Slide title In CAPITALS 50 pt Slide subtitle 32 pt KPI
Reporting and Analysis Templates Naren Mohan
[email protected]
Slide 2
Top right corner for field-mark, customer or partner logotypes.
See Best practice for example. Slide title 40 pt Slide subtitle 24
pt Text 24 pt Bullets level 2-5 20 pt Ericsson
Confidential2006-05-082 Types of Report GnG Report (Per cluster
from ACTIX) Pre-Launch Tuning Tracker Post Launch Tuning Report
Post Launch Tuning Tracker (updated after every drive) Post Launch
Tuning Cluster Close out summary report (One time @ end of tuning)
Any other specific report as and when requested by Cingular,
parameter change / feature trials etc etc.. Issues Tracking
Slide 3
Top right corner for field-mark, customer or partner logotypes.
See Best practice for example. Slide title 40 pt Slide subtitle 24
pt Text 24 pt Bullets level 2-5 20 pt Ericsson
Confidential2006-05-083 Go No-Go Report Think Green !!! GNG drives
are performed currently using Agilent Nitro E6494 and post
processed using ACTIX. GnG drives contain one HSDPA download of 5MB
file, 1 PS R99 download of 3MB file and a MOC-MTC Voice call for 30
seconds and 15 seconds wait. GnG KPIs for packet are divided into
Application Layer and Technology Layer Categories.
Slide 4
Top right corner for field-mark, customer or partner logotypes.
See Best practice for example. Slide title 40 pt Slide subtitle 24
pt Text 24 pt Bullets level 2-5 20 pt Ericsson
Confidential2006-05-084 The Drive to Green RF Perspective At the
end of every GnG Drive post processing you are required to analyze
the logs for all KPIs that are red and provide explanations. RF
Engineer
Slide 5
Top right corner for field-mark, customer or partner logotypes.
See Best practice for example. Slide title 40 pt Slide subtitle 24
pt Text 24 pt Bullets level 2-5 20 pt Ericsson
Confidential2006-05-085 Post Launch Tuning Tracker Post Launch
Drives are performed when 90% sites are available in the cluster
and 60% sites in the neighboring clusters. The KPI at the end of
every drive needs to be updated in the tracker. To present the
results to the customer detailed report from Omega Tool can be
used.
Slide 6
Top right corner for field-mark, customer or partner logotypes.
See Best practice for example. Slide title 40 pt Slide subtitle 24
pt Text 24 pt Bullets level 2-5 20 pt Ericsson
Confidential2006-05-086 Cluster Close-out Report The Cluster
Close-out report is created at the end of the Post Launch Tuning
Activity. The report is per cluster summarizing the results of the
post launch drive. All KPIs that are RED need to be explained with
any long term recommendations to fix the problem. The template and
some plots are automatically generated from the OMEGA Tool.
Slide 7
Top right corner for field-mark, customer or partner logotypes.
See Best practice for example. Slide title 40 pt Slide subtitle 24
pt Text 24 pt Bullets level 2-5 20 pt Ericsson
Confidential2006-05-087