50
South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

Embed Size (px)

Citation preview

Page 1: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

South Deep: Finding It’s FeetSOUTH DEEP SITE VISIT

13 February 2015Nick Holland, Nico Muller and South Deep Team

Page 2: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

IntroductionNICK HOLLAND

Chief Executive Officer

Page 3: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

3

South Deep Gold Mine

● One of the largest undeveloped ore bodies in the

world

76.2 Moz of Mineral Resources

38.2 Moz of Mineral Reserves

● A low cost long life mine

+70-year LoM

● High level of confidence in the ore body

● The mine has been built

● Mechanised operations

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

A Gold Fields Franchise Asset

A Gold Fields Franchise Asset

Page 4: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

4

South Deep Gold Mine

What did Gold Fields Acquire in 2007?

We Had To Build The Mine!

● Low resolution in geological block modelling and limited surface exploration drilling

● No robust Life of Mine plan underpinning reserves

● Shaft hoisting capacity limited to 202 ktpm (Main shaft only)

● Metallurgical plant capacity limited to 220 ktpm

● No development to access the ore body below 95 Level

● Old backfill system

● No underground workshop facilities to maintain large fleet

● Tailings facility was reaching full capacity

● Eskom power supply was limited to 80 MW and no emergency power supply

● Minimal underground cooling facilities and surface fans to develop New Mine

● Mining rate was at an average 80 ktpm (Mechanised 63%, Conventional 37%)

● Hostel accommodation inadequate

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 5: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

5

South Deep Gold Mine

Improved Accuracy and Confidence in Ore Body Modelling

•4 Units

•Shore Line Composite

2000

•7 Units

•Singular Subcrop Point

2005•April 2007 Gold

Fields acquires 100% of South Deep Gold Mine

2007

•16 Units

•Singular Subcrop Point

•Surface Drilling Campaign Started

2008

•16 Units

•Re-aligned Subcrop Positions

•LIB Drilling Campaign Started

•Infill Drilling (GC) Campaign Started

2009

•16 Units

•Palinspastically Reconstructed Depositional Model

2010 •16 Units

•Kriging of Channel Widths & Dynamic Modelling

2013

Detailed reserve designs for Current Mine only. Future mine estimated

using the Bayesian methodology

Future mine north of the wrench fault designed in detail for the first time

Studies in mechanising the

destress commence

The entire Mineral Reserve is designed for the first time in

the LoM

Reserve updated with new models

Reserve updated with new models

Highly detailed designs for 7 years included as part of

the new LOM

Evolution of a Fit for Purpose Geological Modelling Process

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 6: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

6

South Deep Gold Mine

De-risking The Ore Body

Now One Of The Best Understood Ore Bodies In South Africa

3D Seismic Survey

(2003)

~20m resolution

Covers the whole lease area south of the wrench fault. Used to confirm the base of lava position as well as major structures.

Surface drilling

(2007-2013)

(49,536m)

600m x 600m grid

Used for facies boundaries, structural definition, stratigraphic

modelling, assaying and resource estimation.

LIB Drilling (Long Inclined

Boreholes)

(13,023m)

300m x 300m grid

Used for structural definition, stratigraphic

modelling, assaying and grade indication.

Grade Control Drilling

50m x 50m grid

Used for facies determination, structural definition, stratigraphic

modelling, assaying and resource estimation.

0 – 2 Years Ahead of Current Workings.

2 – 10 Years Ahead of Current Workings.

10 - 70 Years Ahead of Current Workings.

10 - 70 Years Ahead of Current Workings.

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 7: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

7

South Deep Gold Mine

Mining Grades Versus Reserve Grades

Positive Grade Reconciliation

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

2010 2011 2012 2013 2014

Mining Grades (g/t)

Actual Mined Grade Reserve Grade

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 8: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

8

South Deep Gold Mine

Infrastructure Status 2015 vs 2007

We Have Built The Mine - Transition To Build Up Enabled

Project Capacity

(2007)

New Capacity

(2015)

Capital*

(R’m )

New Mine Development

- Development Nil 17 km 2,416

- Ore handling capacity 200 ktpm 245 ktpm 489

Twin Shaft Hoisting Capacity 202 ktpm 370 ktpm 868

New Mining Equipment - Fleet upgraded 849

Metallurgical Plant Capacity 200 ktpm 330 ktpm 645

FPT Backfill Nil Plant commissioned 396

Tailings Storage Limited LOM TSF commissioned 389

Surface Exploration Drilling Nil 9 holes completed 116

Underground Refrigeration Nil 25.5 MwR

4 x BAC’s

93

72

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

* Expenditure 2009 to date

Page 9: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

9

South Deep Gold Mine

Infrastructure Status 2015 vs 2007 (Continued)

We Have Built The Mine - Transition To Build Up Enabled

Project Capacity

(2007)

New Capacity

(2015)

Capital*

(R’m )

93 Level Main Workshop

Equipping

Nil 70 Cat 1 machines 33

Single Accommodation Upgrades Nil 922 single rooms 70

Eskom Power Supply

- Emergency Power Supply

80 MW

Nil

160 MW

15 MW

51

Mechanised Training Facilities Nil Technical and practical

capacities

26

Mega Surface Store Nil 3,600 m² 15

Sustaining Capital 1,235

Total 7,769

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

* Expenditure 2009 to date

Page 10: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

10

South Deep Gold Mine

Evolution of Mining Since 2006

Increased Mechanisation = Improved Safety

• Limited mechanised mining commences

• Conventional destress

1998

• April 2007 Gold Fields acquires 100% of South Deep Gold Mine

2007

• Destress mining mechanised

• All conventional mining, including VCR, stopped

2008

• Horizontal destress and LongholeStopingcommences

2009

• Crush pillars introduced

2013

• 96% of current mine destressed vs 66% in 2007 (Reserve 2.2 Moz)

• 9% of Phase 1 NoWdestressed (Reserve 11.3 Moz).

• Current mine = 10 years of mining @ 80 ktpm

2015

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

0

5

10

15

20

25

30

35

40

F2

008

F2009

F2

010

F2

011

C2011

C2012

C2013

C2014

TIFR

Page 11: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

11

South Deep Gold Mine

● People Strategy

• Short term

› Rightsizing of workforce through voluntary separation process

• Medium term

› Recruit South African Team from limited pool of skills

• Long term

› Grow South African skills pool through bespoke mechanised mining training

● Fleet Availability and Utilisation

• Decongest the mine

• Cat A equipment reduced from 126 to 75

• Fast-track Mega Workshop on 93-level

• Upgrade satellite workshops

• Replace key equipment

● Ore handling infrastructure

• Fast-tracked additional ore passes and other key infrastructure

2014 Intervention

Costs and Capital Reduced from ~R5 Billion to ~R4 Billion Despite Ground Support

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 12: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

12

South Deep Gold Mine

● Growing momentum in H1 2014 interrupted in May

● Four-month suspension of production for ground support in 2014

● Knock-on effects into 2015

Destress

Long-hole open stopes delayed

Safety Related Ground Support Intervention

70% of Production Areas Curtailed For Four Months

Acceleration of Medium Term People Strategy

● Medium and long-term people strategy accelerated

Recruiting South African leadership skills

Growing the South African skills pool

● Introduction of new team under Nico Muller

● Australian Team downscaled – key role in skills transfer and training

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 13: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

Observations After First 100 DaysNICO MULLER

Executive Vice President: South Africa Region

Page 14: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

14

South Deep Gold Mine

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Leadership: Structure

Strength and Stability Required

Page 15: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

15

South Deep Gold Mine

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Leadership: The People

Building the Team

Adriaan De Beer

VP South Deep09 Jan 2015

Masala Mutangwa

Technical Head

Francois Van Heerden

Head of Operations09 Jan 2015

Errol Drake

Head of Engineering02 Feb 2015

Andre Marais

Head of Projects

Edwin Matlapeng

Head of Safety & Health

Page 16: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

16

South Deep Gold Mine

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Leadership: The People (continued)

Building the Team

Tumelo Nkisi

Head of Human Resources09 Jan 2015

Ulrich Sibilski

Head of Environment15 Sep 2014

Bonny Sebola

Head of Sustainable Development

Blessed Mazibuko

Head of Finance

Jana Strydom

Head of Legal & Compliance19 Nov 2014

Manie Keyser

Head of Mineral Resource

Management

Page 17: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

17

South Deep Gold Mine

PositionAppointment

DateQualifications and Experience

EVP South AfricaNico Muller

01 Oct 2014

BSc Mining Engineering, 20 years experience in South African mining, underground hardrock mechanized experience at De Beers, Anglovaal, African Rainbow Minerals (TwoRivers) and Royal Bafokeng Platinum. Involved in establishing Target Gold Mine - similarore body and mining methods to South Deep.

VP South DeepAdriaan de Beer

09 Jan 2015NHD Mining Engineering, General Manager at Two Rivers Platinum (300 ktpmmechanized board and pillar operations) from 2009 to 2014, previous leadershipexperience at Anglo Platinum Rustenburg operations

Head of MiningFrancois van Heerden

09 Jan 2015

Mine Managers Certificate, Section Manager at Lonmin from 2010 to 2012 and thenpromoted to Mining leader at Lonmin in December 2012. 3.1 (a) from June 2014.Extensive mechanized mining experience at Lonmin and Two Rivers (2 years as MiningLeader).

Head of EngineeringErrol Drake

01 Feb 2015

Bachelors of Commerce, Graduate Mechanical Engineer, 16 years experience in CentralAfrican gold mining, 26 years South African mining experience. Maintenance andEngineering leadership experience with Gold Fields Ltd, AngloGold Ashanti, AngloAmerican and GenCor Mining.

Head of ProjectsAndre Marais

21 Apr 2006(Jan 1980)

NH Dip Electrical Engineering, Government Certificate Electrical Engineer, ProfessionalCertificated Engineer: ECSA, Wits MAP. Significant experience at Gold Fields with 34years tenure. Project Engineer 2004 -2006, Chief Engineer 2006 -2008, Senior ManagerEngineering Projects 2008-2011 and Senior manager Projects 2011-2014.

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Leadership Resume

Experience

Page 18: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

18

South Deep Gold Mine

Geology: Quality Ore Body

● Massive, multi-layered (16 reef horizons)

● 38.2 Moz reserve, 70+ years life of mine

● Well developed exploration programme and resource modelling

● High predictability

The Value Inherent in South Deep Remains, But May Be Longer Dated

RESOURCE EXTENSION & EXPLORATION

DISCOVERY

RESOURCE

76.2 Moz

RESERVE

38.2 Moz

• Massive, multi-layered

palaeoplacer with high

predictability

• Grade control and LIB drilling

continues to be effective

• Improved regional pillar

configuration being reviewed

• Pilot destress mining

2013 2087LoM Extension Potential

LoM

~15 Moz

produced

since 1968

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 19: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

19

South Deep Gold Mine

Proven Mining Methods

● Deep level massive mining

Destress

Drifting, benching, longhole stoping

● Fully mechanised

● Improved safety, productivity and costs

● Destress pilot tests (4.5x4.5m, inclined slot)

● Key constraint : support installation

One pass support system

Destress pilot projects

Backfill : Full plant tailings

● UG workings not ideal

Roadways

Water management

Ventilation control and temperatures

Backlog support

The Value Inherent in South Deep Remains, But May Be Longer Dated

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

C2

01

5

C2

01

6

C2

01

7

C2

01

8

C2

01

9

C2

02

0

Reef Tonnes Split Per Mining Method

Destress Stoping Drifts and Large Dev Long Hole and Benches

Schematic Cross Section Through The Ore Body

Page 20: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

20

South Deep Mining Methods

Drifting and Benching (detail)

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 21: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

21

South Deep Mining Methods

Longhole stoping (detail)

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 22: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

22

South Deep Mining Methods

Horizontal destress with longhole stoping

• Conceptualised reef block with surrounding waste material at a depth of 2,700 m

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 23: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

23

South Deep Mining Methods

Horizontal destress with longhole stoping

• Cut-out for mining method description

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 24: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

24

South Deep Mining Methods

Horizontal destress with longhole stoping

• Sinking of a shaft and development into the target where destressing can start

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 25: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

25

South Deep Mining Methods

Horizontal destress with longhole stoping

• Destressing continuing

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 26: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

26

South Deep Mining Methods

Horizontal destress with longhole stoping

• Destressing continuing

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 27: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

27

South Deep Mining Methods

Horizontal destress with longhole stoping

• Destressing continuing

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 28: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

28

South Deep Mining Methods

Horizontal destress with longhole stoping

• Second destress cut in progress

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 29: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

29

South Deep Mining Methods

Destress cut – mining sequence

• Establishment of a destress cut

5,0m

2,5m

Destress mining dimensions

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 30: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

30

South Deep Mining Methods

Destress cut – mining sequence

• Once a sufficient area is destressed the initial destress accessed are enlarged to a height of 5.5m.

This allows access for bigger equipment used in longhole stoping

5,0m

2,5m

5,5m

Enlargement of accesses

Accesses ripped to size in

the hanging-wall of the

destress accesses

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 31: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

31

South Deep Mining Methods

Destress cut – mining sequence

• Continuation

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 32: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

32

South Deep Mining Methods

Destress cut – mining sequence

• Completed destress cut

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 33: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

33

South Deep Mining Methods

Destress cut – destress envelope

• A destress zone above and below the destress cut is established allowing large

excavations in close proximity of one another

• Destressed envelope – stresses reduced

from 80 Mpa (insitu) to between 35 and 40

Mpa

• Mimics conditions at a depth of 1,200 m

below surface (actual 2,700 m below surface)

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 34: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

34

South Deep Mining Methods

Destress cut – destressed reserves

• On average every ton of destress mining makes

available 7.2 tonnes of targeted reserves

• Each destress cut destresses on average 155 Koz

of longhole stoping reserves

• Longhole stopes accessed from one destress cut

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 35: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

35

South Deep Mining Methods

Destressed targets

• Detress envelopes describing the what is available for mining (destressed)

Destress Cut-1

Destress Cut-2

Destress Cut-3

Destress Cut-4

Destressed envelope

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 36: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

36

South Deep Mining Methods

Horizontal destress with longhole stoping

• Third destress cut started

• Longhole stoping starts – retreat mining from the outer limits toward the main accessSouth Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 37: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

37

South Deep Mining Methods

Horizontal destress with longhole stoping

• Longhole stoping and destressing continuing

• Initial longhole stope backfilledSouth Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 38: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

38

South Deep Mining Methods

Development

• The spiral ramp system accesses destress cut at 17m vertical intervals

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 39: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

39

South Deep Mining Methods

Development

• Longhole stoping and destressing continuing

• Initial longhole stope backfilledSouth Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 40: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

40

South Deep Mining Methods

Horizontal destress with longhole stoping

• Longhole stoping and destressing continuing

• Initial longhole stope backfilledSouth Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 41: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

41

South Deep Mining Methods

Horizontal destress with longhole stoping

• At a steady state a project such as this will produce at an average rate of 46 Ktpm

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Page 42: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

42

South Deep Gold Mine

● 2009 ramp up capital project

Approved R8.4 billion (2009 terms)

Expenditure to date R7.8 billion

● Primary infrastructure in place to support mine

ramp up

● Key issues :

Ore handling infrastructure

Planned maintenance

Installed Infrastructure Supports Growth

Installed Infrastructure

● Shaft infrastructure and hoisting capacity (330 ktpm)

● Ore handling system (220 ktpm – railbound)

● Ventilation and refrigeration capacity to support production

plans

● Gold plant expansion (330 ktpm)

● Tailings storage facility suitable for life of mine

● Backfill plants (CCT & FPT) and shaft piping

● Underground mega trackless workshop (93L)

Remaining Infrastructure Construction

● On-going New Mine development (100L, 105L 110L)

● Ore handling system (330 ktpm conveyor belts)

● UG backfill reticulation (FPT)

● Pumping (deferred to 2018)

● Ice Plant (deferred to 2020)

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Infrastructure

Page 43: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

43

South Deep Gold Mine

● 2014 fleet rationalisation

● Efficiency gains not realised

● Negative impact on net volumes

● Key issues

Operating conditions

Equipment use / operations

Maintenance infrastructure

Planned maintenance compliance

Skills & quality of maintenance

Performance management

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Trackless Fleet

Trackless Fleet Management Represents A Significant Improvement Opportunity

2013 2014 Var%

Drill Rigs 26 11 -58%

LP Drill Rigs 21 11 -48%

Simbas 5 5 0%

LHDs 25 16 -36%

LP LHDs 25 15 -40%

Dump Trucks 20 13 -35%

Secondary Support 4 4 0%

Total 126 75 -40%

DescriptionFleet Size

81

60

65 5

8

0

10

20

30

40

50

60

70

80

90

C2011

C2012

C2013

C2014

Productivity: Drill Rigs

M/Rig

34

42

50

61

0

10

20

30

40

50

60

70

80

90

C2011

C2012

C2013

C2014

Productivity: LP Drill Rigs

M/Rig

Page 44: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

44

South Deep Gold Mine

● Continual improvement

● Mechanised mining

● 2008

Concluded mining on VCR (conventional)

Phased out conventional destress

● 2014

3 x fatalities related to trackless equipment

Safety related mine stoppages

● Strong platform for further improvement

● Zero harm philosophy

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Sustainability: Health & Safety

Zero Harm Philosophy Supported by Mechanised Mining Methods

0

5

10

15

20

25

30

35

40

F2

008

F2

009

F2

010

F2

011

C2011

C2012

C2013

C2014

TIFR

0

0.4

0.8

1.2

F2

008

F2

009

F2010

F2

011

C2011

C2012

C2013

C2014

FIFR

Page 45: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

45

South Deep Gold Mine

● Social and Labour Plan

● Shared value projects

● HRD commitments

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Sustainability: Charter & SLP

Social Commitment Provides an Enabling Business Platform

Housing and Living Conditions

• 13 X Poortjie Houses for the elderly Q4 2014

• 150 x Westonaria houses Q4 2014

• Hostel conversion Q4 2014

Business Development Centre

• Facilitates training and business

opportunities

• Easy access – local community / SMME’s

Bakery

• Managed and operated by local community

SMME Training

• Training of local community SMMEs

Hillshaven Garment Factory

• Managed and operated by local community

Page 46: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

46

South Deep Gold Mine

● Water Management Projects

Storm water separation channels (Q2 2015)

Water treatment capacity increase from 3 ML/day to 5 ML/day (Q2 2015)

Tailings storage facility dust alleviation and run off reduction

Rehabilitation and lining of old return water dam (Q4 2016)

Ground water modelling to determine plume mitigation (Q3 2015)

● Rehabilitation and pollution management

Rehabilitation of the old South waste rock dump (End Q2 2015)

Environmental Management Systems according to best practice international

standards (ISO14001 certified)

International Cyanide Management Institute (ICMI) compliant

Environmental Stewardship Protects The Future

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Sustainability: Responsible Environmental Stewardship

Page 47: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

47

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Historical Ounces Planned

Actuals Build-up Mid 2017

South Deep Gold Mine

Poor Track Record

2014 Events

Mine stoppages due to support intervention

Safety stoppages due to 3 x fatalities

Fleet reduction

Restructuring

On-going constraints

Knock-on effect of 2014 ground support intervention

Revised geotechnical rules

Reduction in fleet

Gradual move to one-pass support installation regime

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Feb 2014 guidance

Delivery and Performance

Page 48: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

48

South Deep Gold Mine

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

Conclusions

First Fix The Base And Then Grow With Confidence

● The value inherent in South Deep undoubtedly remains

• Quality ore body

• Installed infrastructure

• Proven mining methods & technology

• Strong social and environment agenda

• Constraints are well documented

● Known weaknesses

• Leadership

• Management

• Design

• Operation

● May take longer

Page 49: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

49

South Deep Gold Mine

Systematic, Simplify, Start With The Basics

Redefine core purpose

Leadership

Core Strategies

Operational Excellence

Growth

● Fix the base

● Cash flow

● Organisational design (level 1 complete)

● Leadership and direction (level 1 complete)

● Vertical penetration

● Support installation

● Backfill

● Water management

● Roadways

● Work practices

● Performance management

● Continuous improvement targets

● Operational flexibility / predictability

● Confident base

● Rebase growth

● Continue with New Mine Development

● Earn further capital investment

South Deep: Finding it's Feet | Nick Holland, Nico Muller and the South Deep Team | Friday, 13 February 2015

● Management systems

● Planned maintenance

● Stores / inventory management

● Skills development

The Way Forward

Page 50: South Deep: Finding It’s Feet - overendstudio.co.za · South Deep: Finding It’s Feet SOUTH DEEP SITE VISIT 13 February 2015 Nick Holland, Nico Muller and South Deep Team

South Deep: Finding It’s FeetSOUTH DEEP SITE VISIT

13 February 2015Nick Holland, Nico Muller and South Deep Team

Questions?