State of the AgencyState of the AgencyMike Snyder, P.E., Executive DirectorMike Snyder, P.E., Executive Director
State of the AgencyState of the Agency
• System Overview• Construction Update• 5-Year Work Plan• Trends and Forecast• Summary
Facts:
• 105 mile system
• Over 300,000 Customers
• 91% E-PASS Customer Satisfaction Rating
Construction ProgramFactsConstruction ProgramFacts
• Work Progressing at a Monthly Rate of Between $14 to $18 Million (down from $22 to $30 Million 1 year ago)
• Construction Contract Value of Over $530 Million (down from $770 Million 1 year ago), 80% Completed
• All Major Projects are On Budget and On, or Ahead, of Schedule
• Environmentally Responsible Manner
• Traffic Impacts Minimized, Communication with Customers Maximized
SR 408 WideningSR 414
John Land Apopka Expressway
SR 528 BeachLine Main Express Lanes
SR 429
Daniel Webster Western Beltway
SR 417/Innovation Way Interchange
SR 417/Moss Park Interchange
SR 417/Boggy Creek Road/South Access Road Interchange
Active Active Construction Construction
Project LocationsProject Locations
Active Active Construction Construction
Project LocationsProject Locations
SR 528Narcoosee Road Interchange
5-Year Work Plan5-Year Work Plan
Project $ Project DescriptionM J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J
SR 408 Widening East of I-4253A $63M SR 408 Widening from Rosalind Ave. to Crystal Lake Dr.
253B $78M SR 408 Widening from Crystal Lake Dr. to Conway Rd.
253C $126M SR 408 Widening from Conway Rd to Oxalis Ave
SR 414 Maitland Blvd Extension414-210 $107M SR 414 West of CR 435 to East of Hiawassee Road
414-211 $90.3M SR 414 East of Hiawassee Road to East of SR 441
414-212 $10.9M SR 414 Mainline Plaza
429-200C $36M SR 414 West of CR 535 to SR 429
Interchange Projects528-300 $27.3M Design / Build Services for SR 528 / SR 436 Interchange
907 $23.7M SR 528/Narcoossee Rd Interchange Improvements
457A $17M SR 417/ Moss Park Rd Interchange
417-302 $15M SR 417/Innovation Way Interchange
528-404 $12M SR 528/ Innovation Way Interchange
417-301A $6.8M Boggy Creek Road/ South Access Road Interchange
Express Toll Plaza Projects528-401 $26.8M Beachline Mainline Conversion
528-403 $34.1M SR 528 Beachline East Express Lanes
Renewal and Replacement Projects429 $20.4M SR 429 Resurfacing
20112007 2008 2009 2010
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
$4,500
7/8
7/15
7/22
7/29 8/5
8/12
8/19
8/26 9/2
9/9
9/16
9/23
9/30
10/7
10/1
410
/21
10/2
811
/411
/11
11/1
811
/25
12/2
12/9
12/1
612
/23
12/3
01/
61/
131/
201/
27 2/3
FY 2009 FY 2008
Revenue Tracking Summary Chart 7/1 – 2/3Revenue Tracking Summary Chart 7/1 – 2/3
$14,000
$15,000
$16,000
$17,000
$18,000
$19,000
$20,000Ju
l
Aug
Sep
t
Oct
Nov
Dec Jan
Feb
Mar
Apr
May
Jun
Rev
enue
s (t
hous
ands
)
Actuals
Original Projection
Revised Projectionas of 2/09
Revenue Chart 2009Revenue Chart 2009
Local Traffic TrendsLocal Traffic Trends
Monthly Growth Compared to Previous Year
Roadway July August September October November DecemberSR 50 (West Colonial Drive) -7.25% -5.55% -5.14% -5.07% -4.60% -4.79%SR 50 (East Colonial Drive) -8.88% -9.61% -10.98% -8.03% -11.16% -6.60%I-4 (Attractions) -3.51% -0.29% -5.19% -2.87% -5.84% 0.29%SR 527 (Orange Ave) -7.20% -6.45% -5.65% -6.79% -9.68% -4.15%
Roadway July August* September October November DecemberSR 408 Pine Hills ML -4.45% -14.59% -3.29% -6.07% -9.45% -3.22%SR 408 Conway ML -3.27% -14.78% -0.84% -1.42% -2.04% 2.87%*Impacts from Tropical Storm Fay
Change in Average Weekday Traffic
Change in Monthly Transactions
System Revenue vs. Orlando UnemploymentSystem Revenue vs. Orlando Unemployment
System Revenue Growth versus Orlando MSA Unemployment
-20.00%
-15.00%
-10.00%
-5.00%
0.00%
5.00%
10.00%
Month
*Re
ve
nu
e P
erc
en
t C
ha
ng
e
0.00%
1.00%
2.00%
3.00%
4.00%
5.00%
6.00%
7.00%
8.00%
9.00%
Un
em
plo
ym
en
t Ra
te
Change in System Revenue
Orlando MSAUnemployment
*change over previous year
*Source
System Revenue vs. Orlando Gas PriceSystem Revenue vs. Orlando Gas Price
System Revenue Growth versus Gas Prices
-20.00%
-15.00%
-10.00%
-5.00%
0.00%
5.00%
10.00%
Month
*Re
ve
nu
e P
erc
en
t C
ha
ng
e
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
$3.50
$4.00
$4.50
Avera
ge G
as P
rice
Change in System Revenue
Average Gas Price
*change over previous year
*Source
SR 408 Revenue vs. Orlando UnemploymentSR 408 Revenue vs. Orlando Unemployment
SR 408 Revenues Monthly Growth vs Orlando Unemployment
-20.0%
-15.0%
-10.0%
-5.0%
0.0%
5.0%
10.0%
15.0%
Month
Mo
nth
ly R
even
ue
Gro
wth
ove
r P
revi
ou
s Y
ear
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%
Un
emp
loym
ent
Rat
e
SR 408 Revenue
Orlando Unemployment
*Source
OIA Passengers
1.50
2.00
2.50
3.00
3.50
4.00
Janu
ary
Feb
ruar
y
Mar
ch
Apr
il
May
June
July
Aug
ust
Sep
tem
ber
Oct
ober
Nov
embe
r
Dec
embe
r
Month
Pas
sen
ger
s (M
illio
ns)
2005
2006
2007
2008
OIA PassengersOIA Passengers
*Source
SR 528 Airport Plaza Revenue vs. OIA PassengersSR 528 Airport Plaza Revenue vs. OIA Passengers
SR 528 Airport Plaza Revenue vs. OIA Passengers Monthly Growth over Previous Year
-20.0%
-15.0%
-10.0%
-5.0%
0.0%
5.0%
10.0%
15.0%
Jan-
06
Feb
-06
Mar
-06
Apr
-06
May
-06
Jun-
06
Jul-0
6
Aug
-06
Sep
-06
Oct
-06
Nov
-06
Dec
-06
Jan-
07
Feb
-07
Mar
-07
Apr
-07
May
-07
Jun-
07
Jul-0
7
Aug
-07
Sep
-07
Oct
-07
Nov
-07
Dec
-07
Jan-
08
Feb
-08
Mar
-08
Apr
-08
May
-08
Jun-
08
Jul-0
8
Aug
-08
Sep
-08
Oct
-08
Nov
-08
Dec
-08
Month
Pe
rce
nt
Ch
an
ge
ov
er
Pre
vio
us
Ye
ar
OIA Passengers
SR 528 Airport Plaza Revenue
*change over previous year
*
*Source
SR 417 Southern Connector Revenue vs. OIA PassengersSR 417 Southern Connector Revenue vs. OIA Passengers
SR 417 Southern Connector Revenue vs. OIA Passengers Monthly Growth over Previous Year
-20.0%
-15.0%
-10.0%
-5.0%
0.0%
5.0%
10.0%
15.0%
Month
Pe
rce
nt
Ch
an
ge
ov
er
Pre
vio
us
Ye
ar
OIA Passengers
SR 417 Southern Connector Revenue
*Source
Budget RevisionsBudget Revisions
FY 2009 - Operations, Maintenance and Administration
(OM&A) budgets cut by more than 10%
Budget CutsBudget Cuts
• Delayed certain capital projects
• Reduced toll collection staff
• Postponed hiring of administrative staff
• Fewer maintenance cycles for roadways – i.e.: mowing, trash pick-up, etc.
• Preventative maintenance cycles for equipment
• Eliminated implementing budget for traffic management center
Commitment to Quality & SafetyCommitment to Quality & Safety
• Road Rangers• Florida Highway Patrol• Renewal and Replacement Program
SummarySummary
• Existing Construction Projects On Schedule and On Budget
• Traffic Universally Down on All Transportation Facilities
• Operation, Maintenance and Administration (OM&A) Budgets Cut By More Than 10%
• OOCEA Continues Its Commitment to Safety and Quality Transportation in Central Florida
Florida’s Toll RatesFlorida’s Toll Rates
30.5
23.1
21.4
17.4
12.0
11.7
11.4
10.6
9.5
9.4
9.1
8.7
8.5
7.6
7.5
7.1
6.4
5.6
3.2
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0
Miami Dade Expressway, Airport, S.R. 112 (FL)
Miami Dade Expressway, Gratigny, S.R. 924 (FL)
Tampa Crosstown Expressway (FL)
Miami Dade Expressway, Don Shula, S.R. 874 (FL)
Polk Parkway (FL)
Veterans Expressway (FL)
OOCEA S.R. 408 (East-West Expressway) (FL)
Miami Dade Expressway, Dolphin, S.R. 836 (FL)
OOCEA S.R. 429 (Western Expressway) (FL)
Beachline West, Florida's Turnpike (FL)
OOCEA S.R. 417 (Central Florida GreeneWay) (FL)
Sawgrass Expressway (FL)
Florida's Turnpike (FL) Homestead Extension
OOCEA S.R. 528 (Beachline Expressway) (FL)
Florida's Turnpike (FL) Ticket System
Suncoast Parkway (FL)
Florida's Turnpike (FL) Southern Coin System
Florida's Turnpike (FL) Northern Coin System
Florida's Turnpike (FL) Alligator Alley
Toll Rate Per Mile (cents per mile, non-discounted)
• May 1980– SR 408 (increased $0.05 from $0.20 to $0.25)– SR 528 East Mainline (increased $0.15 from $0.35 to $0.50)
• January 1987– SR 408 (increased $0.25 from $0.25 to $0.50)– SR 528 East Mainline (increased $0.25 from $0.50 to $0.75)– SR 528 Airport Mainline (increased $0.25 from $0.25 to $0.50)
• July 1990– SR 408 all Mainline plazas (increased $0.25 from $0.50 to
$0.75)– SR 417 Curry Ford and University Mainline (increased $0.25
from $0.50 to $0.75)– SR 528 East Mainline (increased $0.25 from $0.75 to $1.00)– SR 528 Airport Mainline (increased $0.25 from $0.50 to $0.75)
Decreased Tolls• July 1992
– SR 408 Hiawassee and Dean Mainline (decreased $0.25 from $0.75 to $0.50)
– SR 417 Curry Ford and University Mainline (decreased $0.25 from $0.75 to $0.50)
OOCEA Toll IncreasesOOCEA Toll Increases
Florida Turnpike Enterprise Toll IncreasesFlorida Turnpike Enterprise Toll Increases
• April 1989 40%
• July 1991 30%
• July 1993 30%
• March 2004 25% (cash only)
• 2011/2012* Statutory CPI increase
*State Law requires the Florida Turnpike to index tolls to the CPI or a similar index a minimum
of every 5 years, which would indicate the index would be initiated no later than 2012.
– Chicago Skyway
– Dallas North Tollway
– Delaware Turnpike (I-95)
– Dulles Greenway (VA)
– E-470 (CO)
– Garden State Parkway (NJ)
– Indiana Toll Road
– Massachusetts Turnpike, Boston Ext.
– New Jersey Turnpike
– New York State Thruway
– Pennsylvania Turnpike
– Pocahontas 895 (VA)
– San Joaquin Hills Corridor (CA)
– SR 241-Foothill/Eastern Toll Road (CA)
– SR 91 (CA)
– Toronto 407
Other AgenciesToll Rate Increases Since January 2008
Other AgenciesToll Rate Increases Since January 2008
– JFK Memorial Highway (MD)
– Maine Turnpike
– Massachusetts Turnpike
– Ohio Turnpike
Other AgenciesCurrently Planning Toll Rate Increases
Other AgenciesCurrently Planning Toll Rate Increases
CUTR* Findings: Value of Expressway CUTR* Findings: Value of Expressway System to the Central Florida RegionSystem to the Central Florida RegionCUTR* Findings: Value of Expressway CUTR* Findings: Value of Expressway System to the Central Florida RegionSystem to the Central Florida Region
Travel Time Savings
• Oviedo to Downtown 23.7 min.
• Ocoee to Downtown 10.8 min.
• Waterford Lakes to Orlando Int’l Airport 13.6 min.
*Source: Center for Urban Transportation Research, 2006
Decision DriversDecision Drivers
• Credit rating
• Traffic and revenue projections
• Construction program (including shovel ready projects)
• Wekiva Parkway
CURRENT2009CURRENT2009
• No Increase• Revenue Impacts
– Projections down 8% since adoption of fiscal year budget in June 08
• Coverage Ratio– 2010 Projection 1.23x– 2013 Projection 1.36x– 2018 Projection 1.61x
Base ForecastFY 2009Base ForecastFY 2009
• 2009 – Raise toll by $.25 at mainline and ramps • Revenue Impacts
– 2010: 19% increase over current projections– 2013: 25% increase over current
projections– 2018: 30% increase over current
projections• Coverage Ratio
– Minimal coverage ratios from 2009-2012– May raise credit concerns
Base 2009 + Option 1Base 2009 + Option 1Base 2009 + Option 1Base 2009 + Option 1
• 2009 – Raise toll by $.25 at mainline and ramps
• 2012 – Introduce index to CPI consistent with FL Turnpike (and every 5 years after) – Index all tolls to the higher of CPI or 3% –
15% minimum increase every five years– Toll for Electronic Customers will be actual
increase– Toll for Cash Customers will be rounded in
$.25 increments
• Revenue Impacts– 2010: 19% increase over current projections– 2013: 47% increase over current
projections– 2018: 71% increase over current
projections• Coverage Ratio
– Coverage in the first 10 years will average 1.60x (assuming $4.9B of Capital Projects in first 12 years)
Base 2009 + Option 1Base 2009 + Option 1
Base 2009 + Option 2Base 2009 + Option 2
• 2009 Raise toll by $.25 at mainline and ramps • 2012 Raise toll by $.25 at mainline and ramps • 2017 Introduce index to CPI (and every 5
years after) – Index all tolls to CPI – 12% increase (2.4%
annual estimate over 5 years)– Toll for Electronic Customers will be actual
increase– Toll for Cash Customers will be rounded in
$.25 increments
Base 2009 + Option 2Base 2009 + Option 2
• Revenue Impacts– 2010 19% increase over current projections– 201356% increase over current projections– 2018 83% increase over current
projections• Coverage Ratio
– Coverage in the first 10 years will average 1.60x (assuming $4.9B of Capital Projects in first 12 years)
Base 2009 + Option 1 or Option 2Impact to Capital ProjectsBase 2009 + Option 1 or Option 2Impact to Capital Projects
4 Projects Accelerated for ConstructionSR 408 Widening
1. SR 417 Interchange
2. Goldenrod to Chickasaw
SR 429
3. Boy Scout Road to US 441
4. SR 429 at SR 414 Interchange Phase II
$648 Million = 18,029 Jobs*$648 Million = 18,029 Jobs*
*Job multiplier source: Federal Highway Administration (FHWA)
Wekiva ParkwayOOCEA Funded Project $1.8 B (2008 dollars)
Wekiva ParkwayOOCEA Funded Project $1.8 B (2008 dollars)
• Open in its entirety (including NW spur to US 441) in FY 2019
• Timeline (under Option 1 or 2)– From the time of approval by Federal Highway
Administration, the conventional schedule of Design, Right of Way Acquisition, and Construction will take approximately 8 years to complete. Construction is the last 4 years of that timeline.
– There may be opportunities to accelerate the schedule.
Economic ImpactEconomic Impact
• Capital Projects Total $3.54 Billion = *65,432 Jobs
• Base 2009 + Option 1 or Option 2
– Priority List $648 Million = *18,029 Jobs– Accelerates 4 projects
*job multiplier source: Federal Highway Administration (FHWA)
Accelerated Projects Accelerated Projects
SummarySummary
• Credit ratings are a very real concern
• Willingness to take decisive board action is
key to credibility with rating services
• Options 1 and 2 provide some economic
opportunities to the community