SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTIAL PO Box 1473 Traralgon 3844 Phone (03) 51761217 [email protected] SMB C O M M E R C I A L A N D R E S I D E N T I A L DESIGN AND CONSTRUCTION PLANNING REPORT Demolish existing Service Station and Buildings To redevelop the land for a 24hour service station incorporating a carwash, associated carparking, variation to the crossover widths (existing crossovers) required by Clause 52.12 and internally illuminated advertising signage. Use Existing. Property Address: 145a Percy Street Portland Date: February 2018 Applicant: SMB Design and Construction Owner: Darren Noseda 922-924 Raglan Parade Warrnambool

SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 [email protected] . SMB C O M M E R

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTIAL PO Box 1473 Traralgon 3844 Phone (03) 51761217 [email protected]

SMB

C O M M E R C I A L A N D R E S I D E N T I A L

DESIGN AND CONSTRUCTION

PLANNING REPORT

Demolish existing Service Station and Buildings To redevelop the land for a 24hour service station incorporating a carwash, associated carparking, variation to the crossover widths (existing crossovers) required by Clause 52.12 and internally illuminated advertising signage. Use Existing.

Property Address: 145a Percy Street Portland Date: February 2018

Applicant: SMB Design and Construction Owner: Darren Noseda 922-924 Raglan Parade Warrnambool

Page 2: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTIAL PO Box 1473 Traralgon 3844 Phone (03) 51761217 [email protected]

1 Site and Surrounds The subject site is located at 145a Percy Street Portland. The site is irregular in shape with a frontage of 62.91 metres to Percy Street. The site has an area of 2749 sqm. The site is currently used as a service station and car repair workshops. The land is zoned IN3Z and partly C2Z the property to the North of the site is zoned IN3Z. The property across Percy Street (RDZ1) is zoned C2Z. Properties to the South are zoned CZ1 and the properties two the West are zoned GRZ1.

Page 3: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTIAL PO Box 1473 Traralgon 3844 Phone (03) 51761217 [email protected]

2 Proposal The proposal is for buildings and works associated with the use of the land for the purpose of a Service Station/Convenience Store and Carwash.

Page 4: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTIAL PO Box 1473 Traralgon 3844 Phone (03) 51761217 [email protected]

Described as follows: SERVICE STATION/CONVENIENCE STORE/CARWASH The Service Station and carwash use will operate 24 hours a day, 7 days a week. No mechanical repairs are proposed to operate from this site. The Convenience Store Building is 120sqm and has a maximum height of 4.20m. The building is setback 8.5m from Percy Street property boundary which is less than the existing building (to be demolished) on the site and 0m on the Northern boundary. There is one public entry to the building on southern side fronting the fuel canopy. The fuelling canopy has an area of 485 sqm. The canopy will have a maximum height of 6.2 m providing weather protection to the petrol pump forecourt. The fuel pumps are located 4.8m from the property boundary. Proposed pumps, fuel refill points and underground fuel storage tanks are shown indicatively on the plans. The carwash building is 73sqm and is located 27.035 meters from the front property boundary, 0.15 meters for the southern boundary and 11.10m from the rear boundary. It has a maximum height of 6.0meters The plantroom is 18sqm and is located 6.15 meters from the front boundary and at its closest point 1.0 meters for the side boundary. It has a maximum height of 3.2 meters. A total of 11 car parking spaces (including one disabled space) are proposed to be located on the north and western side of the site. There is also an additional space provided for air and water. There are also 8 available spaces under the canopy. There is one loading bay on the eastern side of the building and measures 8.0m x 3.8mard area. Convenience store deliveries will occur between zero and 3 times daily. Fuel deliveries will be 2-3 times per week, 7am until 10pm via 19m semi trailer. The attached traffic report shows vehicle turning template and location of the indicative underground fuel filling points demonstrate that a 19m fuel tanker is located wholly on the site while filling the tanks and that all vehicles can enter, circulate and exit the site safely. Mechanical plant will be located either on the roof or adjacent to the building. Vehicle access to the site will be via the existing crossovers on Percy Street. The proposed crossovers will allow for both entry and exiting to and from the site The crossovers are in excess of the 7.7m requirement of Clause 52.12-1. A number of business identification signs are proposed for the site in the form of a non- illuminated and illuminated. See attached signage drawing for details and locations. 490 Sqm of landscaping is provided on the site see the accompanying site plan for details. The landscaping backing on to the Residential properties is 5.7m in width and is in excess of the requirement.

Page 5: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTIAL PO Box 1473 Traralgon 3844 Phone (03) 51761217 [email protected]

3 Planning Controls The subject site is included within the Industrial 3 zone (IN3Z) and Commercial 2 Zone (C2Z) and is not affected by any overlays pursuant to the provisions for the Glenelg Shire Council Planning Scheme. 3.0 Industrial Three and Commercial One Zone The Service Station/Convenience Store is located within the I3Z and is listed in the Permit Not Required section but the land is within 30m of a Residential Zone and therefore requires a permit The development is also subject to existing rights use. The Carwash is located in the CZ1 of the site and is not listed in any of the Sections and therefore requires a permit. A permit is required for construction of a building for both zones. The use of the development is compatible with the needs of the surrounding community and is existing for the service station/convenience store. The scale and intensity of the development is proportionate to the surrounding buildings. The site has adequate landscaping and provides softening of the development. There is adequate carparking on the site. The internal layout of the site provides safety for both traffic and pedestrians. It is noted that the IN3Z is included in the Category 2 and CZ1 is included in Category 1 for the purposes of the advertising sign requirements at Clause 52.05-7 of the Planning Scheme. 3.05 Particular Provisions In addition to the zone and overlay provisions of the Scheme, the following particular provisions are also relevant to the proposal. Clause 52.05 Advertising Signs – A permit is required under the provision for a business identification sign with a total area to the premises in excess of 8 sqm, internally illuminated business identification signs with an area in excess of 1.5sqm and internally illuminated major promotion business identification signs.

• The illuminated ID sign is 1.85sqm. Clause 52.06 Car Parking- 11 Car spaces are provided and therefore the car parking is consistent with the requirements of 52.06. Clause 52.07 Loading and Unloading of Vehicles: A Building with a floor area of 2,600 sqm or less in a single occupation and associated with the manufacture servicing, storage or sale of goods or materials required a loading bay with a minimum length of 7.6m and a width of 3.6 m, resulting in an area of 27.4 sqm. A permit may be granted to reduce or waive these requirements. The proposed loading bay adjoining the building is consistent with the loading bay requirements of Clause 52.07

Page 6: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTIAL PO Box 1473 Traralgon 3844 Phone (03) 51761217 [email protected]

Clause 52.12 Service Station – A permit is required to vary the requirements of this provision. A variation is sought from these requirements in relation to: Crossovers and Dimensions, Road Setbacks.

• The existing crossovers to the Percy Street are 10.2m and 13.8m in width and are therefore exceeding 7.7 metres.

• The building is site back 8.5m from the Percy Street frontage and therefore less that the 9.0m required in road setbacks.

Clause 52.13 Carwash- A permit is required to vary the requirements of this provision. A variation is sought from these requirements in relation to: Crossover widths and queuing lanes.

• The existing crossovers to the Percy Street are 10.2m and 13.8m in width and are therefore exceeding 7.7 metres.

• Refer to the attached Traffic Report for queueing. Clause 52.29 Land Adjacent to a Road Zone, Category 1, or a Public Acquisition Overlay for a Category 1 Road – A permit is required to alter access to a Road Zone Category 1 Under this provision, an application to alter access to land owned by the Roads Corporation for the purpose of a road must be referred to the Roads Corporation under Section 55 of the Act. It is noted that there are crossovers to Percy Street are existing and are not being altered. Clause 52.34 Bicycle Facilities – Table 1 to Clause 52.34-3 Requires the 1 space to each 600sqm of leasable floor area and 1 visitor/ shopper space to each 3500 sqm of leasable floor area. A permit may be granted to vary, reduce or waive any requirement of Clause 52.34-3 and Clause 52.34-4. A bicycle parking area is not required for this development.

5 Planning Assessment The use of the land for purposes of a Service Station/Convenience Store and carwash , aligns with policy guidance contained within the Planning Scheme. In this regard, the proposal is appropriately located on the site with frontages to Percy Street. The likely effect of the proposed use on the surrounding land uses will be minimal as the site is currently operation as a Sevice Station /Conveinece Store and Motor repair workshop located on a Road Zone 1 (RDZ1). A service station in this location will continue to provide a service to the local community, serving the current and future business and residential communities. The design is of a contemporary built form that responds to the scale and form of existing and emerging development. A low rise single storey, built form that will not adversely impact the immediate area and surrounds improving the overall amenity and landscaping. Furthermore, the siting and design of the proposed development will not have any unreasonable shadowing to adjacent properties. The open forecourt of the development and the siting of the crossovers allow for clear view lines to be maintained along both roadways thereby maintaining acceptable safety standards for vehicles and pedestrians. Advertising signs are consistent with typical service station signage advertising the nature of the use and the proposed products and services offered.

Page 7: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTIAL PO Box 1473 Traralgon 3844 Phone (03) 51761217 [email protected]

The accompanying drawings and reports show the swept path diagrams have been designed to facilitate the safe, efficient and functional movement of vehicles and maintain clear view lines for the safety of pedestrians. The provision for car parking spaces is appropriate in satisfying the demands of the proposed development taking into account the fact that the pump forecourt is also capable of accommodating the parking of stationary vehicles whilst being refuelled. In conclusion, it is evident that the built form and use responds to the intent of the Industrial 3 Zone and Commercial Zone to achieve a good balance. For these reasons and the views expressed in the supporting documentation the proposal represents an appropriate and desirable planning outcome that should be supported.

Page 8: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

onemilegrid.com.au 1/59 Keele Street, Collingwood, VIC 3066 (03) 9939 8250

145a Percy Street, Portland Transport Impact Assessment

180015TIA001A-F.docx

20 February 2018

Page 9: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 2

onemilegrid ABN: 79 168 115 679

(03) 9939 8250

1/59 Keele Street

COLLINGWOOD, VIC 3066

www.onemilegrid.com.au

DOCUMENT INFORMATION

Prepared for SMB Design and Construction

File Name 180015TIA001A-F.docx Report Date 20 February 2018

Prepared by James Dear Reviewed by Valentine Gnanakone

Signature

Signature

© One Mile Grid Pty Ltd. This document has been prepared by onemilegrid for the sole use and benefit of the

client as per the terms of engagement. It may not be modified or altered, copied, reproduced, sold or

transferred in whole or in part in any format to any person other than by agreement. onemilegrid does not

assume responsibility or liability to any third party arising out of use or misuse of this document.

Page 10: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 3

CONTENTS

1 INTRODUCTION............................................................................................................ 4

2 EXISTING CONDITIONS ................................................................................................. 4 2.1 Site Location ........................................................................................................................... 4 2.2 Road Network......................................................................................................................... 5 2.2.1 Percy Street .................................................................................................................................. 5 2.3 Sustainable Transport ............................................................................................................ 5 3 DEVELOPMENT PROPOSAL ............................................................................................. 6 3.1 General ................................................................................................................................... 6 3.2 Car Parking and Vehicular Access ..................................................................................... 6 3.3 Loading and Waste Collection............................................................................................. 7 4 DESIGN CONSIDERATIONS ............................................................................................ 8 4.1 General ................................................................................................................................... 8 4.2 Clause 52.06 Assessment ...................................................................................................... 8 4.2.1 Design Standard 1 – Accessways ............................................................................................ 8 4.2.2 Design Standard 2 – Car Parking Spaces ............................................................................... 9 4.3 Clause 52.12 – Service Station ............................................................................................. 9 4.4 Clause 52.13 – Car Wash .................................................................................................... 10 4.5 Fuel Tanker Access .............................................................................................................. 11 4.6 Loading and Waste Collection........................................................................................... 11 5 BICYCLE PARKING CONSIDERATIONS ........................................................................... 11

6 CAR PARKING CONSIDERATIONS................................................................................. 12 6.1 Statutory Car Parking Requirements .................................................................................. 12 6.1.1 Car Parking Requirements – Clause 52.06 ............................................................................ 12 6.2 Review of Car Parking Provision......................................................................................... 12 7 TRAFFIC CONSIDERATIONS .......................................................................................... 14 7.1 Traffic Generation ................................................................................................................ 14 7.1.1 Service Station ........................................................................................................................... 14 7.1.2 Car Wash .................................................................................................................................... 14 7.2 Traffic Impact ....................................................................................................................... 14 8 CONCLUSIONS .......................................................................................................... 15

TABLES

Table 1 Clause 52.06-9 Design Assessment – Design Standard 1 ..................................................... 8 Table 2 Service Station Design Requirements ...................................................................................... 9 Table 3 Clause 52.13 Requirements ..................................................................................................... 10 Table 4 Clause 52.06 – Car Parking Requirements ............................................................................ 12

FIGURES

Figure 1 Site Location ................................................................................................................................. 4 Figure 2 Public Transport Provision ........................................................................................................... 5 Figure 3 Access and Circulation .............................................................................................................. 6

APPENDICES

APPENDIX A SWEPT PATH DIAGRAMS ............................................................................................. 16

Page 11: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 4

1 INTRODUCTION

onemilegrid has been requested by SMB Design and Construction to undertake a Transport Impact

Assessment of the proposed service station and car wash development at 145a Percy Street in

Portland.

As part of this assessment the subject site has been inspected with due consideration of the

development proposal and relevant background reports have been reviewed.

2 EXISTING CONDITIONS

2.1 Site Location

The subject site is located in Portland, on the west side of Percy Street, north of the juncture of Percy

Street and Otway St, as shown in Figure 1.

Figure 1 Site Location

Copyright Melway Publishing

The site is currently occupied by a BP service station, with access to the site provided from separate

crossovers located at the southern and northern ends of the site frontage to Percy Street. The

service station provides four double-sided bowsers, with an associated convenience shop at the

southern end of the site.

The site has a frontage of approximately 62 metres to Percy Street and a total site area of

approximately 2,750m2.

Land use in the immediate vicinity of the site is varied, with largely residential uses to the west and a

mix of commercial uses to the north and south along Percy Street.

The site is located within an Industrial 3 Zone (IN3Z).

Subject Site

Page 12: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 5

2.2 Road Network

2.2.1 Percy Street

Percy Street is an urban collector road generally aligned north-south, intersecting with Glenelg

Street in the south, and connecting through to New Street in the north.

Percy Street provides a single traffic lane and on-road bike lane in each direction, with a painted

median accommodating a right-turn lane into the site. A combination of parallel and angle

kerbside parking are provided on both sides.

A 60km/h speed limit applies to Percy Street in the vicinity of the site.

2.3 Sustainable Transport

There are two public bus services that operate in Portland, comprising the Portland North (Route 1)

and Portland South (Route 2) bus services.

The Portland North (Route 1) service provides good public transport access to the site, with the

service looping around North Portland and allowing passengers to alight within 300 metres walking

distance of the site.

The public transport network map is provided in Figure 2

Figure 2 Public Transport Provision

Subject Site

Page 13: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 6

3 DEVELOPMENT PROPOSAL

3.1 General

It is proposed to demolish the existing buildings on-site and construct a new service station, which

includes the following;

➢ A petrol station with 4 double sided car bowsers and a single LPG gas pump;

➢ An associated convenience shop, with an area of 120m2; and

➢ A hand car wash, with two car wash bays and an associated vacuum bay.

3.2 Car Parking and Vehicular Access

No modifications to access are proposed, with both the northern and southern crossovers to be

retained. The southern crossover will be restricted to inbound movements only, whilst exit

movements will occur from the northern crossover.

A view of the proposed access arrangement is provided in Figure 3 below.

Figure 3 Access and Circulation

Twelve (12) car spaces (including one accessible space, and one air and water space) are to be

provided for the use.

Inbound

Outbound

Page 14: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 7

3.3 Loading and Waste Collection

A dedicated loading bay is provided in the northeast corner of the site, along the east wall of the

convenience store.

Fuel filling will be accommodated in the eastern portion of the petrol station area, with the filling

point located directly to the north of the easternmost bowsers.

Page 15: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 8

4 DESIGN CONSIDERATIONS

4.1 General

onemilegrid has undertaken an assessment of the car parking layout and access for the proposed

development with due consideration of the Design Standards detailed within Clause 52.06, 52.12

and 52.13 of the Planning Scheme. A review of those relevant Design Standards is provided in the

following section.

4.2 Clause 52.06 Assessment

4.2.1 Design Standard 1 – Accessways

A summary of the assessment for Design Standard 1 is provided in Table 1.

Table 1 Clause 52.06-9 Design Assessment – Design Standard 1

Requirement Comments

Be at least 3 metres wide Satisfied

Have an internal radius of at least 4 metres at changes of direction or

intersection or be at least 4.2 metres wide Satisfied

Allow vehicles parked in the last space of a dead-end accessway in

public car parks to exit in a forward direction with one manoeuvre

Satisfied (Wait for swept

paths)

Provide at least 2.1 metres headroom beneath overhead obstructions,

calculated for a vehicle with a wheel base of 2.8 metres

Satisfied – Height

clearances underneath

the fuel canopy will

exceed 2.1 metres

If the accessway serves four or more car spaces or connects to a road

in a Road Zone, the accessway must be designed so that cars can exit

the site in a forward direction

Satisfied – All vehicles

can exit in a forward

direction

Provide a passing area at the entrance at least 6.1 metres wide and 7

metres long if the accessway serves ten or more car parking spaces

and is either more than 50 metres long or connects to a road in a

Road Zone

N/A – Both site

accesses will operate

one-way only.

Therefore, passing is not

required.

Have a corner splay or area at least 50 per cent clear of visual

obstructions extending at least 2 metres along the frontage road from

the edge of an exit lane and 2.5 metres along the exit lane from the

frontage, to provide a clear view of pedestrians on the footpath of the

frontage road. The area clear of visual obstructions may include an

adjacent entry or exit lane where more than one lane is provided, or

adjacent landscaped areas, provided the landscaping in those areas

is less than 900mm in height.

Satisfied – All pedestrian

sight triangles will be

clear of any

obstructions or

landscaping greater

than 900mm height.

If an accessway to four or more car parking spaces is from land in a

Road Zone, the access to the car spaces must be at least 6 metres

from the road carriageway.

Satisfied

Page 16: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 9

4.2.2 Design Standard 2 – Car Parking Spaces

All car spaces on-site are proposed with a minimum width of 2.6 metres, length of 5.5 metres and

are accessed from aisles of no less than 6.4 metres in excess of the Planning Scheme requirements.

The accessible parking space and shared space are dimensioned in excess of the requirements of

the Australian Standard for Off-Street Parking for People with Disabilities AS2890.6 and are

considered appropriate.

4.3 Clause 52.12 – Service Station

Clause 52.12 of the Planning Scheme provides specific requirements with regards to the use of a

service station to ensure that the use of the land for a service station does not impair traffic flow or

road safety.

The relevant items with regard to car parking and traffic are discussed in Table 2 below.

Table 2 Service Station Design Requirements

Category Requirement Comment

Site Area

and

Dimensions

➢ The site must be at least 1,080 square metres.

➢ The frontage must be at least 36 metres (30

metres if the site is on a corner) and the depth at

least 30 metres.

The subject site exceeds

these minimum

dimensions.

Crossovers

No more than 2 vehicle crossovers may service the

site from a road and at the road alignment a

crossover must be:

➢ No wider than 7.7 metres.

➢ At least 4.5 metres from another crossover on the

site.

➢ At least 4.5 metres from another road or if a

splayed corner, at least 7.7 metres from the splay.

➢ At least 1.8 metres from a crossover on another

property.

All of these criteria are

satisfied with the

exception of the crossover

width. Wider crossovers

are required to

accommodate larger

vehicles. Refer to

discussion below.

Kerb or

Barrier

➢ Except at crossovers, a kerb or barrier must be

built along the road alignment to prevent the

passage of vehicles.

Kerbing is provided along

the frontage of the site.

Road

Setbacks

➢ A wall of a building must be at least 9 metres

from a road.

➢ A canopy must be at least 2.5 metres from a

road.

➢ Petrol pumps, pump islands, water and air supply

points and storage tank filling points must be at

least 3.6 metres from a road.

➢ Petrol tankers must be wholly on the site when

storage tanks are being filled.

➢ Driveway space must be sufficient to enable a

vehicle 13.8 metres by 2.5 metres to enter and

leave the site without reversing

➢ No vehicle may be serviced unless it is wholly on

the site.

The above elements have

been achieved in the

design. Swept path

diagrams are provided in

Appendix A

demonstrating petrol

tanker access.

Page 17: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 10

Trailers for

Hire

If trailers are for hire on the site:

➢ The site must be at least 1,080 square metres.

➢ All trailers must be wholly on the site and must not

encroach on landscaping or car parking areas or

accessways.

➢ On a corner site, a trailer higher than 1 metre

must be parked at least 9 metres from the corner.

No trailer hire facilities are

proposed on the site.

It is acknowledged that the crossover widths are in excess of 7.7 metres specified above, however

these crossovers have been designed specifically to accommodate the swept paths of a 19 metre

semi-trailer associated with the existing service station use. No alterations to the existing crossovers

are proposed.

4.4 Clause 52.13 – Car Wash

Clause 52.13 of the Planning Scheme provides specific requirements with regards to the use of a

car wash to ensure that the use of the land for a service station does not impair traffic flow or road

safety.

Relevant traffic engineering requirements are discussed in Table 3.

Table 3 Clause 52.13 Requirements

Category Requirement Comment

Crossovers

No more than 2 vehicle crossovers may service the

site from a road and at the road alignment a

crossover must be:

➢ No wider than 7.7 metres.

➢ At least 4.5 metres from another crossover on the

site.

➢ At least 4.5 metres from another road or if a

splayed corner, at least 7.7 metres from the splay.

➢ At least 1.8 metres from a crossover on another

property.

As above, all of these

criteria are satisfied with

the exception of the

crossover width. Wider

crossovers are required

to accommodate larger

vehicles. Refer to

discussion above.

Kerb or

Barrier

➢ Except at crossovers, a kerb or barrier must be

built along the road alignment to prevent the

passage of vehicles.

As above, kerbing is

provided along the

frontage of the site.

Queuing

Lane

➢ A queuing lane on the site must be able to

accommodate at least 10 vehicles before entry

to the car wash.

➢ If petrol is available for sale to vehicles queuing to

be washed, the lane must be able to

accommodate at least 10 vehicles before the

petrol selling point.

➢ The lane must be clearly shown on the ground

and marked for use only by vehicles queuing to

be washed.

➢ The area between the exit from a car wash and

the nearest crossover must be able to

accommodate at least 2 vehicles in single file.

Refer discussion below

The queuing area on approach to the car wash may accommodate approximately eight vehicles

before circulation to other parts of the site is impacted.

Page 18: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 11

Given the nature of a manual car wash bay, being utilised in largely an opportunistic manner, it is

considered very unlikely that patrons will opt to wait should there be considerable queues. As such,

it is considered that queueing area for eight vehicles is sufficient.

Whilst line marking for designated queueing lanes is currently not proposed, it may be introduced

as required by Council.

4.5 Fuel Tanker Access

The fuel fill point is to be located to the immediate north of the easternmost fuel bowser.

Tankers will enter the site from the southernmost Percy Street access and prop at the fill point,

allowing vehicles to safely and conveniently pass a stationary fuel tanker. Swept paths are

provided in Appendix A illustrating the swept path of a petrol tanker (26m B-Double).

4.6 Loading and Waste Collection

The loading bay has been designed to accommodate trucks 8.8m length (medium rigid truck).

Swept paths are also provided in Appendix A demonstrating access to the loading bay.

5 BICYCLE PARKING CONSIDERATIONS

The bicycle parking requirements for the subject site are identified in Clause 52.34 of the Glenelg

Planning Scheme.

No rate is listed within the scheme for petrol station use, and whilst the convenience shop falls

under the banner of the ‘shop’ land-use classification, there is no trigger for shop uses less than

1,000m2 floor area.

Similarly, no rate is listed within the Planning Scheme for car wash use and as the car wash

component only attracts car drivers, it clearly doesn’t generate a requirement for bike parking.

As such, the development does not trigger any requirements for bicycle parking.

Page 19: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 12

6 CAR PARKING CONSIDERATIONS

6.1 Statutory Car Parking Requirements

6.1.1 Car Parking Requirements – Clause 52.06

The car parking requirements for the subject site are identified in Clause 52.06 of the Glenelg

Planning Scheme, which specifies the following requirement for the convenience store component

of the proposed development.

Table 4 Clause 52.06 – Car Parking Requirements

Use Area Rate Car Parking Measure Total

Convenience shop 120 m2 10 To each premises 10

It is noted that no rate is listed within the clause for the petrol station or the car wash use on-site. In

this regard, Clause 52.06 states:

“Where a use is not specified in Table 1 or where a car parking requirement is not specified

for the use in another provision of the planning scheme or in a schedule to the Parking

Overlay, before a new use commences or the floor area or site area of an existing use is

increased, car parking spaces must be provided to the satisfaction of the responsible

authority.”

As such, the development requires 10 car spaces to be provided on-site, plus any additional

parking required by Council for the service station and the car wash uses.

It is proposed to provide a total of twelve car spaces to service the proposed development.

To confirm the appropriateness of the proposed supply, a review has been undertaken below to

confirm that sufficient parking is provided on-site.

6.2 Review of Car Parking Provision

The proposed convenience shop/service station functions primarily as a petrol outlet rather than a

shop and is unlikely to attract a significant number of shoppers beyond those already purchasing

fuel. Notably, the use comprises only 120m2 floor area and will provide a limited range of

convenience goods for sale.

Based on the above, the vast majority of the service station patronage will be that of motorists

purchasing fuel. These patrons typically proceed to the kiosk to pay for the fuel without moving

their vehicles from the position occupied during refuelling and therefore do not require a separate

parking space. In effect, eight parking spaces are provided at the fuel bowsers for this type of

parking demand.

On occasion, the use may generate some additional parking demand for customers purchasing

convenience goods. It is not anticipated that demands will exceed four parking spaces.

In addition to customer parking demands, the use will also attract regular demands associated with

an employee who operates the kiosk, and the parking of perhaps an additional employee during

the changeover of shifts.

The car wash functions as a hand car wash, whereby drivers enter the car wash bay and use the

car wash facilities to clean their own car. As such, when the car wash is being used it generates no

demand for parking outside of the two dedicated wash bays provided on-site.

A queueing area is provided to the rear of the car wash bays, capable of accommodating up to

eight queued vehicles. Given the provision of this queueing area, it is not anticipated that any

additional parking demands will be generated across the site.

Page 20: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 13

In addition, as the car wash is a self-service car wash, there are no employee demands associated

with the use, as it is assumed that service station staff will maintain the facilities required for

customer operation of the car wash.

In total, the service station and convenience shop uses are expected to generate demand for up

to six parking spaces, and the car wash is not anticipated to generate any parking demands at all.

With 11 customer parking spaces (excluding the air and water space) to be provided on-site, the

provision of parking will far exceed the development-generated demands.

Page 21: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 14

7 TRAFFIC CONSIDERATIONS

7.1 Traffic Generation

7.1.1 Service Station

The volume of traffic generated by a service station depends on the location of the site, time of

day, surrounding traffic volumes, and whether a convenience store or other uses are included in

the development.

As noted above, the subject site has previously operated as a BP (British Petroleum) service station

with associated convenience store. Comparable in size, the previous service station contained

eight fuel pumps and an associated convenience shop with a floor area of approximately 120m2,

which is the number of pumps and the approximate floor area of the convenience shop proposed

for this development.

Noting that the BP service station was operating at the time of writing, it is anticipated that the

traffic generation associated with the proposed service station and convenience store component

of the development will be equivalent to that of the traffic generated by the current service

station/convenience store development. In view of this it anticipated there will be no additional

traffic generated for the service station/convenience store component.

7.1.2 Car Wash

The proposed car wash will contain two manual car wash bays. Case study data collected for

both automatic and manual car wash bays indicates that they typically generate in the order of 4-

6 vehicle movements per bay during the AM and PM commuter peak hours.

Based on the above rates, it is anticipated the car wash will generate a total of 10 vehicle

movements in the AM peak and a total of 10 vehicle movements in the PM peak period.

It is important to note that a large majority of vehicles utilising the car wash facility comprise of

passing trade, i.e. vehicles that are already on the adjacent road network which are merely

diverted to the site from a broader trip purpose. As such, these trips do not represent additional

vehicle movements on the road network.

Furthermore, it is acknowledged that a considerable number of the vehicle trips to the car wash

facility will be directly associated with petrol station trips.

7.2 Traffic Impact

Reviewing the volumes above, it is projected that the proposed redevelopment will generate up to

10 additional vehicle movements during the peak hours from the existing conditions.

This is equivalent to one additional movement (in or out) every six minutes to Percy Street and as

such is not expected to have any considerable impact on the operation of the surrounding road

network.

Page 22: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 15

8 CONCLUSIONS

It is proposed to develop the subject site for the purposes of a service station, with 4 double-sided

bowsers, and an associated convenience shop and car wash.

Considering the analysis presented above, it is concluded that:

➢ The proposed car parking and access design is considered appropriate;

➢ The use does not generate any requirement for bicycle parking;

➢ The car parking layouts and accesses have been designed generally in accordance with the

requirements of the Planning Scheme and are considered appropriate;

➢ The proposed provision of parking is considered sufficient to meet anticipated demands;

➢ The anticipated traffic volumes generated by the development are not expected to have an

impact on the operation of Percy Street or the surrounding road network and;

➢ There are no traffic engineering reasons which should preclude a permit from being issued for

this proposal.

Page 23: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

145a Percy Street, Portland Transport Impact Assessment 180015TIA001A-F.docx 20 February 2018

Page 16

Appendix A Swept Path Diagrams

Page 24: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

DP

DP

DP

CO

ND

UIT LIN

EC

ON

DUIT LIN

EC

ON

DUIT LIN

E

CS

UC

SU

CS

U

DP

CO

ND

UIT LIN

E

CS

U

BIN

VAC

VAC

1

2

3

4

5

6

7

8

910

11

HANDBASIN

ICE

0 2 4 8

SPA100 A180015

13.70

1.60 5.30

4.20

0.20

1.40 9.50

: 2.50Tractor Width

70.0

:27.8

:

Trailer Track

Tractor Track

: 2.50

2.50

:6.0

:

meters

Steering Angle

Lock to Lock Time

Articulating Angle

Trailer Width 2.50:

PM S 19M

PERCY STREET

300mm CLEARANCE ENVELOPE SHOWN DOTTED

19m SEMI SWEPT PATH SHOWN DASHED

ACCESS MANOEUVRES

JDDW

145 PERCY STREET, PORTLAND

SWEPT PATH ANALYSIS

-

1:400 @ A3

SITE ACCESS - 19m SEMI

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2018\180015\Dra

win

gs\180015

SP

A100.d

gn

08-02-2018

Date Plotted:

10:10:03 A

M

Project Number Drawing Number Revision

FUEL FILL POINTP

M S 19

M

AUSTR

OA

DS 2013 (A

U)

(c) 2018

Transoft Solutio

ns, In

c.

All

rig

hts reserved.

PM S 19MAUSTROADS 2013 (AU)

(c) 2018 Transoft Solutions, Inc. All rights reserved.

PM S 19MAUSTROADS 2013 (AU)

(c) 2018 Transoft Solutions, Inc. All rights reserved.

PM S 19MAUSTROADS 2013 (AU)

(c) 2018 Transoft Solutions, Inc. All rights reserved.

Page 25: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

DP

DP

DP

CO

ND

UIT LIN

EC

ON

DUIT LIN

EC

ON

DUIT LIN

E

CS

UC

SU

CS

U

DP

CO

ND

UIT LIN

E

CS

U

BIN

VAC

VAC

1

2

3

4

5

6

7

8

910

11

HANDBASIN

ICE

0 2 4 8

SPA101 A180015

PERCY STREET

JDDW

145 PERCY STREET, PORTLAND

SWEPT PATH ANALYSIS

-

1:400 @ A3

300mm CLEARANCE ENVELOPE SHOWN DOTTED

8.8m SERVICE VEHICLE SWEPT PATH SHOWN DASHED

ACCESS MANOEUVRES

1.50 5.00

8.80

Lock to Lock Time

Width

Track

Steering Angle

:

:

2.50

2.50

:

38.7:

6.0

metersSERVICE VEHICLESITE ACCESS - 8.8m SERVICE VEHICLE

Drawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2018\180015\Dra

win

gs\180015

SP

A101.d

gn

08-02-2018

Date Plotted:

10:07:18 A

M

Project Number Drawing Number Revision

8.8m SERVICE VEHICLE

SERVICE VEHICLE

AUSTROADS 2013 (AU)

SERVICE VEHICLEAUSTROADS 2013 (AU)

(c) 2018 Transoft Solutions, Inc. All rights reserved.

SERVICE VEHICLEAUSTROADS 2013 (AU)

(c) 2018 Transoft Solutions, Inc. All rights reserved.

SE

RVIC

E

VE

HIC

LE

AUSTR

OA

DS 2013 (A

U)

(c) 2018

Transoft Solutio

ns, In

c.

All

rig

hts reserved.

SERVICE VEHICLEAUSTROADS 2013 (AU)

(c) 2018 Transoft Solutions, Inc. All rights reserved.

Page 26: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

DP

DP

DP

CO

ND

UIT LIN

EC

ON

DUIT LIN

EC

ON

DUIT LIN

E

CS

UC

SU

CS

U

DP

CO

ND

UIT LIN

E

CS

U

BIN

VAC

VAC

1

2

3

4

5

6

7

8

910

11

HANDBASIN

ICE

0 2 4 8

SPA102 A180015

PERCY STREET

JDDW

145 PERCY STREET, PORTLAND

SWEPT PATH ANALYSIS

-

1:400 @ A3

SITE ACCESS - B85 WITH TRAILER & B99 VEHICLE

300mm CLEARANCE ENVELOPE SHOWN DOTTED

B85 WITH TRAILER AND B99 VEHICLE SWEPT PATH SHOWN DASHED

ACCESS MANOEUVRES

3.050.95

5.20

B99

Lock to Lock Time

Width

Track

:

:

:

6.0

1.84

1.94

Steering Angle 33.9:

metersDrawing Title

Scale

Designed Approved Melway Ref

CA

D File:

N:\Proje

cts\2018\180015\Dra

win

gs\180015

SP

A102.d

gn

08-02-2018

Date Plotted:

10:16:48

Project Number Drawing Number Revision

Lock to Lock Time

Car Width

Steering Angle

Trailer Track

Trailer Width

Car Track

:

:

:

:

:

:

meters

B85 Car - Trailer

34.1

6.0

1.72

1.77

1.82

1.87

3.341.30

1.502.800.92 2.97

4.91

Articulating Angle 70.0:

B85 WITH TRAILER

B99 VEHICLE

B85 Car - Trailer

onemilegrid(c) 2018 Transoft Solutions, Inc. All rights reserved.

B85 Car - Trailer

onemilegrid(c) 2018 Transoft Solutions, Inc. All rights reserved.

B99

STA

NDARDS 2004 (A

U_

NZ)

(c) 2018 Transoft S

olutions, Inc. All rights reserved. B99

STANDARDS 2004 (AU_NZ)

(c) 2018 Transoft Solutions, Inc. All rights reserved.

B99

STA

NDARDS 2

004 (A

U_NZ)

B99

STA

NDARDS 2004 (A

U_

NZ)

(c) 2018 Tra

nso

ft Solutio

ns,

Inc.

All rig

hts

reserved.

B99

STANDARDS 2004 (AU_NZ)

(c) 2018 Transoft Solutions, Inc. All rights reserved.

B85 Car - Trailer

onemilegrid(c) 2018 Transoft Solutions

, Inc. All rights reserved.

B85 Car - Trailer

onemilegrid(c) 2018 Transoft Solutions, Inc. All rights reserved.

Page 27: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

22nd February 2018 Report Ref. 18012 Title: Determination of Noise Limit as per SEPP N-1 regarding proposed

manual car wash and vacuum facility at 145a Percy Street, Portland, Victoria and assessment of likely compliance.

Brief: Determine Effective Noise Levels and Noise Limits as per State

Environment Protection Policy N-1 (Control of Noise from Industry, Commerce and Trade) at nearest residences re proposed manual car wash and vacuum facility at 145a Percy Street, Portland, Victoria.

Client: SMB DESIGN AND CONSTRUCTION 1 Church Street Traralgon

VIC 3844 Contact: Suzanne Bogan Tel: 03 51761217

Mob: 0428 761217 E: [email protected]

Page 28: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 2 of 12

1.0 Introduction Audiometric & Acoustic Services has been appointed as part of a Planning Permit Application No. 17111 in relation to the proposed carwash facility at 145a Percy Street, Portland, Victoria. The Glenelg Shire has requested that the Client submit an “acoustic report and proposed noise attenuation methods.” The aim of this assessment is to determine the Noise Limits when any relevant EPA Policy is applied. In this case the EPA’s Policy Noise from Industry in Regional Victoria (NIRV) is not applicable as the population is greater than 7000. Specifically, NIRV requires the Limits to be set according to the State Environment Protection Policy N-1 (Control of Noise from Industry, Commerce and Trade) No. N-1 or SEPP N-1. Accordingly, we will use data from previous reports undertaken by this firm for car wash use to calculate proposed noise levels. 2.0 Description of Facility The car wash will be manual in operation with two vacuum units and two wash bays. Entry and exit to the site will be from Percy Street. We are anticipating a combined 5 cars per half hour as likely worst case scenario. SEPP N-1 requires the proposed measurement period to be of 30mins. No noise attenuating doors are proposed in the design of wash bays. It is our understanding that the facility is to be fitted with a central vacuum system which places the drive motor and vacuum pump within the plant room. This is a sensible and practical method of noise control from vacuums. However, it should be noted that some vacuum units are noisier than others, despite the centralizing of the equipment. We recommend that that vacuum units be specified for purchase as quiet operation units. The generating zone is specified on the drawings provided as Industrial (IN3Z) and the nearby residents are specified as Commercial Zone 2 (C2Z) and General Residential (GRZ1). Our area of concern is primarily for #4a, #5 and #6 Tanner Court and #16 Otway Street, Portland. Figure 1 Zoning areas adjacent to 145a Percy Street Portland

Page 29: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 3 of 12

3.0 Operating Hours The Client has asked for 24hrs per day to be assessed and for the proposed hours to reflect any restrictions SEPP N-1 may allocate. 4.0 Applicable EPA Policy – SEPP N-1 4.1 Noise Limits - Times Noise limits are specified by the State Environmental Protection Policy (Control of Noise from Industry, Commerce and Trade) No. N-1 or SEPP N-1. This Policy prescribes noise limits for commercial, industrial or trade premises. The goal of the Policy is to protect residential areas from commercial, industrial or trade noise that may affect the general use of a noise sensitive area. SEPP N-1 guidelines prescribe different levels for different times of the business day and can be defined as follows: Day 0700—1800 Monday—Friday 0700—1300 Saturdays Evening 1800—2200 All Days 1300—1800 Saturdays 0700—1800 Sundays and Public Holidays Night 2200—0700

The Policy prescribes what is known as the Effective Nose Level from the commercial or trade site, meaning the level of noise emitted from the source that is received after adjustments at the nearest noise sensitive receiver (in this case a residential property). Additionally, it identifies the noise limit at the nearest residence which is calculated taking into account the measured background noise level at the subject premises and the zoning levels. This Policy is specified in this report for the purpose of determining whether the commercial premises will likely comply with the EPA’s SEPP N-1 Noise Limits in assessing its potential impact on the defined residential premises of #4a, #5 and #6 Tanner Court and #16 Otway Street, Portland. 4.2 SEPP N-1 Noise Limit Criteria and Measurements 4.2.1 Background Noise Measurements re #5 Tanner Court, Portland. A noise logger was set up on the fence line of #5 Tanner Court and 145a Percy Street from approximately 1530hrs on Friday 26th January until 1100hrs on Friday 2nd February 2018. The weather was fine though at times the wind was moderately elevated. The logger is not believed to be affected by wind. We see no significant difference in the prevailing background noise across the measurement period. Background Noise Measurement – Noise Logger Results The following L90 measurements have been averaged over the EPA time periods.

Page 30: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 4 of 12

Table 1: SEPP N1 Background Level – 26/2/2018 – 2/2/2018 at 5 Tanner Court Average L90 dB(A) Average EPA Day Period 46 Average EPA Evening Period 43 Average EPA Night Period 36

A confirmation spot measurement was taken on Monday 29/2/18 at street front of #6 Tanner Street, Portland by sound level meter. The result as are as per Table 2. This corresponds well with the data collected by the logger for the average Day Period. Table 2: SEPP N1 Background Level on Monday 29/2/18 at street front of #6 Tanner Street, Portland L90 dB(A) Day Period 44

The measurements of the prevailing background noise for Tanner Street residents above are believed to be neutral and representative of the area. 4.3 Noise Limits applicable at Residences Table 3 details the Noise Limits for the EPA time periods. The Limit for any SEPP N-1 related items have been set by applying the Zoning Levels via the Influencing Factor of 0.44 as extrapolated from the SEPP N-1. The Noise Limits for the Night Period are based on Low Background Levels whereas the Zoning Limits apply to the Evening and Day Periods. Table 3: SEPP N-1 Limits

Day Evenings Night

Limits as per Zoning/Low Background Level

58 52 44

*All units in the table above are in dB(A) 5.0 Site Assessment re Future Noise Levels 5.1 Data re Proposed Car Wash Equipment We have been provided with drawings outlining the proposed manual car wash layout. This will be supplemented by prior data from a previous report (Report reference 9015) conducted by this firm in 2008 for the manufacturer at their car wash in Melton Victoria regarding the noise levels generated.

Page 31: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 5 of 12

5.2 Data from Report Ref 9015 The following measurements were obtained. Vehicle – Ford Territory, including vacuuming boot area

Image 1 Pro Wash Power Vac

Table 4 Measurement of Pro Wash Power Vac

Measurement

Position

LAeq Minimum Maximum LA10 Comment

At 5m from

rear

69 67 75 71 3 minutes

incl boot

vacuum

Estimate at

15m from

rear

62 60 68 64

At 5m from

side

76 73 82 77 3 minutes

incl boot

vacuum

Estimate at

15m from

side

69 66 75 70

Page 32: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 6 of 12

Image 2 Manual Wash

Vehicle – small car

Table 6 Measurement of Manual Car Wash

Measurement

Position

Leq Minimum Maximum L10 Comment

At 5m from

front

68 50 69 (rear)

74 (front)

72 Full wash

cycle

At 15m from

front

62 47 (min

background)

62 (rear)

68 (front)

- Full wash

cycle

Estimate at

30m from

front

57 Prevailing

background

level

56 (rear)

63 (front)

61 Ditto

5.3 Calculations of Noise Levels at Nearest Residences The following are our calculations for the possible noise levels of the measured LAeq for a continuous 30 minutes period without any form of acoustic barrier. We believe this scenario to be possible should 2 or 3 cars be alternating between wash cycles and vacuum cycles as both activities typically take 15mins.

Page 33: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 7 of 12

Table 3 SEPP N-1 Limits and Effective Noise Levels at Nearest Residences.

Day Evenings Night

Limits as per Zoning/Low Background Level

58 52 44

Vacuum LAeq at Nearest Residence

76 76 76

Compliance Margin 18 24 32

Manual Wash LAeq at Nearest Residence

58 58 58

Compliance Margin 0 6 14

*All units in the table above are in dB(A) Table 3 above shows exceedances for both the vacuum units and the manual wash bays. We believe a suitable barrier needs to be designed to sufficiently attenuate noise emanating from the site as per Section 6. 6.0 Acoustic Barrier Design Due to the close proximity of the nearest residence and the projected exceedances, it is necessary to create a suitable barrier to reflect/attenuate the emitted noise. The acoustic barrier is proposed to extend the full length of the south and west property lines as per Figure 2, at a minimum height of 2.7m. We have performed calculations for the effective noise level with the proposed barrier at a height of 2.7m. The results are as per Table 4. Table 4 SEPP N-1 Limits and Effective Noise Levels at Nearest Residences with 2.7m Barrier

Day Evenings Night

Limits as per Zoning/Low Background Level

58 52 44

Vacuum LAeq at Nearest Residence

45 45 45

Compliance Margin -13 -7 1

Compliance Y/N/Marginal

Y Y Marginal

Page 34: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 8 of 12

Manual Wash LAeq at Nearest Residence

42 42 42

Compliance margin -16 -10 -2

Compliance Y/N/Marginal

Y Y Marginal

*All units in the table above are in dB(A) We recommend the following construction for the acoustic barrier:

• Minimum 90mm timber stub frame with 7.5mm Blueboard or equivalent cement sheeting fixed to both sides.

A neat fit is required with no gaps. The cement sheet should be dug minimum 50mm into the ground to ensure no breakout of noise under the fence. Figure 2

Page 35: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 9 of 12

7.0 Plant Room. The plant room is in an acoustically appropriate location, however it will need to be constructed of a suitable material. We recommend the following construction:

• Walls: Double brick construction with min 20mm cavity or min 140mm core filled Besser block construction.

• Access door: Must achieve a minimum Rw 35 and face Percy Street. A neat fit is required.

• Ceiling/Roof: Colorbond metal deck or Concrete tile with R3.5 fibrous batts and min 6mm cement sheet lining.

Please advise if any ventilation is needed for plant room as this will cause breakout of noise from the structure. 8.0 Recommended Operating Periods The proposed effective noise levels from the wash bays and vacuum systems are considered to be compliant with SEPP N-1 for the Day and Evening Periods however the results are marginal for the Night Period. SEPP N-1 requires a 30min effective LAeq to be used in calculations. In laymen’s terms the LAeq is the average noise level. This does not take into consideration the intermittent spikes in level (LMax) or any criterion for sleep disturbance. As the distance from the source to the nearby residents is moderate, and the reflective nature of the wash bay, we don’t believe that an increase in height of the noise barrier would be effective. We recommend that the wash bay and vacuums operate during the EPA Day and Evening Period, and that analysis of Night Period operations is undertaken once the car wash is up and running. Confirmation of Night Period compliance would involve a simulated test similar to Section 5.2 of this report to be undertaken at a time and day when the ambient background level is low. For example, a Sunday night after 10pm or before 7am. 9.0 Summary The proposed effective noise levels from the wash bays and vacuum systems are considered to be compliant with SEPP N-1 for the Day and Evening Periods with the proposed 2.7m barrier, however the results are marginal for the Night Period. We believe the situation to be low risk of annoyance to nearby noise sensitive receivers if recommendations as per Section 7 and 8 of this report are implemented. Confirmation of Night Period compliance will need to be undertaken insitu at a later date. Please feel free to contact us should any additional detail be required. This applies to any other parties that have legitimate access to this report.

Page 36: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 10 of 12

Respectfully,

Scott Henderson BEnv DipDes A.A.S Proofread by John Searle M.Eng 26th February 2018 Attachments Technical Appendix I Technical Appendix II

Page 37: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 11 of 12

TECHNICAL APPENDIX I Definitions of Terminology

Sound Pressure Level: The root-mean-square values of the pressure fluctuations above

and below atmospheric pressure caused by the passage of a sound wave, usually expressed in deci Bels (re 20 µ Pa)

decibel: Unit usually used to define sound pressure level relative to a

reference pressure. dB = 20 log10 ( P ) Pref (A): Reference to particular weighting network within a Sound Level

Meter which modifies the linear response. 'A' weighting is designed to approximate the response of the human ear.

(C): Reference to a weighting network within a Sound Level Meter.

Modifies the Linear response only slightly on the lower frequency range.

Rw Weighted Sound Reduction Index. A single figure rating of the

acoustic attenuation of materials either singly or as multiples. L10 The noise level exceeded for 10% of a measurement period.

Often used as a measurement of occasional interruptive noise, such as traffic.

LA1018hr The 18 hour Traffic Noise average. Arithmetic average of the A

weighted L10 sound levels from 0600hrs to 0000hrs. L90 The noise level exceeded for 90% of a measurement period.

Commonly accepted as the natural Background Noise Level. Leq: Equivalent Continuous Sound Level. This is calculated on the

basis of average of the Sound Pressure Level (acoustic energy) over a period of time and is expressed in deci Bels.

LAeq: The 'A' weighted Equivalent Continuous Sound Level. LAeq8hr The equivalent of 8 hours exposure to an LAeq of 85dB. The

actual exposure period may be longer or shorter than 8 hours. Slow - S: Dynamic characteristics of a Sound Level Meter which employs

a time saving averaging constant of 1 second. Fast - F: Dynamic characteristic - time averaging constant is 125m sec. Impulse - Imp: Dynamic characteristic - time averaging constant is 33m sec. Peak - Pk: Dynamic characteristic - time averaging constant is 1m sec.

Page 38: SMB - Shire of Glenelg · SMB DESIGN AND CONSTRUCTION Pty Ltd COMMERCIAL AND RESIDENTI AL PO Box 1473 Traralgon 3844 Phone (03) 51761217 sbogan@teamdesign.com.au . SMB C O M M E R

Page 12 of 12

TECHNICAL APPENDIX II

Equipment Used Convergence Sound Sentry RT (Gr) Serial No. CFJWLvWaW18dAhtiY8BxHD Convergence Windshield Calibration checked against the Quest Calibrator Quest Calibrator Serial No. J.1060008 NATA Laboratory calibration due 13th November 2018 SVANtek Instruments Model 957 - Type 1 Sound Analyser Serial No. 14578 Aco Pacific Type 7052H Microphone Serial No. 40821 SVANtek Instruments Windshield NATA Laboratory calibration due 9th September 2018 Bruel & Kjaer 4230 Acoustic Calibrator Serial No. 1441408 NATA Laboratory calibration due 29th June 2018 The instruments were calibrated before and after the measurements. No significant change was found to have occurred.