SURVEY ACTIVITIES FOR INJECTORS DURING LS1 P. BESTMAN T. DOBERS M. JONES/J.F. FUCHS D. Missiaen

Survey Activities for injectors during lS1 P. Bestman T. Dobers M. Jones/J.F. FUCHS

  • Upload
    berget

  • View
    29

  • Download
    0

Embed Size (px)

DESCRIPTION

Survey Activities for injectors during lS1 P. Bestman T. Dobers M. Jones/J.F. FUCHS. D. Missiaen. Agenda. Complexe SPS SPS, TI2, TI8, TT41, TT10, TT20, North area Complexe PS PSR, PSB, transfer lines L4. Preliminaries. - PowerPoint PPT Presentation

Citation preview

Page 1: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

SURVEY ACTIVITIES FOR INJECTORS DURING LS1

P. BESTMANT. DOBERS

M. JONES/J.F. FUCHS

D. Missiaen

Page 2: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

2

IEFC, March 7-9 2012

•Complexe SPS• SPS, TI2, TI8, TT41, TT10, TT20, North area

•Complexe PS• PSR, PSB, transfer lines• L4

Agenda

D. Missiaen

Page 3: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

3

IEFC, March 7-9 2012

Work presented concerns essentially preventive maintenance/operation of alignment proposed either by : SU when instabilities are well known By OP or ABP for machine improvement

It doesn’t include the alignment requested for installation of new components which is not known yet

Terminology T (tilt) means Transversal inclination (roll angle) of

magnet V means vertical survey H means perpendicular/tranversal to the beam direction

D. Missiaen

Preliminaries

Page 4: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

4

IEFC, March 7-9 2012

Vertical Survey of the quads (regular yearly activity not done at the last TS) 20% of quads realigned each time

D. Missiaen

SPS ring

Page 5: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

5

IEFC, March 7-9 2012

SPS in Vertical realignment of the « hole » in sextant 5 and 6

From the passage of the LHC tunnel below SPS Has been realigned several times Request from the OP team

Problems/consequences Beginning of the TT60/TI2 line that has to be corrected

accordingly Many services concerned (VSC, transport, magnet, etc…) Extra work estimated to 2 months for SU only

D. Missiaen

SPS ring

Page 6: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

6

IEFC, March 7-9 2012

in Horizontal Survey of the quads (it has not been done

since 2005) Realignment of dipoles and intermediate

components to be done also

D. Missiaen

SPS ring

Page 7: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

7

IEFC, March 7-9 2012

Tilt and Vertical of quads done in TS 2011-2012 50% of quads realigned > becoming an

unstable area Proposal for LS1

Quads in V and T : 1.5 month Realign the TT60 if SPS is realigned

D. Missiaen

TI2

Page 8: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

8

IEFC, March 7-9 2012

V survey

D. Missiaen

TI2

Page 9: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

9

IEFC, March 7-9 2012

in H Quads have not been measured since the

first alignment/smoothing in 2006-2007 Proposal for LS1

Remeasure and realign quads Hope mvt will be small and that the others

components will not have to be realigned

D. Missiaen

TI2

Page 10: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

10

IEFC, March 7-9 2012

in Vertical

D. Missiaen

TI8

Page 11: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

11

IEFC, March 7-9 2012

TI8 is a very unstable area A tilt and vertical survey is done at each

winter TS Last year 80% of the quads were realigned in

T and V This year H measurements were done at the

bottom of the line > displacements of 2 mm found

Proposal a full survey in T, V and H of all components

not only quads Estimated time : 5 months

D. Missiaen

TI8

Page 12: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

12

IEFC, March 7-9 2012

TT41 is a also an unstable area V and T survey done for some portions in

2010 and 2011 upon OP request > misalignments of 2mm found and corrected

H survey done on five half cells in 2012 misalignments of 2mm found and corrected

Proposal for LS1 : Nothing up to now

D. Missiaen

CNGS

Page 13: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

13

IEFC, March 7-9 2012

TT10 T+V+R survey done in 2007-2008 > significant

improvement of the beam Proposal for LS1 : Redo the same operation 3 months

TT20 Survey in T + V for some quads done in 2008-2009 Proposal for LS1 : full survey of all the components

but with a low priority 3 months

D. Missiaen

SPS transfer lines

Page 14: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

14

IEFC, March 7-9 2012

Last Survey of main magnets in T, V and H in 2005

Proposal for LS1 : as requested by ABP and OP to redo full survey D.

Missiaen

PS Ring

PSR - altimétrie - Courbes lisse "rabot" et résultat LGC

-4

-3

-2

-1

0

1

2

3

PRB

HZ

1

E

PRB

HZ

5

E

PRB

HZ

9

E

PRB

HZ

1

3E

PRB

HZ

1

7E

PRB

HZ

2

1E

PRB

HZ

2

5E

PRB

HZ

2

9E

PRB

HZ

3

3E

PRB

HZ

3

7E

PRB

HZ

4

1E

PRB

HZ

4

5E

PRB

HZ

4

9E

PRB

HZ

5

3E

PRB

HZ

5

7E

PRB

HZ

6

1E

PRB

HZ

6

5E

PRB

HZ

6

9E

PRB

HZ

7

3E

PRB

HZ

7

7E

PRB

HZ

8

1E

PRB

HZ

8

5E

PRB

HZ

8

9E

PRB

HZ

9

3E

PRB

HZ

9

7E

aimants principaux

dV (m

m)

position lisseresultat du calcul

PSR - planimétrie- Courbe lisse "rabot" et résultat LGC

-4

-3

-2

-1

0

1

2

PRB

HZ

1

E

PRB

HZ

5

E

PRB

HZ

9

E

PRB

HZ

1

3E

PRB

HZ

1

7E

PRB

HZ

2

1E

PRB

HZ

2

5E

PRB

HZ

2

9E

PRB

HZ

3

3E

PRB

HZ

3

7E

PRB

HZ

4

1E

PRB

HZ

4

5E

PRB

HZ

4

9E

PRB

HZ

5

3E

PRB

HZ

5

7E

PRB

HZ

6

1E

PRB

HZ

6

5E

PRB

HZ

6

9E

PRB

HZ

7

3E

PRB

HZ

7

7E

PRB

HZ

8

1E

PRB

HZ

8

5E

PRB

HZ

8

9E

PRB

HZ

9

3E

PRB

HZ

9

7E

aimants principaux

dR (m

m)

position lisserésultat des mesures

Page 15: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

15

IEFC, March 7-9 2012

Last Survey in T, V and H in 2008

Proposal for LS1 : as requested by OP, measurement and realignment of quads and dipoles D.

Missiaen

PS Booster

0 20 40 60 80 100 120 140 160

-3

-1

1

3

PSB - vertical offsets 2008 - beam level (R3)

Cumulated distance (m)dV (m

m)

0 20 40 60 80 100 120 140 160

-3-2-10123 PSB - radial offsets 2008 - beam level (R3)

Cumulated distance (m)

dR (

mm

)

Page 16: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

16

IEFC, March 7-9 2012

TT2/FT16 Survey in T, V and H of the quads

BTM, BTY, BT, BI and FTA Survey and alignment of all components BI will be done in the frame of the LIU project

D. Missiaen

PS transfer lines

Page 17: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

17

IEFC, March 7-9 2012

Linac4 : Important delay

For manufacturing of components For installation : supporting jacks will not be

there before september Fiducialisation and alignment will place in

2013 and 2014 which was not expected Fiducialisation Alignment

D. Missiaen

Linac4

Page 18: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

18

IEFC, March 7-9 2012

20 Targets for TDC2 to prepare and fiducialise on the surface

Non-LHC Experiments areas Isolde/AD areas/PS areas SPS areas H2-H8/Na62 CAST 20 months/ 1 team

D. Missiaen

Other areas

Page 19: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

19

IEFC, March 7-9 2012

Most of the field work is done by a Manpower contract under the supervision of CERN staff Contract people can be increased rather

easily Preparation , Supervision, Coordination,

data post processing, quality checks are done by CERN staff

SU would like to do the major part of the injector works in 2013 because of heavy work load in LHC from sept 2013 to mid 2014

D. Missiaen

Manpower/Planning

Page 20: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

20

IEFC, March 7-9 2012 D. Missiaen

Time estimationAccel/Transfer line

Operation Time (months)/team

when

SPS Quads T + V 1.5 2013Quads H 2 2013Other components in T,V and H 5 2013Realignment of Sext 5 and 6 (extra time)

2 2013

TI2 Quads in T, V and H 2.5 2013TI8 All components in V, T and H 5 2014TT10 Quads in T, V and H 3 2014TT20 Quads in T, V and H (if time

available)3 2013

Total of 24 months Manpower : 4 FTE over 15 months/supervision by staff will be a

bit difficult

Page 21: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

21

IEFC, March 7-9 2012 D. Missiaen

Time estimateAccel/Transfer line

Operation Time (months)/team

When

PSR Main magnets 2.5 2014

PSB Quads and dipoles 2 2013

BTM, BTY

All components 2 2013

BI, BT, FTA

All components 2 2013

TT2 Quads in T, V and H 1 2013

Linac4 First alignment and smoothing of all components

8 20132014

Metrology and fiducialisation 8 2013 2014

Total of 9.5 months for CPS For L4 the problem will be the supervision of the contract team

1 person to be allocated at 100% during this period

Page 22: Survey  Activities  for  injectors during  lS1 P.  Bestman T. Dobers M. Jones/J.F. FUCHS

22

IEFC, March 7-9 2012

Huge amount of work to be done during LS1 It should be possible to include all the activities

with the 15months of shut-down from the planning point of view

Decision has to be taken on the realignment of sext5-6 of SPS

L4 delay of component readyness is not favorable at all for SU 1 person missing to supervise the contract team

for L4 because of heavy work load The survey of the injectors is only a piece of

the puzzle for LS1D. Missiaen

Conclusions