.

    WARNINGIndicates a hazard with a medium or low level of risk which, ifnot avoided, could result in minor or moderate injury.

    CAUTIONIndicates a potentially hazardous situation that, if not avoided,could cause equipment damage, data loss, and performancedegradation, or unexpected results.

    TIP Indicates a tip that may help you solve a problem or save yourtime.

    NOTE Provides additional information to emphasize or supplementimportant points of the main text.

    2. General ConventionsConvention DescriptionTimes New Roman Normal paragraphs are in Times New Roman.

    Boldface Names of files,directories,folders,and users are in boldface. Forexample,log in as user root .

    Italic Book titles are in italics.Courier New Terminal display is in Courier New.

    3. Command ConventionsConvention DescriptionBoldface The keywords of a command line are in boldface.

    Italic Command arguments are in italic.

    [ ] Items (keywords or arguments) in square brackets [ ] are optional.

    {x | y | ...} Alternative items are grouped in braces and separated by verticalbars.One is selected.

    [ x | y | ... ] Optional alternative items are grouped in square brackets andseparated by vertical bars.One or none is selected.

    BTS3900 GSMSite Maintenance Terminal User Guide About This Document

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    3

  • Convention Description{ x | y | ... } * Alternative items are grouped in braces and separated by vertical

    bars.A minimum of one or a maximum of all can be selected.

    [ x | y | ... ] * Alternative items are grouped in braces and separated by verticalbars.A minimum of zero or a maximum of all can be selected.

    4. GUI ConventionsConvention DescriptionBoldface Buttons,menus,parameters,tabs,window,and dialog titles are in

    boldface. For example,click OK.

    > Multi-level menus are in boldface and separated by the ">" signs.For example,choose File > Create > Folder .

    5. Keyboard OperationConvention DescriptionKey Press the key.For example,press Enter and press Tab.

    Key1+Key2 Press the keys concurrently.For example,pressing Ctrl+Alt+Ameans the three keys should be pressed concurrently.

    Key1,Key2 Press the keys in turn.For example,pressing Alt,A means the twokeys should be pressed in turn.

    6. Mouse OperationAction DescriptionClick Select and release the primary mouse button without moving the

    pointer.

    Double-click Press the primary mouse button twice continuously and quicklywithout moving the pointer.

    Drag Press and hold the primary mouse button and move the pointerto a certain position.

    About This DocumentBTS3900 GSM

    Site Maintenance Terminal User Guide

    4 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • 1 Introduction to the Site MaintenanceTerminal

    About This Chapter

    This describes the definitions, functions, logical objects, and software window of the SiteMaintenance Terminal. The Site Maintenance Terminal is used to commission, maintain, andtroubleshoot a BTS.The Site Maintenance Terminal provides a graphical user interface (GUI) for operation andmaintenance.1.1 Definitions Related to the Site Maintenance TerminalThis describes the difference between the Site Maintenance Terminal, Site MaintenanceTerminal PC, and Site Maintenance Terminal application.1.2 Logical Objects of the BTSThis describes the logical objects of the BTS. Different logical objects are maintained in differentways.1.3 Software Window of the Site Maintenance Terminal SystemThe Site Maintenance Terminal System software window consists of the navigation pane,browse pane, and status pane.

    BTS3900 GSMSite Maintenance Terminal User Guide 1 Introduction to the Site Maintenance Terminal

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    1-1

  • 1.1 Definitions Related to the Site Maintenance TerminalThis describes the difference between the Site Maintenance Terminal, Site MaintenanceTerminal PC, and Site Maintenance Terminal application.

    Site Maintenance TerminalThe Site Maintenance Terminal is a logical concept. It refers to a maintenance terminal installedwith the Site Maintenance Terminal software package and connected to the OM network of theBTSs. Through the Site Maintenance Terminal, you can operate and maintain the BTSs.

    Site Maintenance Terminal PCThe Site Maintenance Terminal PC is a hardware concept. It refers to the computer on whichthe Site Maintenance Terminal software package is installed.

    Site Maintenance Terminal ApplicationThe Site Maintenance Terminal application is installed on a Site Maintenance Terminal PC. Itrefers to the Huawei Site Maintenance Terminal software package.

    1.2 Logical Objects of the BTSThis describes the logical objects of the BTS. Different logical objects are maintained in differentways.The logical objects consist of the sites, cells, baseband (BTs), channels (CHs), and TRXs (RCs),as shown in Figure 1-1.

    Figure 1-1 Logical structure of a BTS

    1 Introduction to the Site Maintenance TerminalBTS3900 GSM

    Site Maintenance Terminal User Guide

    1-2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • 1.3 Software Window of the Site Maintenance TerminalSystem

    The Site Maintenance Terminal System software window consists of the navigation pane,browse pane, and status pane.The Site Maintenance Terminal System software window consists of the navigation pane,browse pane, and status pane, as shown in Figure 1-2.

    Figure 1-2 Site Maintenance Terminal System Software Window

    BTS3900 GSMSite Maintenance Terminal User Guide 1 Introduction to the Site Maintenance Terminal

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    1-3

  • 2 Getting Started with the Site MaintenanceTerminal

    About This Chapter

    This describes how to connect the Site Maintenance Terminal PC to the BTS, log in to the SiteMaintenance Terminal System, and exit the Site Maintenance Terminal, after the SiteMaintenance Terminal application is installed.

    2.1 Configuration Requirements for the Site Maintenance Terminal PCThe Site Maintenance Terminal PC should meet the requirements for the configuration ofhardware and software and for the communication capability.2.2 Starting the Site Maintenance Terminal SystemBefore starting the Site Maintenance Terminal, firstly, set the IP address of the Site MaintenanceTerminal PC; secondly, connect the Site Maintenance Terminal PC to the BTS; finally, log into the Site Maintenance Terminal.2.3 Exiting the Site Maintenance TerminalIf you exit the Site Maintenance Terminal, the connection between the Site MaintenanceTerminal and the BTS is disrupted, and the Site Maintenance Terminal System window is closed.

    BTS3900 GSMSite Maintenance Terminal User Guide 2 Getting Started with the Site Maintenance Terminal

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    2-1

  • 2.1 Configuration Requirements for the Site MaintenanceTerminal PC

    The Site Maintenance Terminal PC should meet the requirements for the configuration ofhardware and software and for the communication capability.

    Hardware RequirementsTable 2-1 lists the hardware requirements for the installation of the Site Maintenance TerminalPC.

    Table 2-1 Hardware requirementsItem Quantity Minimum

    ConfigurationCPU 1 PIII 866RAM 1 256 MBHard disk 1 20 GBDisplay adapter resolution 1 800600Ethernet adapter 1 10&100MbpsCD drive - -Other devices 31 Keyboard,

    mouse, modem

    Software RequirementsTable 2-2 lists the software requirements for the installation of the Site Maintenance TerminalPC.

    Table 2-2 Software requirementsItem Recommended

    ConfigurationOperating system Microsoft Windows

    98/2000/XPDefault language of the operating system English (United States)Web browser Microsoft Internet

    Explorer 5.5 or laterversions

    2 Getting Started with the Site Maintenance TerminalBTS3900 GSM

    Site Maintenance Terminal User Guide

    2-2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • Communications Capability RequirementsThe Site Maintenance Terminal PC should support the TCP/IP protocol.

    2.2 Starting the Site Maintenance Terminal SystemBefore starting the Site Maintenance Terminal, firstly, set the IP address of the Site MaintenanceTerminal PC; secondly, connect the Site Maintenance Terminal PC to the BTS; finally, log into the Site Maintenance Terminal.

    1. 2.2.1 Setting the IP Address of the Site Maintenance Terminal PCThis describes how to set the IP address of the Site Maintenance Terminal PC to the samenetwork segment as the IP address (192.168.0.72/255.255.255.0) of the BTS.

    2. 2.2.2 Connecting the Site Maintenance Terminal PC to the BTSTo operate and maintain the BTS on the Site Maintenance Terminal, the Site MaintenanceTerminal PC should be connected to the ETH port on the main control module of the BTSusing the crossover cable.

    3. 2.2.3 Locally Logging In to the BTSYou can run the Site Maintenance Terminal to directly log in to the BTS.

    2.2.1 Setting the IP Address of the Site Maintenance Terminal PCThis describes how to set the IP address of the Site Maintenance Terminal PC to the same networksegment as the IP address (192.168.0.72/255.255.255.0) of the BTS.

    PrerequisiteThe Site Maintenance Terminal PC is configured with the TCP/IP protocol.

    ProcedureStep 1 Take the Windows XP operating system as an example. On the Windows XP operating system,

    choose Start > Control Panel.Step 2 Select Network Connections. A dialog box is displayed. Right-click the Local Area

    Connection icon.Step 3 Choose Properties on the shortcut menu,. The Local Area Connection Properties dialog box

    is displayed.Step 4 Select Internet Protocol (TCP/IP).Step 5 Click Properties. The Internet Protocol (TCP/IP) Properties dialog box is displayed.Step 6 Select Use the following IP address.Step 7 Enter the correct IP address, subnet mask, and default gateway. Ensure that the IP address of the

    Site Maintenance Terminal PC and the IP address (192.168.0.72/255.255.255.0) of the BTS arelocated in the same network segment, so that a local maintenance path can be set up.

    Step 8 Click OK to complete the setting.----End

    BTS3900 GSMSite Maintenance Terminal User Guide 2 Getting Started with the Site Maintenance Terminal

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    2-3

  • 2.2.2 Connecting the Site Maintenance Terminal PC to the BTSTo operate and maintain the BTS on the Site Maintenance Terminal, the Site MaintenanceTerminal PC should be connected to the ETH port on the main control module of the BTS usingthe crossover cable.

    PrerequisiteThe IP address and the subnet mask of the Site Maintenance Terminal PC are set. The IP addressof the Site Maintenance Terminal PC and the IP address (192.168.0.72/255.255.255.0) of theBTS are on the same network segment.

    ProcedureStep 1 Use the crossover cable to connect the Site Maintenance Terminal PC to the BTS. Connect one

    end of the cable to the ETH port on the main control module of the main cabinet, and connectthe other end of the cable to the Ethernet cable port on the Site Maintenance Terminal PC.

    Step 2 Open the command window.l If the operating system of the Site Maintenance Terminal PC is Windows 98, choose Start

    > Program > MS-DOS Prompt. The command window is displayed.l If the operating system of the Site Maintenance Terminal PC is Windows 2000/XP, choose

    Start > Run. In the Run dialog box, run the cmd command. The command window isdisplayed.

    Step 3 Run the ping target_name command to verify the network connection between the PC and theBTS.

    NOTE

    target_name indicates the IP address of the BTS.If the information similar to that in the following example is returned, the LMT PC and theGBAM can communicate normally. In this example, the IP address of the external network is192.168.0.72.Pinging 192.168.0.72 with 32 bytes of data: Pinging 192.168.0.72 with 32 bytes of data: Reply from 192.168.0.72: bytes=32 time=1ms TTL=253 Reply from 192.168.0.72: bytes=32 time=1ms TTL=253 Reply from 192.168.0.72: bytes=32 time=1ms TTL=253 Reply from 192.168.0.72: bytes=32 time=1ms TTL=253 Ping statistics for 192.168.0.72: Packets: Sent = 4, Received = 4, Lost = 0 (0% loss), Approximate round trip times in milli-seconds: Minimum = 1ms, Maximum = 1ms, Average = 1ms

    ----End

    2.2.3 Locally Logging In to the BTSYou can run the Site Maintenance Terminal to directly log in to the BTS.

    Prerequisitel The Site Maintenance Terminal PC is connected properly to the BTS.l The Site Maintenance Terminal PC is installed with the latest site maintenance terminal

    software.

    2 Getting Started with the Site Maintenance TerminalBTS3900 GSM

    Site Maintenance Terminal User Guide

    2-4 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • ProcedureStep 1 Double-click btsm.exe to start the Site Maintenance Terminal System.

    l If the communication between the Site Maintenance Terminal PC and the BTS is not setup, the Communication failed dialog box is displayed, as shown in Figure 2-1. Go toStep 2.

    l If the communication between the Site Maintenance Terminal PC and the BTS is set up, awindow is displayed, as shown in Figure 2-2. The Local Maintenance Terminal issuccessfully started.

    Figure 2-1 Communication failed dialog box

    Figure 2-2 Site Maintenance Terminal System window

    Step 2 Click Yes.The Set Communication Port Parameter dialog box is displayed, as shown in Figure 2-3.

    BTS3900 GSMSite Maintenance Terminal User Guide 2 Getting Started with the Site Maintenance Terminal

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    2-5

  • Figure 2-3 Set Communication Port Parameter dialog box

    Step 3 In the Select Communication Port area, click Network Port. In the Configure IP area, set theIP address to 192.168.0.72.

    Step 4 Click OK.The Site Maintenance Terminal System window is displayed, as shown in Figure 2-2.----End

    2.3 Exiting the Site Maintenance TerminalIf you exit the Site Maintenance Terminal, the connection between the Site MaintenanceTerminal and the BTS is disrupted, and the Site Maintenance Terminal System window is closed.

    ProcedureExit the site maintenance terminal by choosing Daily Maintenance > Exit or clicking Close inthe Site Maintenance Terminal System window.----End

    2 Getting Started with the Site Maintenance TerminalBTS3900 GSM

    Site Maintenance Terminal User Guide

    2-6 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • 3 Using the Site Management RightsAbout This Chapter

    The operations of the site management rights involve obtaining the site management rights andreleasing the site management rights.

    3.1 Site Management RightsThe site management rights refer to the rights to set the parameters of a BTS. After a BTS ispowered on, the remote Site Maintenance System obtains the site management rights by default.Before operating the BTS through the Site Maintenance Terminal System, you must obtain thesite management rights first.3.2 Obtaining the Site Management RightsThis function is performed to obtain the rights for setting parameters of the BTS.3.3 Releasing the Site Management RightsThis function is performed to release the rights for setting parameters of the BTS. Aftercompleting the local maintenance, you must release the site management rights.

    BTS3900 GSMSite Maintenance Terminal User Guide 3 Using the Site Management Rights

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    3-1

  • 3.1 Site Management RightsThe site management rights refer to the rights to set the parameters of a BTS. After a BTS ispowered on, the remote Site Maintenance System obtains the site management rights by default.Before operating the BTS through the Site Maintenance Terminal System, you must obtain thesite management rights first.When operating a BTS through the Site Maintenance Terminal System, pay attention to thefollowing:l Obtain the site management rights before writing data; otherwise, you may not be able to

    write data, for example, load a software or activate a software. You can read data from theBTS without the site management rights.

    l After a BTS is powered on, the remote Site Maintenance System obtains the sitemanagement rights by default and performs all operations directly. Before operating theBTS through the Site Maintenance Terminal System, you must obtain the site managementrights first. You cannot operate the BTS through the Site Maintenance Terminal Systemand the remote Site Maintenance System at the same time.

    l After completing the local maintenance, you must release the site management rights.NOTE

    l Remote Site Maintenance: maintaining the BTS through the LMT on the BSC sidel Site Maintenance Terminal: maintaining the BTS by directly connecting the Site Maintenance Terminal

    PC to the BBU of the base station through the Ethernet ports

    3.2 Obtaining the Site Management RightsThis function is performed to obtain the rights for setting parameters of the BTS.

    PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, click Site. In the right pane

    of the window, double-click Site Management Right.The Site Management Right dialog box is displayed.

    Step 2 Click Get. The result is displayed in the dialog box, as shown in Figure 3-1.

    3 Using the Site Management RightsBTS3900 GSM

    Site Maintenance Terminal User Guide

    3-2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • Figure 3-1 Site Management Right dialog box

    ----End

    3.3 Releasing the Site Management RightsThis function is performed to release the rights for setting parameters of the BTS. Aftercompleting the local maintenance, you must release the site management rights.

    PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    ContextAfter completing the local maintenance, you should release the site management rights tofacilitate remote maintenance. If you do not release the site management rights at the local end,the writing operation can be performed at the remote end.

    ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, click Site. In the right pane

    of the window, double-click Site Management Right.The Site Management Right dialog box is displayed.

    Step 2 Click Release. The result is displayed in the dialog box, as shown in Figure 3-2.

    BTS3900 GSMSite Maintenance Terminal User Guide 3 Using the Site Management Rights

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    3-3

  • Figure 3-2 Site Management Right dialog box

    ----End

    3 Using the Site Management RightsBTS3900 GSM

    Site Maintenance Terminal User Guide

    3-4 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • 4 Managing SitesAbout This Chapter

    The site management involves viewing site resources, querying the delay in reporting boardalarms, resetting the BTS, testing whether the boards in a site operate normally and whether theconnection of transmit links is normal, monitoring and managing the environment parametersin a site, viewing the board parameters of the BTS, testing the RF specifications, and viewingthe settings of parameters in a ring network and the bar codes of a site.

    4.1 Viewing Site ResourcesThis function is performed to view the following site resources: CPU usage, RAM usage, DCvoltage, temperature in a cabinet, humidity in a cabinet, current of battery, temperature of battery,load current, AC voltage, and quantity of state. This function can also be performed to obtainthe board temperature.4.2 Forcibly Loading SoftwareThis function is performed to load software to the main control board.4.3 Activating SoftwareThis describes how to validate the board software loaded onto the main control board. The boardsoftware consists of the main control board software and other board software.4.4 Resetting a Site HierarchicallyResetting a site involves third level reset and fourth level reset. The third level reset and thefourth level reset are used to reinitialize the base station, that is, to reset all the boards in the basestation and load the configuration data of the base station from the BSC.4.5 Monitoring EnvironmentThis function is performed to monitor and manage the environment parameters in a site. Byperforming this function, you can view the current temperature and humidity and set thetemperature and humidity thresholds. The BTS can run normally in a safe and suitable siteenvironment. You can also clear a burglar alarm or a smoke alarm and disable an EAC alarm.4.6 Testing Transport PerformanceThis function is performed to check whether the transmission link is normal through an E1loopback test and a timeslot loopback test.4.7 Querying Alarm Delay TimeThis function is performed to query the alarm delay time of boards.

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-1

  • 4.8 Testing the RF SpecificationsThis describes how to test the RF specifications. The specifications of the receiver involve thereceiver sensitivity, GSM static L1 (first level) function, and the block test. The specificationsof the transmitter involve modulation spectrum, handover spectrum, modulation accuracy, andspurious emission.4.9 Querying the Ring Topology ParametersThis function is performed to query the ring topology parameters, including the workingdirection of a site in the ring topology (Port 0 is forward link and port 1 is reverse link) and theindication of auto rotate in the ring topology. If automatic rotation is permitted, the result alsoinvolves the waiting time before rotation and the scheduled time for attempts before rotation.4.10 Viewing the Bar CodesThis describes how to view the bar codes of the boards configured in the currently connectedBTS.4.11 Managing the Site Board ParametersThis function is performed to view the parameters associated with the boards configured in asite.4.12 Testing the E1 BERYou can get the information about the link transmission quality of the E1 port in real time bymonitoring the E1 BER.4.13 Managing the RET AntennaThis function is performed to query and set parameters of the RET antenna connected to theBTS.

    4 Managing SitesBTS3900 GSM

    Site Maintenance Terminal User Guide

    4-2 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • 4.1 Viewing Site ResourcesThis function is performed to view the following site resources: CPU usage, RAM usage, DCvoltage, temperature in a cabinet, humidity in a cabinet, current of battery, temperature of battery,load current, AC voltage, and quantity of state. This function can also be performed to obtainthe board temperature.

    PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, click Site. In the right pane

    of the window, double-click View Resource.The View Resource dialog box is displayed.

    Step 2 In the Select Resource Type list box, click the type of the source to be viewed, as shown inFigure 4-1. The result is displayed at the bottom of the View Resource dialog box.

    Figure 4-1 View Resource dialog box

    NOTE

    One page may be insufficient to display the result (such as, in combined cabinets or cabinet groupsituations). Click Next Page to view more results. The resources to be viewed are the real-time messages.

    ----End

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-3

  • 4.2 Forcibly Loading SoftwareThis function is performed to load software to the main control board.

    PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    Contextl The main control board of the base station is the GTMU.l You need to load the software of the main control board prior to loading the software of

    other boards. There are no strict requirements for the sequence of loading the software ofother boards.

    Table 4-1 describes the parameters.

    Table 4-1 Parameters available in the Software Download dialog boxParameter Meaning Value RangeFile Name File name of the software to be downloaded,

    that is, the path in which the software is savedUse the actual filename. Note that the filename is case sensitive.

    Send WindowSize

    Size of the data packet when the software isloaded

    149 (49 isrecommended)

    Version Version of the software to be downloaded. Itshould be the same as the version of thedownloaded file.

    -

    File ID Type of a board whose software is to beloaded. It should be consistent with the type ofthe downloaded file.

    -

    ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, click Site. In the right pane

    of the window, double-click Forced Software Load.The Software Download dialog box is displayed.

    Step 2 Set File Name. In the Send Window Size spin box, specify a size. In the Version area, enter aversion number. In the File ID drop-down list box, select DTMU_MAIN, as shown in Figure4-2.

    4 Managing SitesBTS3900 GSM

    Site Maintenance Terminal User Guide

    4-4 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • Figure 4-2 Software Download dialog box

    Step 3 Click Start.You can view the loading progress in the Site Maintenance Terminal System. If the software isloaded successfully, the Loading software successfully message is displayed on the status bar.

    Step 4 Repeat steps 2 through 3 to load the software of other boards.----End

    4.3 Activating SoftwareThis describes how to validate the board software loaded onto the main control board. The boardsoftware consists of the main control board software and other board software.

    Prerequisitel You have logged in to the BTS through the Site Maintenance Terminal.l The board software to be activated is loaded.

    Contextl The main control board of the BTS is the GTMU.l You need to activate the main control board software before activating the software of the

    other boards. There are no specified sequence for activating the software of the other boards.l The loading of software does not affect the services. The activation of software validates

    the new version software on boards and affects the services. Therefore, Huaweirecommends you load the software in the day and activate it at night.

    Table 4-2 lists the descriptions of the parameters.

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-5

  • Table 4-2 Parameters in the Software Activation dialog boxParameterName

    Meaning Value Range

    Version Version of the downloaded software Set this parameterbased on the actualrequirement.

    Board No. Number of the board to be activated Enter an integer thatindicates a boardnumber. You can alsouse between twointegers to activatemore than one board.For example, you enter0-5 to activate boards0-5.If you do not enter aboard number, all theboards of this type inthe BTS will beactivated.

    File ID Type of the board whose software is to beupgraded

    Set this parameterbased on the actualsituation.

    ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, choose Site. In the right

    pane of the window, double-click Software Activation.The Software Activation dialog box is displayed.

    Step 2 In the Version area, enter the version number of the main control board software. In the FileID drop-down list, select the file ID, as shown in Figure 4-3.

    4 Managing SitesBTS3900 GSM

    Site Maintenance Terminal User Guide

    4-6 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • Figure 4-3 Software Activation dialog box

    Step 3 Click OK.The number of the board that is successfully activated is displayed in the The board listactivated successfully: area. The Software activation successfully message is displayed onthe status bar at the bottom of the dialog box.

    Step 4 After that, activate the software of the other boards. In the Version area, enter the version numberof the software to be activated. In the Board No. area, enter the number of the board to beactivated. In the File ID drop-down list, select the board software to be activated, as shown inFigure 4-4.

    Figure 4-4 Software Activation dialog box

    Step 5 Click OK.

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-7

  • The number of the board that is successfully activated is displayed in the The board listactivated successfully: area. The Software activation successfully message is displayed onthe status bar at the bottom of the dialog box.

    NOTEDuring the activation of the DRFU board software, if the Site Maintenance Terminal prompts that the softwareactivation failed, check the communication between the BBU and the DRFU. If there is a communicationproblem between the BBU and the DRFU, rectify the fault by referring to Checking the Transmission Betweenthe BBU and the DRFU.

    ----End

    4.4 Resetting a Site HierarchicallyResetting a site involves third level reset and fourth level reset. The third level reset and thefourth level reset are used to reinitialize the base station, that is, to reset all the boards in the basestation and load the configuration data of the base station from the BSC.

    PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    Context

    CAUTIONBe careful when resetting a site as resetting a site disrupts all the services carried by all the cellsunder the site.

    Table 4-3 describes the parameters.

    Table 4-3 Parameters in the Site Reset Hierarchically dialog boxParameter Meaning Value RangeThird level reset Based on the configuration data of the BTS stored in

    the memory, the BSC configures the BTS again toreset it. In the ring topology, you can change the linkdirection. This requires you to choose a port.

    -

    Fourth level reset Based on the data configuration stored in the database(DB), the BSC updates the data stored in the memory,and then configures the base station again to reset it.In the ring topology, you cannot choose a port.

    -

    Not Select Non-ring topology -Port 0 Ring topology, forward link -Port 1 Ring topology, reverse link -

    4 Managing SitesBTS3900 GSM

    Site Maintenance Terminal User Guide

    4-8 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, click Site. In the right pane

    of the window, double-click Site Reset Hierarchically.The Site Reset Hierarchically dialog box is displayed.

    Step 2 In the Reset Level area, select a reset level. In the Reset Port area, select a port, as shown inFigure 4-5.

    Figure 4-5 Site Reset Hierarchically dialog box

    Step 3 Click OK.----End

    4.5 Monitoring EnvironmentThis function is performed to monitor and manage the environment parameters in a site. Byperforming this function, you can view the current temperature and humidity and set thetemperature and humidity thresholds. The BTS can run normally in a safe and suitable siteenvironment. You can also clear a burglar alarm or a smoke alarm and disable an EAC alarm.

    PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    ContextTable 4-4 describes the parameters.

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-9

  • Table 4-4 Parameters in the Environment Monitor dialog boxParameter Meaning Value

    RangeClear RobberyAlarm

    Clearing the infrared alarm and the door status alarm -

    Set Temperatureand HumidityThreshold

    Set the upper and lower thresholds of temperature andhumidity. Based on the thresholds, the alarm box reportsa temperature alarm and a humidity alarm.

    -

    Relay Operation Control the relay status. The relay is used to start or closethe refrigeration device, heating device, dehumidifier,humidifier, fire extinguisher, and anti-burglar device.The default state is Close.

    -

    Disable the EACAlarm

    Disable the reporting of alarms in a short time. In themaintenance of equipment, the related personnel canselect the option to disable the reporting of alarms forten minutes. After ten minutes, the alarms can bereported. If the equipment is maintained for more than10 minutes, restart the alarm shield.

    -

    Get CurrentTemperature andHumidity

    View the temperature and humidity associated with thebase station in operation. This parameter can be used forquerying the status of the environment alarm.

    -

    Clear SmokeAlarm

    Clearing the smoke alarm -

    ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, click Site . In the right

    pane of the window, double-click Environment Monitor.The Environment Monitor dialog box is displayed, as shown in Figure 4-6.

    4 Managing SitesBTS3900 GSM

    Site Maintenance Terminal User Guide

    4-10 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • Figure 4-6 Environment Monitor dialog box

    Step 2 Perform the following operations in the Select Operation Type area:

    Select... Then...

    Clear Robbery Alarm Go to Step 3.

    Set Temperature and Humidity Threshold In the Temperature and HumidityThreshold area, set the thresholds. Then, go toStep 3.

    Relay Operation In the Relay Operation area, set the relatedoptions to start or stop the equipment. Then, goto Step 3.

    Disable the EAC Alarm Go to Step 3.

    Get Current Temperature and Humidity Go to Step 3.

    Clear Smoke Alarm Go to Step 3.

    Step 3 Click OK.----End

    4.6 Testing Transport PerformanceThis function is performed to check whether the transmission link is normal through an E1loopback test and a timeslot loopback test.

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-11

  • PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    ContextTable 4-5 describes the parameters.

    Table 4-5 Parameters in the Transport Performance Test dialog boxParameter Meaning Value RangeSelect TMU You can select a TMU based on a test object. Active TMU,

    Master/BackupTMU, SlaveTMU1, andSlave TMU2

    Port No. This specifies the port to which the E1 cable isconnected.

    Port 0-port 7

    Test duration This specify the duration of a specific loopback mode. Recommendedvalue:multiples of 10minutes(default value:one minute)

    E1 Loopback During an E1 loopback test, the OML is broken.You can stop the loopback test ahead of time byresetting the BTS. After the test is complete, thesystem automatically releases the loop and resets theBTS.

    All the 32timeslots (0-31)are tested bydefault.

    TimeslotLoopback

    Only one timeslot can be tested once. The timeslotcarrying the OML cannot be tested. In addition, onlyport 0 and port 1 on each DTMU can be tested. Duringa timeslot loopback test, the tested timeslot isunusable. After the test is complete, the BTS will notbe reset.You can stop the loopback test ahead of time byclicking Stop. After the test is complete, the systemautomatically releases the loop and the tested timeslotbecomes usable. You can click Stop to stop the testor wait for the completion of the test duration. Thetimeslot in the self-loop test is normal again.

    -

    ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, click Site. In the right pane

    of the window, double-click Transport Performance Test.The Transport Performance Test dialog box is displayed.

    4 Managing SitesBTS3900 GSM

    Site Maintenance Terminal User Guide

    4-12 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • Step 2 In the Select TMU area, select a TMU. In the Port No. area, select a port number. In the Loop-back Mode area, select a loopback mode. In the Test Duration area, enter the test duration.

    Step 3 Click Start.The Warning dialog box is displayed.

    Step 4 Click OK. The result is displayed on the status bar, as shown in Figure 4-7.

    Figure 4-7 Transport Performance Test dialog box

    ----End

    4.7 Querying Alarm Delay TimeThis function is performed to query the alarm delay time of boards.

    PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    ContextSome alarms that do not affect services are reported frequently in a short time, and then disappearquickly. Therefore, many alarms are generated while the fault alarms are not detected in time.By setting an appropriate alarm delay time, some alarms that are generated and cleared frequentlyin a short time can be prevented from being reported in a large quantity.

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-13

  • ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, click Site. In the right pane

    of the window, double-click Site Alarm Delay Time Query.The Query Warn Delay Time dialog box is displayed.

    Step 2 Click Query. The result is displayed in the Query Warn Delay Time dialog box, as shown inFigure 4-8.

    Figure 4-8 Query Warn Delay Time dialog box

    NOTE

    You can set a specific alarm delay time through the LMT on the BSC side.

    ----End

    4.8 Testing the RF SpecificationsThis describes how to test the RF specifications. The specifications of the receiver involve thereceiver sensitivity, GSM static L1 (first level) function, and the block test. The specificationsof the transmitter involve modulation spectrum, handover spectrum, modulation accuracy, andspurious emission.

    Prerequisitel You have logged in to the BTS through the Site Maintenance Terminal.

    4 Managing SitesBTS3900 GSM

    Site Maintenance Terminal User Guide

    4-14 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • l The test device (for example, a base station integrated tester) is connected to the ANT porton the DRFU.

    ContextA base station integrated tester is required to test the RF specifications. Pay attention to thefollowing points before the test:l Before the test, you need to reset the configured RC by clicking User-defined Message.

    If the E1 cables are connected, after the configured RC is reset, you can observe theRUN LED on the DRFU to check whether the RC is running normally. If the RC isrunning normally, you can perform the test. If the E1 cables are not connected, and if the LAPD alarm is displayed on the status bar

    after the configured RC is reset, you can infer that the RC is running normally. Then,you can perform the test.

    l In the Frequency Hopping Mode drop-down list, choose Baseband hopping or RFhopping. Click Frequency hopping setup to specify the frequency hopping parameters.

    l When testing the specifications of the transmitter, you can choose the modulation mode ofthe channel by clicking Channel Modulation.

    l Based on the configuration mode between the DRFUs on the BTS, you can chooseMode, Transmitter Channel, or Receiver Channel in the DTRU Channel Setup dialogbox.

    ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, select Site. In the right

    pane of the window, double-click RF Specification Test.The Warning dialog box is displayed.

    Step 2 Click OK.The RF Specification Test window is displayed, as shown in Figure 4-9.

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-15

  • Figure 4-9 RF Specification Test window

    Step 3 Choose DRFU. In the Channel type area, specify the Cell No. and RC No., and then clickUser-defined Message.l If the E1 cables are connected, you can observe the RUN LED on the DRFU to check whether

    the RC runs normally. If the RC runs normally, you can perform the test.l If the E1 cables are not connected and if the LAPD alarm is displayed on the status bar, you

    can infer that the DTRU runs normally.Step 4 In the Test Item area, click Transmitter or Receiver, and choose the test item for the transmitter

    or receiver.l If the Transmitter option is selected, you can specify the modulation mode of the channel

    by clicking Channel Modulation.l If the Receiver option is selected, you need not set Channel Modulation.

    Step 5 Choose another item to be tested.l If you choose No frequency hopping from the Frequency Hopping Mode drop-down

    list, you need not set the Frequency hopping setup.l In the Frequency Hopping Mode drop-down list, choose Baseband hopping or RF

    hopping. Click Frequency hopping setup to specify the frequency hopping parameters.Step 6 Click Start Test.

    The result is displayed on the test device.----End

    4.9 Querying the Ring Topology ParametersThis function is performed to query the ring topology parameters, including the workingdirection of a site in the ring topology (Port 0 is forward link and port 1 is reverse link) and the

    4 Managing SitesBTS3900 GSM

    Site Maintenance Terminal User Guide

    4-16 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • indication of auto rotate in the ring topology. If automatic rotation is permitted, the result alsoinvolves the waiting time before rotation and the scheduled time for attempts before rotation.

    PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    ContextIf the result is Auto Rotate Permission, the working direction of the site in ring topology canbe automatically rotated. The system displays the Waiting Time Before Rotate area and theTry Rotating Duration Time area. The data is configured through the Data ConfigurationSystem on the BSC side.If the result is Auto Rotate Not Permitted, the working direction of the site in ring topology isunchanged. At this moment, the Waiting Time Before Rotate and the Try Rotating DurationTime are insignificant. The displayed time is 65535 seconds.

    ProcedureIn the left pane of the Site Maintenance Terminal System window, click Site. In the right paneof the window, double-click Ring Topology Parameter Query.The Ring Topology Parameter Query dialog box is displayed, as shown in Figure 4-10.

    Figure 4-10 Ring Topology Parameter Query dialog box

    NOTEIf the dialog box is open for some time, click Query to refresh the querying result.

    ----End

    4.10 Viewing the Bar CodesThis describes how to view the bar codes of the boards configured in the currently connectedBTS.

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-17

  • PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    ContextThe bar code is the basic information of the board and is used to identify the manufacturinginformation of the board. When several faulty boards are found with the same bar code, traceother boards produced in the same batch through the bar codes to see whether they are faulty.Through the Local Maintenance Terminal, you can view the bar codes of the boards in all theBTSs under the BSC. Through the Site Maintenance Terminal System, you can view the barcodes of the boards in the connected BTS.l The bar code is represented in ASCII code.l You can view only the bar code of the board that is already configured.l The boards that support bar code reporting are the GTMU, the DRFU, the BFU, the PEU,

    and the DEMU.

    ProcedureIn the left pane of the Site Maintenance Terminal System window, select Site . In the rightpane of the window, double-click Bar Code Query.The Bar Code Query dialog box is displayed, as shown in Figure 4-11.

    Figure 4-11 Bar Code Query dialog box

    NOTE

    If the dialog box has been open for a while, click Start to refresh the dialog box.

    ----End

    4 Managing SitesBTS3900 GSM

    Site Maintenance Terminal User Guide

    4-18 Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    Issue 03 (2008-07-15)

  • 4.11 Managing the Site Board ParametersThis function is performed to view the parameters associated with the boards configured in asite.

    PrerequisiteYou have logged in to the BTS through the Site Maintenance Terminal.

    ProcedureStep 1 In the left pane of the Site Maintenance Terminal System window, click Site. In the right pane

    of the window, double-click Site Board Parameter Management.The Site Board Parameter Management dialog box is displayed, as shown in Figure 4-12.

    Figure 4-12 Site Board Parameter Management dialog box

    Step 2 Click Query to query the board parameters of the BTS.The result is displayed in the parameter area, as shown in Figure 4-13.

    BTS3900 GSMSite Maintenance Terminal User Guide 4 Managing Sites

    Issue 03 (2008-07-15) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd

    4-19