Stormwater Utility 20 Year Strategic Plan
2019 Update
April 2, 2019
Stormwater Utility 20 Year Strategic Plan
� Flood Mitigation: Address flood problems by Identifying, Planning, Designing, and Constructing Drainage Improvement Projects
� Floodplain Regulation: Maintain FEMA NFIP & CRS Community Status by Providing Mapping and Flood Information, Developing and Enforcing Regulations, and Watershed Analysis and Studies
� Storm Drainage System Maintenance: Provide StormwaterInfrastructure Asset Management, Perform Routine Maintenance, Repairs, and Cleaning of the City’s Drainage System.
� Water Quality and Pollution Control: Enhance water quality and maintain regulatory compliance with the City’s Kansas Water Pollution Control Permit.
� Stormwater Management Program Funding
Stormwater Utility 20 Year Strategic Plan
Regulatory Requirements
• NPDES/ MS4• Permit Issued in accordance with the EPA by KDHE• Includes 6 Minimum Control Measures
• Portion of the permit includes water quality.• How Shawnee is addressing water quality
• Public Education & Outreach• Cost share program for Rain Barrels and Rain Gardens• Stream Bank Stabilization
Stormwater Utility 20 Year Strategic Plan
Public Outreach & Education
Stormwater Utility 20 Year Strategic Plan
Rain Barrels
Rain Gardens
Stream Bank Stabilization
Stormwater Utility 20 Year Strategic Plan
Flood Mitigation
Stormwater Utility 20 Year Strategic Plan
Stormwater System Inventory
Stormwater Utility 20 Year Strategic Plan
Stormwater Utility 20 Year Strategic Plan
Accomplishments with Increased SWU Fee � Doubled Annual Video Inspection of
Pipes – 2017 & 2018
� Repaired/replaced 164 pipes (3.1 miles) at a cost of $4.7 million total in 2017 and 2018.
� Pipe repair projects focused on repairing pipes in advance of the annual mill and overlay street program and
� Catching up on a three year backlog of surface sinkholes on citizen’s property.
Stormwater Utility 20 Year Strategic Plan
2018 Project - 6329 Halsey Culvert
Stormwater Utility 20 Year Strategic Plan
2019 Deferred Projects - $8 Million
Project Name P.N. Total Cost
Renner Road under Shawnee Mission Parkway 3459 910,000$
Johnson Drive & Widmer 3460 2,385,000$
7 Hills Lake Culvert 3461 590,000$
52nd & Woodland 3463 1,248,000$
Quivira Drive & Park Street 3466 1,441,000$
Blackfish Parkway & Hauser Street 3467 1,415,000$
Totals 7,989,000$
Stormwater Utility 20 Year Strategic Plan
Past City Project Focus
� $77 Million in Flood Control Projects� $49 Million – SMAC Funds
� $26 Million – City Funds (Parks & Pipes)
� $2 Million – CDBG & FEMA
� 25 years
� $8 Million in Storm Water Utility Projects� Small Neighborhood Projects
� Matching for SMAC Projects
� Emergency Repairs
� Annual Pipe Repairs in Advance of Street Program
� 10 Years
Stormwater Utility 20 Year Strategic Plan
Current Needs
� 224 Pipes with new 5-rating
� Failure expected in next 3-5 years
� Estimated Cost: $11.2-14 Million
Future Needs� Proactive Planning
� 57% of stormwater pipes have exceeded their life cycle expectancy
� Expect Repairs will outpace funding
� $100-140 Million Needed in next 10 years
Stormwater Utility 20 Year Strategic Plan
Proactive Plan – Asset Management
• Predict High Risk Failure Pipes
• Probability of Failure
• Consequence of Failure
Stormwater Utility 20 Year Strategic Plan
Questions ?
Stormwater Utility 20 Year Strategic Plan
Appendix
Stormwater Utility 20 Year Strategic Plan
Comprehensive Stormwater Management Program
� Mission� Develop and maintain a comprehensive watershed and stormwater infrastructure management program
� Protect property, health and safety;
� Responsive and sensitive to the needs of residents, property owners and public partners.
Stormwater Utility 20 Year Strategic Plan
NPDES 6 Minimum Control Measures
1. Public Education and Outreach
2. Public Involvement and Participation
3. Illicit Discharge Detection and Elimination
4. Construction Site Runoff Control
5. Post-Construction StormwaterManagement
6. Pollution Prevention/Good House Keeping
Stormwater Utility 20 Year Strategic Plan
Turkey Creek Tributary 57th St to Flint St
� Completed: 2009
� Project Cost: $1,082,371.00
� Stream Bank Restoration
Stormwater Utility 20 Year Strategic Plan
Stream Bank Stabilization - Parks� Clear Creek Trail Phase II –
� Transportation Enhancement (TE) Funds – reduce air pollution
� Project Cost: $1,750,000
� Completed: 2010
� Soldier pile wall
Stormwater Utility 20 Year Strategic Plan
Four Nieman Now Flood Mitigation Projects
Stormwater Utility 20 Year Strategic Plan
Corrugated Metal Pipe
• 185 Miles of Stormwater Piping in Shawnee
• In the past 5 years, there have been 5 arterial roadway failures due to the collapse of corrugated metal pipes (CMP)
• 56% of the overall stormwater pipe network, a total of 101.5 miles, is CMP.
Stormwater Utility 20 Year Strategic Plan
Video Inspections – CMP only, 2018
Stormwater Utility 20 Year Strategic Plan
Current Program� SWU Revenue : $3,500,000 (fee) + 750,000
(transfer)
� Video inspection of pipes based on a 7 year cycle (approximately 25 miles per year)
� Pipe replacement for approximately 1 mile/year @ $2.1 million/year
� CSR maintenance that includes inlet cleaning, pipe clogs cleared and driveway culverts replaced/repaired (reactive)
� Inspecting and clearing improved channels and roadside ditches (reactive)
Stormwater Utility 20 Year Strategic Plan
2017 & 2018 Projects
Year Project Cost Location
s# Pipes Repaired LF Pipe Repaired
2017 2016-2017 Pipe Repair $1,449,444 31 52 4245
2017 Johnson-Mund Pipe Repair $655,216 1 9 812
2017 Total $2,104,660 61 5057 LF
2018 2018 Pipe Repair $1,727,546 36 64 5993
2018 6329 Halsey Culvert Repair $541,067 1 1 286
2018 Johnson Dr: I-435 to Martindale $402,904 1 38 5024
2018 Total $2,671,517 103 11,303 LF
Stormwater Utility 20 Year Strategic Plan
2019 Projects
� Annual Pipe Repair Project
� 64 Pipes
� $1.3 million
� Six Large Deferred Maintenance projects
� 74 Pipes
� $8 million
� 2019 Total Repairs $9.4 million.
Stormwater Utility 20 Year Strategic Plan
Stormwater Management Funding -
Source Funding 2019 Budget 2020 Need 2021 Need
Stormwater Utility Fee $3,518,200
General Fund $750,000
Total Stormwater Utility Fund $4,268,200 $4,231,553 $10,580,220 $9,752,546
* Res erve not included
Stormwater Repair Needs 2020 2021
75th Street: Switzer - Quivira 50% Match $500,000
Pflumm Road: SMP to South City Limits 50% Match $500,000
Annual Pipe Repair $1,500,000 $1,600,000
Unmet Need 5-Rated Pipes $5,600,000 $5,600,000
Total Repair Needs $8,102,020 $7,200,000
Personnel, Contract Srvice & Commodities $2,478,200 $2,552,546
Total SWU Expenditure Needs $10,580,220 $9,752,546
Stormwater Utility 20 Year Strategic Plan
2019 - SIX DEFERRED PROJECTS
Stormwater Utility 20 Year Strategic Plan
� Blackfish Parkway at Hauser
� Widmer at Johnson Drive
� Quivira Drive at Park Street
� Renner Road at Shawnee Mission Parkway
� 52nd Street at Woodland
� Seven Hills Lake drainage pipes� 4 Projects are located beneath major road corridors where repairs are necessary to prevent catastrophic arterial road failures.
Stormwater Utility 20 Year Strategic Plan
Blackfish Parkway & Hauser
Stormwater Utility 20 Year Strategic Plan
Johnson Drive & Widmer St.
Stormwater Utility 20 Year Strategic Plan
Quivira Drive & Park Street
Stormwater Utility 20 Year Strategic Plan
52nd St & Woodland Drive
Stormwater Utility 20 Year Strategic Plan
Renner Road under SMP
Stormwater Utility 20 Year Strategic Plan
7 Hills Culverts
Stormwater Utility 20 Year Strategic Plan
ASSET MANAGEMENT
Stormwater Utility 20 Year Strategic Plan
Asset Management - Pipes
Stormwater Utility 20 Year Strategic Plan
1 2 3 4 5
Pipe Size
(Diameter
Inches)
1-12 13-30 31-60 61-99 100+
Pipe
Material
RCP, RCB HDPP CIPP, SPR
PVC,
HDPE,
Unknown
CMP, SP,
VCP
Pipe Age
(Year
Installed)
2010-
2018
2000-
2010
1996-
2000
1991-
1995
1990 and
Before
Street
Slope (%)0-3 3-5.71
12.13-
24.8924.89-45 45+
Street
Class
(Snow
Route)
ResidentDistrict
Primary
City
Primary
Probability of Failure Ratings
Stormwater Utility 20 Year Strategic Plan
Probability Total Score
Stormwater Utility 20 Year Strategic Plan
1 2 3 4 5
Surface
Above PipeDirt Parking Lot Roadway
Street
Class
(Traffic)
Local Collectors Arterials
Access
Emergency
Services,
Landfill
Flooding
Damage
Areas
Parks,
open/Quas
iPub/ROW
/RuralRes
Low
DensRes/Q
uasiPub
(School)
Med, Mid
Dens.
Res/Wareh
ouse
High Dens.
Res/Mixed
Use
Commerci
al/Office
Pipe Size
(Diameter
Inches)
1-12 13-30 31-60 61-99 100+
Consequence of Failure Ratings
Stormwater Utility 20 Year Strategic Plan
Consequence of Failure
Stormwater Utility 20 Year Strategic Plan
Consequence Total Score