Site Organisation of Nuclear Power Plants
Atoms for the Future Conference, Paris, October 2012
Siegfried Wegerer
EON Kernkraft NPP Isar
Site Organisation of Nuclear Power Plants
Brunsbüttel
Krümmel
Brokdorf
Grohnde
Unterweser
Emsland
2
Grohnde
Gundremmingen B + C
Grafenrheinfeld
Isar 1 + 2
Biblis A+B
Philipsburg 1+2Neckarwestheim
1+2
E.ON-Beteiligung Betrieb EnBW
Betrieb E.ON Betrieb RWE Betrieb Vattenfall
Site Organisation of Nuclear Power Plants
Brunsbüttel
Krümmel
Brokdorf
Grohnde
Unterweser
Emsland
3
Biblis A+B
Philipsburg 1+2
NPP in operation
NPP shut down
Grafenreinfeld
Isar 1+2
Gundremmingen
Neckarwestheim 1+2
Site Organisation of Nuclear Power Plants
Krümmel
P hilippsburg 1
Unterweser
Isar 1
B runsbüttel
B iblis B
N eckarwestheim 1
B iblis A
LZ-Verlängerung Herbst 2010
LZ-Verkürzung nach Moratorium 2011
4
2010 2015 2020 2025 2030 2035
B iblis A
Grafenrheinfeld
Gundremmingen B
P hilippsburg 2
Gundremmingen C
Gro hnde
B ro kdo rf
Isar 2
Emsland
N eckarwestheim 2
20152017
2019
2021
2022
Site Organisation of Nuclear Power Plants
E.ON Kernkraft - Sites
�Emsland
�Brunsbüttel
Hannover
Würgassen
�Brokdorf
�Stade�Unterweser �Krümmel
�Grohnde
5
Würgassen
E.ON Kernkraft, head quarter
NPP, EON Operational Mngmnt.
NPP, shut down, under decommissioning
NPP, EON-Share
Grafenrheinfeld
Isar 1
Isar 2
Gundremmingen B&C
Site Organisation of Nuclear Power Plants
6
Site Organisation of Nuclear Power Plants
Block 1 Block 2
Type BWR PWR
Kernkraftwerk Isar – Basic Data
7
Thermal Reactor Power MW 2.575 3.950
Electric Net Power MW 878 1.410
Commercial Operation since 21.03.1979 09.04.1988
Construction Costs Mio € 548 2.220
Shut down date 17.03.2011 31.12.2022
Site Organisation of Nuclear Power Plants96,0
8
73,4
1
84,9
4
87,7
8
89,9
5
88,0
8 93,1
4
89,8
5
90,7
1 94,1
93,6
1
96,5
1
94,5
97,1
4
95,1
96,5
3
95,3
9
90,8
7 96,8
2
93,4
3
93,3
3
94,3
2
92,9
9
95,4
8
91,6
78,5
1
90,4
2
88,2
7
90,1
3
91,9
1
93,7
2
90,0
8
90,9
4
94,2
8
95,4
96,6
4
94,6
2
97,3
5
95,3
2
96,9
3
95,5
7
91,0
5 96,9
7
93,6
93,5
5
94,4
9
93,1
7
95,6
5
60
70
80
90
100
Pro
zen
t
8
0
10
20
30
40
50
1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
Pro
zen
t
Arbeitsverfügbarkeit Zeitverfügbarkeit
Verfügbarkeiten KKI 2
Site Organisation of Nuclear Power Plants
1990 Grohnde 10,69 TWh1991 Emsland 10,83 TWh1992 Brokdorf 11,33 TWh1993 Unterweser 11,40 TWh1994 Isar 2 11,13 TWh1995 Grohnde 11,36 TWh1996 Philippsburg 2 11,47 TWh1997 Grohnde 12,53 TWh1998 Grohnde 11,76 TWh
Highest Electricity Generation 1990 - 2008
9
1998 Grohnde 11,76 TWh1999 Isar 2 12,27 TWh2000 Isar 2 11,94 TWh2001 Isar 2 12,40 TWh2002 Isar 2 12,17 TWh2003 Isar 2 12,32 TWh2004 Isar 2 12,24 TWh2005 Brokdorf 11,98 TWh2006 Isar 2 12,40 TWh2007 South Texas 1 12,37 TWh2008 Chooz 12,84 TWh2009 Palo Verde 1 12,24 TWh2010 Palo Verde 2 12,29 TWh2011 Isar 2 12,31 TWh
Site Organisation of Nuclear Power Plants
7000
8000
9000
10000
11000
12000
13000Betriebsarbeit [GWh]
40
50
60
Revision [d]
10
0
1000
2000
3000
4000
5000
6000
7000
1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
0
10
20
30
KKI 2: Betriebsarbeit Brutto [GWh] und Revisionsdauer [d]
Site Organisation of Nuclear Power Plants
11
Plant Mngmnt
Department Department Department
Site Organisation of Nuclear Power Plants
12
Plant Mngmnt
Department Department Department
Site Organisation of Nuclear Power Plants
TasksShift Service
Maintenance
Modification
Mechanical
Electrical
Reactor Physics
…
…
…
13
Modification
…
Engineering
Electrical
I & C Rad. Protection
…
…
…
ChemistryT & Q
Site Organisation of Nuclear Power Plants
Process Model (Plant Operation)
Cross Sectional Processes
Core Process – Plant OperationControlling
Process
Strategic
Process
Corporate
Strategy
Production
Integrated
ControllingMaintenance
Modification
Organisation
Purchasing
14
Modification
Training & Qualification
Fuel Managament
Safety & Security
Waste Management
Knowledge Management
Documentation
Purchasing
Licensing
Information Management
Communication
Controlling
Finance
HR
Site Organisation of Nuclear Power Plants
15
Site Organisation of Nuclear Power Plants
16
Plant Mngmnt
Department Department Department
Site Organisation of Nuclear Power Plants
Shift Service
Maintenance …Mechanical
…
…
17
Modification
Engineering
Electrical
I & C Rad. Protection
Reactor Physics
…
…
…
ChemistryT & Q
Site Organisation of Nuclear Power Plants
Production
Maintenance
Modification / Engineering
Production - Dep.
Maintenance - Dep.
Mod. / Engineering - Dep.
Organisational UnitProcess / Task
18
Modification / Engineering
Training & Qualification
…
…
…
Mod. / Engineering - Dep.
T & Q - Dep.
…
…
…
Site Organisation of Nuclear Power Plants
Production - Dep.T & Q - Dep.
…
…
19
Maintenance - Dep.
Mod. / Engineering - Dep.
…
…
…
Site Organisation of Nuclear Power Plants
20
Site Organisation of Nuclear Power Plants
Theme Date21
Site Organisation of Nuclear Power Plants
Interfaces
- require clearance
- raise responsibility questions
22
- cause friction
- cost safety, quality, time, money
Number of Interfaces = Number of Problems
Site Organisation of Nuclear Power Plants
Ownership
23
Ownership
Site Organisation of Nuclear Power Plants
Plant Manager
Organigram PSME
24
Production Surveillance Mechanical Electrical
Site Organisation of Nuclear Power Plants
Mechanical
MaintenanceMaintenance
Electrical
25
Maintenance
&
Engineering
Maintenance
&
Engineering
Site Organisation of Nuclear Power Plants
PSME – Organisation
System Engineers are responsible for
- Maintenance and- Modification and
26
- Modification and- Engineering and- …
Site Organisation of Nuclear Power Plants
Plant Manager
Organigram PSTM
27
Production Surveillance Technics Maintenance
Site Organisation of Nuclear Power Plants
MaintenanceTechnics
Mechanical Mechanical
28
Mechanical
Electrical
Mechanical
Electrical
Site Organisation of Nuclear Power Plants
PSTM – Organisation
System Engineers are responsible for
- Maintenance or- Modification or
29
- Modification or- Engineering or- …
Site Organisation of Nuclear Power Plants
� System-
Engineer A
� System-
30
� System-
Engineer B
System- System- System- System-
Engineer Engineer Engineer Engineer
Pump Heat Exch. Valve Fan
Site Organisation of Nuclear Power Plants
31
System- System- System- System-
Engineer Engineer Engineer Engineer
Pump Heat Exch. Valve Fan
Site Organisation of Nuclear Power Plants
System-
Engineer A
System-
32
System-
Engineer B
Site Organisation of Nuclear Power Plants
Ownership
- creates responsibility
- reduces gaps and double work
33
- concentrates all informations concerning a component /system at one point
- facilitates coordination of different works at one spot
Site Organisation of Nuclear Power Plants
Dep
Mechanical
Dep
Production Unit 1
Dep
Production Unit 2
TechnicalManager T
Staff Group
Officers
Dep
Electrical + I&C
Dep
Surveillance
Dep
Central Tasks
Commercial
Manager K
Work CouncilInfo-Center, PR
Staff Group
Organigram KKI
34
Section
Shift / Supply
Section
Shift / Supply
Section
Work Mngmnt.
Section
Nuclear Systems
Section
Convent. Systems
Staff GroupQuality Assurance
SectionSpec. TasksComponents
Section
I&C
Section
Electrical
Section
Radiation Prot.
Section
Reactor Physics
Section
Management Systems
Section
Safety & Security
Section
Op. Technics
Section
Chemistry
Section
Projects / Long Term Planning
Controlling
Purchasing
HR /Social Affairs
Accounting /Finance
Section
Op. Technics
SectionMaintenanceCivil Works
Staff GroupQuality Assurance
IT-Security
Section
IT
Training & Qual.
Section
Site Organisation of Nuclear Power Plants
The Personal Organisation in German NPP is described in the Operational
Manual.
The Organigram is split into a part with licensed personnel and a part with
non-licensed personnel.
35
All modifications „licensed“ part require authorised approval.
Site Organisation of Nuclear Power Plants
Block 2
Shift Supervisor 1
Deputy Shift Supervisor 1
Shift Organisation
36
Reaktor Operator 3
Electrician Foreman (Meister) 1
Field Operator - Electrician 2
Field Operator - Mechanical 2
Fire Fighter (non-operation) (1)
Total10
Site Organisation of Nuclear Power Plants
Stand – By Personnel
Ca. 10 experts from
- Management (Plant Manger‘s Representative, Rad. Prot.)
- different workshops (mechanical, electrical, I&C)
- Laboratories (Chemistry, Rad. Prot.)
- Production Dept.
37
- Production Dept.
- Fire Fighters
Site Organisation of Nuclear Power Plants
Control Room Shift Team
- Operational Surveillance
Outage Office Shift Team
- Receive plant parts / system groups
Special Arrangements during Outages
The Shift Team is split into
38
- Operational Surveillance
- Assure that all safety requirements
are fulfilled
- Release plant parts / system groups
into maintenance acc.
to all safety requirements
- Receive plant parts / system groups
back after maintenance
- Receive plant parts / system groups
from the Control Room Shift Team
- Release, coordinate and supervise
the works
- Return plant parts / system groups
after maintenance in a ready state to
the Control Room Shift Team
Site Organisation of Nuclear Power Plants
Theme Date39
Site Organisation of Nuclear Power Plants
The Outage Office Team is gradually being built up during the planning phase
ca. 3 months before begin of outage.
These licencees organise different works together with the system engineers
and prepare the safety measures � Few interfaces!
The same persons coordinate the works during the outage together with the
40
The same persons coordinate the works during the outage together with the
system engineers.
Site Organisation of Nuclear Power Plants
Outage
EON Personnel Service Personnel
ca. 300 ca. 1000 - 1500
41
ca. 300 ca. 1000 - 1500
Coordination
High Degree of Ownership
As Few As Possible Interfaces
Site Organisation of Nuclear Power Plants
42
Plant Mngmnt
Department Department Department
Communication
Site Organisation of Nuclear Power Plants
� Priorities in our daily work
Nuclear Safety Work Safety Radiation Protection
43
Environmental Protection Plant SecurityFire Protection
Plant Availability
Each of the a.m. risks is being systematically evaluated during the
work planning phase.
Site Organisation of Nuclear Power Plants
How do we communicate?
Operational Meetings every morning
���� on working level (workshops, work groups etc.)
���� Main Op. Meeting; 40 persons all over the departments; 15 – 30 min.
���� Work Management + workshop foremen; 10 persons; 15 – 30 min.
44
Strategic Meeting every week
���� Management Team; 20 persons; 3 hours
���� subsequently Dept. Meetings weekly / biweekly in order to forward
information and expectation
Topical Meetings internal / external
���� Technical / Commercial topics
���� Regulating Authority / Independent Experts
���� …
Site Organisation of Nuclear Power Plants
45
Site Organisation of Nuclear Power Plants
Thank you very much for your attention!